Compendium
of
Inspection Checklists for Fabrication Division Quality
Management Department
00
29/06/2005
Rev.
No.
Date
Issued for Reference
Description
FABRICATION DIVISION
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Job Number
0
SNS
SNS
AJV
By
Chkd.
Appd.
Department/
Division
Quality Management
Location:
Jamnagar
Document No
0
Hard copy of this document shall be treated as uncontrolled if not signed by approver
Total pages - 11
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
CONTENTS
1. PIPE SPOOL FABRICATION
2. STRUCTURAL STEEL FABRICATION
3. WRAPPING & COATING OF PIPE/PIPE SPOOLS
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Page 2 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
1.
CHECK LIST FOR PIPE SPOOL INSPECTION AT
FABRICATION DIVISION
Sr. no.
Activity
Method
Verify and ensure the storage condition/stock
No mix-up between SS & CS materials
status of the material.
Whether identification of the pipe classes are
shown in the isometric & format
Verify the NDT % & PWHT requirement
written on the spool sheet w.r.t. form 167A
Spool Sheet to be cross checked with
form 167A
Whether the required WPSs are available in
line with form 167 A?
WPS apllication chart
Whether qualified welders only performing
welding / tacking?
PMI check carried out on alloy steel material
prior to welding
10
11
Project specification 22960-3PSGAW004 & Form 167A
Problem faced. Be
careful.
Verify WPQ / ID
100 % on all pipe cut pieces and on
fittings
IBR material TC verified or not?
Verification of IBR material summery
list
Heat numbers are transferred on IBR pipe cut
lengths or not?
Verification on pipes for hard punch
Remarks
LTCS pipes are identified with colour strip
(orange) or not
Verification.
Prior to induction bend positive thickness
Prior to Induction bend, the pipe thickness is
of the pipes shall be ensured. The
checked or not ? Transfer of heat number /
identfication marks i.e. Matcode / Heat
matcode number to inside the pipe is done or numbers shall be transferred to inside the
not?
pipe.
Induction bend ovality. hardness & thinning
of CS and AS checked or not ?
Induction bend ovality & thinning of SS
The bend dimensions and parameters
shall conforms to the induction bend
checked or not ?
procedure 2 PF JEP GE 001
NDT of Induction bend done or not?
12
Electrode baking
Verifying the oven record, randomly
13
Correct usage of electrode
Cross checking the electrode while
welding the job
14
Correct usage of WPS
15
Purging of the pipe
16
Preheating
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Welding Engineer is
ensuring the baking of the
electrode on daily basis.
Cross checking the electrode while
welding the job
Cross checking the purging while
welding the job
Cross checking the preheating while
welding the job
Page 3 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Pipe Spool contd
Cross checking the post heating while
welding the job
17
Post heating
18
Cross check and sign on the PWHT
PWHT, number of thermocouples attachment time - temperature chart during PWHT.
19
No of runs on socket joints
20
Interpass Temperature
21
During Spool weld visual inspection the
followings are verified or not?:
Cross check while welding socket joints.
Cross check while welding the joint.
Line no
Verify the punching on spool as well as
on Aluminium tag
Verify the punching on spool as well as
on Aluminium tag
FCO no
Verify the punching on spool as well as
on Aluminium tag
Joint no
Verify the punching on spool weld joint
Welder no
Verify the punching on spool weld joint
STS no
Spool verification with ISO for no. of
joints and Spec break
Verify the punching on spool weld
joint
Verify the WPS number mentioned in
spool clearance report.
Weld process with WPS
Physical condition of the spool, especially
for pitting on ERW pipes.
Physical verification
Flange serration
Physical verification
Reinforcement of weld joint is within code
limit and not less than the thickness.
Complaints
Received
from site on this point
For dissimilar thickness or external
overlap, the weld shall be tapered to
suit the step.
Orifice flange internal grinding
Physical verification
Power brushing on joint internal wherever
accessible
Physical verification
Internal cleaning by air blowing
Physical verification
Aluminum tag verification
Ensuring proper gauge of GI wire is used for
tag and wooden blanks
Physical verification
Ensuring SS wire is used for tag n the case of
SS spools.
Flagging of the spools for the status:
Orange colour ribbon for readiness of the
spool for inspection
Green colour ribbon for NDE cleared spools
Red colour ribbon for repair spools
Complaints
Received
from site on this point
Physical verification
Physical verification
Physical verification
All spools are to be rotated to 360 and
inspected. All weld joints shall be inspected
from inside if open joints.
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Page 4 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Pipe Spool contd
22
Radiography testing
23
Whether the approved NDT procedures are
available or not?
Site approval from BARC is available or
not?
Document verification with NDE agency
24
Record of present strength of the camera is
available or not?
Document verification with NDE agency
25
26
Calibration for safe light, densitometer,
survey meter, IQI are available or not?
Document verification with NDE agency
27
Radiography camera operating system is in
good condition or not?
28
Qualified site incharge is in site or not?
29
Qualified personnel operating the camera or
not?
30
Availability of the procedures
Physical verification
Physical verification during testing
31
NDT Darkroom condition verified or not?
Work instruction of film processing
procedure is displayed in the dark room or
not?
32
Log book for humidity, room temperature ,
film process and chemical replenishing are
maintained or not?
33
Magnetic particle testing
34
Magnetic particle testing procedure and
qualified procedures are available with NDE
contractor or not?
Physical verification
35
Yoke calibrated, and Lifting capacity
verified or not?
Physical verification
36
Magnetic particle bath concentration is
verified with centrifuge or not? Log book for
the same is maintained or not?
Physical verification
37
Field indicator is being used during the test
or not?
Physical verification
38
Sprayer is in working condition or not?
Physical verification
39
During test surface contrast enhancement
properly being done or not?
Physical verification
40
NDT marking for random NDT pipe
classes
41
identification of lot (per day offering or as
per production manager)
42
minimum % of joints as per form 167A to be
covered
43
At least one joint per welder per lot shall be
marked for NDT
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Physical verification
Physical verification
Physical verification
2QA WIN ME 009
Page 5 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Pipe Spool contd
45
Spec wise minimum % as per form 167A per
welder shall be covered.
In case of repair, penalty shall be selected
from the same lot and shall not be carried
over to other lot.
46
Evaluation of welder performance are being
done on daily basis or not?
Daily welder performance reports
Issue repair memo and follow up
48
Status of repair joints are being moinitored or
not?
After RT interpretation, for repair joints
repair memo are issued to the contractor or
not?
Penalty joints offered on same group of
joints or not?
Issue repair memo and follow up
49
44
47
Issue repair memo and follow up
For Other Jobs like PP,
ASME B 31.3 table 341.3.2
the applicable
Project specification 22960-3PS-GAWspecification to be
004
followed
50
Whether the copies of acceptance criteria are
available or not?
51
Whether the fit-up is as per the requirement
or not?
Root gap, off-set if any
52
In case of Impact requirements, whether the
electrode weaving are controlled or not?
Applicable WPS
53
Whether DPT material is in stock or not?
The set is from single manufacturer or
not? DPT is carried out as required in
Form 167A or not?
54
The required weld fillet size of supports, RF
pads, branch connections are verified or not?
55
The PWHT procedure is available or not?.
PWHT procedure - 2QM 00 JEP ME 006
All the PWHT recorders and the
The chart is to be
WPS, Calibration records
thermocouples alongwith compensating leads
certified at 300 deg and
again at soaking temp.
are calibrated or not?
As per procedure required nos/locations of
thermocouples are installed or not?
PWHT procedure - 2QM 00 JEP ME 006
56
The heating band width is maintained as per
the PWHT procedure or not?
PWHT procedure - 2QM 00 JEP ME 006
57
58
After PWHT the butt weld joints Hardness is
checked or not as per specification?
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Coordination with stores
All
Temporary
attachment
including
thermocouple
attachment
shall
be
DP/MP tested
Physical verification
Project specification 22960-3PSGAW004 & Form 167A
Page 6 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Pipe Spool contd
Hydrotest
59
Verify the offer report with the spool
numbers and maximum permissible
pressure.
60
Physical verification of spools for any
damage etc.
61
Verification of the dressing of temporary
attachment, fill-up & NDT.
62
For alloy steel temp. joints, verify preheat,
postheat & PWHT as per WPS.
63
Verify the dummy used are rated as per the
pressure rating
Verify with the pipe class wise
maximum permissible pressure list.
Combination of SS to CS & LAS not
permitted.
Verify with the hard punch.
For Carbon Steel 300 ppm and for SS 30
ppm
64
Chloride content of hydrotest water is
verified or not?
65
The used pressure gauges for the hydrotest
are calibrated on daily basis with date
marking
66
Two gauges used or not?
Physical verification
Calibration record
67
Test pressure is within 1.5 to 4 times of the
gauge pressure or not?
Physical verification
68
Carry out inspection after min 30 min
holding time.
69
Verify whether pressure gauges are returning
to 0 after pressure test.
71
All NCR / MDR / FOR / SER are being
maintained or not?
Whether all stagewise inspection records are
prepared and signed by the concerned
persons.
72
The safety practices at work area being
maintained or not?.
70
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Problem faced. Be
careful.
Verify all flange for any leaks and all
joints & Long Seam Welds.
As per QAP: 2 QA QAP GE 001
Physical verification
Physical verification
Page 7 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
2.
CHECK LIST FOR STRUCTURAL STEEL INSPECTION AT
FABRICATION DIVISION
Method
Sr. no.
Activity
Verify and ensure the storage condition/stock status of
the customer supplied material.
Remarks
Stock register and propoer
storage methodology.
Applicable ITPs
2
Whether the approved copy of the ITP available?
3
Whether the copy of project / job specification is
available?
Whether applicable WPS is used?
4
5
Whether welders performing welding / tacking are
qualified? Are they do weld with in the qualified
ranges?
Whether the electrodes being used are approved
brands or not?
3PS SS 001 / applicable spec.
Availability of applicable
WPS
WPQ Certificate / Welder ID
card
List of approved brand,
Physical verification along
with batch test certificates
Reviewed batch test
certificates
Whether the batch test certificates are reviewed before
start use of the electrodes?
Whether all the low hydrogen electrodes are properly daily baking record
baked or not?
Whether the materials other than IS 2062 are verified
along with MTC?
PMI check on alloy steel / stainless steel material
prior to start use?
10
Whether the copies of acceptance criteria are
available?
11
Whether DPT material is of from single
manufacturer?
12
13
14
If welding electrodes are in
contractors scope
If welding electrodes are in
contractors scope
Document review and
physical verification
IS 7215, BS 5135, IS 3658,
Physical verification before
start of job
BS 5135 acceptance level for
Whether the surface defects on weldment is visually butt and fillet welds.
verified for 100% ?
Whether the required weld fillet size is verified for
Physical verification during
structural being inspected?
weld visual inspection along
with drawing
Whether the distortion occurred in the fabricated
structural is with in the acceptable limit?
IS 7215 / Applicable std or
code
IS 7215 / Applicable std or
code
15
Whether the camber/sweep in column or beam of the
fabricated structural is with in the acceptable limit ?
16
Whether the weld access holes are properly dressed /
shaped?
17
Verify the structural is have the correct identification
by hard punch.
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
As per drawing / AWS D 1.1
physycal verification
Page 8 of 11
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Structural Steel contd ..
physical verification
18
Confirm whether the structural are tied with duly hard
punched aluminium tag by 16 swg. GI wire.
physical verification
22
23
Verify the correctness of the description punched
in the tag including revision no
Whether any NDT requirement is shown in drawing? Arrange to perform require
NDE
24
Whether the specified NDE on the structural is carried Perform NDE and confirm its
out?
acceptance
25
Whether the relevant NDE reports are attached with
the Structural steel fabn. Report?
26
All NCR / MDR / FOR / SER are being maintained or
not?
3.
Mandatory Verification. Few
complaints received from site
on wrong punching.
Random NDT shall be carried
out on daily lot as per the %
given
Verify and confirm during
NDE clearence
CHECK LIST FOR WRAPPING & COATING INSPECTION
AT FABRICATION DIVISION
Sr. no.
Activity
Method
Whether the Project specification 22960-3PSGAW008 - latest revision available with contractor
Verify the inspection doc
file .
Whether Contractor is having the Thermometer,
coating thickness gauges and Holiday tester (2 nos)
with valid calibration certificates.
Correlate and Verify the
Equipment & Certificates.
Check whether ITP No. 2QAITPME013 is available.
Verify the inspection doc
file .
Consumables supplied in Steel Drum are properly
sealed & marked
Visual inspection
Co-relate the Material TC with the wrapping & coating
materials :
Verify with TC document
and batch number
1. Primer synthetic enamel paint
2. Coal tar enamel.
Check Coal tar enamel & Primer are of same
manufacturer.
Verify with TC document
Physical characteristics of wrapping & coating
materials to be verified.
Verify with TC document/as
per specification
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Page 9 of 11
Remarks
All tests as per 22960-3PSGAW008 - latest revision
shall be reported
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Wrapping & Coating contd ..
Check whether the Wrapping & reinforcing materials
are stored in dry place.
As per manufacturers
recommendation / as per
specification.
Check the outer surface of pipe is free from all lose
materials,dirt, grease or moisture etc before sand
blasting.
Surveillance
10
Check the sand blasting of external surface of pipe is
SA2-1/2. Finish
Physical verification
11
Check the primer is applied within 4hrs after sand
blasting is carried out.
Surveillance
12
Check while handling of prime coated & wrapped
pipes, Sling belts are used or not, to prevent damage to Surveillance
outer area of pipe.
13
Verify the temperature
Check whether the enamel heated in the appliance is
frequently during heating by
not exceeding the permissible temperature limit of 260 means of calibrated
deg C
temperature measuring
instrument
14
Visual examination of Wrapping for wrinkles, pockets,
Physical verification
tears & for thorough bonding to surface.
15
Whether the enamel applied have overall thickness
of 4 mm on the pipe body & 2.4 mm when
measured from top of the weldment.
Check frequently the
thickness by using
calibrated coat thickness
measurement instrument.
16
Whether the spot thickness test is being performed.
Sample shall be taken 25mm
x 25mm square for checking
the thickness and
adhesiveness.
17
Whether Coating & wrapping shall be trimmed off
150 mm from end of each pipe.
Physical verification
18
Whether all repairs identified in the coating during
visual inspection are rectified.
Visual inspection of the
repaired surface.
19
Whether the coated pipes are examined for holidays
(at 14KV) and the identified holidays are repaired and
reexamined.
Check by calibrated holiday
detector.
20
Whether Tag identification is marked on inner surface
As per Tag Identification as
of pipe before Wrapping & coating by Permanent
tied on spool.
marker.
21
Whether adhesion test has been conducted on the day's Adhesion test as per AWWA
lot (1 nos in 50 pipes with minimum 1 no)
C203
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Page 10 of 11
Visual Inspection shall be
carried out after the coating
is hard.
Check carefully,
complained received from
site for less thickness
Quality Management
Jamnagar
Fabrication Division
RELIANCE INDUSTRIES LIMITED, JAMNAGAR
Sr. no.
Activity
Method
Remarks
Wrapping & Coating contd ..
22
Whether all inspection data are filled properly in the
Review of the reports before
latest revision format and signed by relevant personnel. final sign.
23
Whether the inspection reports are submitted to
planning department in time
Inspection checklists for Fabrication Division Quality
Management Department
Doc. No.: 2QMGUIGE001, Rev.00, Dt. 29/06/2005
Surveillance
Page 11 of 11
Verify once in a week
Quality Management
Jamnagar