Priority Issues (Package Wise) : 1 AHS Package (Unit 2 COD and Continues Operation)

1. Fabrication and erection of the ash handling system is ongoing with a total scope of 1529.63 MT. As of January 31st, 1381.504 MT had been fabricated and 1194.604 MT erected, leaving balances of 148.126 MT for fabrication and 335.026 MT for erection. 2. Specific structures like the bed ash hopper and supporting structure are nearing completion while others like the fly ash silo still have significant balances remaining for both fabrication and erection. 3. No fabrication or erection progress was reported for January 31st but work on the various ash handling structures is ongoing to complete the remaining scopes.

Uploaded by

saravan1891
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views29 pages

Priority Issues (Package Wise) : 1 AHS Package (Unit 2 COD and Continues Operation)

1. Fabrication and erection of the ash handling system is ongoing with a total scope of 1529.63 MT. As of January 31st, 1381.504 MT had been fabricated and 1194.604 MT erected, leaving balances of 148.126 MT for fabrication and 335.026 MT for erection. 2. Specific structures like the bed ash hopper and supporting structure are nearing completion while others like the fly ash silo still have significant balances remaining for both fabrication and erection. 3. No fabrication or erection progress was reported for January 31st but work on the various ash handling structures is ongoing to complete the remaining scopes.

Uploaded by

saravan1891
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 29

Priority Issues(Package wise)

1 AHS Package(Unit 2 COD and continues operation)


a No significant work is progress in Unit-2. Manpower to be increased up to 80 Nos to complete th
b One more contractor to be mobilised
2 BOP Package(For continues and safe operation of units)

a Fire fighting system to be completed(Only hydrant system available in power house area. But, a
yet completed)
b Completion of ETP system. No manpower and some matirials yet to be received at site
c Manpower to be increased in fire fighting and ETP system
ge wise)
up to 80 Nos to complete the job.

n power house area. But, all other system not

be received at site
Daily Progre
Project: Bhavna
2x250 MW LIGNITE B
Boiler unit-2

Sr No DESCRIPTION
1 Structure
2 Pressure Parts
3 APH
4 Non Pressure Parts
5 Refractory Weight (NPP)
6 NPP ( 48 Group)
7 Rotary Parts
8 Piping
9 Insulation
10 Bed Material
11 ESP
Remarks: Insulation and platform work is in progress
Daily Progress Report of Boiler unit-2
Project: Bhavnagar Energy Company Limited
2x250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR
Boiler unit-2

ERECTION (MT)
Total Scope (MT)
Up to 31-01-2017 2/1/2017 Cumm
8733 8734.86 0 8734.86
4302 4303.95 0 4303.95
721 720.49 0 720.49
3629 3575.76 0 3575.76
238 238.00 0 238.00
2404 2342.20 0 2342.20
493 490.56 0 490.56
1775 1800.16 0 1800.16
1625 1482.28 0 1482.28
1250 1535.00 0 1535.00
3560 3439.00 0 3439.00
work is in progress
GAR

Date- 01/02/2017
ALIGNMENT & WELDING (MT)
Up to 31-01-2017 2/1/2017 Cumm
8446.38 0 8446.38
4270.89 0 4270.89
720.49 0 720.49
3491.42 0 3491.42
238 0 238

2236 0 2236
489.56 0 489.56
1520.65 0 1520.65
1086.12 0 1086.12
1122 0 1122
3402 0 3402
Mechanical Erection Daily Progress Report for Chimney System as
Scope Completed Today
Sr No. Area Description
(MT) Quantity Progress

1 STAIRCASE Erection 90 87.5 0

2 Hand Rails Erection(Rmt) 8550 6200 200


Chimney System as on dated 01.02.2017
Balance work
as on Remarks
31.01.2017
2.5 Work is in progress

2150 Work is in progress


Mechanical Erection Daily Progress Report for NDCT System as on dated 01.02.201
1) Spray system Work is completed
dated 01.02.2017
Daily Progress Report of LMCS
Project: Bhavnagar Energy Company Limited
2x250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR

Structural Steel Works (LMCS)


Prefabrica ERECTION (MT) ALIGNMENT & WELDING (MT)
Total Balance
Sr No DESCRIPTION
Scope
ted steel
( Prefab)
Up to 31-01-
Scope 2/1/2017 Cumm Up to 31-01-2017
2017
1 LMCS Structure (MT) 1050 1050 0 930 0 930 759

Lime Milling system


2 70 NA NA 34 0 34 34
(Nos/Set)

3 Ball Mill -(Nos/Set) 3376 NA NA 938 0 938 938

4 Main Bag Filter-(Nos/Set) 7864 NA NA 2088 0 2088 2088

5 Ducting for Air System-Mtrs 520 NA NA 357 0 357 357

Dense phase Lime


6 274 NA NA 174 0 174 174
conveying-(Nos)
7 Piping -Mtrs 2480 NA NA 1980 0 1980 1980
Mislleneous (EOT
crane,Hoist,Exhaust fan,Air
8 20 NA NA 9 0 9 0
conditioning system-
(Nos/Set)
Date- 01/02/2017

ALIGNMENT & WELDING (MT)

2/1/2017 Cumm Remarks

1. Truss,Floor Beam , Angle Bracing


0 759
erection.
1. Cyclone separator duct ,
0 34
Damper,Feeder, Gate.
1. Feed Box, support box, Flow switch, Mill
0 938
head liner, Bolts for liner.

0 2088 1.Ladder, Valve, Filter Bag, Cage

Ducting dai 1360mm , 1500 mm, 500 mm,


0 357
1450 mm.
LOCI fitting for lime conveying, 200 NB
0 174
Knife Gate Valve, Sump pump.
0 1980 200 NB Pipe

EOT crane,Hoist,Exhaust fan,Air


0 0
conditioning system.
Structural Fabrication & Erection Daily Progress Report for Ash Handling System as on dated 31.01.2017

Total Scope Completed Completed


Todays- Balance Todays-
as per fabrication erection Balance Erection
Sl. No. Description Fabrication Fabrication Erection Remarks
Drawing in quantity in quantity in in MT
in MT in MT in MT
MT MT MT

1 Bed Ash Hopper and Supporting Structure 320.000 315.500 0.000 4.500 240.600 0.000 79.400
2 a. BAISH 243.420 234.004 0.000 9.416 234.004 0.000 9.416
b. FAISH 191.990 166.000 0.000 25.990 155.000 0.000 36.990
3 Pipe Rack
a. Inter. Surge to Silo 205.000 207.000 0.000 -2.000 204.000 0.000 1.000
b. ESP to Surge Hopper 283.000 230.000 0.000 53.000 195.000 0.000 88.000
4 Misc. Work. 286.220 229.000 0.000 57.220 166.000 0.000 120.220
Total Scope in MT. 1529.630 1381.504 0.000 148.126 1194.604 0.000 335.026

Mechanical Erection Daily Progress Report for Ash Handling System as on dated 31.01.2017

ALIGNMENT,WELDING/BO
Balance PLACEMENT/ ERECTION
G AND GROUTING
Received. QTY. to be
Sl.No DESCRIPTION TOTAL QTY UOM
QTY received at TODAY
site TODAY 'S PREVIOU
CUMULATIVE 'S
TOTAL S
TOTAL

1 DRAG CHAIN CONVEYOR (IMPORTED COMPONENT) 4 Sets 4 0 0 2 2 0


2 BED ASH SYSTEM 0
2.1 Vacuum Pressure Relief Door 8 No's 8 0 0 4 4 0
2.2 Vent Filter 8 No's 8 0 0 4 4 0
2.3 Vent Fan for above Vent filter 8 No's 8 0 0 4 4 0
2.4 Knife gate Valve 8 No's 8 0 0 4 4 0
2.5 Vacuum Pressure Relief Door 8 No's 8 0 0 4 4 0
2.6 DRAG CHAIN CONVEYOR (Fabricated Part) 4 Sets 4 0 0 2 2 0
3 BED MATERIAL BUNKER
3.1 Vacuum Pressure Relief Door 4 No's 4 0 0 4 4 0
3.2 Vent Filter 4 No's 4 0 0 2 2 0
3.3 PIPE Fittings (Bend/Lateral/Tee/Elbow/Spool piece) 1 LOT 0 1 0 120 120 0
3.4 Vent Fan for above Vent filter 4 No's 4 0 0 3 3 0
1St Stage Pneumatic Conveying: From BAH to
4
BAISH
4.1 Manual Isolation Valve 24 NOS 24 0 0 12 12 0
4.2 Expansion bellow 24 No's 24 0 0 0 0 0
4.3 Ash Inlet Cup Valve 24 No's 24 0 0 12 12 0
4.4 Transporter Vessel Below BAH 24 No's 24 0 0 18 18 0
5 Ash Conveying DRC Pipe (BAH &BAISH)
5.1 125 ID DRC PIPE 5000 Meter 5000 0 0 3642 3642 0
5.2 PIPE Fittings (Bend/Lateral/Tee/Elbow/Spool piece) 400 Nos. 164 236 0 148 148 0
5.3 Vacuum Pressure Relief Door on Bed Material Bunker 4 No's 4 0 0 2 2 0
5.4 Ash Discharge Valve 40 No's 40 0 0 20 20 0
2nd Stage Pneumatic Conveying: From BAISH
6
to Main BA Silo
6.1 Manual Isolation Valve 12 No's 12 0 0 9 9 0
6.2 Transporter Vessels Below BAISH 12 No's 12 0 0 10 10 0
6.3 Ash inlet cup valve 12 No's 12 0 0 9 9 0
6.4 Ash discharge pipe 200 ID 2000 Meter 2000 0 0 378 378 0
6.5 Ash discharge pipe 175 ID 2400 Meter 2400 0 0 2006 2006 0
6.6 Ash discharge pipe 150 ID 3500 Meter 3500 0 0 2124 2124 0
6.7 Ash Discharge Valve 12 No's 12 0 0 6 6 0
Fly Ash Pressure Conveying System
7
1st stage: From Fly ash hoppers to FAISH
7.1 Adapter Piece below hoppers 200NB 140 No's 140 0 0 132 132 0
7.2 Manual Isolation Valve 140 No's 140 0 0 123 123 0
7.3 Expansion bellow 128 No's 128 0 0 114 114 0
7.4 Ash inlet cup valve 140 No's 140 0 0 133 133 0
7.5 Transporter Vessels for 1,2,3 field 48 No's 48 0 0 48 48 0
7.6 Transporter Vessels for 4/5/6/7/8th field 80 No's 80 0 0 80 80 0
7.7 Transporter Vessels for ECO Hoppers 8 No's 8 0 0 7 7 0
7.8 Transporter Vessels for APH 4 No's 4 0 0 4 4 0
8 Ash Conveying Pipe (ERW PIPE) 1 LOT 1 0
8.1 80NB 400 Mtrs 400 0 0 412 412 0
8.2 100NB 385 Mtrs 385 0 0 449 449 0
8.3 125NB 1600 Mtrs 1600 0 0 1857 1857 0
8.4 Fluidising Pad Assy 256 No's 256 0 0 196 196 0
8.5 VENT VALVE 36 NOS 36 0 0 30 30 0
9 Compressor house
9.1 Air Receiver for Conveying Air Compressor 6 No's 6 0 0 5 5 0
9.2 Air Dryer for Conveying Air 11 No's 11 0 0 11 11 0
9.3 Instrument Air Compressor 3 No's 3 0 0 3 3 0
9.4 Air Receiver for Instrument Air Compressor 3 No's 3 0 0 3 3 0
9.5 Air Drying Plant for Instrument Air 3 No's 3 0 0 3 3 0
9.6 Conveying Air Compressor 11 No's 11 0 0 11 11 0
9.7 Ash Conditioner Water Pump 2 No's 2 0 0 2 2 0
9.8 ESP fluidising blower 3 No's 3 0 0 3 3 0
9.9 Heater for ESP fludising blower 2 No's 2 0 0 2 2 0
9.10 Supply Fan, Exhaust Fan & Ventilation System, 1 LOT 0 1 0 0 0 0
9.11 Split A/C 1 LOT 0 1 0 0 0 0
10 2nd stage: From FAISH to Main FA/BA Silo
10.1 VENT VALVE 8 No's 8 0 0 2 2 0
10.2 Manual Isolation Valve 8 No's 8 0 0 8 8 0
10.3 Expansion bellow 8 No's 8 0 0 0 0 0
10.4 Transporter Vessels Below FAISH 8 No's 8 0 0 8 8 0
10.5 Cup Valve 8 No's 8 0 0 8 8 0
10.6 Vent filter (Silo Area) 6 No's 6 0 0 1 1 0
10.7 Vent filter (For ISH) 6 No's 6 0 0 6 6 0
10.8 Vent Fan for (Silo Area) Vent Filter 6 No's 6 0 0 2 2 0
10.9 150NB 5500 Mtrs 5500 0 0 3175 3175 0
10.10 200NB 1300 Mtrs 1300 0 0 408 408 0
Alloy CI Fittings (Bend/Lateral/Tee/Elbow/Spool
10.11 400 Nos. 400 0 0 272 272 0
piece)
10.12 Vent Fan for (For ISH) vent filter 6 No's 6 0 0 5 5 0
11 BA + FA Main Silo 0
11.1 Aeration pad assembly 160 No's 160 0 0 93 93 0
12 SILO UNLOADING SYSTEM
12.1 Manual Knife gate type Isolation Valve 18 No's 18 0 0 18 18 0
12.2 Pn. Cylinder Optd. Cut off Valve with cyl. & sol. 18 No's 18 0 0 6 6 0
12.3 Dry Unloading Chute 6 No's 6 0 0 4 4 0
12.4 Ash Conditioner (120tph) 6 No's 6 0 0 6 6 0
12.5 GEARED MOTOR for Ash conditioner 6 No's 6 0 0 6 6 0
12.6 Silo Fluidising Blower 4 No's 4 0 0 4 4 0
12.7 Heater 4 No's 4 0 0 4 4 0
12.8 Rotary Feeder 18 No's 18 0 0 2 2 0
12.9 Cranes 1 No's 1 0 0 0 0 0
12.10 Hoists 1 LOT 1 0 0 0 0 0
ERW Pipe (Air & Water line at ESP ,ECO, Air
13 6435 Meter 6691 -256 18 6439 6457 18
pre heater and silo area)
Instrument Air GI Piping at ESP/ISH and silo
3 2400 Meter 2400 0 12 2464 2476 12
area
15 Misc. balance work
15.1 125 NB MS Ash Conveying pipe, 2000 Mtrs. 2000 Meter 0 2000 0 0 0 0
15.2 125 NB DRC pipe, 4200 Mtrs. 4200 Meter 0 4200 0 0 0 0
15.3 400 NB Pipe, 20 Mtrs 20 Meter 0 20 0 0 0 0
15.4 350 NB Pipe, 244 Mtrs 244 Meter 0 244 0 0 0 0
15.5 250 NB Pipe, 244 Mtrs 244 Meter 0 244 0 0 0 0
15.6 100 NB Pipe, 500 Mtrs 500 Meter 0 500 0 0 0 0
15.7 80 NB Pipe, 400 Mtrs 400 Meter 0 400 0 0 0 0
15.8 65 NB Pipe, 400 Mtrs 400 Meter 0 400 0 0 0 0
15.9 200 NB X90' DRC Bend, 120 Nos. 120 NOS. 0 120 0 0 0 0
15.10 200 NB Y DRC lateral , 60 Nos. 60 NOS. 0 60 0 0 0 0
15.11 200NB/175 NB DRC Expander, 12 nos. 12 NOS. 0 12 0 0 0 0
15.12 175NB/150 NB DRC Expander, 12 nos. 12 NOS. 0 12 0 0 0 0
15.13 175 NB X 90' DRC Bend 10 NOS. 0 10 0 0 0 0
15.14 150 NB-150 NB-150 NB Y lateral, 14 nos. 14 NOS. 0 14 0 0 0 0
15.15 150 NBX45' DRC Bend, 14 nos. 14 NOS. 0 14 0 0 0 0
15.16 150 NBX90' DRC Bend, 65 nos. 65 NOS. 0 65 0 0 0 0
15.17 125-150 NB DRC Expander, 24 nos. 24 NOS. 0 24 0 0 0 0
15.18 125 NBX90' DRC Bend, 28 nos. 28 NOS. 0 28 0 0 0 0
15.19 125 NBX45' DRC Bend, 24 nos. 24 NOS. 0 24 0 0 0 0
15.20 125 NBX45' DRC Y Lateral, 70 nos. 70 NOS. 0 70 0 0 0 0

Remarks : Structure Part is not updated because DPR is not sent by MBCEL
Remarks

ALIGNMENT,WELDING/BOLTIN
G AND GROUTING
Remarks
PREVIO
Cumulative
US

2 2

4 4
4 4
4 4
4 4
4 4
2 2

4 4
2 2
112 112
3 3

12 12
0 0
12 12
18 18

2996 2996
147 147
2 2
20 20

9 9
9 9
8 8
336 336
1754 1754
2104 2104
6 6

129 129
110 110
116 116
104 104
41 41
76 76
5 5
3 3

410 410
435 435
1832 1832
200 200
30 30

5 5
11 11
3 3
3 3
3 3
11 11
1 1
2 2
1 1
0 0
0 0

2 2
8 8
0 0
8 8
8 8
1 1
6 6
1 1
3112 3112
390 390
262 262
5 5

80 80

8 8
6 6
0 0
3 3
0 0
0 0
0 0
2 2
0 0
0 0
6135 6153

2367 2379

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

not sent by MBCEL


Mechanical Erection Daily Progress Report for BOP System as on dated 01.02.17
Total UPTO Nov, This Month
Sr No Description UOM Today Cumulative
Scope 2016 (Jan-2017)
1 PUMP WITH MOTOR ERECTION NOS 32 25 0 25
2 GUARD POUND TO DS SYSTEM MTRS 450 695 695
B FIRE FIGHTING 0.00 0
1 PIPE ERECTION MTRS 14000 12964 40 1170 14134
2 PIPE UNDER GROUNG LAYING MTRS 14000 4419 4419
3 ISOLATION VALVE ERECTION NOS 134 135 135
4 HYDRENT VALVE NOS 136 92 92
5 DELUGE VALVE NOS 132 44 44
6 WATER MONITOR NOS 134 10 10
7 HOSE BOX NOS 136 33 33
C SERVICE WATER LINE ERECTION MTRS 3989 3730 0 3730
D POTABLE WATER LINE ERECTION MTRS 3100 2612 0 2612
E SERVICE AIR ERECTION MTRS 2100 2110 2110
F INSTRUMENT AIR ERECTION MTRS 1679 1679 0 1679
G HVAC
1 VENTILATION DUCT SQMTRS 5500 3058 3058
2 AHU ESP CONTROL ROOM UNIT#2 NOS 3 3 0.00 3
3 BLOWERS NOS 10 6 6
4 PRDS NOS 500 0 0
5 VENTILATION DIFFUSERS NOS 200 303 303
6 ROOF EXTRACTOR FANS NOS 36 36 36
7 EXHAUST FANS NOS 50 20 20
8 VALVE ERECTION NOS 200 60 60
9 WASHER WATER PIPE LINE 900 600 600
10 HYDRO TEST MTRS 1200 840 840
11 PIPE LINE INSULATION MTRS 1200 1320 0 1320
H WEIGH BRIDGE 0.00
1 STRUCTURE LOT 2 1 1
2 LOAD CELL NOS 12 6 6
I WORK SHOP MT 286 0.00 0
J EOT CRAIN/UNDER SLUNGE NOS 10 3 3
K DG SET 1250KVA NOS
1 STRUCTURE ERECTION MT 15 15 15
2 EXHAUST PIPE MTRS 80 80 80
3 SILENCER NOS 2 2 2
L ETP system
1 PIPE ERECTION MTRS 2800 1803.5 0 1804
2 CLARIFLOUCULATOR NOS 3 1 1
M RAIN WATER HARVESTING PIPE ERECTION MTRS 1200 698 0 698
N COLONY WATER PIPE ERECTION MTRS 1000 411 39 589 1000
ted 01.02.17
Remarks
FABRICATION (MT
Total Scope Prefabricated steel Prefabricated Scope of Fabrication
Sr No DESCRIPTION Upto Jan,
(MT) Scope Received at site to be done at site
2017

1 CRUSHER HOUSE 920 724 724 196 143


2 CH Adj Building 126 0 126 126
3 JNT-1 982 958 958.0 24 24
4 JNT-2 155 155 155 0 0
5 JNT#3 151 0 151 149
6 BCN 8B 60 4 4 56 56
7 BCN 11A & 11B 450 420 420 30 53
8 BCN 15A & 15B 675 540 535 135 135
9 BCN 26A & 26B 1019 587 587 432 429
10 BCN 28A & 28B 36 0 36 36
11 Lignite Shed 1180 1180 230 0
12 SCREEN HOUSE 2400 889 866 1511 1369
13 JNT#4 150 0 150 149
14 JNT#5 213 0 213 196
15 JNT#6 228 23 23 205 182
16 JNT#7 248 248 248 0 0
17 BCN 4A & 4B 422 72 67.2 350 300
18 BCN 6A & 6B 102 18 84 22
19 BCN 7A & 7B 74 67 43.41 8 0
20 BCN 10A & 10B 63 55 45 8 0
21 BCN 8A 47 40 18 7 5
22 BCN 19A & 19B 240 82 61.68 158 127
23 BCN 25A & 25B 270 95 85 176 106
24 Lime Stone Building & Bunker 1146 0 1146 1132
25 JNT-LS#1 75 0 75 71
26 JNT-LS#2 77 0 77 77
27 JNT-LS#3 170 0 170 165
28 BCN LS 2A & 2B 210 136 120 74 74
29 BCN LS 3A & 3B 210 127 107.72 83 54
30 BCN LS 4A & 4B 800 314 307.4 486 477
31 BCN LS 5A & 5B 110 5 5 105 105
Reclaimer Hopper & Tunnel for Lime
32 30 30 0
Stone
TOTAL (MT) 13039 6768 5610 6271 5762
Project: Bhavnagar Energy Company Limited
2x250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR
Structural Steel Works (LLHS)

FABRICATION (MT) BLASTING & PAINTING (MT) ASSEMBLY (MT)


Balance
Balance
This Month Fabrication to be Upto Jan, This Month Upto Jan, This Month
Cumm (Fab+Prefab) Cumm Cumm
(Feb-2017) Done at Site 2017 (Feb-2017) 2017 (Feb-2017)

143 53 53 143 143


126 0 0 126 126
24 0 0 24 24
0 0 0 0 0
149 2 2 149 149
56 0 0 56 56 60 60
53 0 0 53 53 448 448
135 0 5 135 135 667 667
429 3 3 429 429 1019 1019
36 0 0 36 36 35 35
0 0 950
1369 142 165 1274 1274
149 1 1 149 149
196 17 17 144 144
182.0 23 23 157 157
0 0 0 0 0
5 305 45 50 184 184 150 0 150
22 62 80 15 15
0 8 31 0 0
0 8 18
5 3 25 1 1
127 31 51 113 113 93 0 93
106 70 79 53 53
1132 14 14 1132 1132
71 4 4 71 71
77 0 0 76 76
165 5 5 162 162
74 0 16 66 66
54 29 48 39 39 36 36
0 477 9 16 466 0 466 685 0 685
105 0 0 110 110 110 110
0 0 30
5 5767 505 1685 5362 0 5362 3303 0 3303
DATE: 01.02.2017
ERECTION (MT) ALIGNMENT & WELDING (MT)

Upto Jan, This Month Upto Jan, This Month


Cumm Cumm
2017 (Jan-2017) 2017 (Feb-2017)

862 862 849 849


126 126 126 126
963 963 958 0 958

PRIORITY#1
151 151 148 148
149 149 149 149
60 60 60 60
441 441 425 425
665 665 655 655
1014 1014 1014 0 1014
35 35 35 35

1422 32 1453 720 720


145 145 140 140
129 129 120 120
124 0 124

PRIORITY#2
31 0.000 31
6 0 6

1133 1133 1105 1105


71 71 65 0 65
75 75 75 75
LIME STONE

162 162 158 158

26 26
659 0.00 659 634 0 634
109 109 102 102
ME STONE
8556 32 8588 7538 0 7538
INDURE PVT LTD
Project: Bhavnagar Energy Company Limited
2x250 MW LIGNITE BASED TPP AT PADVA, BHAVNAGAR
Structural Steel Works (LLHS)

IDLERS PLUMBER
Sr No DESCRIPTION PULLEYS
(ROLLER) BLOCKS
SCOPE ERECTION SCOPE ERECTION SCOPE ERECTION
1 CRUSHER HOUSE
2 BCN 8B 673 673 13 13 26 26
3 BCN 11A & 11B 921 921 20 20 40 40
4 BCN 15A & 15B 677 338 12 6 24 12
5 BCN 26A & 26B 1640 1640 14 14 28 28
6 BCN 28A & 28B 246 246 12 12 24 24
7 BCN 29A & 29B 244 244 12 12 24 24
8 BCN 4A & 4B 692 16 32 0
9 BCN 6A & 6B 210 14 28 0
10 BCN 7A & 7B 154 14 28 0
11 BCN 10A & 10B 147 14 28 0
12 BCN 8A 672 13 26 0
13 BCN 19A & 19B 1520 12 24 0
14 BCN 25A & 25B 1425 12 24 0
15 BCN LS 2A & 2B 700 10 20 0
16 BCN LS 3A & 3B 400 20 40 0
17 BCN LS 4A & 4B 900 14 28 0
18 BCN LS 5A & 5B 150 12 24 0
19 SFD - 2A & 2B 44 6 12
20 SFD - 3A & 3B 32 4 8
21 SFD - 6A1 & 6B1 42 6 12
22 SFD - 9A & 9B 56 6 12
23 RSFD - 16A & 16B 96 6 12

TOTAL (MT) ### 4062 262 77 524 154


VT LTD
y Company Limited
P AT PADVA, BHAVNAGAR
Works (LLHS)
DATE: 01.02.2017
TECHNOLOGICAL
BEARING Gear Box
STRUCTURE
SCOPE ERECTION SCOPE ERECTION SCOPE ERECTION

PRIORITY#1
26 26 65 65 2 2
40 40 110 95 2 1
24 12 45 28 2 1
28 28 136 136 4 3
24 24 15 15 2 2
24 24 14 14 2 2
32 40 2

PRIORITY#2 LIME STONE


28 15 2
28 8 2
28 8 2
26 65 2
24 42 2
24 42 2
20 45 2
40 40 2
28 95 2
24 18 2
12 4
8 4
12 4
12 4
12 4

524 154 803 353 56 11

You might also like