Keywords: Building Faculty of Engineering UNSRAT, Cost Control and Time, Curve S

The document discusses controlling costs and time in the implementation of a construction project to build a faculty of engineering building. It notes that controlling costs, time, and resources is important for successful project implementation and to prevent delays. The results of a study on the construction project found that actual costs and time used in the field differed from the original project plan, leading to delays. Controlling costs and time is needed to optimize the project schedule and additional resources like 47 craftsmen and 94 workers would be needed over 14 to 26 weeks to complete remaining work.

Uploaded by

R M S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views1 page

Keywords: Building Faculty of Engineering UNSRAT, Cost Control and Time, Curve S

The document discusses controlling costs and time in the implementation of a construction project to build a faculty of engineering building. It notes that controlling costs, time, and resources is important for successful project implementation and to prevent delays. The results of a study on the construction project found that actual costs and time used in the field differed from the original project plan, leading to delays. Controlling costs and time is needed to optimize the project schedule and additional resources like 47 craftsmen and 94 workers would be needed over 14 to 26 weeks to complete remaining work.

Uploaded by

R M S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ABSTRACT

Implementation of a construction project, never be separated with


knowledge of material control. So there are three things that must be considered.
That is implementation time, implementation cost and resource. In project
implementation, the problem of limited resources can lead to delays in the
implementation of the project.
As we know the success of a project must be accompanied by a good
construction management in the implementation of a project which could serve to
organize and control the implementation of the project from an early stage until
the project ends. One of the components of the management is controlling, in this
case would be to control the cost and time, the purpose of controlling the cost and
time to the development of Building Faculty of Engineering, University of Sam
Ratulangi is to prevent this from happening excessive cost and time. With the
expected role of construction management oversight or control in the field can run
properly.
From the results of research in the field authors to conclude that a delay in
controlling the cost and time that the use of cost and time in the field is different
from project planning. In the continuing construction building engineering faculty
lecturers need to do a study on cost control and time for the optimization of
project delays, and on the job, to finish the rest of the work volume of the week 14
to week 26 (week of completion) be required 47 craftsmen and 94 workers.

Keywords : Building Faculty of Engineering UNSRAT, Cost Control and


Time, Curve S