DIVINE TOOLINGS
UNIT II, S-49,M.I.D.C. BHOSARI, PUNE-26.
CONTRACT REVIEW MINUTES OF MEETING
REPRESENTED BY:
VENUE:
SR. NO.
FORM NO:
DATE:
NAME OF PARTICIPANTS
ORGANISATION
DESIGNATION
SIGNATURE
POINTS DISCUSSED / ACTION PROPOSED
SR. NO.
RESPONSIBILITY
DATE
PREPARED BY:
APPROVED BY:
DT/QMS/FM/10/REV: 00/DT: 01.06.2010
DIVINE TOOLINGS
UNIT II, S-49,M.I.D.C. BHOSARI, PUNE-26.
CONTRACT REVIEW CHECKLIST
REPRESENTED BY:
FORM NO:
VENUE:
DATE:
Item no
CONTRACT REVIEW CHECKLIST ITEM
Responsibility
RESPONSE
SCOPE OF WORK
{Detail here exactly what
products and/or services the
customer is expecting, and what
action you should take to
comply with the tender. If Divine
Tooling can not comply, note
the non-compliances. If it is
anticipated to submit a nonconforming tender the
alternative tender qualifications
should be identified. If it is a
contract review and the contract
requirements can not be met the
actions to be taken must be
noted}
RELEVANT COMPLIANCE STANDARDS
{Note here the national or
international standards to which
the products and/or services
must comply. If there is a
conflict between required
standards and ability to comply,
the non-compliances must be
noted for action.}
DELIVERY REQUIREMENTS
{Note here when the products
and/or services are required to
be completed and any actions
to be taken as a consequence}.
PRICING DETAILS
{Analyse the anticipated sales
and the projected margins. For a
tender these may only be
estimates}.
Due Date
{Note here the requirements for
resources under the proposed
contract and whether MAUS
Business Systems can satisfy the
resource requirements.
Document and action anything
that has to be done to comply or
otherwise}.
5
RESOURCE REQUIREMENTS
Plant & Equipment
Manning levels (available Vs.
projected)
Cash Flow
Finance
Bank Guarantees
Design & technology;
manufacturing drawings
INSURANCE REQUIREMENTS
{Discuss here any project
specific insurance needs that
may be required and
consequential actions}
CONTRACT RISKS
{Complete a formal review of
the contract terms, using legal
advice if necessary, to
determine the extent of the
contract risk profile and the
ability of Devine tooling to
comply with the contract.
Record actions during the
review process.}
Any other points
PREPARED BY:
APPROVED BY:
DT/QMS/FM/10/REV: 00/DT: 01.06.2010