CALCULATION SHEET
FIRE WATER DEMAND
JOB NO. : INL/SPJ/02/2016
FIRE ZONE : Fire Zone 12 (FZ-12)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17
1. FRONT OFFICE 1ST FLOOR
Sprinkler Quantity per Area
A. Part A (Ruang Rapat 2)
Floor Area : 16 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
B. Part B (Ruang Humas/HRD)
2
Floor Area : 16 m
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
2
Protection Area : 20.9 m
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
C. Part C (Ruang HSE)
2
Floor Area : 20 m
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
2
Protection Area : 20.9 m
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
D. Part D (Ruang Lobby 2)
Floor Area : 7 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 1
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
E. Part E (Ruang Lobby 1)
Floor Area : 7 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 1
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
F. Part F (Ruang Rapat 1)
Floor Area : 30 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 2
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
G. Part G (Ruang Tunggu + Koridor)
G1
2
Floor Area : 26 m
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
2
Protection Area : 20.9 m
Sprinkler quantity (minimum) : 2
Sprinkler quantity / branch line : 2
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
CALCULATION SHEET
FIRE WATER DEMAND
JOB NO. : INL/SPJ/02/2016
FIRE ZONE : Fire Zone 12 (FZ-12)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17
G2
Floor Area : 9 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 1
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
G3
Floor Area : 9 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 1
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
H. Part H (Resepsionis)
Floor Area : 14 m2
Sprinkler spacing (maximum) : 4.6 m
Sprinkler spacing (minimum) : 1.83 m
Protection Area : 20.9 m2
Sprinkler quantity (minimum) : 1
Sprinkler quantity / branch line : 1
Distance from Sprinkler to wall (Maximum) : 2.7 meter NFPA 13 (2007) 8.6.3.2.4
Distance from Sprinkler to wall (Minimum) : 0.1 meter
2.22 m
2.1 m
2.25 m
H 1.73 m
2.22 m
1.13 m
E G 1.95 m 1.95 m F
1.58 m
1.58 m 2.25 m
2.25 m 1 2
1.13 m D 1m
2.12 m
2.12 m
B 1.8 m 3
C 2.25 m
1.75 m
0.68 m
2.25 m 2.25 m
A 2.25 m
Minimum Flow & Pressure per Sprinkler
A. Part A (Ruang Rapat 2)
Sprinkler distance along the wall (maximum) (S) : 2.25 m
Sprinkler distance across the room (maximum) (L) : 1.75 m
Protection area of coverage per sprinkler (As) : 15.75 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 64.575 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.6 bar
Sprinkler Quantity : 1
CALCULATION SHEET
FIRE WATER DEMAND
JOB NO. : INL/SPJ/02/2016
FIRE ZONE : Fire Zone 12 (FZ-12)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17
Total Flow : 65 L/min
B. Part B (Ruang Humas/HRD)
Sprinkler distance along the wall (maximum) (S) : 2.25 m
Sprinkler distance across the room (maximum) (L) : 1.8 m
Protection area of coverage per sprinkler (As) : 16.2 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 66.42 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.7 bar
Sprinkler Quantity : 1
Total Flow : 66 L/min
C. Part C (Ruang HSE)
Sprinkler distance along the wall (maximum) (S) : 2.25 m
Sprinkler distance across the room (maximum) (L) : 2.25 m
Protection area of coverage per sprinkler (As) : 20.25 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 83.025 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 1.1 bar
Sprinkler Quantity : 1
Total Flow : 83 L/min
D. Part D (Ruang Lobby 2)
Sprinkler distance along the wall (maximum) (S) : 1.58 m
Sprinkler distance across the room (maximum) (L) : 1.13 m
2
Protection area of coverage per sprinkler (As) : 7.1416 m
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 29.28056 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.1 bar
Sprinkler Quantity : 1
Total Flow : 29 L/min
E. Part E (Ruang Lobby 1)
Sprinkler distance along the wall (maximum) (S) : 1.58 m
Sprinkler distance across the room (maximum) (L) : 1.13 m
2
Protection area of coverage per sprinkler (As) : 7.1416 m
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 29.28056 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.1 bar
Sprinkler Quantity : 1
Total Flow : 29 L/min
F. Part F (Ruang Rapat 1)
Sprinkler distance along the wall (maximum) (S) : 2.22 m
Sprinkler distance across the room (maximum) (L) : 2.25 m
2
Protection area of coverage per sprinkler (As) : 19.98 m
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 81.918 L/min
K-Factor : 80.6 L/min/bar1/2
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 1.0 bar
Sprinkler Quantity : 2
Total Flow : 164 L/min
G. Part G (Ruang Tunggu + Koridor)
G1
Sprinkler distance along the wall (maximum) (S) : 1.95 m
Sprinkler distance across the room (maximum) (L) : 2.25 m
2
Protection area of coverage per sprinkler (As) : 17.55 m
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 71.955 L/min
K-Factor : 80.6 L/min/bar1/2
CALCULATION SHEET
FIRE WATER DEMAND
JOB NO. : INL/SPJ/02/2016
FIRE ZONE : Fire Zone 12 (FZ-12)
PREP'D : ADT
PROJECT : PROYEK PEMBANGUNAN PABRIK MINYAK GORENG KAPASITAS 600.000 Ton CPO/Tahun CHK'D : ABI
APP'D : IS
CLIENT : PT. INDUSTRI NABATI LESTARI REV : 1
DATE : 22-Feb-17
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.8 bar
Sprinkler Quantity : 2
Total Flow : 144 L/min
G2
Sprinkler distance along the wall (maximum) (S) : 2.25 m
Sprinkler distance across the room (maximum) (L) : 1 m
Protection area of coverage per sprinkler (As) : 9 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 36.9 L/min
1/2
K-Factor : 80.6 L/min/bar
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.2 bar
Sprinkler Quantity : 1
Total Flow : 37 L/min
G3
Sprinkler distance along the wall (maximum) (S) : 2.12 m
Sprinkler distance across the room (maximum) (L) : 0.68 m
Protection area of coverage per sprinkler (As) : 5.7664 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 23.64224 L/min
1/2
K-Factor : 80.6 L/min/bar
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.1 bar
Sprinkler Quantity : 2
Total Flow : 47 L/min
H. Part H (Resepsionis)
Sprinkler distance along the wall (maximum) (S) : 2.1 m
Sprinkler distance across the room (maximum) (L) : 1.73 m
Protection area of coverage per sprinkler (As) : 14.532 m2
Density / Application Rate : 4.10 L/min/m2
Minimum Flow per Sprinkler (Q) : 59.5812 L/min
1/2
K-Factor : 80.6 L/min/bar
Minimum sprinkler pressure : 0.5 bar
Minimum pressure required (P) : 0.5 bar
Sprinkler Quantity : 1
Total Flow : 60 L/min
Total Overall Flow : 724.1 L/min
3. HYDRANT / MONITOR / HYDRANT BOX
Available hydrant, hydrant box or monitor:
Tag Equipment
HB-05 Hydrant Box (Inside of the building) : 189.3 L/min/hose NFPA 14 Section 7.10.1.1.1
WH-12 Pillar Hydrant (Outside of the building) : 946.4 L/min/hose NFPA 14 Section 7.10.1.1.1
WH-13 Pillar Hydrant (Outside of the building) : 946.4 L/min/hose NFPA 14 Section 7.10.1.1.1
4. SUMMARY
Scenario 1: Front Office 1st Floor on fire
Sprinkler system Front Office 1st Floor : 724 L/min
Hydrant Box HB-05 : 189 L/min
Total Fire Water Requirement 913 L/min
Scenario 2: Front Office 1st Floor fire escalate
Pillar Hydrant WH-12 : 946 L/min
Pillar Hydrant WH-13 : 946 L/min
Total Fire Water Requirement 1893 L/min
Sprinkler Nozzle Head Quantity
Front Office : 13