STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
Tacs [anus conven evo mea [EST] OS aeg |
18.04.95 [ISSUED IN CONFORMITY WITH STD PMS REV-2] MP AKG NS AS
ov. a isin a sr anoAno oEEATEN sa [em [ern nie
DATE REVISION ey | ohecxeo | convenon [Gaarmwan Si
STANDARD SPECIFICATION FOR |___SPECIFICATION _| REV
ENGINEERS INDIA LIMITED ION DESTRUCTIVE EXAMINATION 6-44-0016 4
REQUIREMENTS OF PIPING mer ariebe reproduced |
tod
CONTENTS
TITLE
i GENERAL.
2 VISUAL EXAMINATION
3. NON DESTRUCTIVE EXAMINATION
4. TABLE-I (with applicable Notes to Table-t)
PAGE NO.
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
ENGINEERS INDIA LIMITED
‘NEW DELHI
SPECIFICATION _| REV
6-44-0016 4
Page 2 of 191. GENERAL.
1.1 SCOPE
Tot be reproduced
This specification covers the general requirements for the non destructive examination of shop
& field fabricated piping,
1.2 RELATED CODES & ENGINEERING STANDARDS
’A4 210x297
Referred codes / standards are as follows. Latest editions of the Codes/Standards referred to
shall be followed.
a) ASME Boiler & Pressure Vessel Codes, Section V & VIII (Div.1) including addenda
b) ASME B31.3
swar's express agracment at they
©) ASME BI6.5 & B16.34
4) ASTM E10
©) Standard Specification for Piping Material 6-44-0005
f) Standard Specification for Welding 6-77-0005
8) Standard Specification for Fabrication & Erection of Piping 6-44-0012
h) Standard Specification for Pressure Testing of Piping Systems 6-44-0017
1) Welding Specification for the Fabrication of Piping 6-77-0001
j) Design Guide for Radiography Requirement 8-77-0010
2. VISUAL EXAMINATION
2.1 Weld shall be visually inspected wherever accessible in accordance with the following
requirements
‘Property of ENGINEERS INDIA LIMITED. They are mer
3 2) Internal misalignment 1.5 mm or less
b) Cracks or lack of fusion None permitted
©) Incomplete penetration Depth shall not exceed
(For other than 100% ‘The lesser of 0.8 mm or 0.2 times thickness of
radiography butt-weld) thinner component joined by butt-weld
‘The total length of such imperfections shall not
exceed 38 mm in any 150 mm of weld length
d) Surface porosity and Not permitted
exposed slag inclusions
(4.7 mm nom, wall thickness
and less)
STANDARD SPECIFICATION FOR |__SPECIFICATION __| REV
ENGINEERS INDIA LIMITED
NEW DELHI
NON DESTRUCTIVE EXAMINATION 6-44-0016 4
REQUIREMENTS OF PIPING Page 3 of 193 ©) Concave root surface For single sided welded joints, concavity of the root
e (Suck up) surface shall not reduce the total thickness of joint,
z including reinforcement, to less than the thickness of
: the thinner of the components being joined
2 | i Weld ripples irregularities 2,5 mm or less.
33 2) Lack of uniformity in bead 2.5 mm or less.
28 width
a5 h) Lack of uniformity of leg 2.5 mm or less.
* = Jength
BB 1) Unevenness of bead 2.0 mm or less.
gs j) Weld undercutting 0.8 mm or 1/4 thickness of thinner components
#H Joined by butt weld, whichever is less. (shall be
3 smooth finished)
: k) Overlap 1.5 mm ot less
=e » Bead deflection 2.5 mm or less
es m) External weld reinforcement and internal weld protrusion (when backing rings are not
ae used) shall be fused with and shall merge smoothly into the component surfaces. The
is height of the lesser projection of external weld reinforcement or internal weld
nel protrusion from the adjacent base material surface shall not exceed the following
limits:
33] Wall thickness of thinner Weld reinforcement or internal weld protrusion
26 component joined by butt (mm) max
23 weld (mm)
28]
32] 6.4 and under 16
se] Over 6.4 -12.7 3.2
BS Over 12.7 -25.4 4.0
2 Over 25.4 48
e| n) Throat thickness of fillet welds
BE Nominal thickness of the thinner component x 0.7 or more.
©) Flattening
Flattening of a bend, as measured by difference between the nominal oulside diameter
and minimum or maximum diameter at any cross section shall not exceed 5 % of the
nominal outside diameter of pipe
P) Reduction of wall thickness
Reduction of wall thickness of a bend, as measured by difference between the nominal
thickness and minimum thickness shall not exceed 10 % of the nominal wall thickness
of pipe
STANDARD SPECIFICATION FoR |__SPECIFICATION _| REV
ENGINEERS INDIA LIMITED | NON DESTRUCTIVE EXAMINATION 6-44-0016 4
REQUIREMENTS OF PIPING eager3
‘xpress agreement
Futea)-s07 Ad
=y of ENGINEERS INDIA LIMITED. Th
nya written co
22
3
3.2
33
Welds having any of imperfections which exceed the limitations specified in various clauses
of 2.1 shall be repaired by welding, grinding or overlaying etc. Number of times of repair
welding for the same weld, however shall conform to applicable notes to Table 1- Note
6(b)b.5
NON DESTRUCTIVE EXAMINATION
‘The type and extent of weld examination shall be in accordance with Table-1. All visual and
supplementary methods of girth weld examination shall be in accordance with ASME B31.3
and the requirements of this standard,
‘Welds between dissimilar materials shall be examined by method & to the extent required for
the material having the more stringent examination.
Certain categories of critical piping are classified under inspection Class IV (100%
radiography) as follows:
a) High Pressure Classes above 600 #
b) Severe Cyclic As defined by ASME B31.3.
©) Low Temperature Below temperature of -45°C & all materials.
4) Critical Service Hydrogen, Oxygen, NACE, Caustic, Chlorine &
such other critical services.
©) High Alloys 5 Cr & above for all pressure classes.
) High Temperature Above 500°C
ENGINEERS INDIA LIMITED
NEW DELHI
STANDARD SPECIFICATION FOR |__SPECIFICATION | REV
NON DESTRUCTIVE EXAMINATION 6-44-0016 L4
REQUIREMENTS OF PIPING Page 5 of 18[REV
[4
Page 6 of 19)
SPECIFICATION
6-44-0016
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
1: SSVI NONOSdSNI
NOLLVNIAWX4 (THM dO LNILXA F SdAL “SSVIO | 1 TEV
(sjou aqquondde qua) -ATAVL
262x012 PY LOs-1P9L-Ua
seth eyt Wawoaibe ssordxe &,Ja%s0109 40 D9
‘poanposdes oq
ENGINEERS INDIA LIMITED
NEW DELHI
Ssam r emnos | catos | estos] ssa
IL: SSV19 NOLLIG4SNI
(G.LNOD) NOLLVNINVXA TAM AO LNALXS 7% Td AL “SSVTO | 1 ATV.
usex01z
aun 24
205-19)
lg0iDe ss0xceo s,20m0109 By) YO PeULO} AjHOW B18 ABUL “CLINT WICNI SHINIONS Jo Auodosd ay} ove eU
REV
Page 7 of 19
‘SPECIFICATION
6-44-0016
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
ENGINEERS INDIA LIMITED
NEW DELHI
@REV
4
Page 8 of 19
‘SPECIFICATION
6-44-0016
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
Il = SSV19 NOMLOGASNI
(G.LNO) NOLLVNINVXS (TAM IO LNSLXS % Gd AL 'SSW19 | 1 TTAVL
ipoonpoxsor a9
262%0.
fog
bY 1091991113 “9
wowaerbe ssexdxo s,s0mo110
ENGINEERS INDIA LIMITED
NEW DELHI
©REV
Page 9 of 19
‘SPECIFICATION
6-44-0016
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
(GLNOD) IIL: SSV19 NOLLOAdSNI
(GLNOD) NOLLWNINWX4 CTAM AO LNALXA IAAL “SSVTO: | ATAVL
ENGINEERS INDIA LIMITED
NEW DELHI
S(GLNOD) Ill: SSVTD NOLLIGdSNI
(G.LNOD) NOLLVNINVX4 OTAM dO LNALXS P AdAL “SSWT9 | 1 ATAVL
REV
4
Page 10 of 19
‘SPECIFICATION
6-44-0016
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
REQUIREMENTS OF PIPING
$Y £09-1991-713 “28n papuow ai 10) somo
uowisaibe ssaKx9 s s0Mmouoq auf UO PauEe} A)
1uasv0D UIA ® Aa p
218 AYL “O3LINT VIGNI SU33NIONG Jo AUodoxd ay} ave Yewto} Sx UO UOAI SHELOp puE UBI=H ‘CuImesP a4.
ow
x2 “posh 2 poise
RS INDIA LIMITED
NEW DELHI
@ ENGINE!REV
4
Page 11 of 19
‘SPECIFICATION
6-44-0016
REQUIREMENTS OF PIPING
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
(Q.LNOD) III | SSV19 NOLLOTASNI
(“GLNOD) NOLLVNINVXS GTM dO LNILXA P dd AL “SSVIO © | ATEVL
9 paidos
naezn
ENGINEERS INDIA LIMITED
NEW DELHI
Speanpoxdes aq rou
‘out 1842 wautoaibe sseicxe 5,30%01109 out
Ble]?
« 3
2] |8]
e/g)"
3/8
=
AB
=
&
z
eo
REg
2
52:
eee
cath] suo] cauow ] cain | caton | caion 5$4
‘ero 2%
wou ven] vr | ww ; cua
sone ng venver oer! 8 25
Hee ‘ gee
one ae
Vettes wv 00 vas ah g
wer | seo | sont YEN | asdev | ow saan | samt | a3
20g
7 - - gon
7 7 7 — a t > TF 7 z Bz
Taare Tao °2
wrtgr | Naa | Sen | “cae | ine 3
vonievt | sonia | soviiw | asses | inns a
: (csi sv> =
severe GRR TaN TONAL ‘oat wat | oovs | ami | ones | ote =
ze
AL: SSV'1D NOLLOAdSNI a i
23
(GQLNOO) NOLLWNINVX4 TAM JO LNALXS 9 TAAL 'SSV1O 1 TEV ee
a
i=
Go
2
&@)+|?
zI*]s
al |?
ale
s/8
ale
5
«&
= aie Lee
age |u| a |e ot 232
[|e REE
wa : Sx5
: » | sau) sous zu
wee | canvas cue
soot oon | snatenorse BEG
: . Sos
: fe
con i ~ = iF =
woe i £53
: 7 gag
- a 7 : 7 : — 7 : t zou
5S
am °2
ao nak a
i ste &
= S68, | sos0 i g
Saar Gian a aitonw | 2a = 5
5
st
(°GLNOD) Al : SVT NOLLOAASNI Bz
2
(CGLNOD) NOLLVNINVX CTEM JO INILXG 9 UAL 'SSVTO | 1 TTYL ae
o
2
a
2
a
2h WO pauioy AYU ave AANL “GLIA WIG SUBSNIONG Jo AUodes! By 0 18} S41 UO LOMB SIE. p Ce)[REV
Page 14 of 19
SPECIFICATION
6-44-0016
REQUIREMENTS OF PIPING
STANDARD SPECIFICATION FOR
NON DESTRUCTIVE EXAMINATION
(°GLNOO) Al: SSV19 NOLLOAdSNI
CGLNOO) NOLLYNINVX4 OTAM JO LNALXA ® AdAL “SSVTO * 1 ATEVL
{62x01 vy Los-IPa
ays eur wuowaaibe ssoudxa 5,1
yosdes 2q 104
ENGINEERS INDIA LIMITED
NEW DELHI
Szlele
wl?
c 3
z| | 4
Fg
9/9
E
a3
2
5
«&
: = ty 58
sos 7 Beg
232
el lee 52:
Esa
a a an 009 saunas siu
ome = O86
gee
oa i Ss eevee 2
: a st | ate BEG
5o8
=
Cn ie os ee
: aug
7 ry tr 7 7 7 * . * gag
2 ; 7 : zoe
z
ae] rae 5S
2
(NOD) AL: SSV19 NOLLOAASNI
(GLNOD) NOLLVNINVXS GTM HO LNILXS AdAL “SSVTO
TaTav
‘peonpoidos aq 104
ENGINEERS INDIA LIMITED
NEW DELHI
©Applicable Notes to Table-T
1 Branch welds shall consist of the welds between the pipe & reinforcing element (if any),
nozzles & reinforcing element and the pipe & nozzle under the reinforcing element
Reinforcing element to be interpreted as pads, saddles, weldolets, sockolets ete
Seal welds of threaded joints shall be given the same examination as socket welds.
Unless specifically stated, all materials shall be for "Non-IBR™ service.
4. The Magnetic Particle & the Liquid Penetrant method of examination shall be in accordance
with Section V of the ASME Boiler and Pressure Vessel Code, Article VIL and VI
respectively. The entire area of the accessible finished weld surface shall be examined
Selected root runs, subject to a maximum of 10%, before finished weld, may also be
examined, at the discretion of the engineer-in-charge.
a) Wherever MP / LP testing is specified, either MP or LP test may be used. But
wherever only MP test is specified, MP method of examination may be used only if
MP examination is impracticable in the field as concurred by EIL site-in charge.
intended use, EiL-1641-307 Ad 210x297
b) ‘Random 10%" of Liquid Penetrant / Magnetic Particle test shall mean testing, by
applicable test, one weld for each ten welds or less made by the same welding
procedure or operator or both. Similarly "Random 20%" shall mean testing, by
applicable test, one weld for each five welds or less made by the same welding
procedure or operator or both.
1 borrower
©) When Liquid Penetrant examination is specified, the surface shall be free of peened
discontinuities. Abrasive blast cleaning shall be followed by light surface grinding
prior to Liquid Penetrant examination.
4) Inspection shall be performed in the welds excluding those for which radiography has
been done.
€) Girth weld, branch weld, attachment weld & socket weld of 3-1/2 Ni steel shall be
Liquid Penetrant tested only when welded with austenitic material where MP test has
been specified.
5. Radiography
a) andom 10% or 20% radiography" shall mean examining not less than one from
each 10 welds or less in case of "Random 10% radiography” or one from each five
welds or less in case of "Random 20% radiography” made by the same welding
procedure or welder or both, Irrespective of percentage. no. of welds to be
radiographed shall be minimum 1. However first two welds made by each welder
shall also be radiographed in case of "Random radiography”. Welds selected for
examination shall not include flange welds and shall be radiographed for their entire
length. However, where it is impossible or impracticable to examine the entire weld
length of field welds for either random or 100% radiography, and if the same
impossibility is agreeable to EIL site-in- charge, then a single 120 deg. exposure of
the weld length may be given a Magnetic Particle test or Liquid Penetrant test
However in such cases for ferro-magnetic materials, only MP test shall be acceptable
for classes higher than 600#
ed, except
‘oxhibited o
STANDARD SPECIFICATION FOR |__SPECIFICATION __| REV
ENGINEERS INDIA LIMITED | yon DESTRUCTIVE EXAMINATION 6-44-0016 4
eee REQUIREMENTS OF PIPING
Page 16 of 19b) —_In-process examination shall not be substituted for any required radiographic
examination.
©) Number of radiographs per one circumferential weld shall be as per ASME Sec.V
Articles 2 and 22.
6. When radiography or other non destructive inspection is specified, acceptance criteria for
repairs or defects shall be as follows:
a) In _case of 100% examination, any unacceptable weld shall be repaired and
reinspected
b) If required random examination reveals a defect requiring repair, then
b.1 Two additional examinations of same type shall be made of the same kind of
item (if welded joint, then by the same welding procedure or operator or
both).
b.2 If the group of items examined as required by b.1 above is acceptable, the
items requiring repair shall be repaired or replaced and reexamined as
required and all items represented by this additional examination shall be
accepted.
b.3 If any of the items examined as required by b.1 above reveals a defect
requiring repair, two further comparable items shall be examined for cach
defective item found by examination.
b4 If all the items examined as required by b.3 are acceptable, the items
requiring repair shall be repaired or replaced and reexamined as required, and
all items represented by this further examination shall be accepted.
ame weld before
b.S Number of times repair welding could be done for the
acceptance shall be as follows:
Material No, of times repair welding is allowed
C:S. upto 300 # 3 or less
CS. above 300 # 2 or less
Killed steel 2 or less
Low alloy steel 2 or less
Austenitic $.S. 2 or less
3.5 Ni steel 2 or less
Al & Al base alloy 2 or less
Cu & Cu base alloy 2 or less
Others 2 or less
STANDARD SPECIFICATION FoR |__ SPECIFICATION
REV
ENGINEERS INDIA LIMITED | yo DESTRUCTIVE EXAMINATION, 6-44-0016
a
Cee REQUIREMENTS OF PIPING
Page 17
of)b.6 Welds not found acceptable for allowed number of times of repair as per b.5
above shall be replaced and reexamined.
b.7 If any of the items examined as required by b.4 above reveals a defect
requiring repair, all items represented by these examinations shall be either:
repaired or replaced and reexamined as required
- fully examined and tepaired or replaced as necessary, and
reexamined as necessary
Hardness Test
a) Hardness test for each weld (unless mentioned otherwise in NDT Table-t ) shall be
im accordance with ASTM specification E10, ASME B31.3 and as called for in NDT
Table-V/PMS(Piping Material Specification), and shall be made after final heat treat
‘ment (wherever heat treatment is specified in welding specification). All welds which
are given heat treatment shall be hardness tested, A minimum of 10% of welds of hot
formed and hot bent materials in each heat treatment batch which are furnace heat
treated and 100% of those which are locally heat treated, shall be hardness tested. The
hardiness limit applies to the weld and heat affected zone. Hardness tests of the heat
affected zone shall be made at a point as near as practicable to the edge of the weld
One test per weld shall be performed
b) Hardness test where specifically called out in Table-I of NDT or in PMS, shall be
carried out irrespective of thickness and to the extent (éage) as mentioned therein.
©) For C-0.5 Mo steels, a minimum of 10% of welds shall be hardness tested.
4) Following hardness values shall be maintained
Base Metal Group Maximum
Hardness
(BHN/RC)
cs 238BHN/RC22
CS (NACE) 200BHN
Cr 0.5% oF less 225BHN
Cr >0.5% & upto 2% 225BHN
Cr 2.25%-3%(C < 0.15%) 241BHN
Cr 2.25%-3%(C > 0.15%) 241BHN
Cr 53% & upto 10% 241BHN
18/8 SS (NACE) RC22
©) Incase hardness values are mentioned in both welding specifications (6-77-0005) &
table given in Note-7(d), the lower of the two values shall be applicable
STANDARD SPECIFICATION FoR |__SPECIFICATION | REV
ENGINEERS INDIA LIMITED | WON DESTRUCTIVE EXAMINATION 6-44-0016 4
REQUIREMENTS OF PIPING eisai5 8. For IBR service lines, following IBR requirements shall apply in addition to the notes 4, 5,
B 6, 7, 12 and Table I. In case of conflict between above notes and these requirements, the more
b stringent ones shall apply. IBR piping shall be erected of IBR inspector approved material and
7 construction procedure. Erected piping shall be hydrotested, inspected and approved by IBR
inspector.
3 a) Piping over 102 mm (4") bore
5 10% of welds made by each welder on a pipeline with a minimum of two welds per
z welder, selected at random, shall be subjected to radiography
: b) Piping 102 mm (4") bore and under, but not less than 38 mm (1-1/2") bore
BB ‘Two percent of welds made by each welder on a pipeline with a minimum of one weld
6 per welder, selected at random, shall be subjected to radiography or may be cut for
2S visual examination and tests.
2 °) Piping less than 38 mm (1.5") bore :
2 Special tests are not normally required but 2% of welds by each welder on a pipe line
5 ‘may be cut out from the pipeline for the visual examination and bend tests.
a) Retests
If any test specimen is unsatisfactory, two further weld specimens for retests shall be
selected from the production welds and subjected (o tests. In the event of failure of
any retest specimens, the production welds carried out by this welder subsequent to
the previous test shall be given special consideration.
9. For fabricated fittings LP test shall be done on the final pass of welding only, in addition to
visual examination.
10. For mitres and fabricated reducers, LP / MP test shall be done on root pass in addition to
radiography applicable to circumferential joint of respective piping class
11, For branch connections, LP/MP test shall be done on root pass and final pass.
12. As per TAC requirements, 10% of the butt weld joints shall be radiographed, however, 50%
of these butt weld joints shall be field weld joinis
13, In addition to 100% radiography, butt weld joints for A16A and BL6A classes shall be wet
fluorescent magnetic particle tested
14, For lined specs, testing (MP/LP/Radiography etc.) shall be performed before lining
STANDARD SPECIFICATION FOR | SPECIFICATION _| REV
ENGINEERS INDIA LIMITED | NON DESTRUCTIVE EXAMINATION 6-44-0016 4
REQUIREMENTS OF PIPING Paes ia si8