0% found this document useful (0 votes)
24 views4 pages

Tribhuvan University Institute of Engineering Central Campus, Pulchowk Department of Civil Engineering Survey Instruction Committee

This document appears to be survey observation notes from a field survey containing resection and transferring station measurements. It includes details like the date, observer, instrument used, horizontal angle observations from two sets at each station, and computations to determine coordinates of transferred points based on the observed angles and known control points. Key information observed and computed includes bearings, distances, coordinates of points, and angles between points.

Uploaded by

rahul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views4 pages

Tribhuvan University Institute of Engineering Central Campus, Pulchowk Department of Civil Engineering Survey Instruction Committee

This document appears to be survey observation notes from a field survey containing resection and transferring station measurements. It includes details like the date, observer, instrument used, horizontal angle observations from two sets at each station, and computations to determine coordinates of transferred points based on the observed angles and known control points. Key information observed and computed includes bearings, distances, coordinates of points, and angles between points.

Uploaded by

rahul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Tribhuvan University

Institute Of Engineering
Central campus , Pulchowk
Department of Civil Engineering
Survey Instruction Committee
Group No : 07

Date :

Observer :

Weather :

Recorder :

Temperature :

Instrument :

Face

Sigh to

Ins at

RESECTION

D
0

Set-I
M
0

146

56

7M11

170

50

57

312

45

179

59

56

326

56

7M11

260

50

57

42

44

179

59

52

S
0

Horizontal Angle Observation


Mean-I
Set-II
D
M
S
D M S
90 0 0
14
23 5
56
8
6
6
6
6
17
26 5 5
50 57
0
0
0 7
31
4
6
45 42 6
2
4
36
0
2
90 0 2
0
26 5 5
9
9 6
14
5
56 10 56
4
6
6
5
80 51
1
80
0
0
22
4
42
6
48
6
2
2
35
26 5 5
59 56
9
9
9 8

Mean-II
D
M S
146
170

5
6
5
0

312

360

146
170

5
6
5
0

6
5
7
4
4
2

8
4

312

4
6

360

HZ. Angle
D
146
170

M
5
6
5
0

S
7
31

312

360

Transferring to station point from resection point from resection point


Ins.
at

M11

Sigh
to

Fac
e

X
7M1
2

7M1
2

D
0
17
0
18
0
31
5

Set-I
M
0
1
9

S
0
1
9

1
9

2
7

Horizontal Angle Observation


Mean-I
Set-II
Mean-II
D M S
D M S
D M S
90 0
0
17 1 1 26 1
17 1 1
10
0
9 9
0
9
0
9 0
27
0 14
0
17 1 1
1
17 1
80
17
3
0
9 9
9
0
9

HZ. Angle
D

HD

M S
5.958
103.963

170

1
9

Horizontal angle computation :


Angle
SXC
CXT
TXS
Sum

Observed angle values


D
M
S
146
56
7
165
10
38
47
53
55
360
0
40

D
0
0
0

Correction
M
0
0
0

S
-15
-15
-10

Corrected values
D
M
S
146
55
52
165
10
23
47
53
45
360
0
0

Known Co-ordinates :
Location
Chobhar(C)
Swoyambhu(S)
Clock Tower(T)
LINE
SC
CT
TS

Easting
627611.753
627464.718
626832.547

Northing
3061479.468
3066928.474
3063142.819

E
147.035
-779.206
632.171

N
-5449.006
1663.351
3785.655

R.L.
1442.31
1434.995

LENGTH
5449.006
1836.817503
3838.085

ANGLE
S
C
T
SXC
TXC
SXT

D
11
23
145
146
165
47

M
41
39
15
55
10
53

S
26
45
49
52
23
45

Calculation of coefficient :
K1=1 / (COT (S)-COT (TXC)) = 0.116
K2=1 / (COT (C)-COT (TXS)) = 0.73
K3=1 / (COT (T)-COT (SXC)) = 10.654
TAN (Bearing of XC) = (DEP. OF C-DEP. OF X) / (LAT. OF C-LAT. OF X)
Bearing of XC = 1553703
Bearing of XM11 = 1553703+ 235453
= 1793156
Easting of M11 = Easting of X + L SIN(CXM11)
=626888.175
Northing of M11 = 3063070.085

Bearing of M11M12 = Bearing of XM11+ 1701913- 1800000


=1700555

You might also like