Urs Template
Urs Template
Urs Template
Name
Populate
Signature
Date
Signature
Date
Populate
Approval
Name
Position
Populate
Populate
Populate
Populate
URS
TABLE OF CONTENTS
Section
Page
1.
DOCUMENT CONTROL..........................................................................................................................................2
2.
GENERAL DESCRIPTION.......................................................................................................................................3
3.
SPECIFIC REQUIREMENTS...................................................................................................................................3
4.
DEFINITIONS............................................................................................................................................................6
1.
DOCUMENT CONTROL
1.1
Revision History
Date Issued
Revision
Populate
Populate
URS
2.
GENERAL DESCRIPTION
2.1
Overview
The objective of this URS is to inform the equipment supplier of the general and specific requirements that will form
the scope of supply. The supplier must provide a detailed specification that addresses the requirements of this URS.
The supplier should identify where their equipment differs from the clauses contained in this URS, specifically where
they are unable to meet these requirements. The specification may be provided in combination with a quotation or as a
separate document.
3.
SPECIFIC REQUIREMENTS
3.1
Performance Parameters
Speed
Temperature
Humidity
Pressure
Light level
Noise level
Size
Shelf capacity
Alarm functionality
3.2
Construction Standards
Any product contact parts should be 304/316 stainless steel and traceable certificates of conformity supplied.
Where non-stainless product contact parts are used, these must be of a suitable material, e.g. PTFE, silicone,
with certificates of conformity provided.
All working parts to be suitably enclosed and efficiently segregated from the product contact areas to prevent
ingress of process fluids which may affect the workings of the equipment and egress of oils, greases and other
potential contaminants.
Designed to be easily and effectively cleaned with no product entrapment areas present.
All connections to be of an appropriate design and construction, e.g. hygienic flanges for liquid product contact
and suitable fittings for dry services (compressed air, nitrogen, etc)
URS
3.3
Engineering Standards
Engineering standards must comply with National and International Statutory Standards with respect to safety, noise,
guarding and interlocks, ingress protection, electrical/mechanical standards and levels of protection.
All wiring/pneumatics to be tagged at either end in accordance with electrical/pneumatic drawings. Similarly,
all components to be labelled in accordance with the drawings.
Cabinets, panels, doors, etc must be suitably earthed and evidence provided that electrical signal, power,
continuity and earthing tests have been carried out. Ideally, this will be in the form of a test certificate
3.4
Utilities
Compressed air
Any required utilities not shown above to be identified in the specification/quotation. Utility requirements must be
adequately specified to ensure that there is sufficient capacity.
3.5
General Documentation
A detailed specification to be provided in response to this URS. This may be combined with the quotation or
provided separately.
A CE declaration of conformity.
All pre-installation tests, e.g. pressure tests, factory acceptance tests, and subsequent site commissioning tests
must be fully documented and provided prior to commencement of equipment validation.
All instruments regarded as critical to the quality of the product, safety and/or operability of the equipment
must be calibrated and provided with suitable calibration certificates.
An instrument list identifying the following critical parameters to be provided prior to FAT:
A minimum of 2 hard copies of an Operating & Maintenance Manual are required. Electronic copies of
manuals and drawings are also preferred. Manuals must be written in plain English. Generic information will
not be accepted and this includes drawings and electrical diagrams. Typical information contained in the
manual:
Operating instructions
URS
3.6
Cleaning procedures.
Data sheets for all components and assemblies, including computer hardware.
Instrument list with calibration certificates including instrument range and tolerance.
Service requirements.
Commissioning report shall be provided prior to commencement of validation. This should demonstrate
satisfactory delivery, installation and testing.
3.7
Validation
Commissioning or Site Acceptance Testing (if performed) should be approved by the client prior to IQ/OQ.
IQ to be provided that demonstrate the equipment has been installed according to the design intent
OQ protocol for site qualification to be provided to demonstrate that the equipment operates as expected.
3.8
For computerised systems test protocol must ensure that all operating functions specified in the Functional
Specification (FS) are tested effectively.
Does the equipment support 21 CFR Part 11 requirements for electronic records
3.9
Training
Operators
Maintenance engineers
URS
Evidence that the trainer is suitably qualified for this purpose; this may be in the form of a CV or a company
statement.
URS
4.
DEFINITIONS
AHU
CV
HFEA
HVAC
FS
cGMP
cGLP
HEPA
IQ
MHRA
O&M
OQ
PA
URS
SAT
VMP
VPP