Vessel'S Midnight Ullage Report

The document provides a midnight ullage report and daily activity report for the FSO Surya Putra Jaya vessel, including details of cargo operations with production loading into tank 6C, planned and unplanned maintenance activities, fuel status and consumption, personnel transfers, EHS incidents and drills, and issues for the reporting period. Key details reported include cargo volumes and temperatures, maintenance tasks completed, bunkering quantities and fuel levels, along with personnel onboard numbers and safety statistics.

Uploaded by

nawhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views33 pages

Vessel'S Midnight Ullage Report

The document provides a midnight ullage report and daily activity report for the FSO Surya Putra Jaya vessel, including details of cargo operations with production loading into tank 6C, planned and unplanned maintenance activities, fuel status and consumption, personnel transfers, EHS incidents and drills, and issues for the reporting period. Key details reported include cargo volumes and temperatures, maintenance tasks completed, bunkering quantities and fuel levels, along with personnel onboard numbers and safety statistics.

Uploaded by

nawhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL:
PRODUCT:
TANK

FSO SURYA PUTRA JAYA


OYONG CRUDE OIL

ULLAGE

ULLAGE

VOLUME

VOLUME

CORRECTED

T.O.V.

T.O.V.

Interface

Int. Cor'ed

FREE WATER
m.cm

NO.

m.cm

m.cm

CU.M.

BBLS

m.cm

1C
2C
3C
4C
5C
6C
7C
8C
SL.P

18.76
17.68
14.68
18.23
18.24
8.73
12.68
13.84
18.46
11.16

18.481
17.413
14.420
17.961
17.977
8.475
12.426
13.590
18.173
10.862

0
156
1,374
0
0
3,804
2,184
1,517
2
233

0
984
8,645
0
0
23,928
13,736
9,540
9
1,465

Nil
Nil
Nil
Nil
Nil
17.89
NIL
NIL
Nil
15.920

9,270

58,309
917

SL.S

OIL VOL

Volume
CU.M.

VOL.(BBLS)

V.C.F.

G.O.V.

TEMP

BBLS

30.4
31.0
31.5
30.4
30.5
32.4
32.0
32.0
30.0
30.5

86.7
87.8
88.7
86.7
86.9
90.3
89.6
89.6
86.0
86.9

17.623

103.628

652

15.622

80.83

508

0
984
8,645
0
0
23,277
13,736
9,540
9
957

184

1,160
62

57,147
855

OIL VOLUME

W.C.F

@ 60F

TABLE 11

TEMP API 60 F TABLE 6

44.5
44.6
44.6
44.6
44.6
44.6
44.5
44.6
44.6
44.6

0.98670
0.98613
0.98568
0.98668
0.98658
0.98488
0.98525
0.98523
0.98703
0.98658

G.S.V.

G.S.V.

N.S.V.

0
970
8,521
0
0
22,925
13,533
9,399
9
944

0.000
1.941
17.042
0.000
0.000
45.85
27.067
18.799
0.023
2.360

0
968
8,504
0
0
22,879
13,506
9,381
9
942

0.12551
0.12544
0.12544
0.12544
0.12544
0.12544
0.12551
0.12544
0.12544
0.12544

TOTAL
TOTAL
REMARKS:

56,302
844

56,189
843

PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.)


Less Free Water :
Oil Volume :(G.O.V.)
Oil Volume @60F:(G.S.V.)
Long Tons/Metric Tons :
API 60 F :

58,309
1,160
57,147
56,302
7,063
7,177
44.6

Oil Volume @ 60 F :(T.C.V.)


Less OBQ/ROB :
Overall Loaded Vol @ 60 F:
Long tons/Metric tons :
Vessel Experience Factor :
Adjusted Volum @ 60 F :

56,302

DRAFT FWD

6.40 m

Capt. Juanda Pardede

AFT

B.S & W. % Vol :.

0.20

Long Tons/Metric Tons :

CARGO INSPECTOR

BERTH:
PORT:
DATE:

OYONG
OYONG OILFIELD
25-Jan-17

WEIGHT

W.C.F.

WEIGHT

TABLE 13
LT

M/T

0.000
121.712
1,068.882
0.000
0.000
2,875.666
1,698.569
1,179.050
1.171
118.406

0.12752
0.12745
0.12745
0.12745
0.12745
0.12745
0.12752
0.12745
0.12745
0.12745

7,063

8.70 m

0.000
123.662
1086.009
0.000
0.000
2921.745
1725.771
1197.943
1.189
120.304
7,177

TRIM
LIST

Capt. Ihwan Asrul

2.30 m
NIL

MASTER

OYONG OPERATORS DAILY REPORT


FSO SURYA PUTRA JAYA

25-Jan-17 @ 2400 HRS

Staff
Surya Putra Jaya Master

Capt. Ihwan Asrul

Crude Storage

Santos Rep.

Capt. Juanda Pard

Lifting

24 Hours Total (bbls)

917

Last Lifting

BS and W %

0.20

Lifting Vol (bbls)

Storage Gross (bbls)

57,147

Storage Net / G.S.V (Nbbls)

56,302

Storage Net / N.S.V (Nbbls)

56,189

Days to Tank Tops

296

Total Crude This Month (Nbbls)

19-D

141,

Next Lifting
Next Lifting Vol (bbls)

Vessel ETA

56,302

Water

Offtake

Water Received 24hrs (bbls)

62

Total Water in Cargo (bbls)

1,160

Total P/W Received (bbls)

85,048

Offtake 24 Hours (bbls)


Note :

Water Drawn off (bbls)

Loading/Incoming Temp

42.0

Specific Gravity

Storage tanks's temperature

32.4

PFW PH

0
Note:

OIW Average (mg/I)

10

OIW Peak (mg/I)

: PRODUCTION LOADING INTO COT 6C

Non Regulated Waste


Category

Vol (m3)

Kg

Soft Waste

0.00

Non Metal Waste

0.00

Metal Waste

0.00

Regulated Waste

Comments

Category

Vol (m3)

Kg

0.00

Solid Hazardous From Process

Liquid Chemical Waste

Biological Waste

Liquid Hazardous Waste (Oil)

SMF (Synthetic Mineral Fibre)

Solid Hazardous Waste

Note :

Comments

OYONG OPERATORS DAILY REPORT


Fuel

FSO-MFO

Opening (m3)
Received / Bunkered (m3)
Consumption (m3)
Closing (m3)

FSO-MDO

228,862

Service Vessel
MDO

### 92,362

###

1,310

228,862

91,052

Supply Remaining (days)


Remarks :

Meetings
Type

Time

Tool box meeting

Supervisory Meeting

06.30

16.30

Comment

1. Review previous day activity


2. Maintenance fire hydrant on deck
3. Corrective action for the workplace inspection
4. Maintenance main deck , etc at COT 7C
5. Test PV valve, pump room fire damper and portable gas
6. Maintenance main air compressor No.2
7. Install transformator for washing machine at laundry are
8. Maintenance emergency fire pump
9. Maintenance A/E No.3

1. Review deck, engine and galley dept. activity


2. Maintenance fire hydrant in engine room
3. Maintenance main deck , etc at COT 7C
4. Weekly sampling PW
5. Repair tank cleaning pipe at COT 7C

Incidents
Type
NIL

Reference

Comments

Drills
Type

S.T.O.P. Audit program


Observation Card Report : 20
The details see SPKK sheet *)
###

Time

Comment

Capt. Juanda Pardede

19-Dec-16
141,460
-

deg C
deg C

TO COT 6C

22651 / 56014

e Vessel

Comment

nspection
T 7C
per and portable gas detector
No.2
chine at laundry area

t. activity
oom
T 7C

Comment

FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT


1. LOG OF EVENT 24 HOURS
1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
NIL

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


05.30: 1 Person Santos Rep, 20 Persons Pkp & 1 Person Mafhindo by. KST.51 ( Out )
14.30: Additional food stuff Spj by. Cb. Adventurer 1 ( In )
17.00: 1 Person Mafhindo, 6 Persons Pkp by. KST.51 ( In )
18.15: 1 Person Santos Rep by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Santos Rep and Contractor Personnel
2. Maintenance main deck , etc at COT 7C
3. Checked and maintenance fire hydrant on deck
4. Tested portable / personnal gas detector , PV valve and pump room fire damper
5. Received additional food stuff from Cb. Adventurer 1
5. Corrective action for the workplace inspection

ENGINE :
1. Maintenance RO No.2
2. Maintenance A/E No.3
3. Checked / adjusted the governoor of A/E No.1 and running tested
4. Checked and repaired power source 220V in crew mess room
5. Installed the transformator for washing machine at laundry area
6. Welding sea water pipe outlet for emergency fire pump
7. Running up A/E No.2 & 3 :
14.00 - 15.00: - Lifted additional food stuff from Cb. Adventurer 1

2.

PERMIT TO WORK

2.1
J HA
3. BUNKERS(M3)

PW

MW

HW

CSE

IP

VAL

444

1705
1705

374

171

957

374

171

957

M.F.O
M.D.O

CONS
0
1,310

RCVD
0
0

CONS

RCV

TRNSF

PROD

0
10

0
0

0
0

0
19

444

4. FRESH WATER (MT)


BLR
DOM

5. DISPERSANT, FOAM, CHEMICALS (LTRS)


REASON FOR USE
6. POB
MAN HOURS ( POB X 12 HRS )
Previous man hours
Man hours today
Total man hours

216108
240
216348

OSD
200

Days W/O LTI

1154

REC
0
IN

CONS
0
OUT

22

Since

216348
Safe man hours
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM
IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
`
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES
9. EHS AUDIT/INSPECTION
10. ISSUES WITH LOCAL COMMUNITY
11. VESSEL ARRIVAL/DEPARTURE
12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS

28-Nov-13

25-Jan-17

@2400 HRS

TOTAL
3658
3656

TRANS
0
0
ROB

56
134

ROB
228,862
91,052
`

ROB
200
POB

28
28-Nov-13

Previous

Today

Total

0
0
0
0
1642
2085
3
0
59

0
0
0
0
2
20
0
0
0

0
0
0
0
1644
2105
3
0
59

NIL
NIL
NIL
NIL
NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MDO

Date

Opening
Balance
( Ltr )

( Ltr )

A/E
No.1
(Hrs)

A/E
No.2
(Hrs)

A/E
No.3
(Hrs)

Closing
Balance
( Ltr )

Receive

Transfer

Cons.

Adj.

( Ltr )

( Ltr )

( Ltr )

Remarks

01

75,622

1,296

5.0

19.0

0.0

74,326

02

74,326

1,296

15.0

0.0

9.0

73,030

03

73,030

1,752

4.0

0.0

24.0

71,278

Internal Cargo Transferred

04

71,278

1,808

8.0

0.0

24.0

69,470

Internal Cargo Transferred

05

69,470

1,338

3.0

0.0

24.0

68,132

Transferred Materials

06

0
0

0
0

1,324
1,394

0
0

2.0
17.0

0.0
0.0

24.0
14.0

66,808

Transferred Materials

07

68,132
66,808

65,414

Transferred Materials

08

65,414

1,324

24.0

0.0

2.0

64,090

Transferred Materials

09

64,090

1,296

24.0

0.0

0.0

62,794

10

62,794

1,310

13.0

0.0

12.0

61,484

Transferred Materials

11

61,484

1,310

1.0

0.0

24.0

60,174

Transferred Materials

12

60,174

1,310

1.0

0.0

24.0

58,864

Transferred Materials

13

0
0

0
0

1,324
1,352

0
0

14.0
15.0

0.0
4.0

12.0
9.0

57,540

Transferred Materials

14

58,864
57,540

56,188

Transferred Materials

15

56,188

1,303

0.5

0.0

24.0

54,885

Transferred Materials

16

54,885

1,352

4.0

0.0

24.0

53,533

Transferred Materials

17

53,533

30,000

1,524

2.0

0.0

24.0

82,009

Warming up boiler

18

82,009

10,000

1,801

7.5

0.0

24.0

70,208

Internal Cargo Transferred

19

70,208

1,310

1.0

0.0

24.0

68,898

Transferred Materials

20

68,898

1,296

0.0

0.0

24.0

67,602

21

67,602

1,352

0.0

4.0

24.0

66,250

22

66,250

1,296

0.0

0.0

24.0

64,954

23

64,954

30,000

1,296

16.0

0.0

8.0

93,658

24

93,658

1,296

8.0

0.0

16.0

92,362

25

92,362

1,310

0.0

15.0

10.0

91,052

26
27
28
29
30
31

Transferred Materials

Transferred Materials

NIL

NIL

FUEL STATUS REPORT


Vessel Name
Period

FSO. SURYA PUTRA JAYA


Jan-17
MFO

Date

Opening
Balance
( Ltr )

( Ltr )

( Ltr )

( Ltr )

( Ltr )

Closing
Balance
( Ltr )

Receive

Transfer Consumption Adjusment

Remarks

01

235,612

235,612

02

235,612

235,612

03

235,612

1,000

234,612

Internal Cargo Transferred

04
05
06

234,612
231,612

0
0

0
0

3,000
0

0
0

231,612
231,612

Internal Cargo Transferred

231,612

231,612

07

231,612

231,612

08

231,612

231,612

09

231,612

231,612

10

231,612

231,612

11

231,612

231,612

12

231,612

231,612

13

231,612

231,612

14

231,612

231,612

15

231,612

231,612

16

231,612

231,612

17

231,612

231,612

18

231,612

2,750

228,862

19

228,862

228,862

20

228,862

228,862

21

228,862

228,862

22

228,862

228,862

23

228,862

228,862

24

228,862

228,862

25

228,862

228,862

26
27
28
29
30
31

Internal Cargo Transferred

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Domestic Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

12

TOTAL

313

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

13
11
12
12
14
13
12
13
13
14
12
13
11
13
14
12
13
11
12
12
13
12
14
12

LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date

Quantity Sanitary Waste Water ( M3 )


Jan

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

TOTAL

191

Feb Mar Apr May Jun

Jul

Aug Sep Oct Nov Dec

7
7
8
8
7
8
8
8
7
8
7
7
8
8
8
8
7
7
8
8
8
7
8
8

LOG SHEET COOLING WATER


Vessel Name
FSO. SURYA PUTRA JAYA
Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Quantity Cooling Water Discharge ( M3 )


JAN FEB MAR APR MAY JUN
4,964
4,951
4,971
4,954
4,980
4,969
4,972
4,957
4,960
4,987
4,991
4,984
4,966
4,958
4,963
4,974
4,988
4,964
4,978
4,971
4,973
4,970
4,966
4,960
4,969

TOTAL 124,240
Averag
e/Day

JUL AUG SEP OCT NOV DEC

4,008

LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode
2017
Date
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOTAL

Quantity R.O Waste Water ( M3 )


Jan Feb Mar Apr May Jun

Jul Aug Sep Oct Nov Dec

80
70
135
80
120
125
130
60
40
110
100
105
100
55
85
90
90
95
55
75
90
80
80
80
95

2,225

DATA PERSONNEL ON BOARD


VESSEL
MONTH OF

: FSO SURYA PUTRA JAYA


: Jan 2017

DATE

CREW SPJ

SANTOS

VISITOR/KONTRAKTOR

DAILY TOTAL

1-Jan-2017
2-Jan-2017
3-Jan-2017
4-Jan-2017
5-Jan-2017
6-Jan-2017
7-Jan-2017
8-Jan-2017
9-Jan-2017
10-Jan-2017
11-Jan-2017
12-Jan-2017
13-Jan-2017
14-Jan-2017
15-Jan-2017
16-Jan-2017
17-Jan-2017
18-Jan-2017
19-Jan-2017
20-Jan-2017
21-Jan-2017
22-Jan-2017
23-Jan-2017
24-Jan-2017
25-Jan-2017

22
22
22
22
22
22
22
22
22
22
21
21
21
21
21
21
21
21
21
20
20
20
20
20
20

0
0
0
0
0
1
0
0
0
0
0
0
1
1
1
1
1
1
1
1
1
1
0
1
1

0
0
0
0
0
6
6
6
10
10
19
19
21
22
22
21
21
22
22
19
19
19
19
19
7

22
22
22
22
22
29
28
28
32
32
40
40
43
44
44
43
43
44
44
40
40
40
39
40
28

TOTAL

529

13

329

871

REMARKS

SIKLUS PENGAMATAN KESELAMATAN KERJA


Vessel Name : FSO. SURYA PUTRA JAYA
Date :
25/Jan/17
Action/Commen
t

Positive /
Negative

Total

Done

Positive

Replace battery

Negative

Done

Positive

Checked and maintenance fire hydrant

Well Done

Positive

Checked and adjust the governoor of A/E No.1


and 2 and running tested

Well Done

Positive

Engine room Maintenance RO No.2

Done

Positive

3/E

Engine room Maintenance A/E No.3

Done

Positive

8 HENDRA PRATAMA

4/E

Engine room Assisted 2/E maintenance RO No.2

Done

Positive

9 SURYADINATA

E/E

Crew mess
room

Checked and repaired power source 220V

Well Done

Positive

Bosun

Main deck

Lifted food stuff as operator crane

Done

Positive

11 ACHMAD NURUL HUDA

AB

Main deck

House keeping Main deck area after finish job

Done

Positive

12 UDIYANTO

AB

Main deck

Assisted boatswain maintenance main deck , etc


at COT 7C

Done

Positive

13 BAYU SEGARA

AB

Laydown

Assisted boatswain maintenance main deck , etc


at COT 7C

Done

Positive

14 DEDI

OS

Main deck

Assisted boatswain maintenance main deck , etc


at COT 7C

Done

Positive

15 ELIK BUDIANTO

FTR

Engine room

Welding sea water pipe outlet for emergency fire


pump

Done

Positive

16 SUAIB

MTM

Engine room Assisted 3/E maintenance A/E No.3

Done

Positive

Reported by

Rank

Location

Master

Crew mess
room

2 DENNY DAVID PAULUS

C/O

CCR

3 CENG UMAR

2/O

Main deck

4 IHSANUDIN

3/O

On deck

5 JULY MANGIRI

C/E

Engine room

6 AGUNG RISTIANTO

2/E

7 IRVAN TAHIR

1 IHWAN ASRUL

10 AANG

17 CHULWAN NURFALLAH WIPER

Description
Advice to all crew received additional food stuff
Portable gas detector RX-517 low batt during
tested
Lifted Food stuff as signal man

Engine room

Sea water pipe outlet for emergency fire pump


was leakage

Repaired (Closed)

Negative

18 MASRUDI

C/Cook

Provison
store

checked and arranged additional provision new


arrival

Done

Positive

19 BOBY MANGONTO

STWD

Main deck

Assisted deck Crew bring the provision to store

Done

Positive

20 HARIANTO SULE TANAN STWD

Main deck

Assisted deck crew bring the provision to store

Done

Positive

TOTAL 20