Zone Factor            = 0.
36                 Floor       hi       Wi
Importance factor      =    1                   1         4.5    3837.61
R                      =    5                   2         7.5    3358.69
Height                 = 16.6 m                 3        10.5    3358.69
T a (RC frame)         = 0.6168 sec             4        13.5    3358.69
T a (brick infill)     =                        5        16.5    2400.84
S a /g                 = 2.2049
Ah                     = 0.0794
Concrete Density       =    25                       First floor
Column breadth             450      mm        Beam       675         kN
Column depth           = 450        mm       Column 474.609          kN
Beam breadth           = 300        mm        Slab      1536         kN
Beam depth                 450      mm           2nd, 3rd, 4rth floor
Slab thick for floor   = 120        mm        Beam       675         kN
Slab thick for roof    = 120        mm       Column 379.688          kN
Storey height          =     3      m         Slab      1536         kN
Foundation depth       = 1.5        m
No. of Bay along X     =     4
No. of Bay along Y     =     4
c/c b/w col along X    =     6      m
c/c b/w col along y    =     4      m
 Total beam length     = 200             m
FF                     =     1      kN/m2
LL                     =     4      kN/m2
FF                     =    384      kN
LL                     =    768      kN
W1                     =   3837.6    kN
W2                     =   3358.7    kN
W3                     =   3358.7    kN
W4                     =   3358.7    kN
W5                     =   2400.8    kN
Total W                =   16315     kN
Base Shear             =   16315     kN
 Wihi2       Qi
77711.6   666.339
188926    1619.95
370295     3175.1
612121    5248.64
653630 5604.56
1902684
           Roof             Floor       Ht
 Beam       675     kN   first floor   3.75   m
Column    189.844   kN      roof        1.5   m
 Slab      1152     kN