0% found this document useful (0 votes)
43 views5 pages

Communication of Expectations

The document is a communication matrix for contractor SENDAN INTERNATIONAL COMPANY LTD. for their scaffold services contract at ABQAIQ plants. The matrix outlines the various Saudi Aramco standards, codes, and documents that were communicated to the contractor for quality, safety, and environmental expectations. It also includes aspects that will be evaluated for the contractor's overall performance such as site inspections, permit violations, and injury reporting.

Uploaded by

Farrukh Javed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views5 pages

Communication of Expectations

The document is a communication matrix for contractor SENDAN INTERNATIONAL COMPANY LTD. for their scaffold services contract at ABQAIQ plants. The matrix outlines the various Saudi Aramco standards, codes, and documents that were communicated to the contractor for quality, safety, and environmental expectations. It also includes aspects that will be evaluated for the contractor's overall performance such as site inspections, permit violations, and injury reporting.

Uploaded by

Farrukh Javed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

NO.

CONTRACT
TYPE

Contract No

Contract Title

Contractor Name

24

MFC

6510801170

SCAFFOLD SERVICES AT
ABQAIQ PLANTS

SENDAN
INTERNATIONAL
COMPANY LTD.

Pro

Communication of Expec
Contracts Quality References
SA General
Instructions
GI's

SA Engg.
Standards

SA Material
Std. Spec.

SA
Sanitary
Codes

SA
Standard
Drgs

ABQAIQ PLANT MAINTENANCE DEPARTMENT


Process # OE 7.1 Communication of Expectations
Communication Matrix

Communication of Expectations (Quality & Safety, Health & Environment (SHE) relevant issues)
SHE Reference Communication
Documents
Guide:07003-2012
Abqaiq Plants Contractor's
SA Const.
Safety
Contractor
Instrc.
Acknowledge
Safety
Hand
Pre-job
Manual
ment
Manual
Book
Safety
Explanations

ENT
tations

ment (SHE) relevant issues)


Contractor Overall Performance
Site
Evaluation

Camp
Inspection

Work
Permit
Violations

Traffic
Violations

Contr.
Injuries
Reporting

Enviro.
Health
Inspection

% of Comm.
Expectation

You might also like