National Transmission & Despatch Company LTD.: Fax Message

The National Transmission & Despatch Company Ltd requested that power distribution companies implement scheduled load shedding starting December 23rd due to a reduction in hydropower generation from dams. The hydropower generation is reduced by 1,200 MW on average and 2,400 MW during peak hours due to the start of canal closure period. Urban areas are requested to implement 3 hours of load shedding while rural areas should implement 4 hours to avoid unplanned power outages and issues for the electrical system.

Uploaded by

IrfanUllah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

National Transmission & Despatch Company LTD.: Fax Message

The National Transmission & Despatch Company Ltd requested that power distribution companies implement scheduled load shedding starting December 23rd due to a reduction in hydropower generation from dams. The hydropower generation is reduced by 1,200 MW on average and 2,400 MW during peak hours due to the start of canal closure period. Urban areas are requested to implement 3 hours of load shedding while rural areas should implement 4 hours to avoid unplanned power outages and issues for the electrical system.

Uploaded by

IrfanUllah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

National Transmission & Despatch Company Ltd.

General Manager (System Operations)


No. _

__/GM (SO)/NPCC/NRCC

FAX MESSAGE
Time: 1500 hrs
Date: 22/12/2016
To:

C.E.O/O.D/XEN INCHARGE: ALL DISCOS

Subject:

Load Management Message

Due to start of canal closure period, the indent of Tarbela and Mangla has been
reduced by IRSA resulting in reduction of 1200 MW generation in average and 2400MW
during peak hours from hydel stations.
Therefore, you are requested that following load shedding may please be implemented
from 0000HRS, dated 23/12/2016 to avoid force load shedding and system disturbance.
Urban domestic:
Rural Domestic:

03 Hours
04 Hours

Chief Engineer (N.Op)


NPCC, NTDC, Islamabad.

CC:
1. PS to Secretary MoW&P, Islamabad.
2. General Manager (System Operations) NPCC, Islamabad.

National Power Control Center NTDC H8/1 Islamabad Phone No. 051-9257061 Fax No. 051-9257146