Qatalum Power Plant Project
MOBILE / TOWER CRANE INSPECTION CHECKLIST
Ser No:
Sr. #
From:
Points
to
Observation
Sa
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Su
Mo
Tu
We
Remarks
Th
Fr
Hook and Hook Latch
Over-Hoist Limit Switch
Boom-Limit Switch
Boom Angle Indicator
Boom Limit Cut-off Switch
Condition of Boom
Condition of Ropes
No. of Load Lines
Size and Condition of the Slings
Stability of Crane
Soil Condition
Swing Brake and Lock
Propel Brake and Lock
Hoist Brake and Lock
Boom Brake and Lock
Main Clutch
Leakage in Hydraulic Cylinders
Out Riggers fully Extendible
Type Pressure
Condition of Battery and Lamps
Guards of Moving and Rotating Parts
Load Chart Provided
No. and position of pendant ropes
Load Test Details
Operators Fitness
Fire Extinguisher in Operation Cabin
Crane Operators: ___________________________ & _________________
Name
Signature
Inspected By: ___________________________
HSE Officer / Engineer
Reviewed By: __________________________
Project In-charge