VESSEL'S MIDNIGHT ULLAGE REPORT
VESSEL:
PRODUCT:
TANK
FSO SURYA PUTRA JAYA
OYONG CRUDE OIL
ULLAGE
ULLAGE
VOLUME
VOLUME
CORRECTED
T.O.V.
T.O.V.
Interface
Int. Cor'ed
FREE WATER
m.cm
NO.
m.cm
m.cm
CU.M.
BBLS
m.cm
1C
2C
3C
4C
5C
6C
7C
8C
SL.P
18.76
17.68
14.68
18.23
18.24
8.73
12.68
13.84
18.46
11.16
18.481
17.413
14.420
17.961
17.977
8.475
12.426
13.590
18.173
10.862
0
156
1,374
0
0
3,804
2,184
1,517
2
233
0
984
8,645
0
0
23,928
13,736
9,540
9
1,465
Nil
Nil
Nil
Nil
Nil
17.89
NIL
NIL
Nil
15.920
9,270
58,309
917
SL.S
OIL VOL
Volume
CU.M.
VOL.(BBLS)
V.C.F.
G.O.V.
TEMP
BBLS
30.4
31.0
31.5
30.4
30.5
32.4
32.0
32.0
30.0
30.5
86.7
87.8
88.7
86.7
86.9
90.3
89.6
89.6
86.0
86.9
17.623
103.628
652
15.622
80.83
508
0
984
8,645
0
0
23,277
13,736
9,540
9
957
184
1,160
62
57,147
855
OIL VOLUME
W.C.F
@ 60F
TABLE 11
TEMP API 60 F TABLE 6
44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6
0.98670
0.98613
0.98568
0.98668
0.98658
0.98488
0.98525
0.98523
0.98703
0.98658
G.S.V.
G.S.V.
N.S.V.
0
970
8,521
0
0
22,925
13,533
9,399
9
944
0.000
1.941
17.042
0.000
0.000
45.85
27.067
18.799
0.023
2.360
0
968
8,504
0
0
22,879
13,506
9,381
9
942
0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544
TOTAL
TOTAL
REMARKS:
56,302
844
56,189
843
PRODUCTION LOADING INTO COT 6C
Gross Volume :(T.O.V.)
Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :
58,309
1,160
57,147
56,302
7,063
7,177
44.6
Oil Volume @ 60 F :(T.C.V.)
Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :
56,302
DRAFT FWD
6.40 m
Capt. Juanda Pardede
AFT
B.S & W. % Vol :.
0.20
Long Tons/Metric Tons :
CARGO INSPECTOR
BERTH:
PORT:
DATE:
OYONG
OYONG OILFIELD
25-Jan-17
WEIGHT
W.C.F.
WEIGHT
TABLE 13
LT
M/T
0.000
121.712
1,068.882
0.000
0.000
2,875.666
1,698.569
1,179.050
1.171
118.406
0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745
7,063
8.70 m
0.000
123.662
1086.009
0.000
0.000
2921.745
1725.771
1197.943
1.189
120.304
7,177
TRIM
LIST
Capt. Ihwan Asrul
2.30 m
NIL
MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA
25-Jan-17 @ 2400 HRS
Staff
Surya Putra Jaya Master
Capt. Ihwan Asrul
Crude Storage
Santos Rep.
Capt. Juanda Pard
Lifting
24 Hours Total (bbls)
917
Last Lifting
BS and W %
0.20
Lifting Vol (bbls)
Storage Gross (bbls)
57,147
Storage Net / G.S.V (Nbbls)
56,302
Storage Net / N.S.V (Nbbls)
56,189
Days to Tank Tops
296
Total Crude This Month (Nbbls)
19-D
141,
Next Lifting
Next Lifting Vol (bbls)
Vessel ETA
56,302
Water
Offtake
Water Received 24hrs (bbls)
62
Total Water in Cargo (bbls)
1,160
Total P/W Received (bbls)
85,048
Offtake 24 Hours (bbls)
Note :
Water Drawn off (bbls)
Loading/Incoming Temp
42.0
Specific Gravity
Storage tanks's temperature
32.4
PFW PH
0
Note:
OIW Average (mg/I)
10
OIW Peak (mg/I)
: PRODUCTION LOADING INTO COT 6C
Non Regulated Waste
Category
Vol (m3)
Kg
Soft Waste
0.00
Non Metal Waste
0.00
Metal Waste
0.00
Regulated Waste
Comments
Category
Vol (m3)
Kg
0.00
Solid Hazardous From Process
Liquid Chemical Waste
Biological Waste
Liquid Hazardous Waste (Oil)
SMF (Synthetic Mineral Fibre)
Solid Hazardous Waste
Note :
Comments
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO
Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)
FSO-MDO
228,862
Service Vessel
MDO
### 92,362
###
1,310
228,862
91,052
Supply Remaining (days)
Remarks :
Meetings
Type
Time
Tool box meeting
Supervisory Meeting
06.30
16.30
Comment
1. Review previous day activity
2. Maintenance fire hydrant on deck
3. Corrective action for the workplace inspection
4. Maintenance main deck , etc at COT 7C
5. Test PV valve, pump room fire damper and portable gas
6. Maintenance main air compressor No.2
7. Install transformator for washing machine at laundry are
8. Maintenance emergency fire pump
9. Maintenance A/E No.3
1. Review deck, engine and galley dept. activity
2. Maintenance fire hydrant in engine room
3. Maintenance main deck , etc at COT 7C
4. Weekly sampling PW
5. Repair tank cleaning pipe at COT 7C
Incidents
Type
NIL
Reference
Comments
Drills
Type
S.T.O.P. Audit program
Observation Card Report : 20
The details see SPKK sheet *)
###
Time
Comment
Capt. Juanda Pardede
19-Dec-16
141,460
-
deg C
deg C
TO COT 6C
22651 / 56014
e Vessel
Comment
nspection
T 7C
per and portable gas detector
No.2
chine at laundry area
t. activity
oom
T 7C
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C
Mooring/Unmooring :
NIL
Bunkering/Debunkering :
NIL
Personnel & Material Transfer :
05.30: 1 Person Santos Rep, 20 Persons Pkp & 1 Person Mafhindo by. KST.51 ( Out )
14.30: Additional food stuff Spj by. Cb. Adventurer 1 ( In )
17.00: 1 Person Mafhindo, 6 Persons Pkp by. KST.51 ( In )
18.15: 1 Person Santos Rep by. KST.51 ( In )
1.2 Planned/Unplanned Maintenance
DECK :
1. Assist Transferred Santos Rep and Contractor Personnel
2. Maintenance main deck , etc at COT 7C
3. Checked and maintenance fire hydrant on deck
4. Tested portable / personnal gas detector , PV valve and pump room fire damper
5. Received additional food stuff from Cb. Adventurer 1
5. Corrective action for the workplace inspection
ENGINE :
1. Maintenance RO No.2
2. Maintenance A/E No.3
3. Checked / adjusted the governoor of A/E No.1 and running tested
4. Checked and repaired power source 220V in crew mess room
5. Installed the transformator for washing machine at laundry area
6. Welding sea water pipe outlet for emergency fire pump
7. Running up A/E No.2 & 3 :
14.00 - 15.00: - Lifted additional food stuff from Cb. Adventurer 1
2.
PERMIT TO WORK
2.1
J HA
3. BUNKERS(M3)
PW
MW
HW
CSE
IP
VAL
444
1705
1705
374
171
957
374
171
957
M.F.O
M.D.O
CONS
0
1,310
RCVD
0
0
CONS
RCV
TRNSF
PROD
0
10
0
0
0
0
0
19
444
4. FRESH WATER (MT)
BLR
DOM
5. DISPERSANT, FOAM, CHEMICALS (LTRS)
REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours
216108
240
216348
OSD
200
Days W/O LTI
1154
REC
0
IN
CONS
0
OUT
22
Since
216348
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS
28-Nov-13
25-Jan-17
@2400 HRS
TOTAL
3658
3656
TRANS
0
0
ROB
56
134
ROB
228,862
91,052
`
ROB
200
POB
28
28-Nov-13
Previous
Today
Total
0
0
0
0
1642
2085
3
0
59
0
0
0
0
2
20
0
0
0
0
0
0
0
1644
2105
3
0
59
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
Vessel Name
Period
FSO. SURYA PUTRA JAYA
Jan-17
MDO
Date
Opening
Balance
( Ltr )
( Ltr )
A/E
No.1
(Hrs)
A/E
No.2
(Hrs)
A/E
No.3
(Hrs)
Closing
Balance
( Ltr )
Receive
Transfer
Cons.
Adj.
( Ltr )
( Ltr )
( Ltr )
Remarks
01
75,622
1,296
5.0
19.0
0.0
74,326
02
74,326
1,296
15.0
0.0
9.0
73,030
03
73,030
1,752
4.0
0.0
24.0
71,278
Internal Cargo Transferred
04
71,278
1,808
8.0
0.0
24.0
69,470
Internal Cargo Transferred
05
69,470
1,338
3.0
0.0
24.0
68,132
Transferred Materials
06
0
0
0
0
1,324
1,394
0
0
2.0
17.0
0.0
0.0
24.0
14.0
66,808
Transferred Materials
07
68,132
66,808
65,414
Transferred Materials
08
65,414
1,324
24.0
0.0
2.0
64,090
Transferred Materials
09
64,090
1,296
24.0
0.0
0.0
62,794
10
62,794
1,310
13.0
0.0
12.0
61,484
Transferred Materials
11
61,484
1,310
1.0
0.0
24.0
60,174
Transferred Materials
12
60,174
1,310
1.0
0.0
24.0
58,864
Transferred Materials
13
0
0
0
0
1,324
1,352
0
0
14.0
15.0
0.0
4.0
12.0
9.0
57,540
Transferred Materials
14
58,864
57,540
56,188
Transferred Materials
15
56,188
1,303
0.5
0.0
24.0
54,885
Transferred Materials
16
54,885
1,352
4.0
0.0
24.0
53,533
Transferred Materials
17
53,533
30,000
1,524
2.0
0.0
24.0
82,009
Warming up boiler
18
82,009
10,000
1,801
7.5
0.0
24.0
70,208
Internal Cargo Transferred
19
70,208
1,310
1.0
0.0
24.0
68,898
Transferred Materials
20
68,898
1,296
0.0
0.0
24.0
67,602
21
67,602
1,352
0.0
4.0
24.0
66,250
22
66,250
1,296
0.0
0.0
24.0
64,954
23
64,954
30,000
1,296
16.0
0.0
8.0
93,658
24
93,658
1,296
8.0
0.0
16.0
92,362
25
92,362
1,310
0.0
15.0
10.0
91,052
26
27
28
29
30
31
Transferred Materials
Transferred Materials
NIL
NIL
FUEL STATUS REPORT
Vessel Name
Period
FSO. SURYA PUTRA JAYA
Jan-17
MFO
Date
Opening
Balance
( Ltr )
( Ltr )
( Ltr )
( Ltr )
( Ltr )
Closing
Balance
( Ltr )
Receive
Transfer Consumption Adjusment
Remarks
01
235,612
235,612
02
235,612
235,612
03
235,612
1,000
234,612
Internal Cargo Transferred
04
05
06
234,612
231,612
0
0
0
0
3,000
0
0
0
231,612
231,612
Internal Cargo Transferred
231,612
231,612
07
231,612
231,612
08
231,612
231,612
09
231,612
231,612
10
231,612
231,612
11
231,612
231,612
12
231,612
231,612
13
231,612
231,612
14
231,612
231,612
15
231,612
231,612
16
231,612
231,612
17
231,612
231,612
18
231,612
2,750
228,862
19
228,862
228,862
20
228,862
228,862
21
228,862
228,862
22
228,862
228,862
23
228,862
228,862
24
228,862
228,862
25
228,862
228,862
26
27
28
29
30
31
Internal Cargo Transferred
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
Quantity Domestic Waste Water ( M3 )
Jan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
12
TOTAL
313
Feb Mar Apr May Jun
Jul
Aug Sep Oct Nov Dec
13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
11
12
12
13
12
14
12
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
Quantity Sanitary Waste Water ( M3 )
Jan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
191
Feb Mar Apr May Jun
Jul
Aug Sep Oct Nov Dec
7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
7
8
8
8
7
8
8
LOG SHEET COOLING WATER
Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Quantity Cooling Water Discharge ( M3 )
JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988
4,964
4,978
4,971
4,973
4,970
4,966
4,960
4,969
TOTAL 124,240
Averag
e/Day
JUL AUG SEP OCT NOV DEC
4,008
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
Vessel Name FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL
Quantity R.O Waste Water ( M3 )
Jan Feb Mar Apr May Jun
Jul Aug Sep Oct Nov Dec
80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
55
75
90
80
80
80
95
2,225
DATA PERSONNEL ON BOARD
VESSEL
MONTH OF
: FSO SURYA PUTRA JAYA
: Jan 2017
DATE
CREW SPJ
SANTOS
VISITOR/KONTRAKTOR
DAILY TOTAL
1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
19-Jan-2017
20-Jan-2017
21-Jan-2017
22-Jan-2017
23-Jan-2017
24-Jan-2017
25-Jan-2017
22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
21
20
20
20
20
20
20
0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
1
1
1
1
0
1
1
0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
19
19
19
19
19
7
22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
44
40
40
40
39
40
28
TOTAL
529
13
329
871
REMARKS
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date :
25/Jan/17
Action/Commen
t
Positive /
Negative
Total
Done
Positive
Replace battery
Negative
Done
Positive
Checked and maintenance fire hydrant
Well Done
Positive
Checked and adjust the governoor of A/E No.1
and 2 and running tested
Well Done
Positive
Engine room Maintenance RO No.2
Done
Positive
3/E
Engine room Maintenance A/E No.3
Done
Positive
8 HENDRA PRATAMA
4/E
Engine room Assisted 2/E maintenance RO No.2
Done
Positive
9 SURYADINATA
E/E
Crew mess
room
Checked and repaired power source 220V
Well Done
Positive
Bosun
Main deck
Lifted food stuff as operator crane
Done
Positive
11 ACHMAD NURUL HUDA
AB
Main deck
House keeping Main deck area after finish job
Done
Positive
12 UDIYANTO
AB
Main deck
Assisted boatswain maintenance main deck , etc
at COT 7C
Done
Positive
13 BAYU SEGARA
AB
Laydown
Assisted boatswain maintenance main deck , etc
at COT 7C
Done
Positive
14 DEDI
OS
Main deck
Assisted boatswain maintenance main deck , etc
at COT 7C
Done
Positive
15 ELIK BUDIANTO
FTR
Engine room
Welding sea water pipe outlet for emergency fire
pump
Done
Positive
16 SUAIB
MTM
Engine room Assisted 3/E maintenance A/E No.3
Done
Positive
Reported by
Rank
Location
Master
Crew mess
room
2 DENNY DAVID PAULUS
C/O
CCR
3 CENG UMAR
2/O
Main deck
4 IHSANUDIN
3/O
On deck
5 JULY MANGIRI
C/E
Engine room
6 AGUNG RISTIANTO
2/E
7 IRVAN TAHIR
1 IHWAN ASRUL
10 AANG
17 CHULWAN NURFALLAH WIPER
Description
Advice to all crew received additional food stuff
Portable gas detector RX-517 low batt during
tested
Lifted Food stuff as signal man
Engine room
Sea water pipe outlet for emergency fire pump
was leakage
Repaired (Closed)
Negative
18 MASRUDI
C/Cook
Provison
store
checked and arranged additional provision new
arrival
Done
Positive
19 BOBY MANGONTO
STWD
Main deck
Assisted deck Crew bring the provision to store
Done
Positive
20 HARIANTO SULE TANAN STWD
Main deck
Assisted deck crew bring the provision to store
Done
Positive
TOTAL 20