New CT Fresh
water to
hot water
460 tank
Total Fresh Water IN Fresh Water From LK From PH FRESH WATER Water in WWL EVAPORATOR FRESH WATER
697 445 42 10 125 71 10 SEC-COND 65
1080 85
Water in WBL
123 Water in Water in Water in GL Water in
EVAPORATOR RECOVERY BOILER CAUSTICIZING LIME KILN
SBL GL 71 MUD
12 5
70 3 30 5 425 5 85 12 2 123 58 1 1 1
MECH-
MECH-
WATER IN SEAL
2 SEAL
WL ROLLER'S
MAIN STACK COOLING 5
NCG VAPOURS
TO HOTWELL& MECH- SEC-COND TO GRITS & STACK
EJECTOR SEAL CAUSTICIZING PUMP'S TO NCT DREGS 22
HOT
COOLER WATER GLAND THROUGH
WATER
EVAPORATION
SEC-COND
SA,ID,
MAKE UP 40
AT OLD &NEW SPOUT
Cooling Tower DRAIN COOLING VACUUM PP
1
SEAL AND
WARM CONDENSOR
WATER WARM WATER FOR
71 SHELL
PULP MILL WATER WASHER
445 1080 425 WWL TO SRB
BOILING/WASH
MODE
TO NEW
COOLING
TOWER
8.4
1092 85 137 70
1080 1080 208 208 166 132 5 70 70
Internal water circulation Losses
TOTAL FRESH WATER CONSUMPTION IN RECOVERY 957 Seco.condesate to causticizing 85 NCG vapours & Ejector 50 Grits & dregs 1
WATER COMING IN WBL 123 Warm water to P.mill 425 Mech-seal-EVAP 3 Hot water flow
WATER COMING FROM POWER HOUSE 10 Vacuum seal water to chipper 35 CT Evaporaion 30 Mech-seal-Caust 1
LK cooling water LB+Rollers 42 Water in WL 58 Sec.Cond Drain 5 Shell washer 1
TOTAL 1132 Total 603 Total 88 LK stack 5
SRB Stack 12 0
705 SRB Mech-seal 2
Total 14
125 M3/Hr.
330 M3/Hr
OLD COOLING TOWER
NCT
OCT
EJECTORS
TO PULP MILL
WATER BOILING
SODA RECOVERY PLANT WATER BALANCE
DETAILS
INPUT FRESH WATER DETAILS M3/Hr
FRESH WATER LINE 150mm AND GOING
TO NEW COOLING TOWER AFTER
1 USING FOR ID FAN, SA FAN 125
OILCOOLERS, SPOUT COOLING AND
RECOVERY PUMPS COOLING
2 CAUSICIZING 65
FRESH WATER MAKEUP AT OLD
3 445
COOLING TOWER (320+125)
FRESH WATER MAKEUP AT NEW
4 75
COOLING TOWER
TOTAL 710
CONSUMPTION DETAILS M3/Hr
1 WARM WATER GOING TO PULP MILL 600
2 CT DRIFT LOSSES 30
3 HOTWELL DRAIN 70
4 MECH.SEAL WATER(2+2+1) 5
5 WARM WATER FOR WATER BOILING 5
TOTAL 710