Rates of Major Items
Rates of Major Items
GO             GO
Status of                                                   
                               Click for Rly
various RSP                                                 
                               wise                  Select
sanctions                                                        Insert
                               status/updat Equip
for Electric                                                    PB no.
                               e ment
Locomotive                                                  
                               
s                                                           
                                                            
             Provisionof
             fabricated
             bolstersfor
             WAP4/WAP1
           1 Electriclocos           0            DRF           16-17          Bolster    I        0   0
             -50nos.@
             Rs.4.5lacs
             each(Below
             2.50Cr.)
             Provisionof
             OilCooling
             Blowerunit
             (30kW)
             complete
             withcasing
           2                           0            DRF           16-17           OCB       I        0   0
             andBlower
             motor-50
             nos.@Rs.
             3.5lacseach
             (Below2.50
             Cr.)
             Bogieframe
             withbrake
             riggingfor
             WAG9three
             phaselocos-                                                      Bogie3-
           3                           0            DRF           16-17                     I        0   0
             15nos.@                                                            Ph
             Rs.15.25
             lacseach
             (BelowRs.
             2.5Cr.)
  Bogieframe
  withmodified
  brakerigging
  forWAP7
  threephase                         Bogie3-
4                   0    DRF   16-17               I    0   0
  locos-5nos.                        Ph
  @Rs.19.0
  lacseach
  (BelowRs.
  2.50Cr.)
  Setof
  Auxiliarybus
  stationfor
  threephase                          Aux.
5 locos-8nos.   0    DRF   16-17    Conv.     I    0   0
  @Rs.27.0                          BusStn.
  lacseach
  (BelowRs.
  2.50Cr.)
  Provisionof
  brakecontrol
  systemfor
  threephase
                                         BC
6 locos-5nos.   0    CAP   16-17               I    0   0
                                       System
  @Rs.36.5
  lacseach
  (BelowRs.
  2.5Cr.)
  05nosTM
  Hitachifor
  elect.Locos
  @22lakh.                                                 Allsupplied.
7 611/05-06,       40   DRF   5-Jun     TM       CLW   0   0   Work
  45/08-09,                                                    Completed
  72/12-13,
  77/14-
  15(Below)
   03nostap
   changersfor
   elect.Locos
   ex.CLW@
                                          Tap
 8 Rs.26lakh.     43   DRF   9-Oct               CLW   0   0   Notallotted.
                                        changer
   182/09-10,
   94/12-13,
   94/14-15
   Below
   02nos
                                                                  Allare
   tractionconv.
                                                                  balance,as
   Busstation
                                                                  CLWisnot
   ex.CLW@
                                                                  purchasing
   Rs.43lakh.                        T.C.Bus
 9                   43   DRF   5-Jun               CLW   2   2   Busstation
   CLW617/05-                            Stn.
                                                                  separately.b
   06.69/08-09,
                                                                  )Hence
   100/12-13,
                                                                  maybe
   94/14-15
                                                                  diverted.
   (Below)
   04nosvalve
   setex.CLW
   @Rs.37
                                                                  Material
   lakh.CLW
                                                                  received
10 618/05-06,       44   DRF   5-Jun   Valveset   NR    2   2
                                                                  andwork
   70/08-
                                                                  completed
   09.101/12-
   1395/14-
   15(Below)
                                                                  a)
   06nosTFP
                                                                  Demand:-
   HETT-5400
                                                                  06nos.b)
   forelect.
                                                                  Supply:-06
   Locos.@
                                                                  nos.(CR-
   24lakh.
                                                                  1,ER-
11 664/06-07,       49   DRF   6-Jul     TFP       CLW   1   0
                                                                  1,NCR-
   56/08-09,
                                                                  1,SECR-
   84/12-13,
                                                                  1,WCR-
   77/13-14,
                                                                  1,WR-1)c)
   84/14-15
                                                                  Balanc:-
   (Below).
                                                                  NIL.
   Provisionof
   200nos
   DBR'son
   electriclocos                                                    Work
12                   51   DRF      4-May     DBR        I    26   0
   @Rs.7.5                                                         Completed
   laceach.
   508/04-05,
   16/15-16
   40nos
   HitachiTM
   ex.CLW@                                                       Allmaterial
   20lakh.              CAP/                                      supplied.
13                   53            4-May     TM        CLW   8    5
   526/04-05,            DRF                                         Work
   101/08-09,                                                        completed.
   19/14-15,
   18/15-16
   02nos
   tractionconv.
   Busstation
   ex.CLW@
   Rs.43lakh.                           T.C.Bus
14                   54   DRF      6-Jul               CR    1    0   Completed.
   CLW672/06-                               Stn.
   07.19/08-
   09.40/12-13,
   59/14-15
   (Below))
   04nosvalve
   setex.CLW
                                                                      Not
   @Rs.37
                                                                      suppliedtill,
   lakh.CLW
                                                                      CLWisnot
15 673/06-07,       55   DRF      6-Jul   Valveset   CLW   0    0
                                                                      procuring
   20/08-
                                                                      valavesets
   09.41/12-13,
                                                                      seprately.
   60/14-
   15(Below)
   07nos                                                          a)work
   transformer                                                     completed.
   HETT5400                                                       (notby
   forelect.                                                      CLW)
   Locos@                                                       b)Thiswork
16 25lakh.CLW     57   DRF      7-Aug    TFP       CLW           wasnot
   WB127/07-                                                       allotedto
   08,16/08-                                                       CLW
   09.44/12-13,                                                    through
   62/14-15                                                        Boards
   (Below)                                                          letter.
   Prov.Of6
   sets
   distributed
                                                                    3sets(=6
   power
                                                                    Nos.)
   wireless/radi
                                                                    supplied/Fitt
   oremote
                                                                    edin
   control               CAP/
17                   60            5-Jun   Locotrol   CLW   0   0   locomotives
   systemfor            DRF
                                                                    .Restqty.
   electllocos
                                                                    nottobe
   @83lakh.
                                                                    procuredby
   595/05-06,
                                                                    CLW
   121/08-09,
   101/10-11,
   27/15-16
   177nos
   bogie
   frames.
                                                          Tobe
   38/05-06
                                                          procuredby
18 suppl.       63   DRF   5-Jun   Bogie   I   20   20
                                                          CLW&
   130/08-09,
                                                          supply.
   110/09-10,
   32/13-14,
   31/15-16
                                                              racer&
                                                              distance
                                                              piece-PO
                                                              placedDD-
                                                              31.08.2014(
                                                              received),
                                                              4)62teeth
                                                              gearwheel
                                                              forroller
                                                              suspension
                                                              bearing
                                                              arrangeme
                                                              nt-PO
                                                              placedDD-
                                                              31.05.2014(
   Conversion                                                received),5)
   ofWheelset                                              Setof
   rollersus.                                               sparesfor
   Bearingon                                                TMTAO
   250locos.                                                659
19 (TAO659       64   DRF   5-Jun   TAOchi   I    30   14   modification
   TM)42/05-06                                               withroller
   suppl.                                                    bearing
   132/08-                                                    arrangeme
   09.112/09-                                                 nt-PO
   10,32/15-16                                               placedfor
                                                              Qty-
                                                              66(received
                                                              )DD-
                                                              31.08.2014
                                                              ,POQty-
                                                              114(receive
                                                              d)DD-
                                                              31.01.2015
                                                              ,6)Setof
                                                              taperroller
                                                              bearingfor
                                                              modification
                                                              ofTAO659
                                                              TMwith
                                                              roller
   120nosPCB
   cardsfor
   traction
   convertor,
   aux.conv,
   control                                                   COSfile
   electronics.                       PCB                    No.470990
20                 64   DRF   7-Aug            CR   30   30
   @Rs2lakh                       Card                    11,TOD
   each.WB                                                  awaited.
   136/07-08,
   10/08-
   09.24/12-13,
   31/14-15
   (Below)
                                                                     A)POfor
                                                                     100nos
                                                                     roof
                                                                     mounted
                                                                     DBRplaced
                                                                     withdirect
                                                                     diliveryto
   Provisionof                                                     consignee.
   198DBRon                                                       Z.Rlysto
   elect.Locos                                                     confirm.B)
   @7.5lakh.                                                    For98nos
                         CAP/
21 650/06-07,      68            6-Jul    DBR       CLW   15    0   vertical
                         DRF
   145/08-                                                           DBR'sallof
   09.125/09-                                                        the98nos.
   10,42/13-14,                                                    were
   40/15-16                                                          supplied
                                                                     (ECoR-
                                                                     33,ECR-
                                                                     20,ER-
                                                                     25,WCR-
                                                                     20).C)
                                                                     Balance:-
                                                                     NIL.
   Provisionof
   micro
   processor
   aidedcontrol
   &diagnostic                                                     POplaced
   for350                                                          withdirect
   locos.@Rs.         CAP/                                      delieveryto
22                  69            6-Jul   MPCS       CLW   108   0
   3lakh.              DRF                                         consignee.
   652/06-07,                                                       Work
   147/08-09,                                                       completed.
   127/098-10,
   43/13-14,
   43/14-15,
   41/15-16
   08nosbogie
   framefor3
   phlocos@
                                                                     Board's
   18lakh.                              Bogie3-
23                  69   DRF      8-Sep              CLW   0     0   letter
   152/08-09,                              Ph
                                                                     required
   106/12-13,
   96/14-
   15(Below)
   10nos
   compressor
   withmotor                                                 Notinthe
   for3ph.                                                  listofCLW.
24 Locos@4     70   DRF   8-Sep   MCP     CLW   1     1   (Boards
   lkh.153/08-                                                lettermay
   09,107/12-                                                 besent)
   13,97/14-15
   (Below)
   Provisionof
   1150micro
   precessor                                                  Thiswork
   basedspeed                                                wasnot
   recorders@                                                allotedto
25 1.5lakh.     70   DRF   6-Jul   ESMON   CLW   100   0   CLW
   653/06-07,                                                 through
   128/09-10,                                                 Boards
   44/13-14,                                                  letter.
   44/14-15,
   42/15-16
   Modification
   of100WAP4
   locosfor
   fitmentof
   roofmounted
26                  71   DRF   6-Jul    DBR     I    0     0
   DBR@11
   lakh.657/06-
   07,152/08-
   09,48/14-15,
   46/15-16
   05nosE-70
   unitpanel
   withvalves                                                Notinthe
   for3ph.                                                  listofCLW.
27 Locos@28      71   DRF   8-Sep    E-70   CLW   0     0   (Boards
   lakh.154/08-                                               lettermay
   09,108/12-                                                 besent)
   13,98/14-15.
   (Below)
                                                                07Bogie
                                                                frames,30
                                                                TMs&15
   11nos
                                                                wheelsets
   assemble
                                                                &Brake
   motorized
                                                                riggings-3
   bogiesex.
                                                                suppliedto
   CLW@88
28                  73   DRF   6-Jul   M.Bogie    CLW   2   2   Rlys.Rest
   lakh.661/06-
                                                                itemsare
   07,156/08-
                                                                due(Bogie
   09,51/13-14,
                                                                frame-
   51/14-15,
                                                                4,TM-3,
   49/15-16
                                                                Wheelset-
                                                                18,Brake
                                                                rigging-8).
   63nos
   HitachiTM
   ex.CLW@
   22lakh.
                                                                Work
29 662/06-07,      74   DRF   6-Jul     TM       CLW   9   9
                                                                completed.
   157/08-09,
   52/13-14,
   52/14-15,
   50/15-16
   32nos
   HitachiTM
   armatureex.                                                POplaced
   CLW@11                         Hitachi                 withDDto
30 lakh.663/06-    75   DRF   6-Jul   Armatur    CLW   3   3   consignee.
   07,158/08-                            e                     Work
   09,53/13-14,                                               completed.
   53/14-15,
   51/15-16
   Provisionof
   250nos
   Static
   convertorfor
   elect.Locos
   @30lakh.
31                   81   DRF   7-Aug     SIV     I    20   15
   683/07-08,
   175/08-
   09.155/09-
   10,65/13-
   14,65/14-15,
   65/15-16
                                                                 LOAissued
                                                                 for40rotor
                                                                 and18
                                                                 statoron
                                                                 M/sSaini,
   Reht.Of50                                                  all40rotor
   statorand50                                                &18stators
   rotorof3ph.                                               completed.
   Locos@                                                    Re-Tender
   14lakh.                                                     openedon
32                   82   DRF   7-Aug   Reht.TM   CR   40   22
   685/07-08,                                                   06.12.2013
   177/08-09,                                                   for22
   157/09-10,                                                   stator.Tend
   67/14-15,                                                    er
   64/15-16                                                      discharged
                                                                 and
                                                                 transferred
                                                                 to
                                                                 TMW/NKR
                                                                 D.
                                                                 LOAissued
                                                                 30setsto
                                                                 M/s
   Upgadation                                                   Stesalite.
   ofBApanel                                                  LOANo.
   on100locos.                                                L.253.AC/2
   @20akh                                                   008/BA,
   each.                                                        dated:
33                  83   DRF   7-Aug   BApanel   I    30   16
   686/07-08,                                                   12.8.09.
   178/08-09,                                                   Qty14nos
   158/09-10,                                                   completed.
   68/14-15,                                                    Noarising
   65/15-16                                                      forbalance
                                                                 Qty.Under
                                                                 short
                                                                 closing.
   Reht.Of200
   tapchangers
   onelect.
   Locos@
   15.5lakh
                                         T.                     Work
34 each.           84   DRF   7-Aug              I    5    0
                                       Changer                   completed.
   687/07-08,
   179/08-09,
   159/09-10,
   69/14-15,
   66/15-16
   10nosgear
   case
   assemblyfor
                                                                 All40gear
   WAP5locos
                                                                 caseshave
   @1.2
                                        Gear                    been
35 crore.          85   DRF   7-Aug              NR   0    0
                                        case                     received.
   688/07-08,
                                                                 Work
   180/08-09,
                                                                 completed.
   160/09-10,
   70/14-15,
   67/15-16
                                                                Supply:68
   Procurement                                                 nos(ECoR-
   ofDI/DU                                                    10,ECR-8,
   relaysfor                                                  NCR-12,
   elect.Locos                                                SECR-
   @4.3lakh.                                               12,SR-
36 691/07-08,      86   DRF   7-Aug   DI/DU    CLW   14   14   6,WCR-19
   183/08-                                                      &WR-1).
   09.163/09-                                                   For
   10,72/13-14,                                               balalnceno
   72/14-15,                                                   Rly
   69/15-16                                                     approached
                                                                .
   Repl.Of
   plain
   suspension
   bearingon
   64WAP1
37 locos@27    87   DRF   7-Aug   TAOchi    I    0    0
   lakh.692/07-
   08,184/08-
   09,164/09-
   10,72/14-15,
   70/15-16
                                                               a)
                                                               Distribution
                                                               of39Wheel
                                                               set:WAG-
                                                               7=15,
                                                               WAP-4=24.
                                                               b)WAG-7:
   39noswheel
                                                               Supply-09
   setsforconv.
                                                               nos.(ECR-
   Locos@6
                                                               3,NCR-
   lakheach.
                                                               3,SER-3),
   PBno
38                   88   DRF   9-Oct   Wheel   CLW   6    6   Balance-06
   184/09-10,
                                                               nos.(CR-6).
   161/12-13,
                                                               C)WAP-4:
   131/13-14,
                                                               Supply-14
   139/14-15
                                                               nos.(NR-
   Below.
                                                               6,SR-
                                                               2,WCR-6),
                                                               Balance:
                                                               10nos.(ER-
                                                               3,SCR-
                                                               3,SR-
                                                               1,WR-3).
                                                               i)POplaced
                                                               &material
                                                               receivedfor
                                                               Qty-29
                                                               .Supplied
                                                               Qty-CR-
                                                               5,WCR-
   56nosTM
                                                               7,NR-
   rotorsfor3
                                                               8,SCR-
   ph.Locos@
                                                               15,SECR-
   Rs.4lakh
                                                               6.ii)BalQty-
39 each.PBno      89   DRF   9-Oct   Rotor   CR    10   5
                                                               27
   185/09-10,
                                                               processed
   162/12/13,
                                                               asper
   140/14-
                                                               Scheme-
   15Below.
                                                               II,PO
                                                               placed&
                                                               material
                                                               receivedfor
                                                               Qty-23,Bal
                                                               uncovred
                                                               Qty-4.
                                                               a)
                                                               Demand:-
   08nos
                                                               08nos.a)
   bogiesfor3
                                                               Supply:06
   ph.Locos@
                                                               nos.(NR-
   Rs.23lakh.
                                      Bogie3-                 1,SECR-
40 PBno          90   DRF   9-Oct              CLW   0   0
                                        Ph                     2,SR-
   186/09-10,
                                                               1,WCR-2).
   163/12-13,
                                                               b)Balance:
   141/14-15
                                                               02nos.
   Below.
                                                               (SCR-
                                                               1,SR-1)
   03nosE-70
   brakesystem
   unitpanel                                                 Work
   withvalve@                                               completed
   Rs37lakh                                                 and
41                 91   DRF   9-Oct    E-70      SCR   0   0
   each.PB                                                   paid.Item
   no187,                                                     maybe
   164/12-13,                                                 deleted.
   142/14-15
   Below.
                                                               a)Demand
                                                               qty:WAG-
                                                               7=3,WAP-
                                                               4=9.
                                                               b)Supplied
                                                               qty:-
   12assemble
                                                               WAG7:-
   motorized
                                                               Bogie
   bogieex.
                                                               frame-3,
   CLW@89
                                                               TM-9,
42 lakhs.        93   DRF   7-Aug   M.Bogie    CLW   0   0
                                                               Wheelset-
   703/07-08,
                                                               6.WAP-4:-
   193/08-09,
                                                               Bogie
   82/14-15,
                                                               frame-
   79/15-16
                                                               1,Brake
                                                               Rigging-
                                                               1,Bolster-
                                                               1,TM-21
                                                               ,wheelsets-
                                                               9.
   64nos
   HitachiTM
   ex.CLW@
                                                               Allmaterial
   23lakh.
                                                               supplied.
43 704/07-08,     94   DRF   7-Aug     TM       CLW   4   4
                                                               Work
   194/08-09,
                                                               completed.
   83/13-14,
   83/14-
   15,80/15-16
                                                                 a)Entry
                                                                 shallbe
                                                                 corrected
                                                                 as70
                                                                 against76.
                                                                 (WAG9-
                                                                 55,WAP7-
                                                                 12,WAP5-
                                                                 3)b)FOR
                                                                 WAG9:-Out
                                                                 of55,9of
                                                                 CR,6of
                                                                 ER,5of
                                                                 SCR,6of
                                                                 SER
                                                                 balance.
   70noswheel                                                 c)WAP7:-
   setsex.CLW                                                 Outof12
   @9lakh.                                                  nos,6nos
   706/07-08,                                                   wheelset
44                  95   DRF   7-Aug   Wheel      CLW   15   0
   196/08-                                                       suppliedto
   09.176/09-                                                    ECR,6nos.
   10,85/14-15,                                                toNR
   82/15-16                                                      d)WAP5:-
                                                                 Outof3
                                                                 nos,03nos.
                                                                 suppliedto
                                                                 NR.d)All
                                                                 thebalance
                                                                 wheelsets
                                                                 tobe
                                                                 collected
                                                                 fromKPAor
                                                                 BSL.vide
                                                                 RB'sletter
                                                                 No.
                                                                 2008/Elect.
                                                                 (TRS)/720/
                                                                 1
                                                                 Dt.15.09.08
                                                                 a)Entry
                                                                 shallbe
                                                                 corrected
   14nosTr.
                                                                 as14
   Convertor
                                                                 against13.
   busstation
                                                                 b)Allare
   ex.CLW@
                                       T.C.Bus                  balance,as
45 45lakh,        96   DRF   7-Aug              CLW   2    2
                                         Stn.                    CLWisnot
   711/07-08,
                                                                 purchasing
   201/08-09,
                                                                 Busstation
   88/14-15,
                                                                 separately.c
   85/15-16
                                                                 )Hence
                                                                 maybe
                                                                 diverted.
   28nosvalve                                                    Allbalance
   setex.CLW                                                     asCLWis
   @38lakh.                                                   not
46 712/07-08,       97    DRF   7-Aug    Valveset   CLW   8   8   purchasing
   202/08-09,                                                      separately.
   89/14-15,                                                       Hencemay
   86/15-16                                                         bediverted.
   20nosoil
   coolingunit
   withradiator
   @25lakh.                                                    Material
47 720/07-08,       102   DRF   7-Aug    Radiator    ECR   5   0   received
   210/08-09,                                                      formCLW
   190/09-10,
   94/14-15,
   91/15-16
   50nosfault
   diagnostic
   toolfor3ph.
   Locos@
   16lakheach.
                                          F.Diag.                  Allmaterial
48 721/08-09,       103   CAP   7-Aug                CLW   5   5
                                            tool                    supplied.
   211/08-09,
   191/09-
   10,95/13-14,
   95/14-
   15.92/15-16
   9NosBogie
   framefor                                                       a)Total
   WAP5three                                                      demand:
   phaselocos                                                     09nos.(NR-
   @16.5                                                        7,WR-2).b)
   lakhsper                             Bogie3-                  Supply:06
49                   103   DRF   10-Nov               CLW   0   0
   unit.PBno                              Ph                      nos.(NR-
   204/10-11,                                                      6).c)
   18/12-                                                           Balance:
   13,24/13-                                                        03nos.(NR-
   14,24/14-15.                                                     1,WR-2)
   (Below).
   Rehabilitatio                                                 Qty
   nof20loco                                                 enhanced
   setsofPCB                                                  inexisting
   cardsfor3                                                contracton
   locos@Rs.                            PCB                  M/s
50                   111   DRF   11-Dec             I    3   0
   9                                      card                  Indocen,Na
   lakh.239/11-                                                  vi
   12,33/12-13,                                                Mumbai.Wo
   36/14-15                                                     rk
   Below                                                         Completed.
   50nos
   Bolstersfor
   WAP4/
                                                                 Centralised
   WAP1
                                                                 procuremen
   electriclocos
                                                                 tbySR.PO
51 @4.0lakh     112   DRF   11-Dec   Bolster   SR   3   0
                                                                 placed.all5
   each240/11-
                                                                 nos
   12,34/12-13,
                                                                 received.
   34/13-14,
   37/14-15
   Below
   Provisionof
   1000nos
   Gapless
   surge
   arrestorson
                                                                   Material
   electriclocos
                                            Surge                 received&
52 @0.22         113   Bond   11-Dec              I   95   0
                                           arrestor                work
   lakh
                                                                   completed.
   each.241/11-
   12,35/12-13,
   35/13-14,
   38/14-15
   Below
   Rehabilitatio
   nof50nos
   traction
   motorrotors
   of3locos
53                   114   DRF    11-Dec    Rotor     I   0    0
   @4.0lakh
   each243/11-
   12,37/12-13,
   39/14-15
   Below
   Provisionof
   50setsDC
   linkvoltage
   sensor
   modulesfor
                                                                  Work
   power
                                                                  completed
   convertersof                          V.
54                  115   DRF   11-Dec            SCR   12   0    andpaid.
   3locos@                          sensor
                                                                  Itemmay
   4.0lakh
                                                                  bedeleted..
   per
   loco.242/11-
   12,11/12-
   13,14/14-15
   Below
   Provisionof
   200nos
   Static
   converters
   forelect.
55 Locos@       119   DRF   8-Sep     SIV      I    60   31
   32.5lakh.
   843/08-09,
   223/09-10,
   125/14-15,
   118/15-16
                                                                   LOAissued
                                                                   15setsto
                                                                   M/s
   Upgadation                                                     Stesalite.
   ofBApanel                                                    LOANo.
   on100locos.                                                  L.253.AC/2
   @16.5                                                       009/BA,
   akheach.                                                      dated:
56                   120   DRF   8-Sep    BApanel   I   15   11
   845/08-09,                                                     4.9.09.Qty
   225/09-10,                                                     completed-
   127/13-14,                                                     04Nos.No
   127/14-15,                                                     arisingfor
   120/15-16                                                       balance
                                                                   11Nos.Und
                                                                   ershort
                                                                   closing.
                                                                   POplaced
                                                                   &Material
                                                                   received
                                                                   againstall
   Provisionof                                                   indents
   20setsof                                                     except
   Sparesfor                                                     Resistor
   SIVsofAC                             SIV                    2*1.1K.Oh
57 DClocos@       120   CAP   Dec-13   Spares    I   20   20   m,+/-
   Rs.8.0lakh/                         DC                      5%,320Wat
   set.244/12-                                                    t,R1of
   13,40/14-15                                                   inverter
   (bel)                                                           module-
                                                                   indent
                                                                   returnedfor
                                                                   local
                                                                   purchase
   04nosbogie
   framefor                                                      a)Supply:
   WAP7/WAG                                                        01no.(NR-
   93ph.                                                        1).b)
                                         Bogie3-
58 Locos.@       121   CAP   Dec-13              CLW   1    1   Balance:03
                                           Ph
   27lakheach.                                                  nos.(CR-
   245/12-                                                         1,ER-
   13,41/14-15.                                                   1,SCR-1).
   Below
   Reht.Of250
   tapchangers
   onelect.
   Locos@
   15.5lakh
   each.                                  T.                     Work
59                  121   DRF   8-Sep                I    15   0
   846/08-                               Changer                   completed.
   09.226/09-
   10,128/13-
   14,128/14-
   15,121/15-
   16.
                                                                    Works
                                                                    contract
                                                                    awardedfor
                                                                    480Stator
                                                                    modification
   Conversion                                                      ,480
   ofplansus.                                                    completed
   Bearingto                                                      and
   rollersus.                                                     paid.Qty
   Bearingincd.                                                   supplied
   RepairofTM                                                    total480
   on250                                                          outof480,
60 WAG5elect      122   DRF   8-Sep    TAOchi      I    480   0   distribution-
   locos@45                                                     ELS/KYN-
   lakheach.                                                      151
   847/08-                                                          ELS/BSL-
   09.227/09-                                                       281
   10,129/14-                                                      ELS/BRC-
   15,122/15-                                                      12
   16                                                               ELS/GZB-
                                                                    18ELS/ET-
                                                                    6ELS/TKD-
                                                                    6ELS/BIA-
                                                                    6TOTAL-
                                                                    480.
   02nosbogie
   framewith
   brakerigging                                                   a)Supply:
   forWAP53                                                      Nil.b)
                                         Bogie3-
61 ph.Locos.@     122   CAP   Dec-13              CLW   0     0   Balance:
                                           Ph
   Rs.16.5                                                         02nos.(NR-
   lakh.246/12-                                                     1,WR-1)
   13,42/14-15.
   Below
   24Nos
   wheelsets
   for
   WAP7/WAG
   93ph.locos                        Wheel3-
62                  123   CAP   Dec-13               I    0     0
   @Rs.9.0                               Ph
   lakh/
   unit.247/12-
   13,43/14-15
   below
                                                                Tobe
                                                                procuredby
                                                                CLW&
                                                                supply.(02
                                                                Nosbogies
                                                                receivedon
                                                                26-03-2010
                                                                fromM/s.
                                                                Titagarh
                                                                SteelsLtd.,
   250nos                                                     Kolkatta
   bogiesfor                                                  againstRly.
   WAG5locos                                                  Bd's.
   @Rs.12.5                                                  Contract
   lakheach.                                                  no.
63 850/08-          123   DRF   8-Sep   Bogie    I    16   14   2009/RS
   09.230/09-                                                   (PF&EC)/
   10,132/13-                                                  951/Co-
   14,132/14-                                                  Co/1dated
   15,125/15-                                                  22-04-09
   16                                                           fortotal
                                                                quantityof
                                                                162Nos.
                                                                (11Nos.
                                                                allotedfor
                                                                C.Rly.-02
                                                                Nos.for
                                                                ELS
                                                                Kalyan,09
                                                                Nos.for
                                                                ELSBSL).
   300nos
   micro
   processor
   aidedcontrol
   &fault
   diagnostic
                                                                POpalaced
   systemon
                                                                withDDto
   elect.Locos
64                  124   CAP   8-Sep   MPCS    CLW   35   0    consignee.
   @3lakh
                                                                Work
   each.
                                                                completed.
   852/08-
   09.232/09-
   10,134/13-
   14,134/14-
   15,127/15-
   16.
   06Nos
   wheelsets
   forWAP5
   threephase
                                         Wheel3-
65 locos@       124   CAP   Dec-13               I    0   0
                                           Ph
   9.0lakheach
   248/12-13,
   44/14-15
   Below
   12nosTM
                                                                  a)Supply:
   statorsfor
                                                                  07nos.
   WAP7/WAG
                                                                  (ER-2,NR-
   9elect.
                                                                  1,SECR-2,
   locos@Rs.
66                  125   CAP   Dec-13    Stator    CLW   0   0   WCR-2).b)
   10.0lakh
                                                                  Balance:05
   each.
                                                                  nos.(NR-
   249/12-
                                                                  1,SER-
   13,45/14-15
                                                                  2,SR-2)
   below
   03nosTM
                                                                  a)Supply:
   statorsfor
                                                                  01nos.
   WAP5
                                                                  (WR-1).b)
   electric
67                  126   CAP   Dec-13    Stator    CLW   0   0   Balance:
   locos.@
                                                                  02nos.
   10lakheach.
                                                                  (NR-1,WR-
   250/12-13,
                                                                  1).
   46/14-15bel
                                                                  a)Supply:
   12NosTM
                                                                  10nos.(ER-
   rotorfor
                                                                  2,NR-
   threeph.
                                                                  2,SECR-2,
   Locos@
68                  127   CAP   Dec-13    Rotor     CLW   0   0   SR-2,WCR-
   6.5lakhsper
                                                                  2).b)
   unit.251/12-
                                                                  Balance:
   13,47/14-15
                                                                  02nos.
   below
                                                                  (SER-2).
                                                                   Nodal
                                                                   agency:NR
                                                                   Tender
                                                                   openedon
                                                                   20.3.2013.
                                                                   Qty.has
                                                                   been
                                                                   coveredon
                                                                   dated
                                                                   22.8.2013
                                                                   inP.O.no.
                                                                   191051391
                                                                   60327dt.
                                                                   01.6.2012.
                                                                   against
                                                                   30%option.
                                                                   DP:
   06Nosvalve                                                   30.11.2013.
   setsZV+MV                                                     letter
   @Rs12.5                                                      writtento
69 lakhsper        128   CAP   Dec-13   Valveset   NR   0   0   firm&on
   unit.252/12-                                                   15.9.2014
   13,48/14-15                                                   forrisk
   Below                                                           purchase.
                                                                   Materialstill
                                                                   awaited.
                                                                   EDP:31.7.2
                                                                   015.All
                                                                   material
                                                                   receivedat
                                                                   ELS/GZB
                                                                   on
                                                                   22.6.2015
                                                                   andadvised
                                                                   toallrlys.to
                                                                   collectthe
                                                                   material
                                                                   from
                                                                   ELS/GZB
                                                                   on
                                                                   23.6.2015.
                                                                   1)Traction
                                                                   converter
                                                                   bus
   02set                                                         station(mai
   Control                                                        n)converter
   Electronics                                                    Qty-02Sets,
   (locoset)                                                     TOD
   control,conv.                                                 22.08.2013
                                             C.
   &Aux.                                                         underTC&
70                   129   CAP   Dec-13   Electroni   CR   1   1
   converter@                                                    2)Bus
                                             cs
   Rs.34.5                                                       stationaux.
   lakhs                                                          converter-
   /unit.253/12-                                                   POplaced
   13,49/14-15                                                   DD-
   bel.                                                            31.03.2015(
                                                                   received,
                                                                   Dist-CR-1
                                                                   WR-1).
   03NosE-70
   brakesystem
   unitpanel
   withvalve@
71 Rs.32lakh    130   CAP   Dec-13    E-70     CR    1    0   Completed.
   per
   unit254/12-
   13,50/14-15
   bel
                                                                 a)Total
                                                                 demand
                                                                 quantity=
                                                                 08nos.
                                                                 (WAG-7
                                                                 =04,WAP-
                                                                 4=04).
   8nos                                                        b)WAG7:-
   moterized                                                    Supply:
   bogiesfor                                                   Bogie
   WAG7/WAP                                                      frame-
72 4locos@    130   CAP   8-Sep    M.Bogie   CLW   12   0   03(SCR-
   90lakh.                                                     1,SECR-
   859/08-9,                                                    2),TM-
   141/14-19,                                                   10(SCR-
   134/15-16                                                     4,SECR-6).
                                                                 c)WAP4:-
                                                                 Supply:
                                                                 TM-12(NR-
                                                                 6,SR-
                                                                 6),Wheel
                                                                 set-6(NR-
                                                                 6).
   38nos
   HitachiTM
   ex.CLW@
   21lakheach.
73 860/08-09,      131   CAP   8-Sep   TM   I   0   0
   142/13-
   14,142/14-
   15,135/15-
   16.
   38nos
   Armatureof
   HitachiTM
   ex.CLW@                         Hitachi                Centrallyby
74 12lakheach.   132   CAP   8-Sep   Armatur    I   6    6   CLW.(Not
   861/08-09,                             e                    required.)
   143/13-14,
   143/14-15,
   136/15-16.
                                                                Qty
   75noswheel                                                supplied-
   setfor3ph.                                               CR-
   Locosex.                                                   12(WAG-9)
   CLW.@Rs.                                                  NR-
75                  133   DRF   8-Sep   Wheel      I   12   0
   5lakh.                                                     10(WAP-7)
   862/08-09,                                                  WCR-
   144/14-15,                                                  09(WAG-
   137/15-16                                                    9).work
                                                                completed
                                                                   POplaced
                                                                   onCGL&
                                                                   SAINIfor
                                                                   55nos
                                                                   stator(Qty-
                                                                   55received
                                                                   givento
                                                                   ELW/BSL(C
                                                                   R)-13
                                                                   CR(AQ)-14
                                                                   CR(KYN)-
                                                                   10
   65nosTM
                                                                   SR(RPM)-
   (Stator&
                                                                   3,SCR-
   Rotor)for3
                                                                   5,WCR-
   ph.Locosex.
                                                                   6,SECR-4,
76 CLW@Rs.       134   DRF   8-Sep      TM       CR    45   0
                                                                   uncovered
   15lakh.
                                                                   Qty-10,
   863/08-09,
                                                                   Distribution
   145/14-15,
                                                                   Rotor-
   138/15-16
                                                                   65(Distributi
                                                                   on-CR-45
                                                                   (ELW-15
                                                                   AQ-20
                                                                   KYN-10)
                                                                   NR-04,
                                                                   SCR-5,
                                                                   SECR(BIA)-
                                                                   4,SR-3
                                                                   WCR-4).
                                                                   work
                                                                   completed
   27nos
   Wheelsets
   withaxlebox
                                                                   POplaced
   for
                                                                   &material
   WAP4/WAG
                                                                   receivedfor
77 7locos@       134   CAP   Dec-13   Wheel       I    3    0
                                                                   all
   6.6lakh
                                                                   items.Suppl
   each.
                                                                   ied-KYN-3
   191a/23/13-
   14,54/14-15
   Below
   12nosTr.
                                                                   a)Entry
   Convertor
                                                                   shallbe
   busstation
                                                                   corrected
   ex.CLW@                          T.C.Bus
78                  135   DRF   8-Sep               CLW   1    1   as12
   45lakh,                               Stn.
                                                                   against13
   866/08-09,
                                                                   b)All
   146/14-15,
                                                                   balance.
   139/15-16
                                                                a)
                                                                Supplied:
                                                                29nos.
                                                                (ECR-8,
   37nosOCB
                                                                NR-8,SCR-
   comt.for3
                                                                5,SECR-4,
   ph.Locos
                                                                WCR-4).b)
79 @16lakh.      136   DRF   8-Sep   OCB      CLW   10   0
                                                                Balance:
   869/08-09,
                                                                10nos.
   149/14-15,
                                                                (CR-10).c)
   142
                                                                Excess
                                                                supplyof02
                                                                nos.to
                                                                SECR/BIA.
                                                                pSCR-4
                                                                NR-4
                                                                SECR-
                                                                1,SR-2
                                                                WCR-
                                                                4,ECR-6.
                                                                Procureme
                                                                ntstatus-
                                                                1)Motorfor
                                                                Scavanger
                                                                blower(TM)-
                                                                RT/TOD
   37setaux.                                                 24.02.2015,
   motorsetfor                                               2)Motorfor
   3phlocos.                                                 TMblower
   (TMblower,                                                 -POplaced
   TM                                                          forQty-
   scavenger,                                                  11(received
   MR                                                          )DD-
   scavenger,                                                  31.05.2013,
   SRoilpump,                         3-Ph                  POplaced
80                  137   DRF   8-Sep            CR    9    9
   TFPoil                             Spares                  forQty-
   pump,MCP,                                                  26(received
   MCPA,m/c                                                   ,dist-SR-3
   roomblower                                                 SCR-4WR-
   motor)@Rs.                                                2SECR-2
   12lakh.                                                    NR-4)DD-
   870/08-09,                                                  10.08.2014,
   150/14-15,                                                  TOD
   143/15-16                                                    18.01.2016
                                                                forQty-37
                                                                f,3)Motor
                                                                for
                                                                Scavanger
                                                                Blower
                                                                (MR)-
                                                                RT/TOD
                                                                19.01.2016,
                                                                4)Motorfor
                                                                Main
                                                                compressor
                                                                (11
   06noswheel
   setswithaxle
   forWAG9/P7
   locos@Rs.                          Wheel3-
81                   137   CAP   13-14               I    0   0
   9.0lacper                            Ph
   set.204/13-
   14,25/14-15
   below
   04noswheel
   setswithaxle
   forWAP-5
   locos@Rs.                          Wheel3-
82                   138   CAP   13-14               I    0   0
   15.6lakh                              Ph
   each.205/13-
   14,29/14-15
   Below
   18Locosets
   HB1,HB2
   panelfor3                                                   Tobe
   phlocos@                             HB                    procuredby
83                   138   DRF   8-Sep               I    2   2
   Rs.22lakh.                          Panel                   CLW&
   871/08-09,                                                    supply.
   151/14-15,
   144/15-16
   8nos
   Traction
   Motors6
   FRA6068for
   WAG9/P7                                                       Boards
84 threeph.        139   CAP   13-14     TM       CLW   0   0   letternot
   Locos@                                                     received
   28.7lakh
   each.207/13-
   14,83/14-15
   below.
   04bogie
   frameswith                                                    a)Supply:
   brakerigging                                                  NILb)
   forWAP-5                           Bogie3-                   Balance:
85                  140   CAP   13-14              CLW   0    0
   locos5.17                          Ph                       04nos.
   lakh.206/13-                                                   (NR-2,WR-
   14,27/14-15                                                   2)
   Below
   160nos                                                        AsperRly
   forcecooled                                                   Bd.this
   roofmounted                                                   itemsisto
   DBR.PNno                                                     befittedon
86 Suppl.93/08-    144   DRF   8-Sep    DBR       CLW   15   15   CLWbuit
   09,258/09-                                                     locosonly
   10,158/13-                                                     atCLW,
   14,158/14-                                                     hencenot
   15,151/15-16                                                    supplied.
   MTRof50
   locosatDHD
   @Rs.85
   lakheach.
87 PBno           144   DRF   9-Oct    MTR        I    0    0
   937/09-10,
   270/10-11,
   167/14-15,
   158/15-16
   50Oil
   cooling
                                                                   Complete
   blower
                                                                   filewith
   complete
                                                                   indentsent
   withcaging&
                                                                   to
88 blowerfor3-    146   DRF   14-15    OCB       ECR   3    3
                                                                   COS/HJP.
   Phaselocos
                                                                   Procureme
   @Rs.3.6
                                                                   ntunder
   lacseach.
                                                                   progress.
   219/14-15
   Below
   5nos.
   Traction
   motor
   6FXA7059                                                     Qty.fully
   for3-Phase                                                  supplied
89                  147   DRF   14-15     TM       CLW   0   0
   locos@Rs.                                                  (NR-2,WR-
   27.0lacs                                                    3)
   each.
   214/14-15
   Below
                                                                 a)Supply:
                                                                 NILb)
   10nos.
                                                                 Balance:
   Bogieframe
                                                                 10nos.
   withBrake
                                                                 (CR-
   riggingfor
                                                                 1,ECoR-
   WAG9/WAP                             Bogie3-
90                  148   DRF   14-15              CLW   1   1   1,ECR-
   7locos@                             Ph
                                                                 1,ER-
   Rs.10.0lacs
                                                                 1,SCR-
   each.
                                                                 1,SECR-
   215/14-15
                                                                 1,SER-
   Below
                                                                 1,SR-
                                                                 2,WCR-1)
   2nos.Bogie
   framewith
   brakerigging
   (Discbrake                                                  a)Supply:
   arrangement                                                   NIL.b)
                                        Bogie3-
91 )forWAP-5     149   DRF   14-15              CLW   0   0   Balance:
                                          Ph
   locos@Rs.                                                  02nos.
   60.0lacs                                                    (WR-2)
   each.
   216/14-15
   Below
                                                                 a)Supply:
                                                                 02(ECR-
   10Bogie                                                     1,SER-01).
   framewith                                                   b)Balance:
   brakerigging                                                08nos.
   forWAG7                                                     (ECoR-
92 locos@Rs.     150   DRF   14-15    Bogie     CLW   0   0   1,ER-
   10.0lacs                                                    1,NCR-
   each.                                                        1,NR-
   220/14-15                                                    1,SCR-
   Below                                                         1,SR-
                                                                 1,WCR-
                                                                 1,WR-1)
   10nos.
   Wheelset
   withaxlebox
   forWAP53-
   Phaselocos                         Wheel3-
93                  151   DRF   14-15              I   0    0
   @Rs.29.0                            Ph
   lacsper
   wheelset.
   217/14-15
   Below
   Static
   inverterfor
   electric
   locos.100
                                                                BalQty-2
   nos@Rs.
                                                                TOD
   30lakheach.
94                  161   DRF   9-Oct     SIV      I   30   2   09.02.2015,
   PBno
                                                                (Dist-ELW-
   960/09-
                                                                21,AQ-7).
   10,293/10-
   11,189/14-
   15,177/15-
   16
                                                                Completed(
                                                                Distribution-
                                                                NCR-8,
                                                                WCR-3,
   Crewfriendly
                                                                CR-14,
   cabon100
                                                                WR-4,SR-
   elect.Locos.
                                                                2,SCR-3,
   @Rs.12
                                                                NR-1).
95 lakh.PBno     162   DRF   9-Oct   CFcab     I   35   0
                                                                Items
   961/09-10,
                                                                balance
   294/10-11,
                                                                throughnon
   190/14-15,
                                                                stock-Setof
   178/15-16
                                                                measuring
                                                                instrument
                                                                Qty-126
                                                                balance.
   Reht.Oftap
   changerson
   100locos@
                                                                  Contract
   Rs.15.5lakh
                                                                  awardedto
   each.                                  T.
96                  163   DRF    9-Oct              I    10   0   M/sBTIL,
   962/09-10,                           Changer
                                                                  Work
   295/10-11,
                                                                  Completed.
   191/13-14,
   191/14-15,
   179/15-16
                                                                  Tender
   Rep.of50
                                                                  openedon
   nosbolsters
                                                                  13-08-13.
   @Rs.6lakh
                                                                  POplaced.
   each.PBno
97                  164   DRF    9-Oct   Bolster   SR    5    0   50Nosat
   963/09-10,
                                                                  various
   296/10-11,
                                                                  zonal
   192/14-15,
                                                                  Railways
   180/15-16
                                                                  received.
   Provisionof
   10nosE-70
   brakepanel                                                   Work
   @Rs.32                                                      completed
   lakheach.                                                    and
98                  165   Bond   9-Oct    E-70     SCR   2    2
   PBno                                                         paid.Item
   966/09-10,                                                    maybe
   299/10-11,                                                    deleted.
   195/14-15,
   183/15-16
    03nosTM
                                                                  a)
    rotorsfor
                                                                  Supplied:
    WAP5
                                                                  02nos.
    electric
                                                                  (NR-1,WR-
 99 locos.@     165   CAP    Dec-13   Rotor   CLW   0    0
                                                                  1).b)
    6.5lakh.
                                                                  Balance:01
    258/12-13,
                                                                  nos.(WR-
    146/14-15
                                                                  1).
    below.
                                                                  a)
                                                                  Supplied:
                                                                  46nos.
                                                                  (ECR-6,ER-
    150nos                                                      10,NCR-
    microprocess                                                  1,NR-
    oraided                                                     4,SECR-
    control&                                                    5,SER-
    diagnostic                                                   10,WR-10).
    sytemfor                                                    b)Balance:
    elect.Locos                                                 104nos.
100                 166   CAP    9-Oct    MPCS    CLW   25   0
    @3lakh                                                   (CR-
    each.PBno                                                  25,ECoR-
    967/09-10,                                                   10,ECR-
    300/10-11,                                                   4,NCR-
    196/13-14,                                                   14,NR-
    196/14-15,                                                   6,SCR-
    184/15-16                                                     15,SECR-
                                                                  5,SER-
                                                                  5,SR-
                                                                  10,WCR-
                                                                  10)
    Cable
                                                                  Centralized
    management
                                                                  procuremen
    systemon
                                                                  tbyS.Rly
    100locos@
                                                                  after
    Rs4.5lakh.
101                 167   Bond   9-Oct    CMS      I    30   30   clearance
    PBno
                                                                  by
    970/09-10,
                                                                  RDSO.Mate
    303/10-11,
                                                                  rialnot
    199/14-15,
                                                                  recd.
    187/15-16
                                                                 Tobe
                                                                 procureby
    Reht.Of46
                                                                 ECR.LOA
    locosets
                                                                 issuedin
    PCBcards
                                                                 favourof
    onelect.
                                                                 M/SBT.
    Locos@Rs.
                                         PCB                    Worknot
102 10.35lakh.    168   DRF    9-Oct           ECR   6    6
                                         card                    started
    PBno
                                                                 Contract
    971/09-10,
                                                                 terminated
    304/10-11,
                                                                 &fresh
    200/14-15,
                                                                 tenderwork
    188/15-16
                                                                 under
                                                                 process.
    Newly
    developed
    drivers
    displayfor
    100nos3ph
                                                                 Complete.
    elect.Locos
103                 169   Bond   9-Oct   DDU     CLW   20   20   All
    @8.4lakh
                                                                 Supplied.
    each.PBno
    972/09-10,
    305/10-11,
    201/14-15,
    189/15-16
                                                                 a)
                                                                 Supplied:
                                                                 10nos.
    13nosbogie                                                (ER-2,NR-
    framesex.                                                  2,SCR-
    CLW/BHEL                                                    2,WCR-
    @26lakh                                                 2,WR-2).b)
104 each.PBno    170   DRF    9-Oct   Bogie   CLW   1    0    Balance:04
    974/09-10,                                                  nos.(CR-1,
    202/13-14,                                                  NCR-1,
    202/14-15,                                                  SER-2).c)
    190/15-16                                                   01no.
                                                                 excess
                                                                 supplyto
                                                                 ER.
    29nos.
    Traction
    MotorHitachi
    forelect.
    locosex.
105 CLW/BHEL         171   DRF   9-Oct     TM        CLW   0    0   Allsupplied.
    @23lakh
    each.PBno
    975/09-10,
    203/14-15,
    171/15-16
                                                                     Total
                                                                     centralised
    68noswheel
                                                                     procuremen
    setsfor3ph.
                                                                     tQty-
    Electlocos
                                                                     38,complet
    @Rs9lakh
                                                                     edQty-
106 perset.PB      172   DRF   9-Oct    Wheel       I    10   0
                                                                     10(CR).Lett
    no976/09-
                                                                     erfrom
    10,204/14-
                                                                     Rly.Bdthat
    15,192/15-
                                                                     thiswork
    16
                                                                     givento
                                                                     CLW.
    56nsoTM
                                                                     POplaced
    statorfor3
                                                                     &material
    phlocos@
                                                                     receivedfor
    Rs12lakh
                                                                     Qty-14
107 perunit.PB     173   DRF   9-Oct    Stator     CR    10   0
                                                                     (Distribution
    no977/09-
                                                                     -CR(ELW)-
    10,205/14-
                                                                     14).BalQty-
    15,193/15-
                                                                     42.
    16
    03nos
    traction                                                        a)
    convertoer                                                      Supplied:
    for3ph.                                                       02nos.
    Locos.@                                                      (SECR-
108                   174   DRF   9-Oct   Tr.Conv.   CLW   0    0
    331lakh                                                        1,WCR-1).
    each.PBno                                                     b)Balance:
    979/09-10,                                                     01no.(SR-
    207/14-15,                                                      1).
    195/15-16
                                                                   POplaced
                                                                   &material
                                                                   receivedfor
    07nostr.
                                                                   Qty-4CR
    Converter
                                                                   Qty-1
    busstation
                                                                   Balance
    for3ph.
                                                                   direct
    Locos@rs.                         T.C.Bus
109                  175   DRF   9-Oct               CR    1   0   deliveryto
    45lakheach.                         Stn.
                                                                   consignee(
    PBno
                                                                   Distribution
    980/09-10,
                                                                   CR-1ECR-
    208/14-15,
                                                                   1SCR-1
    196/15-16
                                                                   NR-1).Qty-3
                                                                   RT/TOD
                                                                   awaited.
                                                                   Total
                                                                   centralised
    06nosaux.                                                   Qty-
    conv.Bus                                                     6,Material
    station@                                                     received
                                          Aux.
    Rs.45lakh                                                   Qty-
110                  176   DRF   9-Oct    Conv.     CR    1   0
    each.PBno                                                   6(Distribuito
                                         BusStn.
    981/09-10,                                                    n-CR-2,
    209/14-15,                                                    SCR-1,
    197/15-16                                                      SECR-1,
                                                                   WCR-2)-
                                                                   Completed.
    03nos
    control
    electronics
    for3ph
                                            C.
    locos@Rs.                                                   Work
111                  177   DRF   9-Oct   Electroni   SCR   0   0
    95lakheach.                                                 completed.
                                            cs
    PBno
    983/09-10,
    211/14-15,
    199/15-16
    03nosaux.
                                                                   Centralized
    conv.For3
                                                                   procuremen
    ph.Locos@
                                                                   tmadeby
    Rs.97lakh                          Aux.
112                  178   DRF   9-Oct               SCR   0   0   SCRand
    each.PBno                          Conv.
                                                                   paid.No
    984/09-10,
                                                                   allotmentto
    212/14-15,
                                                                   SCR.
    200/15-16
                                                            blower-
                                                            RT/TOD
                                                            18.01.2016,
                                                            3)Motorfor
                                                            Scavanger
                                                            Blower
                                                            (TM)-PO
                                                            Qty-10DD-
                                                            30.03.2012,
                                                            POQty-
                                                            11(received
                                                            )DD-
                                                            20.03.2014
                                                            and
    34Setsof
                                                            RT/TOD
    Aux.motors
                                                            24.02.2015
    (OCB,TM
                                                            forQty-47,
    blower,TM
                                                            4)Motorfor
    scavenge,
                                                            Scavenger
    MRblower,
                                                            Blower
    MR                                Aux.
113                179   DRF   9-Oct           CR   6   6   (MR)-PO
    scavenge                          Mach.
                                                            Qty-10DD-
    SR)@Rs.
                                                            20.11.2011,
    48lakhper
                                                            POQty-
    set.PBno
                                                            11(received
    985/09-10,
                                                            )DD-
    213/14-15,
                                                            31.10.2013,
    201/15-16
                                                            RT/TOD
                                                            19.01.2016
                                                            Qty-47,
                                                            5)Machine
                                                            Room
                                                            Blowerwith
                                                            motor(Inde
                                                            ntsplited
                                                            formotor-
                                                            RT/TOD
                                                            18.12.2015
                                                            &blower-
                                                            TOD
                                                            20.02.2014,
                                                                  4,SR-
                                                                  2,WCR-
                                                                  5,CR-
                                                                  13.2)Setof
                                                                  Brake
                                                                  electronics
                                                                  CR-8Direct
                                                                  deliveyto
                                                                  consignee
                                                                  Qty-18,3)Air
                                                                  DryerELW-
                                                                  6NR-5
                                                                  WCR-5SR-
    34setsof
                                                                  2,4)DClink
    miscspares/
                                                                  voltage
    (Airdryer,
                                                                  sensorAQ-
    aux.conv.Ca
                                                                  68,Active
    pacitorbank,
                                                                  speed
    radiator,brak
                                                                  sensorAq-
    eelectronics,
                                                                  204,5)Oil
    Treadbrake
                                           3-Ph                  Cooler
114 arrangement,     180   DRF   9-Oct             CR   8    8
                                          Spares                  radiatorAQ-
    master
                                                                  4ELW-4
    controller)@
                                                                  direct
    Rs.52lakh
                                                                  deliveryto
    eachset.PB
                                                                  consignee
    no986/09-
                                                                  byfirm,
    10,214/14-
                                                                  6)Capacitor
    15,202/15-
                                                                  Bank
    16
                                                                  assembly
                                                                  SCR-5,NR-
                                                                  5,SECR-
                                                                  4,SR-
                                                                  2,WCR-
                                                                  5.Procurem
                                                                  entstatus-
                                                                  1)Trade
                                                                  brake
                                                                  arrangeme
                                                                  nt-POplaed
                                                                  &material
                                                                  receivedfor
    150nosHall
    effectbase
    sensorsfor
    WAG-9locos
    @Rs.Rs.6
                                                                  Work
115 lakhperset.    185   DRF   9-Oct   Sensors   I    45   0
                                                                  completed.
    PB38/09-
    10(suppl),
    327/10-11,
    221/14-15,
    209/15-16
    MTRof60
    electriclocos
    atDHD@
    Rs100lakh
116                    202   DRF      10-Nov   MTR   I   0    0
    each.PBno
    1113/10-11,
    260/14-15,
    239/15-16
    Provisionof
    300nos
    staticinvertor
    forelectic
                                                                  Completed.
    locos@29
                             CAP/                               (BSL-30
117 lakheach.PB      207            10-Nov   SIV   I   40   0
                             Bond                                 AQ-3ELW-
    no1114/10-
                                                                  7)
    11,261/13-
    14,261/14-
    15,240/15-
    16
    Provisionof
    Crewfriendly
    cabon50                                                        Allmaterial
    electriclocos                                                   recd,work
    @Rs.12               CAP/                                    beingdone
118                   208            10-Nov   CFcab    I   20   20
    lakheach.             Bond                                      byELW
    PBno                                                            during
    1115/10-11,                                                      POH.
    262/14-15,
    241/15-16
                                                                      LOAissued
    Rehablitation
                                                                      11.06.12to
    of200nos
                                                                      AALfor24
    tapchangers
                                                                      tap
    onelectric
                                                                      changers.0
    locos@Rs.                                T.
119                   209   DRF      10-Nov             I   30   0    6Nos.
    15lakheach.                            Changer
                                                                      Enhanced
    PBno
                                                                      withBT.The
    1116/10-11,
                                                                      entire
    263/14-15,
                                                                      30Nos.com
    242/15-16
                                                                      pleted.
    Modified
    MSU
    arrangement
                                                                 Tobe
    on100
                                                                 procuredby
    electriclocos
120                   210   DRF   10-Nov   MSU    I    20   20   KPAwork
    @Rs.24
                                                                 shopE.Rly
    lakheach.PB
                                                                 &supply.
    no1119/10-
    11,266/14-
    15,245/15-16
                                                                 Centralized
                                                                 procuremen
                                                                 tby
                                                                 C.Rly..LOA
                                                                 issuedon
    Reht.of61
                                                                 M/s
    locosetsof
                                                                 Indocenfor
    PCBcards
                                                                 61
    for3ph.
                                                                 sets.Being
    electriclocos
                                           PCB                  shortclosed
121 @Rs21          211   CAP   10-Nov          CR   61   0
                                           card                  forfew
    lakhperset.
                                                                 cards
    PBno
                                                                 balance
    1120/10-11,
                                                                 againstthe
    267/14-15,
                                                                 contractas
    246/15-16
                                                                 fresh
                                                                 contract
                                                                 awarded
                                                                 withlesser
                                                                 rates.
    Provisionof
    10locosets                                                    Nodal
    hurth                                                           agency:NR
    couplingon3                                                   Allmaterial
    ph.WAP-5                                                        received
    Electriclocos                         Hurth                   and
122                   212   DRF   10-Nov              NR   0    0
    @Rs.52                              coupling                  suppliedto
    lakhperset.                                                   concern
    PBno                                                           Railway.
    1121/10-11,                                                     Work
    268/14-15,                                                      completed.
    247/15-16
    Provisionof
    10locosets                                                    Nodal
    gearcase                                                       agency:NR
    assemblyon                                                     POplaced
    3phase                                                         onCLWbY
    WAP-5                                                           COS/NRon
                                            Gear
123 electriclocos   213   DRF   10-Nov              NR   0    0    18.6.2014.
                                            case
    @Rs120                                                        for5loco
    lakhper                                                        sets.
    set.PBno                                                       DP:23.6.20
    1122/10-11,                                                     15.Material
    269/14-15,                                                      awaited.
    248/15-16.
                                                                     Centralized
    Provisionof
                                                                     procuremen
    500nos
                                                                     tbyERly.
    CAMtype
                                                                     TCNo.
    enhanced
                                                                     10/13/6012,
    capacity
                                                                     RTOT
    reversers
                                                                     under
    with
                                                                     processfor
    connecting
124                   214   DRF   10-Nov   Reveser    ER   45   45   145Nos,
    busbarfor
                                                                     Allotted
    electriclocos
                                                                     fund
    @Rs3lakh
                                                                     withdrawn,
    each.PBno
                                                                     casewill
    1123/10-11,
                                                                     processed
    270/13-14,
                                                                     innext
    270/14-15,
                                                                     financial
    249/15-16
                                                                     year.
    Provisionof
    100nos
    Microprocess
    orbase
    control&
    intergrated
    Monitoring
                            CAP/
125 Systemon        215            10-Nov   MPCS     I    0   0
                            Bond
    electriclocos
    @Rs.10
    lakheach.
    PBno
    1124/10-11,
    271/14-15,
    250/15-16
                                                                    a)
                                                                    Demand:i)
                                                                    Auxiliary
                                                                    converter-
                                                                    05L/s.ii)
    Retrofitment                                                   Traction
    ofIGBT                                                        converter-
    convertor                                                      05L/s.b)
    andAux.                                                       Supply:i)
    convertoer                                                     Aux.
    on05electric                           Aux.                 converter-
126                   216   DRF      10-Nov           CLW   5   5
    locos@                                Conv.                 NIL.ii)Tr.
    300lakh                                                       converter-
    each.PBno                                                     NIL.c)
    1125/10-11,                                                    Balance:i)
    272/14-15,                                                     Aux.
    251/15-16                                                       converter
                                                                    -05L/s(CR-
                                                                    5)ii)Tr.
                                                                    converter-
                                                                    05L/s(CR-
                                                                    5).
                                                                      POplaced
                                                                      onM/S
                                                                      Lotus
                                                                      ,Directly
    20locosets                                                     deliveryto
    ofdistributed                                                   Consignee.
    power                                                            Consignee
    wireless/                                                       asperPO
    radioremote                                                     a)Sr.DEE(T
    control                                                          RS),Ajni,CR
    systemon              CAP/                                    ly=3sets,
127                   217            10-Nov   Locotrol   CR   6   0
    electriclocos         Bond                                      b)Sr.DEE,L
    @Rs.18                                                         alaguda,SC
    lakhper                                                         R=3sets,
    set.PBno                                                        c)Sr.DEE,T
    1126/10-11,                                                      atanagar,S
    273/14-15,                                                       ER=1set,
    252/15-16                                                         d)Sr.DEE,B
                                                                      hllai,SECR
                                                                      =1set.
                                                                      Uncovered
                                                                      Qty-4.
    60Nos.
    Bogieframe
    forWAP4/
    WAG7Elect
    locosex.
                                                                      Material
    CLW@
128                   218   DRF      10-Nov    Bogie     I    4   0   received.Co
    Rs.19lakh
                                                                      mpleted.
    each.PBno
    1127/10-11,
    274/13-14,
    274/14-15,
    253/15-16
    90Nos
    Traction
    motorHS
    15250Afor
    WAP4/WAG
                                                                   Fullqty.
129 7Electlocos   219   DRF   10-Nov     TM       CLW   6   6
                                                                   supplied.
    @Rs.20
    lakheach.PB
    1128/10-11,
    275/14-15,
    254/15-16
    90Nos.
    Traction
    motor
    armatureHS
                                                                   Fullquantity
    15250Afor
                                                                   (90nos)
    WAP4/WAG                              Hitachi
                                                                   supplied.
130 7Elect         220   DRF   10-Nov   Armatur    CLW   6   6
                                                                   (directly
    locos@                                  e
                                                                   suppliedby
    Rs.10lakh
                                                                   firm).
    each.PB
    1129/10-11,
    276/14-15,
    255/15-16
                                                              Qty
                                                              supplied-
                                                              CR-6,NCR-
    96nos
                                                              12ECR-6.
    Wheelsets
                                                              Work
    forWAP4/
                                                              completed.
    WAG7Elect
                                                              (Wheelsets
    locos@6.6
131                 221   DRF   10-Nov   Wheel   I   6    0   are
    lakheachPB
                                                              nanufacture
    1130/10-11,
                                                              dby
    277/13-14,
                                                              utilizingthe
    277/14-15,
                                                              wheeldiscs
    256/15-16.
                                                              &Axle
                                                              against
                                                              Stock).
                                                              POplaced
    96Nos
                                                              &material
    wheelsets
                                                              receivedon
    forthree
                                                              maximum
    phaseElect.
                                                              items
    Locos@
                                                              .Distribuitio
132 Rs.10lakh     222   DRF   10-Nov   Wheel   I   12   0
                                                              n-AQCR-
    perunit.PB
                                                              12(G/9)SR-
    no1131/10-
                                                              6(P/7)
    11,278/14-
                                                              WCR-
    15,257/15-
                                                              15(G/9-
    16
                                                              15,P/7-3).
                                                                RSPbeing
                                                                operatedby
                                                                TMW
                                                                NKRDfor
    84NosTM                                                  Qty-44(Qty
    statorsfor                                                completed-
    threephase                                                17).ForQty-
    Elect.Locos                                               40,PO
    @Rs.12                                                    placed&
133                 223   DRF   10-Nov   Stator   CR   12   1
    lakhsper                                                  material
    unit.PBno                                                 receivedfor
    1132/10-11,                                                Qty-10,Bal
    279/14-15,                                                 Qty-30.
    258/15-16                                                   (supplied
                                                                AQ-10
                                                                ELW-6SR-
                                                                5SCR-3
                                                                WCR-4)
                                                                RSPbeing
                                                                operatedby
                                                                TMW
                                                                NKRDfor
                                                                Qty-44(Qty
                                                                completed-
    84NosTM
                                                                23).ForQty-
    rotorfor
                                                                40,PO
    threephase
                                                                placed&
    Elect.Locos
                                                                material
    @Rs.4
134                 224   DRF   10-Nov   Rotor    CR   12   0   receivedfor
    lakhsper
                                                                Qty-29,Bal
    unit.PBno
                                                                Qty-11.
    1133/10-11,
                                                                (Supplied-
    280/14-15,
                                                                AQ-10
    259/15-16
                                                                ELW-
                                                                17(ECR-5,
                                                                NR-5,AQ-
                                                                1),SR-5
                                                                SCR-2NR-
                                                                5).
    04Nos
    Transformer
    forthree
    phaseElect.
                                                                    Work
    Locos@
                                                                    completed
135 Rs.133lakh     225   DRF   10-Nov    TFP       SECR   0   0
                                                                    andbill
    perunit.PB
                                                                    paid.
    no1134/10-
    11,281/14-
    15,260/15-
    16
                                                                    Tobe
                                                                    procured
                                                                    centrallyby
                                                                    CRwith
                                                                    direct
                                                                    deliveryto
                                                                    consignee
                                                                    railways(CR
                                                                    -5ER-4
    50nos.Oil
                                                                    ECR-8
    cooling
                                                                    ECOR-3
    blowerunit
                                                                    NR-6,SR-4
    withcaging
                                                                    SCR-4
    (30kW)for
                                                                    SER-4
136 3-Phase         225   DRF   15-15     OCB       CR     5   5
                                                                    SECR-4
    locos@Rs.
                                                                    WR-4
    3.5lacs
                                                                    WCR-
    each.
                                                                    4).New
    225/15-16
                                                                    allotment
    Below
                                                                    (CR-3ER-5
                                                                    ECR-12
                                                                    ECOR-2
                                                                    NR-4SR-2
                                                                    SCR-6
                                                                    SER-2
                                                                    SECR-3
                                                                    WR-9
                                                                    WCR-2).
                                                                    Tobe
                                                                    procured
    10nos.                                                        centrallyby
    Bogieframe                                                    CRwith
    withModified                                                  direct
    brakerigging                                                  deliveryto
    forWAP7                             Bogie3-                  consignee
137                  226   DRF   15-16               CR     2   2
    locos@Rs.                            Ph                      railways(CR
    10.0lacs                                                      -2ECR-1
    each.                                                          ECOR-1
    226/15-16                                                      SCR-2
    Below                                                           SER-2
                                                                    SECR-1
                                                                    WCR-1).
    9NosGTO/
    IGBT
    Traction                                                         a)Supplied:
    convertors                                                       07nos.
    forthree                                                        (ER-2,NR-
    phaseElect.                                                     1,SER-1,
138 Locos@Rs.      226   DRF   10-Nov   Tr.Conv.   CLW    0   0   SR-1,WR-
    231lakhs                                                        2).b)
    perunit.PB                                                      Balance:02
    no1135/10-                                                       nos.(SCR-
    11,282/14-                                                       1,SECR-1).
    15,261/15-
    16
                                                                      a)
    9setAuxilary                                                   Supplied:
    convertorfor                                                    05nos.
    threephase                                                      (ER-1,NR-
    Elect.Locos                                                     1,SCR-
    @Rs.88.5                             Aux.                     1,SR-
139                   227   DRF   10-Nov               CLW    0   0
    lakhsper                              Conv.                     1,WR-1).b)
    unit.PBno                                                       Balance:04
    1139/10-11,                                                      nos.(ER-
    286/14-15,                                                       1,SECR-
    265/15-16                                                         1,SER-1,
                                                                      WCR-1).
                                                                      Central
                                                                      procuremen
                                                                      tbyECoR
                                                                      withdirect
    20nos.
                                                                      deliveryto
    Bogieframe
                                                                      consignee
    withbrake
                                                                      railways.18
    riggingfor
                                                                      Nos
140 WAG7locos       227   DRF   15-16     Bogie      ECoR   2   2
                                                                      received
    @Rs.10.0
                                                                      and
    lacseach.
                                                                      delivered.2
    227/15-16
                                                                      NosP.O
    Below
                                                                      placedon
                                                                      Simplex
                                                                      Engineering
                                                                      .
    50nos.
    Singlebottle
    vacuum
    circuit
    breakersfor
141                  228   DRf   15-16     VCB        I    0   0
    Elect.locos
    @Rs.2.9
    lacseach.
    228/15-16
    Below
                                                                   a)Supply:
                                                                   10nos.
                                                                   (CR-2,NR-
    18Nos                                                        2,SCR-
    Bogieframe                                                   4,SECR-2).
    for                                                           b)Balance:
    WAG9/WAP                                                       08nos.
    7three                                                       (ER-1,SER-
    phaselocos                          Bogie3-                 1,SR-
142                  228   DRF   10-Nov              CLW   2   0
    @Rs.27                               Ph                     2,WCR-4).
    lakhsper                                                     c)i)02nos
    unit.PBno                                                    allottedto
    1140/10-11,                                                   ECRisnot
    287/14-15,                                                    requiredto
    266/15-16                                                      them.ii)02
                                                                   nos.excess
                                                                   supplydone
                                                                   toSCR.
    9NosE-70
                                                                   Centralized
    brakepanel
                                                                   procuremen
    withvalves
                                                                   tbyS.C
    forthree
                                                                   Rly.
    phaseElect.
                                                                   Material
143 Locos@Rs.     229   DRF   10-Nov    E-70      SCR   1   1
                                                                   received
    28.5lakhper
                                                                   and
    unit.PBno
                                                                   paid.Item
    1141/10-11,
                                                                   maybe
    288/14-15,
                                                                   deleted.
    267/15-16
                                                                received),
                                                                remaining
                                                                direct
                                                                deliveryto
                                                                consingee,
                                                                7)Blowerfor
                                                                Traction
                                                                motor
                                                                (W/out
    18locosets                                               motor)-SR-
    ofaux.                                                    2SCR-
    motorsfor                                                 6.Procurem
    threephase                                                entstatus-
    Elect.Locos                                               1)Motorfor
    (Comprising                                                Traction
    of:OCBwith                                              motor
    impeller,TM                                               blower
    blower,TM                                                 -RT/TOD
    scavenger,                                                 18.01.2016,
    Highcapacity                                              2)Scavenge
                                           3-Ph
144 MRblower,      230   DRF   10-Nov            CR   3   3   rBlower
                                          Spares
    MR                                                         TM(Indent
    scavenger,                                                 splitedfor
    SRoilpump,                                               motor-PO
    TFPoil                                                    placedfor
    pump,MCP,                                                 Qty-
    MCPA)@                                                    15(received
    Rs.48lakhs                                               )DD-
    perset.PB                                                30.08.2014,
    no1142/10-                                                 POQty-
    11,268/15-                                                 15(received
    16                                                          )DD-
                                                                25.03.2015,
                                                                Balqty-6
                                                                TOD
                                                                24.02.2015
                                                                &blower-
                                                                POplaced
                                                                DD-
                                                                21.10.2014(
                                                                qty-9
                                                                   placed&
                                                                   material
                                                                   receivedfor
                                                                   allitems
                                                                   except
                                                                   1)Trade
                                                                   brake
                                                                   arrangeme
                                                                   ntcomplete
                                                                   for3phase
                                                                   loco-PO
    36locosets                                                  placed&
    ofmisc.                                                      material
    sparesfor3-                                                  receivedfor
    PhLocos                                                      Qty-4,Bal
    (MCBs,                                                        uncovered
    Contactors,                                                   Qty-
    tractionbar                                                  2,2)Push
    withhousing,                                                 pull
    dampers,                                                      rod(traction
    Display                                   3-Ph               bar)for
145                   231   DRF      10-Nov            I   5   5
    screen,FDU,                             Spares               WAP-
    TBU/PBU,                                                      7/WAG-9
    Auxconv,                                                     loco-PO
    Cap.bank,                                                    placedDD-
    Radiator,                                                     31.01.2014
    Brake                                                         NEWDD-
    electronics,                                                  07.08.2015,
    MPPBno.                                                     3)Filter
    290/14-15,                                                    assembly
    269/15-16                                                      for
                                                                   machined
                                                                   room
                                                                   ventilation-
                                                                   POplaced
                                                                   forQty-1
                                                                   DD-
                                                                   30.04.2014,
                                                                   Qty-
                                                                   5(received
                                                                   distWR-
                                                                   1),,
    MTRof40
    electriclocos
    atDHD@
    Rs116lakh            DRF/
146                   242            11-Dec   MTR      I   0   0
    each.PBno            Bond
    1045/11-12,
    318/14-15,
    292/15-16
    Rehablitation
    of100nos
    tapchangers
    on
    conventional
    electriclocos                           T.
147                   249   DRF    11-Dec                I   0    0
    @Rs.10                               Changer
    lakheach.
    PBno
    1048/11-12,
    321/14-15,
    295/15-16
    Provisionof
    200nostri-
    platepanel                                                      poplaced
    electriclocos                                                   onM/sSIL
                                            Tri-plate
148 @Rs.5.5        250   Bond   11-Dec                I   60   0   and
                                             panel
    lakhs.PBno                                                    material
    1049/11-12,                                                      received.
    322/14-15,
    296/15-16
    Provisionof
    50nos
    Microprocess
    orbased
    controland
    fault
    diagnostic
149                   251   Bond   11-Dec   MPCS         I   12   0   Completed.
    sytemon
    electriclocos
    @Rs.5.5
    lakhs.PBno
    1050/11-12,
    323/14-15,
    297/15-16
    Provisionof
    CableHead
    Termination
    (CHT)on
    200electric
150 locos@Rs.      252   Bond   11-Dec    CHT       I    35   0    Completed.
    2.5lakh.PB
    no1051/11-
    12,324/14-
    15,298/15-
    16
                                                                      a)
                                                                      Demand:i)
                                                                      Auxiliary
                                                                      converter-
    Retro-fitment
                                                                      10L/s.ii)
    ofIGBT
                                                                      Tr.
    based
                                                                      converter-
    traction
                                                                      10L/s.b)
    converter&
                                                                      Supply:i)
    Aux.
                                                                      Aux.
    converteron
                                             Aux.                    converter-
151 10three         253   Bond   11-Dec             CLW   10   10
                                             Conv.                    NILii)Tr.
    phase
                                                                      converter-
    electriclocos
                                                                      NIL.c)
    @Rs365
                                                                      Balance:i)
    lakh.PBno
                                                                      Aux.
    1052/11-12,
                                                                      converter-
    325/14-15,
                                                                      10L/s(CR-
    299/15-16
                                                                      10)ii)Tr.
                                                                      converter-
                                                                      10L/s(CR-
                                                                      10).
    Acquistionof
    halleffect
    basedspeed
    sensor
    systemfor
    adhesion                                                         3Setsare
    controlon                                                       Uncovered.
152 100WAG9         254   DRF    11-Dec   Sensors    I    25   3    Not
    electriclocos                                                   required,Co
    @Rs.6.0                                                        mpleted.
    lakhper
    locos.PBno
    1053/11-12,
    326/14-15,
    300/15-16
    DClink
    voltage
    sensor
    modulefor
    Power                                                             Work
                                              V.
153 convertersof    255   DRF    11-Dec              SCR   12   12   completed
                                            sensor
    503-Ph                                                           andpaid.
    locos@Rs.
    4lakh.PB
    no.14/14-
    15301/15-16
    CAMtype
    enhanced
    capacity
    reversers
    with
    connecting
                                                                       Indentsent
    busbarfor
                                                                       toERvide
    125nos
                                                                       letter
154 WAG7/WAP          258   DRF    11-Dec   Reveser     I    10   10
                                                                       dt.28.03.20
    4typeelect.
                                                                       13byCOS
    locos@Rs.
                                                                       office.
    3.0lakh
    /loco.PBno
    1056/11-12,
    329/13-14,
    330/14-15,
    304/15-16
    50nos(25
    locosets)                                                        a)
    distributed                                                       Demand:
    power                                                             25L/s.(50
    wireless/radi                                                      nos.).b)
    oremote                                                          Supply:
    control                                                           NIL.c)
155                   261   Bond   11-Dec   Locotrol   CLW   6    6
    systemfor                                                        Balance:
    electriclocos                                                    25L/s.
    @18lakh.                                                      (ECoR-
    PBno.                                                            8,SCR-
    1060/11-12,                                                       3,SECR-
    334/14-15,                                                        7,SER-7).
    308/15-16
    50setsof
    sparesfor
    static
                                                                  POplaced
    invertersfor
                                                                  forvariuos
    electriclocos
                                                                  itemsof
    @9.0lakh.                          SIV
156                   262   DRF   11-Dec             I    4   0   static
    PBno                                 Spares
                                                                  inverters,
    1061/11-
                                                                  material
    12,334/13-
                                                                  received.
    14,335/14-
    15,309/15-
    16
    Provisionof
    10nos
    2x500KVA
    hotelload                                                   a)Supply:
    converters                                                   02nos.
    onWAP7                               Hotel                 (NR-2).b)
157                   263   DRF   11-Dec            CLW   0   0
    locos@                             Load                   Balance:
    1.5Cr./loco.                                                08nos.
    PBno                                                        (NR-8).
    1062/11-12,
    336/14-15,
    310/15-16
    MTRof38
    electriclocos
    atDHD@
    110lakh
158                   275   DRF   Dec-13   MTR       I    0   0
    each.1106/12
    -13,364/14-
    15,335/15-
    16
                                                                    POplaced
                                                                    &material
                                                                    receivedfor
                                                                    allitems
                                                                    except
    Provisionof
                                                                    1)Emergen
    Crewfriendly
                                                                    cystop
    cabwithair
                                                                    push
    conditioning
                                                                    button-PO
    on50electric
                                                                    placedDD-
159 locos@Rs.      281   DRF   Dec-13   CFCab    I    10   10
                                                                    09.05.2014
    14.5lakh
                                                                    and2)Set
    each.
                                                                    of
    1108/12-13,
                                                                    measuring
    366/14-15,
                                                                    instruments
    337/15-16
                                                                    for25KV
                                                                    Elect.loco-
                                                                    TOD
                                                                    19.08.2013(
                                                                    DAcase).
                                                                    enhance
                                                                    theqty.up
                                                                    to96nos.
                                                                    P,O,no.
                                                                    191350121
                                                                    60512
                                                                    dt.27.1.14
                                                                    DP:30.8.14
                                                                    Totalcost
                                                                    Rs.34020
                                                                    lacs.
                                                                    (Detailsof
                                                                    81sets--
    Acquisitionof                                                 CR-13,
    Halleffect                                                    ECR-30,
    speed                                                          NR-23,
    sensor                                                         SCR-11,
    systemfor                                                     SER-4).
    adhesion                                                       Amendmen
    controlof                                                     tssuedon
160 100nos3        287   CAP   Dec-13   Sensors   NR   15   2    27.3.14up
    Ph.Locos@                                                    to96sets
    Rs.5.6                                                        17.4.14.
    lakh/loco                                                      DP:
    set.1114/12-                                                    15.10.14.
    13,372/14-                                                     (ii)P.O.
    15,343/15-                                                     placedon
    16                                                              M/s
                                                                    Laxeven
                                                                    System,
                                                                    Hyderabad
                                                                    for04nos.
                                                                    P,O,no.
                                                                    191350121
                                                                    60511
                                                                    dt.27.1.14
                                                                    DP:27.9.14
                                                                    Totalcost
                                                                    Rs.16.80
                                                                    lacs.
                                                                    (Detailsof
    DClink
    voltage
    sensor                                                       Centralised
    modulefor                                                   procuremen
    power                                                        tbySCR.
    converters                                                   100%
    for400nos3                          V.                   material
161                  288   DRF   Dec-13            SCR   95   0
    Ph.Locos@                          sensor                  received
    Rs.6.0                                                      andpaid.
    lakh/loco                                                   couldbe
    set.1115/12-                                                  deleted
    13,373/14-                                                   from16-17.
    15,344/15-
    16
    Provisionof
                                                                  PONo:
    150nos
                                                                  471290441
    Singlebottle
                                                                  71265Date
    Vacuum
                                                                  :
    circuit
                                                                  03/10/2013
    breakerson
                                                                  Qty-
    elect.Locos
                                                                  15(received
162 @Rs.2.82      292   DRF   Dec-13   VCB       I    15   0
                                                                  )DD-
    lakh
                                                                  15.03.2014
    each.1119/12
                                                                  onM/s
    -13,376/13-
                                                                  Schneider
    14,377/14-
                                                                  Cost-
    15,377/14-
                                                                  Rs.46,27,68
    15,348/15-
                                                                  7/-
    16
    Provisionof
    09locosets
    ofHurth
    couplingfor
    WAP5elect.                                                  POplaced
                                            Hurth
163 Locos@Rs.      293   DRF   Dec-13              I   9   0   &material
                                           coupling
    30lakh/loco                                               received.
    set.1120/12-
    13,378/14-
    15,349/15-
    16
    Provisionof
    50nosstatic
    invertorfor
    electiclocos
    @Rs.30
164 lakheach.PB     293   DRF   11-Dec     SIV      I   5   0   Completed.
    no1046/11-
    12,319/13-
    14,319/14-
    15,293/15-
    16
    Provisionof                                                 POplaced
    Crewfriendly                                                forvarius
    cabwithair                                                 itemsof
    conditioning                                                 Crew
    on100                                                       friendlycab,
    electriclocos                                               materialfor
165                   294   DRF   11-Dec   CFcab   I   30   30
    @Rs.14.5                                                   someitems
    lakheach.                                                   received,
    PBno                                                        workbeing
    1047/11-12,                                                  doneduring
    320/14-15,                                                   POHby
    294/15-16                                                     ELW.
                                                                  sofaxle
                                                                  drive
                                                                  assembly
                                                                  forWAP-5
                                                                  locomotive-
                                                                  RT/TOD
                                                                  27.01.2015
                                                                  DA
                                                                  case,POUI,
                                                                  2)Setof
                                                                  gear&
                                                                  pinionfor
                                                                  WAP-5loco
                                                                  gearcase-
                                                                  POplaced
                                                                  forQty-
    Provisionof
                                                                  28(received
    08locosets
                                                                  )DD-
    ofGearcase
                                                                  15.06.2014,
    forWAP5
                                                                  Qty-4DD-
    elect.Locos
                                           Gear                  15.04.2014(
166 @Rs.75         294   DRF   Dec-13            I   8    8
                                           case                   received),3)
    lakh/loco
                                                                  Setof
    set.1121/12-
                                                                  bearingfor
    13,379/14-
                                                                  WAP-5loco
    15,350/15-
                                                                  gearcase-
    16
                                                                  POplaced
                                                                  forQty-
                                                                  24(received
                                                                  )DD-
                                                                  31.03.2015
                                                                  Uncovered
                                                                  Qty-
                                                                  8,4)Indent
                                                                  forGear
                                                                  boxcase
                                                                  machined
                                                                  forWAP-5
                                                                  locogear
                                                                  caseQty-
                                                                  32Nos.sub
                                                                  mittedto
    Provisionof
    50setsof
    distributed
    power
    wireless/
                                                                      CLWhas
    radioremote
                                                                      processed
    control
167                   295   CAP   Dec-13   Locotrol   CLW   0    0    the
    systemon
                                                                      procuremen
    electriclocos
                                                                      t.
    @Rs.38
    lakh/set.
    1122/12-13,
    380/14-15,
    351/15-16
                                                                      Caseno.
                                                                      19135011
                                                                      Tenderno.
                                                                      411913060
    Provisionof
                                                                      5isopened
    10nos
                                                                      16.9.2013&
    Aluminum
                                                                      discharged
    tankfor
                                                                      duetonone
    transformer
                                           Aluminu                    availability
    of3phelect.
168                   299   DRF   Dec-13   mTFP     NR    1    1    ofFunds.
    Locos@Rs.
                                            Tank                      Tender
    35.8lakh
                                                                      OPENED
    each.1126/12
                                                                      ON
    -13,384/14-
                                                                      09.1.2015.&
    15,355/15-
                                                                      TCfinalized
    16
                                                                      for04
                                                                      nos.andPO
                                                                      isunder
                                                                      vetting.
    100nos
    Bolsterfor
    WAP-4
    /WAP1
    electriclocos
169 @Rs.3.3        300   DRF   Dec-13   Bolster    SE    10   10
    lakheach.
    1127/12-13,
    384/13-14,
    385/14-15,
    356/15-16
                                                                       POplaced
                                                                       &material
                                                                       receivedfor
                                                                       items
                                                                       exceptSet
                                                                       ofhelical
                                                                       springfor
                                                                       WAG-9H
                                                                       locomotive-
                                                                       POplaced
                                                                       forQty-40,
    Provisionof
                                                                       Qty-20
    200setsof
                                                                       Received,
    springand
                                                                       Remaining
    dampersfor
                                                                       Qty-20DD-
    WAG9H
                                                                       20.09.2016,
    threephase
                                                                       Bal
    electriclocos
170                   302   Bond   11-Dec   Dampers     I    80   80   uncovered
    @Rs.7.4
                                                                       Qty-
    lakhperloco
                                                                       160.Works
    set.PB
                                                                       portion-For
    no1054/11-
                                                                       modification
    12,328/14-
                                                                       workon
    15,302/15-
                                                                       loco,LOA
    16
                                                                       issuedfor
                                                                       45Locoson
                                                                       M/sSuper
                                                                       Tech.Anoth
                                                                       er19locos
                                                                       being
                                                                       undertaken
                                                                       atAQ&
                                                                       ELW.One
                                                                       loco
                                                                       converted.
    Remote                                                            40nos
    monitoringof                                                     suppliedto
    50nosthree                                                      zonal
    phase                                                             Railways.
    electriclocos                         R.Monito                   The
171                   303   DRF    11-Dec              CLW   9    9
    @Rs.7.0                                ring                     performanc
    lakh.PBno                                                       eisunder
    1055/11-12,                                                       watchdue
    329/14-15,                                                        toproblems
    303/15-16                                                          inthefield.
    12nos
    Traction
    MotorHitachi
    forelect.
    Locos@Rs.
172                   303   CAP    Dec-13     TM        I    0    0
    24.42lakh
    each.1130/12
    -13,388/14-
    15,359/15-
    16
    02nos
    Transformers
    forthree                                                       Material
    phaseelect.                                                    received
    Locos@Rs.                                                     fromCLW.
173                   304   CAP    Dec-13   TFP      WCR   0    0
    125lakhper                                                    Case
    unit.1131/12-                                                    closedfrom
    13,389/14-                                                      WCRside.
    15,360/15-
    16
                                                                     POplaced
                                                                     and
                                                                     material
                                                                     receivedfor
    Provisionof                                                    allitems
    50nos                                                          except
    Forced                                                          Forced
    cooledRoof                                                     cooledroof
    Mounted                                                         mounted
    DBRson                                                         DBRwith
174                   305   Bond   11-Dec   DBR       I    15
    electriclocos                                                  DCmotor
    @19.32                                                       driven
    lakh.PBno                                                     cooling
    1057/11-12,                                                     blowerfor
    331/14-15,                                                      ACElectric
    305/15-16                                                        locomotive-
                                                                     TOD
                                                                     16.04.2015
                                                                     Qty-15
                                                                     underTC
                                                                     Estimate
    Provisionof                                                    sanctioned.
    stainless                                                       Tender
    steelpipe                                                      openedon
    lineon100                                                     28.07.2014.
    WAP4/WAG                                                         LOAissued
                                            Steel
175 7electric       307   DRF    11-Dec             I    50   50   onM/s
                                            pipe
    locos@18                                                    Jainexon
    lakh.PBno                                                     06.05.2015
    1059/11-12,                                                     for15
    333/14-15,                                                      locos.Work
    307/15-16                                                        startedat
                                                                     ELW.
    Midterm
    rehablitation
    of50elect.
    Locos@
176                  315   DRF   13-14    MTR        I    0    0
    Rs.110lakh.
    1164/13-14,
    415/14-15,
    384/15-16
                                                                   100%
    Retrofitment
                                                                   Material
    of300three
                                                                   received
    Ph.Locos
                                                                   andbillfor
    (600tr.
                                                                   Rs.66.34
    Conv.)with
                                                                   lacks
    modified
                                                                   pending.
    cooling
                                                                   Fundmay
    radiators@
177                  328   CAP   13-14   Radiator   SCR   65   0   beprovided
    Rs.1.1lacs
                                                                   onpriority.
    perlocos
                                                                   Couldbe
    (0.5lakhper
                                                                   deleted
    traction
                                                                   from16-17
    converter.117
                                                                   iffullfunds
    3/13-14,
                                                                   are
    424/14-15,
                                                                   providedin
    393/15-16
                                                                   15-16.
    Microprocess
    orbased
    control&
    faull
    diagnostic
    systemwith
    distant
    monitoring
178                  330   CAP   13-14   MPCS        I    0    0
    featuresfor
    75elect.
    Locos@Rs.
    10lacs
    each.1175/13
    -14,426/14-
    15,395/15-
    16
    8nosbogie
    frameswith                                                  a)Supply:
    brakerigging                                                NIL.b)
    for                                                          Balance:
    WAP7/WAG                                                      08nos.
                                         Bogie3-
179 9locos@       333   CAP   13-14              CLW   0   0   (ER-2,SCR-
                                           Ph
    Rs.37.6lacs                                                1,SECR-
    each.1179/13                                                  1,SER-
    -14,429/14-                                                  1,SR-
    15,398/15-                                                   1,WCR-2).
    16
    02nosTFP
    6531for
    WAG9three
    phaselocos
                                                                  Work
180 @1.25        334   CAP   13-14    TFP       SER   0   0
                                                                  completed
    Croreeach.
    1182/13-14,
    430/14-15,
    399/15-16
    02nosTFP
    7475for
    WAP7three
    ph.Locos@
    Rs.1.43                                                     Work
181                  335   CAP   13-14    TFP       SR    0   0
    crore                                                        completed.
    each.1180/13
    -14,430/14-
    15,400/15-
    16
    Provisionof
    75nosstatic                                          POPlaced
    invertorfor                                           forQty
    electiclocos                                          3Nos.
    @33.76                                              DD.30.04.2
182                  336   CAP   Dec-13   SIV   I   7   7
    lakh                                                   016.
    each.1107/12                                            Balance
    -13,365/14-                                            Qty4Nos,
    15,336/15-                                             POUI.
    16
    Rehablitation
    of50nostap
                                                                     Estimate
    changerson
                                                                     sanctioned.
    conventional
                                                                     LOAissued
    electriclocos
                                             T.                     onM/sAAL
183 @Rs.10         338   DRF   Dec-13                I   5    5
                                           Changer                   on
    lakheach.
                                                                     26.12.2014.
    1109/12-13,
                                                                     Workunder
    366/13-14,
                                                                     completion.
    367/14-15,
    338/15-16
    Provisionof
    150nostri-
    platepanel
    electriclocos
                                           Tri-plate
184 @Rs.5.6        339   CAP   Dec-13                I   35   0   Completed.
                                            panel
    lakhs.
    1110/12-13,
    368/14-15,
    339/15-16
    Provisionof
    120nos
    Microprocess
    orbased
    controland
    fault
    diagnostic
185                   340   CAP   Dec-13   MPCS   I    25   0   Completed.
    sytemon
    electriclocos
    @Rs.6.22
    lakhs.1111/12
    -13,369/14-
    15,340/15-
    16
    Reht.Of30                                                Tender
    setsofPCB                                                openedon
    Cardsfor3                                                30.01.13for
    ph.Locos@                                                30locosets
    Rs.9.0lakh/                        PCB                 ,Contract
186                   341   DRF   Dec-13          CR   6    6
    loco                                  card                 awardedon
    set.1112/12-                                                M/s
    13,370/14-                                                 Indocen.Wo
    15,341/15-                                                 rkin
    16                                                          progress.
    Repaircum
    Reconditioni
    ngof20loco
                                                                Detailed
    setsofPCB
                                                                estimateIS
    cardsof3
                                           PCB                 UNDER
187 Ph.Locos@      342   DRF   Dec-13          NR   3    3
                                           card                 VETTING
    Rs.47
                                                                INUNDER
    lakh/set.1113
                                                                DIVISION.
    /12-13,
    371/14-15,
    342/15-16
    MTRof10
    Electriclocos
                                                                    Material
    atDHD@
                                                                    under
188 Rs.125lakh     344   DRF   14-15    MTR      WR    0    0
                                                                    procuremen
    each.PBno.
                                                                    t
    1184/14-15,
    424/15-16
    Reht.cum
    reconditionin
    gof25nos                                                    Estimate
    TMstatorsof                                                  sanctioned
    3Ph.Locos                                                    and
189                   345   DRF   Dec-13   Stator   CR    4    4
    @Rs.9.5                                                      excutionin
    lakh.1116/12-                                                   progressat
    13,374/14-                                                     TMW.
    15,345/15-
    16
    Reht.cum
    reconditionin
    gof25nos                                                    Estimate
    TMrotorsof                                                   sanctioned
    3Ph.Locos                                                    and
190                   345   DRF   Dec-13   Rotor    CR    12   12
    @Rs.5.75                                                     excutionin
    lakh.1116/12-                                                   progressat
    13,374/14-                                                     TMW.
    15,345/15-
    16
                                                                    a)Supply:
                                                                    18L/s.(CR-
    Provisionof                                                   10,NR-
    newly                                                          3,WCR-5).
    developed                                                      b)Balance:
    Drivers                                                       82L/s(CR-
    displayin                                                     10,ECR-
    100electric                                                   20,NR-
191                   346   CAP   Dec-13   DDU      CLW   20   20
    locos@Rs.                                                    12,SCR-
    7.95lakh                                                      25,SECR-
    each.1117/12                                                    10,WCR-5).
    -13,375/14-                                                    c)Each
    15,346/15-                                                     Locoset
    16                                                              consistsof
                                                                    02nos.of
                                                                    DDU.
                                                                      All
    Remote
                                                                      pending.No
    monitoringof
                                                                      actionhas
    100nos3
                                                                      beentaken
    ph.Locos@
                                           R.Monito                   assincethe
192 Rs.7.0lakh     347   CAP   Dec-13              CLW   20   20
                                             ring                     performanc
    each.1118/12
                                                                      eofearlier
    -13,376/14-
                                                                      40nosis
    15,347/15-
                                                                      stillunder
    16
                                                                      watch
    3setof
    sparesfor
    threephase
    Elect.locos                           3-Ph                     MSunder
193                   351   CAP   14-15               WR    0    0
    @Rs.474.2                           Spares                     preparation
    lacsperset,
    1187/14-15,
    427/15-16
                                                                      Fresh
                                                                      Vetted
                                                                      indentsfor
                                                                      1)Setof
                                                                      sparesfor
                                                                      static
                                                                      invertersfor
                                                                      electric
                                                                      locosfor
    145setsof
                                                                      spares
    sparesforfor
                                                                      Siemens
    Static
                                                                      makeand
    inverters@
                                                                      2)Setof
    Rs.9.0lakh/                         SIV
194                   352   DRF   Dec-13               I    15   15   sparesfor
    set.1123/12-                           Spares
                                                                      static
    13,380/13-
                                                                      invertersfor
    14,381/14-
                                                                      electric
    15,352/15-
                                                                      locosfor
    16
                                                                      sparesM/s
                                                                      AALmake
                                                                      are
                                                                      received
                                                                      and
                                                                      processed
                                                                      for
                                                                      CEE/CELE'
                                                                      sapproval.
                                                                  All
                                                                  pending.As
                                                                  perRB's
    Setofspares
                                                                  L/No.
    for12nos3
                                                                  2013/Elect.
    ph
                                                                  (TRS)/441/
    elect.locos
                                            3-Ph                 3dt.-
195 @Rs.335        353   CAP   Dec-13            CLW   1   1
                                           Spares                 08.11.2013
    lakh/set.1124
                                                                  centralised
    /12-13,
                                                                  procuremen
    382/14-15,
                                                                  tby
    353/15-16
                                                                  Western
                                                                  Railway
                                                                  advised.
    Provisionof                                                 a)Supply:
    50nosHigh                                                  03nos.
    capacityOil                                                 (NR-
    free                                                         2,WCR-1)
    compressors                                                  b)Balance:
    forWAP4                                                     47nos.
196 elect.Locos     354   DRF   Dec-13    CP      CLW   6   6   (CR-6,ECR-
    @Rs.6.5                                                    2,ER-6,NR-
    lakh                                                         8,SCR-
    each.1125/12                                                  6,SER-
    -13,383/14-                                                  6,SR-
    15,354/15-                                                   6,WCR-
    16                                                            3,WR-4).
    Provisionof
    Hotelload
    converterfor
    5Three
                                           Hotel
197 phaselocos      354   CAP   14-15             CLW   0   0
                                           Load
    @Rs.5.0
    lachsperset.
    1190/14-
    15,430/15-16
    Provisionof
    150nos.
    Microprocess
    orbased
    Control&
    fault
    diagnostic
198                   355   DRF   14-15     MPCS       WR    15   15
    system(Ver.
    3)forElect.
    locos@Rs.
    14.0lacs
    each.
    1191/14-15,
    431/15-16
    80locopairs
    (1locopair
    consistof2
    locos)of
    distributed
    power
                                                                       Indent
    wireless/
                                                                       beingsent
    radioremote
199                   357   CAP   14-15    Locotrol    SCR   0    0    toFA&
    control
                                                                       CAO/WST
    systemfor
                                                                       forvetting.
    Conventional
    Elect.locos
    @Rs.38.0
    lacsperpair.
    1193/14-15,
    433/15-16
    Re-
    conditioning
    cumrepairof
    100valve
                                                                       LOAissued
    setsof
                                                                       onM/sCGL
    traction
                                                                       on
    converters
200                   357   DRF   Dec-13   Valveset    I    15   15   18.12.2014.
    for3ph.
                                                                       Work
    Locos@Rs.
                                                                       physically
    4.5
                                                                       completed.
    lakh.1128/12-
    13,386/14-
    15,357/15-
    16
                                                               a)Asper
    Prov.Of
                                                               advisedby
    1000nos
                                                               Rly.Bd.
    highreach
                                                               Procureme
    pantographs
                                                               nt
    forelectric
                                                               processed
    locos@Rs.
201                 358   CAP   Dec-13   PT    CLW   85   65   for200
    4.0lakh
                                                               nos.only.b)
    each.1129/12
                                                               Supply:15
    -13,386/13-
                                                               nos.(CR-
    14,387/14-
                                                               6,ECoR-
    15,358/15-
                                                               2,NR-6,SR-
    16
                                                               1)
                                                               a)
                                                               Demand:
    2nos.
                                                               02nos.
    transformer
                                                               transformer
    7475kVAfor
                                                               forWAP-
    3-Phase
                                                               5/WAP-7
202 locos@Rs.    360   DRF   14-15    TFP   CLW   0    0
                                                               Loco.b)
    1.45Cr.
                                                               Supply:01
    each.
                                                               no.(ER-1).
    1196/14-15,
                                                               c)Balance:
    436/15-16
                                                               01no.
                                                               (WR-1).
    20nos.                                                   a)Supply:
    Traction                                                  15nos.
    motors                                                    (CR-
    6FRA6068                                                  2,ECoR-
    forWAG-                                                   3,ER-3,NR-
203 9/WAP-7        361   DRF   14-15    TM    CLW   2    0    3,SECR-
    locos@Rs.                                               2,WCR-2).
    27.0lacs                                                 b)Balance:
    each.                                                     05nos.
    1197/14-15,                                               (SCR-
    437/15-16                                                  2,SER-3).
                                                                   Tenderno.
                                                                   411913006
                                                                   8opened
                                                                   on
                                                                   20.3.2013.
                                                                   &Tender
                                                                   finalized
                                                                   P.O.placed
                                                                   onM/s
                                                                   BTIL.
                                                                   P.O.no.191
    Provisionof
                                                                   051391603
    18nosvlalve
                                                                   27
    setsZV+ZV
                                                                   dt.22.8.201
    forelect.
                                                                   3DP:
    Locos@Rs.
204                  361   CAP   Dec-13   Valveset   NR   2   2   30.11.2013
    14lakh
                                                                   Material
    each.1132/12
                                                                   Still
    -13,390/14-
                                                                   awaited.
    15,361/15-
                                                                   EDP:31.7.2
    16
                                                                   015.All
                                                                   material
                                                                   receivedat
                                                                   ELS/GZB,
                                                                   on22.6.15
                                                                   andadvised
                                                                   toallrlys.
                                                                   on23.6.15
                                                                   tocollect
                                                                   the
                                                                   material.
    03nos
    traction
    converters
    forthreeph.
                                                                   Centrallyby
    Locos@Rs.
205                  362   CAP   Dec-13   Tr.Conv.   I    1   1   WR.Materia
    125lakh
                                                                   lnotrecd.
    each.1133/12
    -13,392/14-
    15,363/15-
    16
                                                                 Centrallyby
                                                                 WR.
                                                                 (L.No.B/25/
                                                                 TRS/2014-
                                                                 15/D-16
                                                                 dt.22.04.20
                                                                 15from
                                                                 Sr.DEE/TR
    03nos
                                                                 S/BRCY/W
    auxillary
                                                                 Rstating
    converters
                                                                 qty-1set
    (locosets)
                                                                 aux
    for3ph.
                                          Aux.                  converter
206 Locos@Rs.     363   CAP   Dec-13             I    1   0
                                          Conv.                  maybe
    83.5lakhper
                                                                 collectedas
    set.1134/12-
                                                                 material
    13,391/14-
                                                                 receivedon
    15,362/15-
                                                                 14.03.2015
    16
                                                                 against
                                                                 COS/CGS's
                                                                 Po
                                                                 No.22.12.5
                                                                 118.1.8505
                                                                 5
                                                                 dt.27.10.20
                                                                 14)
    MTRof70
    Elect.locos                                                Materials
    atDHD@                                                    under
207                  371   DRF   15-16     MTR      WR   0   0
    Rs.150.0                                                    procuremen
    lacs.                                                       t.
    1168/15-16
                                                                 SRisthe
                                                                 nodal
    100nos.                                                    agencyfor
    Fabricated                                                  centralised
    Bolsterfor                                                 procuremen
    WAP4/WAP1                                                   t.Estimate
208                  377   DRF   16-17    Bolster   SR   5   5
    locos@Rs.                                                 sanctioned.
    4.5lacs                                                    Indentsent
    each.                                                       toCOSfor
    1170/15-16                                                   procuremen
                                                                 t.under
                                                                 TCM.
    5nos.Bogie
    framewith
    brakerigging
    (Discbrake
    arrangement                          Bogie3-                MSunder
209                  383   DRF   15-16              WR   0   0
    )forWAP-5                           Ph                    preparation
    locos@Rs.
    55.0lacs
    each.
    1176/15-16
    20nos.
    wheelsets
    withaxlebox
    forWAP5                            Wheel3-
210                  385   DRF   15-16              I    0   0
    locos@Rs.                           Ph
    37.0lacsper
    wheelset.
    1178/15-16
                                                                   Estimate
    Rehablitation                                                 sanctioned.
    oftap                                                        6Nos.
    changerin                                                    Enhancein
    75conv.                                                      existing
    Locos@Rs.                                                   contract.Bal
                                           T.
211 10lacs         385   DRF   13-14              I    7    7    ance1No.
                                         Changer
    each.1165/13                                                   Coveredin
    -14,1165/13-                                                  LOA
    14,416/14-                                                    dt.26.12.20
    15,385/15-                                                    14.Work
    16                                                             under
                                                                   completion.
    DClink                                                       100%
    voltage                                                       material
    sensor                                                        received.
    modulesfor                                                   Billof
    power                                                         Rs.21680(0
    converterfor                                                 00)pending
    100three                             V.                     forpayment
212                  386   DRF   13-14             SCR   10   10
    phaselocos                         sensor                    in15-16.
    @Rs.6lacs                                                  Couldbe
    perloco                                                      deleted
    set.1166/13-                                                   from16-17
    14,417/14-                                                    iffullfunds
    15,386/15-                                                    providedin
    16                                                             15-16.
                                                                     a)Supply:
                                                                     13L/s
                                                                     (SECR-
                                                                     10,SR-
                                                                     1,WR-02).
    Provisionof
                                                                     b)Balance:
    newly
                                                                     87L/s.(CR-
    developed
                                                                     10,ECR-
    Drivers
                                                                     10,ER-
    displayin
                                                                     5,NR-
    100electric                         Dopler
213                   387   CAP   13-14              CLW   10   10   10,SCR-
    locos@Rs.                          radar
                                                                     10,SECR-
    9.0lakh
                                                                     10,SER-
    each.1167/13
                                                                     5,SR-
    -14,418/14-
                                                                     4,WCR-
    15,387/15-
                                                                     20,WR-3)
    16
                                                                     c)Each
                                                                     Locoset
                                                                     consistsof
                                                                     02nos.of
                                                                     DDU)
    3locosetof
    hurth
                                                                     Caseno.
    couplingfor
                                           Hurth                    22-16-5088
214 WAP5locos       387   DRF   15-16              WR    0    0
                                          coupling                   TOD:30-05-
    @Rs.83.5
                                                                     16
    lacsperloco.
    1180/15-16
                                                                    Individually
                                                                    actiontobe
                                                                    takenby
    250Nos
                                                                    Z.Rlys.
    singlebottle
                                                                    Vetted
    vacuum
                                                                    indent
    circuit
                                                                    received.P
    breaker@
215                   388   DRF   13-14    VCB       I    20   12   Oplaced
    Rs2.9lakh
                                                                    forQty-
    each.1168/13
                                                                    8(received)
    -14,419/14-
                                                                    DD-
    15,388/15-
                                                                    31.03.2015,
    16
                                                                    Bal
                                                                    uncovered
                                                                    Qty-12.
    56locos
    pairs(one
    pairconsists
    oftwolocos)                                                  Tobe
    ofdistributed                                                 procured
    power                                                          centrallyby
    wireless/                                                     C.Rlywith
216 radioremote     389   CAP   13-14   Locotrol   CR   10   10   direct
    control                                                        deliveryto
    sysytem@                                                      consignee.
    Rs38lakh                                                     TOD
    perpair.                                                      awaited.
    1169/13-14,
    420/14-15,
    389/15-16
    10setsof
    sparesfor
    threephase
    locos@Rs.                                                    Material
    4.97crore                           3-Ph                     under
217                  390   CAP   13-14               WR   1    1
    per                                 Spares                     procuremen
    set.1170/13-                                                    t
    14,421/14-
    15,390/15-
    16
    Reconditioni
                                                                    Nodal
    ngcum
                                                                    agency:NR
    repairof130
                                                                    Administrati
    valvesetsof
                                                                    veapproval
    traction
                                                                    advisedto
    converters
218                  391   DRF   13-14   Valveset   NR   20   20   ELS/GZB
    for3phase
                                                                    ON
    locos@Rs.
                                                                    24.11.2014
    4.5lacs.
                                                                    andtender
    1171/13-14,
                                                                    isdueon
    422/14-15,
                                                                    01.10.2015.
    391/15-16
                                                                    Tobe
                                                                    procured
                                                                    centrallyby
                                                                    C.Rlyand
                                                                    being
                                                                    provideon
                                                                    locosby
                                                                    ELW/BSL.T
    Provisionof
                                                                    OD
    IGBTbased
                                                                    09.03.2015.
    2x500Kva
                                                                    Letter
    hotelload
                                                                    dt.16.02.20
    converteron
                                                                    15toRDSO
    8threeph.
                                          Hotel                    foreligibity
219 Passenger       392   CAP   13-14               CR   1    1
                                          Load                      criteria.Cop
    locos@Rs.
                                                                    yofletterto
    1.6
                                                                    CMM/Cfor
    crore.1172/1
                                                                    postponeof
    3-14,423/14-
                                                                    ofabove
    15,392/15-
                                                                    tendertill
    16
                                                                    clarification
                                                                    from
                                                                    RDSO.
                                                                    Letter
                                                                    dt.17.03.20
                                                                    15received
                                                                    from
                                                                    RDSO.
    Up-gradation
    of355
    existing3
    bridge
                                                                     Individually
    design
                                                                     by
    rectifiersto4
                                                                     Z.Rlys.Esst.
220 bridge            394   DRF   13-14     RSI      I    15   15
                                                                     Sanctioned,
    design@
                                                                     Tenderto
    Rs.2.35
                                                                     befloated.
    lacs/unit.117
    4/13-14,
    425/14-15,
    393/15-16
                                                                     14,Bhillai-3
                                                                     dt.19.09.20
                                                                     14.LGD-5
                                                                     dt.15.09.20
                                                                     14,RPM-1
                                                                     dt.14.10.20
                                                                     14,TKD-3
                                                                     dt.10.11.20
                                                                     14,GMO-7
                                                                     dt.15.10.20
                                                                     14,TATA-2
                                                                     dt.03.11.20
                                                                     14,BRC-1
                                                                     dt.30.09.20
    100nosoil                                                     14,ER-1
    cooing                                                          2)ForPO
    radiatorsfor                                                   Qty-
    replacement                                                     34,Material
    onTFP&                                                        tobe
    traction                                                        suppliedto
221 convertersof     396   CAP   13-14   Radiator   CR   15   10   Ultimate
    3ph.Locos                                                     Consignee
    @4.67                                                        asi]Sr.
    lacs.1176/13-                                                    DEE/TRS/G
    14,427/14-                                                      haziabad,
    15,396/15-                                                      N.Rly=12
    16                                                               Nos.(Rec)
                                                                     ii]
                                                                     Sr.DEE/TR
                                                                     S/Bhilai,
                                                                     SEC.Rly=
                                                                     07Nos.
                                                                     (rec)iii]
                                                                     Sr.DEE/TK
                                                                     D,W.C.Rly
                                                                     =07Nos.
                                                                     (rec)iv]
                                                                     Sr.DEE/TR
                                                                     S/Tatanagar
                                                                     ,SER.Rly=
                                                                     03Nos.v]
                                                                   loco-PO
                                                                   placedfor
                                                                   Qty-1DD-
                                                                   14.11.2014,
                                                                   POQty-
                                                                   5(received)
                                                                   DD-
                                                                   30.04.2015,
                                                                   2)Axle
                                                                   rough
                                                                   turnedfor
                                                                   WAG-7
                                                                   locos-PO
                                                                   placedDD-
                                                                   31.03.2015,
                                                                   3)EndAxle
    38noswheel
                                                                   box
    setswithaxle
                                                                   assembly-
    boxfor
                                                                   TOD
    WAG7/WAP
                                                                   25.04.2014,
    4locoselect.
                                                                   POUI,4)BG
222 Locos@        397   CAP   13-14   Wheel     I    3    3
                                                                   Loco
    8.4lacsper
                                                                   Wheels-PO
    set.1177/13-
                                                                   placedDD-
    14,428/14-
                                                                   31.03.2015.
    15,397/15-
                                                                   ,5)Setof
    16
                                                                   taperroller
                                                                   bearing
                                                                   assembly-
                                                                   TOD
                                                                   10.04.2014
                                                                   DA
                                                                   case,6)65te
                                                                   ethgear
                                                                   wheelfor
                                                                   WAG-7
                                                                   locomotive-
                                                                   TOD
                                                                   05.05.2014
                                                                   underTC&
                                                                   7)Setof
                                                                   thrower
    Acquisitionof
    Halleffect
    speed
    sensor
    systemfor
    adhesion                                                      Nodal
    controlof                                                    agency:NR
223 100nos3        401   CAP   13-14   Sensors   NR   10   10   Tenderis
    Ph.Locos@                                                   dueon
    6.0                                                         17.9.2015.
    lakh/loco
    set.1181/13-
    14,432/14-
    15,401/15-
    16
                                                                   a)Supply:
    40nos.Fault
                                                                   NILb)
    Diagnostic
                                                                   Balance:
    toolsfro
                                                                   40nos.
    threephase
                                                                   (CR-4,ECR-
    electriclocos
                                          F.Diag.T                 4,ER-4,NR-
224 @12.5         403   CAP   13-14              CLW   4   4
                                             ool                   4,SCR-
    lakheach.
                                                                   4,SECR-
    PBno.
                                                                   4,SER-
    1183/13-14,
                                                                   4,SR-
    434/14-15,
                                                                   4,WCR-
    403/15-16
                                                                   4,WR-4).
    Provisionof
    25nos.static
    invertersfor
    Electriclocos
                                                                   POUIfor4
225 @Rs.21         425   DRF   14-15     SIV       I    4   4
                                                                   Nos.
    lakhseach.
    PBno.
    1185/14-15,
    425/15-16
                                                                     PONo:
                                                                     471590061
                                                                     70946Date
                                                                     :
    Provisionof                                                    03/12/2015
    100nos.Tri-                                                    Qty-20DD-
    platepanels                                                    31.05.2016,
    forElect.                          Tri-plate                  Cost-
226                  426   CAP   14-15                I    20   20
    locos@Rs.                          panel                      RS.1,24,43,
    6.5lacseach                                                   905/-on
    1186/14-15,                                                     M/s
    346/15-16                                                        KNORR-
                                                                     BREMSE
                                                                     INDIA
                                                                     PVT.LIMITE
                                                                     D/Palwal.
    Reconditioni
                                                                     Nodal
    ngcum
                                                                     agency:
    repairof50
                                                                     NR.
    valvesetsof
                                                                     Administrati
    traction
                                                                     veapproval
    converterfor
227                  429   DRF   14-15   Valveset    NR   5    5    givento
    3-Phase
                                                                     shedon
    locos@Rs.
                                                                     17.4.2015.
    5lacsper
                                                                     &tenderis
    set.1189/14-
                                                                     dueon
    15,429/15-
                                                                     28.9.2015.
    16
                                                                    Tobe
                                                                    carriedout
                                                                    centrallyby
                                                                    CR
                                                                    Rly.Estimat
                                                                    e
                                                                    sanctioned(
                                                                    CR-50ER-
                                                                    10ECR-50
                                                                    ECOR-10
                                                                    NR-50SR-
                                                                    10SCR-50
                                                                    SER-10
                                                                    SECR-20
                                                                    WR-20
    Provisionof
                                                                    WCR-20).
    300nos.Oil
                                                                    POQty-
    Cooling
                                                                    20(Material
    radiatorsfor
                                                                    tobe
    Transformer/
                                                                    suppliedto
    Traction
228                  432   DRF   14-15   Radiator   CR    50   50   Ultimate
    Converterfor
                                                                    Consignee
    ThreePhase
                                                                    asbelow:-
    locos@Rs.
                                                                    1]Sr.
    6.0lacs.
                                                                    DEE/TRS/A
    1192/14-15,
                                                                    JNI,C.Rly
    432/15-16
                                                                    =10Nos.
                                                                    2]Sr.
                                                                    DEE/TRS/K
                                                                    azipat,
                                                                    SC.Rly=10
                                                                    Nos.Total
                                                                    Qty=20
                                                                    Nos.)DD-
                                                                    31.07.2015,
                                                                    TOD-
                                                                    29.10.2015
                                                                    for
                                                                    Qty.75,Und
                                                                    erTC,Bal
                                                                    qty-205.
    GGand
    WREmodule
                                                                    COS/SC
    forAux.
                                                                    Case
    converterof
                                                                    No.25.16.5
    103-Phase                          GG/WR
229                  434   CAP   14-15              SCR   1    1    002dt.27-
    locos@Rs.                           E
                                                                    01-16.is
    52.5Lacs
                                                                    being
    perloco.
                                                                    floated.
    1194/14-15,
    434/15-16
                                                                     a)
                                                                     Demand:
    3nos.
                                                                     03nos.
    trasformer
                                                                     Transforme
    6531kVAfor
                                                                     rforWAG-9
    WAG93-
                                                                     Loco.b)
230 Phaseloco       435    DRF   14-15     TFP       CLW   1   1
                                                                     Supply:02
    @Rs.1.25
                                                                     mo.(ECoR-
    Cr.each.
                                                                     1,SECR-1)
    1195/14-15,
                                                                     c)Balance:
    435/15-16
                                                                     01nos.
                                                                     (CR-1).
    50Wheel
    setswith
    Axleboxfor
    WAG9/WAP
    7locos@                             Wheel3-
231                   438    DRF   14-15                I    6   6
    Rs.7.0lac                             Ph
    perwheel
    set.1198/14-
    15,438/15-
    16
    Mid-term
    rehabilitation
                                                                     Estimate
    of65Electric
232                   1163   DRF   16-17     MTR       WR    0   0   under
    locosatDHD
                                                                     preparation.
    @Rs.150
    Laceach
    GTOvalve
    setfor
    traction
233 converters-     1164   DRF   16-17   Valveset    I    0   0
    30nos.@
    Rs.27lac
    each
    Setof
    traction
    converter
    Busstation
                                           T.C.Bus
234 comprisingof    1165   DRF   16-17                I    0   0
                                             Stn.
    ALG1&
    ALG2units-
    8sets@Rs.
    55lacseach
    Provisionof
    HighReach
    Pantographs
    forElectric
235                  1166   CAP   16-17      PT       I    0   0
    locos-2000
    nos.@Rs.
    5.25lacs
    each
    Provisionof
    IGBTbased
    traction
    converters
236 forthree       1167   CAP   16-17   Tr.Conv.   I    0   0
    phaselocos-
    5nos.@Rs.
    250lacs
    each
    Provisionof
    IGBTbased
    Auxiliary
    converters
                                           Aux.
237 forthree       1168   CAP   16-17               I    0   0
                                           Conv.
    phaselocos-
    10nos.@
    Rs.60lacs
    each
    GG&WRE
    modulesfor
    Auxiliary
    converters
                                          GG/WR
238 forthree       1169   CAP   16-17               I    0   0
                                            E
    phaselocos-
    10locosets
    @Rs.52.5
    lacsperset
    20nos.GTO
    valvesetfor                                                 Nodal
    Traction                                                      agency;NR
    Converterfor                                                 Detailed
239                  1169   CAP   15-16   Valveset   NR   2   2
    3-Phase                                                       estimate
    locos@Rs.                                                   under
    27.0lacs.                                                    preparation.
    1169/15-16
    Provisionof
    transformer
    7775kVA
    withHotel
    loadwinding
240 forthree        1170   CAP   16-17     TFP        I    0    0
    phase
    passenger
    locos-5nos.
    @Rs.160
    lacseach
    Provisionof
    100nos.
    SingleBottle
    Vacuum
241 Circuit          1171   DRF   16-17     VCB        I    0    0
    breakersfor
    conventional
    locos@Rs.
    3lacseach
    Reconditioni
    ngcum
    repairof100
                                                                       Nodal
    Valvesetsfor
                                                                       agency;NR
    Traction
                                                                       Detailed
242 converters       1171   DRF   15-16   Valveset   NR    10   10
                                                                       estimate
    for3_phase
                                                                       under
    locos@Rs.
                                                                       preparation.
    5.0lacsper
    set.1171/15-
    16
    Provisionof                                                      a)Supply:
    5nos.IGBT                                                       NIL.b)
    basedAux.                                                        Balance:
    converters                                                        05nos.
                                            Aux.
243 for3-Phase      1172   CAP   15-16               CLW   1    1    (CR-
                                            Conv.
    locos@Rs.                                                       1,ECoR-
    55.0lacs                                                         1,SER-
    each.                                                             1,WCR-
    1172/15-16                                                         1,WR-1).
    Bogieframe
    withbrake
    riggingfor
    WAG7
244                   1172   DRF   16-17    Bogie      I    0   0
    conventional
    locos-40
    nos.@Rs.
    10lacseach
    Wheelset
    withAxleBox
    for
    WAG9/WAP
                                           Wheel3-
245 7three          1173   DRF   16-17               I    0   0
                                             Ph
    phaselocos-
    50nos.@
    Rs.8.5lacs
    perwheelset
    GGand
    WRE
                                                                    COS/SC
    modulesfor
                                                                    case
    Aux.
                                                                    No.25.16.5
    Converters                            GG/WR
246                   1173   CAP   15-16              SCR   1   1   025for15
    for153-                                E
                                                                    Nos.is
    Phaselocos
                                                                    being
    @Rs.52.5
                                                                    floated.
    lacsperloco.
    1173/15-16
                                                                    a)
                                                                    Demand:
                                                                    05nos.
    Provisionof
                                                                    Transforme
    5nos.
                                                                    rforWAG-9
    Transformer
                                                                    Loco.b)
    6531kVAfor
                                                                    Supply:05
247 3-Phase          1174   CAP   15-16     TFP      CLW   1   1
                                                                    nos.(CR-
    locos@Rs.
                                                                    1,ECoR-
    115.0lacs
                                                                    1,SCR-
    each.
                                                                    1,SER-
    1174/15-16
                                                                    1,WCR-1).
                                                                    c)Balance:
                                                                    NIL.
    Wheelset
    withAxleBox
    for
    conventional
248                   1174   DRF   16-17    Wheel      I   0   0
    Electriclocos
    -50nos.@
    Rs.7.5lacs
    perwheelset
    Rehabilitatio
    noftap
    changerof
    conventional                            T.
249                   1175   DRF   16-17               I   0   0
    locos-75                            Changer
    nos.@Rs.
    14.0lacs
    each
    Wheelset
    withaxlebox
    forWAP5
    threephase                           Wheel3-
250                   1176   DRF   16-17               I   0   0
    locos-10                              Ph
    nos.@Rs.
    37lacseach
    wheelset
    Reconditioni
    ngcum
    repairof
251 Valveset-      1177   DRF   16-17   Valveset   I   0   0
    50nos.@
    Rs.5.0lacs
    each
    50nos.
    Wheelset
    withAxleBox
    for
    WAG9/WAP                               Wheel3-
252                   1177   DRF   15-16               I   5   5
    7locos@                               Ph
    Rs.8.0lacs
    perwheel
    set.1177/15-
    16
           8nos
           Traction
           Motors6
           FRA6068for                                                   All
           WAG9/P7                                                        supplied.
       253                  1178   CAP   13-14     TM        CLW   0   0
           threeph.                                                      Work
           Locos@Rs.                                                    Completed
           28.7lakh
           each.1178/13
           -14Below
                                                                           a)Supply:
                                                                           08nos.(ER-
                                                                           2,SECR-
           20nos.
                                                                           2,SER-
           Traction
                                                                           2,WCR-2).
           motorfor
                                                                           b)Balance:
           Hitachifor
                                                                           12nos.
       254 Conventional    1179   CAP   15-16     TM        CLW   1   1
                                                                           (CR-
           locos@Rs.
                                                                           1,ECoR-
           25.0lacs
                                                                           2,NCR-
           each.
                                                                           2,NR-
           1179/15-16
                                                                           1,SCR-
                                                                           2,SR-
                                                                           2,WR-2).
                                                                           a)Supply:
           Provisionof
                                                                           01nos.(CR-
           IGBTbased
                                                                           1)b)
           traction
                                                                           Balance:
           converters
       255                  1181   CAP   15-16   Tr.Conv.   CLW   1   1   04nos.
           for3-Phase
                                                                           (ECoR-
           locos@Rs.
                                                                           1,ER-
           2.5Cr.each.
                                                                           1,SCR-
           1181/15-16
                                                                           1,WR-1).
Home
ER                                    ECR                                    ECoR
0 0 0 0 0 0
0 0 0 0 0 0
     0           0                          0            0                          0           0
0   0                    0   0                    0   0
0 0 0 0 0 0
0 0 0 0 0 0
        Allsupplied.           Allsupplied.
0   0   Work            0   0   Work            0   0
        Completed                Completed
0   0   Notallotted.    0   0   Notallotted.    0   0
        Allare                 Allare
        balance,as             balance,as
        CLWisnot              CLWisnot
        purchasing              purchasing
0   0                    0   0                    0   0
        Busstation             Busstation
        separately.b)           separately.b)
        Hencemay               Hencemay
        bediverted.             bediverted.
        Material                Material
        receivedand            receivedand
0   0                    0   0                    0   0
        work                    work
        completed                completed
        a)Demand:-            a)Demand:-
        06nos.b)              06nos.b)
        Supply:-06            Supply:-06
        nos.(CR-                 nos.(CR-
        1,ER-1,NCR-              1,ER-1,NCR-
0   0                    0   0                    0   0
        1,SECR-                  1,SECR-
        1,WCR-                   1,WCR-
        1,WR-1)c)              1,WR-1)c)
        Balanc:-               Balanc:-
        NIL.                     NIL.
0   0                    0   0                    0   0
        Allmaterial            Allmaterial
        supplied.               supplied.
3   0                    3   0                    3   0
        Work                    Work
        completed.               completed.
0 0 Completed. 0 0 Completed. 0 0
        Notsupplied            Notsupplied
        till,CLWis            till,CLWis
0   0   notprocuring   4   4   notprocuring   0   0
        valavesets             valavesets
        seprately.               seprately.
        a)work                  a)work
        completed.               completed.
        (notbyCLW)            (notbyCLW)
        b)Thiswork             b)Thiswork
        wasnot                 wasnot
        allotedto              allotedto
        CLWthrough             CLWthrough
        Boardsletter.           Boardsletter.
        3sets(=6               3sets(=6
        Nos.)                   Nos.)
        supplied/Fitte           supplied/Fitte
        din                    din
0   0   locomotives.    0   0   locomotives.    0   0
        Restqty.not           Restqty.not
        tobe                   tobe
        procuredby             procuredby
        CLW                      CLW
                                  Materialnow
                                  required.
        Orderplaced             Requisition
        fromRly                 nos
        Board,4                0592250169
7   3   NosRecdon    14   14   dt25/10/14    12   12
        25-04-09.                under
        balancenot              vetting.
        yetRecd.                 procurement
                                  under
                                  process.
          Indentfor
          discPlaced
          atboard.
          Axle,
          Screws,
          GWERWE,
          Setofspare
10   10   andGearare   0    0                  20   16
          available,
          andforgear
          case-PO
          placedand
          received.Wor
          kunder
          execution.
          COSfile                 COSfile
          No.47099011               No.47099011
0    0                    40   40                 0    0
          ,TOD                    ,TOD
          awaited.                  awaited.
         A)POfor                 A)POfor
         100nosroof              100nosroof
         mounted                   mounted
         DBRplaced                DBRplaced
         withdirect               withdirect
         diliveryto               diliveryto
         consignee.                consignee.
         Z.Rlysto                Z.Rlysto
         confirm.B)               confirm.B)
         For98nos                For98nos
35   0   vertical         20   0   vertical         15   -18
         DBR'sallof              DBR'sallof
         the98nos.               the98nos.
         were                      were
         supplied                  supplied
         (ECoR-                     (ECoR-
         33,ECR-                    33,ECR-
         20,ER-                     20,ER-
         25,WCR-20).               25,WCR-20).
         C)Balance:-             C)Balance:-
         NIL.                       NIL.
         POplaced                 POplaced
         withdirect               withdirect
         delieveryto              delieveryto
86   1                     1    1                     0    0
         consignee.                consignee.
         Work                      Work
         completed.                 completed.
         Board'sletter            Board'sletter
1    1                     0    0                     0    0
         required                   required
           Notinthelist            Notinthelist
           ofCLW.                    ofCLW.
1     1    (Boards           1    1   (Boards           0     0
           lettermaybe              lettermaybe
           sent)                       sent)
           Thiswork                  Thiswork
           wasnot                    wasnot
150   83   allotedto        80   0   allotedto        100   20
           CLWthrough                CLWthrough
           Boardsletter.              Boardsletter.
           Centralised
           procurement
           byCLW40
           Nos.Full
           materialrecd
           DATnot
           Recd.10                   02nos
50    10   Noswas           10   8   Material          0     0
           processed                  received.
           throughCOS
           butPO
           cancelled
           anddecided
           nottobe
           procured.
           Notinthelist            Notinthelist
           ofCLW.                    ofCLW.
1     1    (Boards           0    0   (Boards           0     0
           lettermaybe              lettermaybe
           sent)                       sent)
        07Bogie               07Bogie
        frames,30             frames,30
        TMs&15               TMs&15
        wheelsets&           wheelsets&
        Brake                  Brake
        riggings-3             riggings-3
        suppliedto            suppliedto
1   0                   0   0                   2   2
        Rlys.Rest             Rlys.Rest
        itemsare              itemsare
        due(Bogie              due(Bogie
        frame-4,TM-             frame-4,TM-
        3,Wheelset-           3,Wheelset-
        18,Brake               18,Brake
        rigging-8).             rigging-8).
        Work                   Work
6   3                   0   0                   0   0
        completed.              completed.
        POplaced              POplaced
        withDDto             withDDto
3   3   consignee.     3   3   consignee.     0   0
        Work                   Work
        completed.              completed.
         Fullmaterial
         Recdfrom
15   0   CLW.MAY         25   0                     10   10
         BE
         DROPPED.
         LOAissued                LOAissued
         for40rotor              for40rotor
         and18stator             and18stator
         onM/sSaini,             onM/sSaini,
         all40rotor&            all40rotor&
         18stators                18stators
         completed.                completed.
         Re-Tender                 Re-Tender
0    0   openedon        0    0   openedon        0    0
         06.12.2013                06.12.2013
         for22                    for22
         stator.Tender             stator.Tender
         discharged                discharged
         and                       and
         transferredto            transferredto
         TMW/NKRD                  TMW/NKRD
         .                          .
         Outof20
         Sets,14Sets
         procured
20   6   fromtrade.     0    0                  0    0
         Remaining6
         Setsnot
         required.
                                   Material
         Fullmaterial            received.
20   0                    10   0                  25   25
         recd.                     Payment
                                   done.
         All40gear              All40gear
         caseshave               caseshave
         been                     been
0    0                    0    0                  0    0
         received.                received.
         Work                     Work
         completed.                completed.
          Supply:68             Supply:68
          nos(ECoR-               nos(ECoR-
          10,ECR-8,              10,ECR-8,
          NCR-12,                NCR-12,
          SECR-                   SECR-
10   10   12,SR-         12   4   12,SR-         10   0
          6,WCR-19&             6,WCR-19&
          WR-1).For            WR-1).For
          balalnceno            balalnceno
          Rly                    Rly
          approached.             approached.
0    0                   0    0                  0    0
        a)                     a)
        Distribution           Distribution
        of39Wheel            of39Wheel
        set:WAG-              set:WAG-
        7=15,WAP-              7=15,WAP-
        4=24.                  4=24.
        b)WAG-7:              b)WAG-7:
        Supply-09              Supply-09
        nos.(ECR-               nos.(ECR-
        3,NCR-                  3,NCR-
        3,SER-3),              3,SER-3),
3   3                   3   0                   0   0
        Balance-06             Balance-06
        nos.(CR-6).            nos.(CR-6).
        C)WAP-4:              C)WAP-4:
        Supply-14              Supply-14
        nos.(NR-                nos.(NR-
        6,SR-                   6,SR-
        2,WCR-6),              2,WCR-6),
        Balance:10           Balance:10
        nos.(ER-                nos.(ER-
        3,SCR-3,SR-             3,SCR-3,SR-
        1,WR-3).                1,WR-3).
        i)POplaced            i)POplaced
        &material             &material
        receivedfor           receivedfor
        Qty-29                 Qty-29
        .Supplied              .Supplied
        Qty-CR-                 Qty-CR-
        5,WCR-                  5,WCR-
        7,NR-8,SCR-             7,NR-8,SCR-
        15,SECR-                15,SECR-
0   0   6.ii)BalQty-   0   0   6.ii)BalQty-   0   0
        27                     27
        processedas           processedas
        perScheme-             perScheme-
        II,POplaced           II,POplaced
        &material             &material
        receivedfor           receivedfor
        Qty-23,Bal            Qty-23,Bal
        uncovred               uncovred
        Qty-4.                  Qty-4.
        a)Demand:-           a)Demand:-
        08nos.a)             08nos.a)
        Supply:06            Supply:06
        nos.(NR-               nos.(NR-
        1,SECR-                 1,SECR-
0   0                   0   0                   0   0
        2,SR-                   2,SR-
        1,WCR-2).b)           1,WCR-2).b)
        Balance:02           Balance:02
        nos.(SCR-             nos.(SCR-
        1,SR-1)                 1,SR-1)
        Work                   Work
        completed              completed
        and                    and
0   0                   0   0                   0   0
        paid.Item              paid.Item
        maybe                 maybe
        deleted.                deleted.
        a)Demand               a)Demand
        qty:WAG-7            qty:WAG-7
        =3,WAP-                =3,WAP-
        4=9.                   4=9.
        b)Supplied             b)Supplied
        qty:-WAG7:-            qty:-WAG7:-
        Bogieframe-            Bogieframe-
        3,TM-9,               3,TM-9,
0   0   Wheelset-6.   0   0   Wheelset-6.   2   2
        WAP-4:-                WAP-4:-
        Bogieframe-            Bogieframe-
        1,Brake                1,Brake
        Rigging-                Rigging-
        1,Bolster-              1,Bolster-
        1,TM-21                1,TM-21
        ,wheelsets-            ,wheelsets-
        9.                      9.
        Allmaterial           Allmaterial
        supplied.              supplied.
4   0                   6   0                   0   0
        Work                   Work
        completed.              completed.
          a)Entryshall            a)Entryshall
          becorrected             becorrected
          as70against            as70against
          76.(WAG9-                 76.(WAG9-
          55,WAP7-                  55,WAP7-
          12,WAP5-3)               12,WAP5-3)
          b)FOR                    b)FOR
          WAG9:-Out                WAG9:-Out
          of55,9of              of55,9of
          CR,6ofER,             CR,6ofER,
          5ofSCR,6              5ofSCR,6
          ofSER                   ofSER
          balance.                 balance.
          c)WAP7:-                 c)WAP7:-
          Outof12                Outof12
          nos,6nos               nos,6nos
          wheelset                wheelset
12   12   suppliedto     12   0   suppliedto     0   0
          ECR,6nos.              ECR,6nos.
          toNR                    toNR
          d)WAP5:-                 d)WAP5:-
          Outof3                 Outof3
          nos,03nos.              nos,03nos.
          suppliedto              suppliedto
          NR.d)Allthe            NR.d)Allthe
          balance                  balance
          wheelsetsto            wheelsetsto
          becollected             becollected
          fromKPAor              fromKPAor
          BSL.vide                BSL.vide
          RB'sletter              RB'sletter
          No.                      No.
          2008/Elect.               2008/Elect.
          (TRS)/720/1              (TRS)/720/1
          Dt.15.09.08               Dt.15.09.08
          a)Entryshall            a)Entryshall
          becorrected             becorrected
          as14against            as14against
          13.b)Allare            13.b)Allare
          balance,as              balance,as
0    0    CLWisnot      4    4   CLWisnot      0   0
          purchasing               purchasing
          Busstation              Busstation
          separately.c)            separately.c)
          Hencemay                Hencemay
          bediverted.              bediverted.
        Allbalance              Allbalance
        asCLWis                asCLWis
        not                      not
0   0   purchasing     10   10   purchasing     0   0
        separately.              separately.
        Hencemay                Hencemay
        bediverted.              bediverted.
        Material                 Material
0   0   received       10   0    received       0   0
        formCLW                  formCLW
        Allmaterial             Allmaterial
4   4                   4    0                    3   0
        supplied.                 supplied.
        a)Total                 a)Total
        demand:09              demand:09
        nos.(NR-                  nos.(NR-
        7,WR-2).b)              7,WR-2).b)
0   0   Supply:06    0    0    Supply:06    0   0
        nos.(NR-6).             nos.(NR-6).
        c)Balance:             c)Balance:
        03nos.(NR-               03nos.(NR-
        1,WR-2)                   1,WR-2)
                                 Centralised
                                 procurement
                                 by
                                 C.Rly(case
                                 clubwith
                                 1120/10-11)
0   0                    3   0                    0   0
                                 workunder
                                 progress.LO
                                 Aissuedto
                                 M/S
                                 indosen.Wor
                                 kCompleted
        Centralised             Centralised
        procurement             procurement
5   0   bySR.PO       3   0   bySR.PO       0   0
        placed.all5           placed.all5
        nosreceived.            nosreceived.
                                   51nos
                                   procuremnt
                                   done.Payme
                                   ntdonefo51
          Notrequired
                                   nos.Rest
60   60   byEastern     85   0                    75   0
                                   34nos
          Railway
                                   material
                                   procurement
                                   under
                                   process.
                                   Revised
                                   estimate
0    0                    5    5                    0    0
                                   under
                                   preparation.
          Work                   Work
          completed              completed
0    0    andpaid.      4   0   andpaid.     0   0
          Itemmaybe            Itemmaybe
          deleted..               deleted..
          Outof40
          sets11sets
          procured,PO
40   40                   0   0                  0   0
          placedfor3
          nos.Balance
          26sets.
                                    Mod.should
                                    bedone
                                    100%during
          POPlaced,               POH.Vetted
          material                 estimate
10   10                   10   10                     5   5
          expectingin             sendtoKPA
          2016-17.                  on
                                    20/06/09.Wo
                                    rknotstarted
                                    tilldate.
0    0                    0    0                      0   0
         a)Supply:              a)Supply:
         01no.(NR-               01no.(NR-
         1).b)                   1).b)
1    1   Balance:03     0    0   Balance:03   0    0
         nos.(CR-                  nos.(CR-
         1,ER-1,SCR-               1,ER-1,SCR-
         1).                       1).
                                   Workfor
                                   upgradation
         Fullmaterial
20   0                    15   0   Completed.p    30   30
         Recd.
                                   aymentdone
                                   in2013-14
         Major
         material
30   8   Recd,          0   0                   0   0
         balanceyet
         toberecd.
         a)Supply:            a)Supply:
         Nil.b)                Nil.b)
0    0   Balance:02   0   0   Balance:02   0   0
         nos.(NR-                nos.(NR-
         1,WR-1)                 1,WR-1)
         6supplied,
4    4                   2   2                   0   0
         balance6.
         Centralised
         procurement
         byBoard.15
22   7   NosRecdon    0    0                  34   30
         14-07-11.
         Balancenot
         yetRecd.
         POpalaced               POpalaced
         withDDto               withDDto
20   0   consignee.     20   20   consignee.   20   0
         Work                     Work
         completed.                completed.
0   0                   0   0                   0   0
        a)Supply:            a)Supply:
        07nos.(ER-            07nos.(ER-
        2,NR-                   2,NR-
        1,SECR-2,              1,SECR-2,
2   0   WCR-2).b)     0   0   WCR-2).b)     0   0
        Balance:05            Balance:05
        nos.(NR-               nos.(NR-
        1,SER-2,SR-             1,SER-2,SR-
        2)                      2)
        a)Supply:            a)Supply:
        01nos.(WR-            01nos.(WR-
        1).b)                 1).b)
0   0                   0   0                   0   0
        Balance:02           Balance:02
        nos.(NR-              nos.(NR-
        1,WR-1).                1,WR-1).
        a)Supply:            a)Supply:
        10nos.(ER-             10nos.(ER-
        2,NR-                   2,NR-
        2,SECR-2,              2,SECR-2,
2   0   SR-2,WCR-       0   0   SR-2,WCR-       0   0
        2).b)                 2).b)
        Balance:02           Balance:02
        nos.(SER-              nos.(SER-
        2).                     2).
        Nodal                     Nodal
        agency:NR                agency:NR
        Tender                    Tender
        openedon                 openedon
        20.3.2013                 20.3.2013
        .Qty.has                 .Qty.has
        been                      been
        coveredon                coveredon
        dated                     dated
        22.8.2013in              22.8.2013in
        P.O.no.                   P.O.no.
        1910513916                 1910513916
        0327dt.                  0327dt.
        01.6.2012.                01.6.2012.
        against30%               against30%
        option.DP:               option.DP:
        30.11.2013.le              30.11.2013.le
        tterwrittento           tterwrittento
1   1                      0   0                      0   0
        firm&on                 firm&on
        15.9.2014for             15.9.2014for
        risk                      risk
        purchase.                 purchase.
        Materialstill            Materialstill
        awaited.                  awaited.
        EDP:31.7.20                EDP:31.7.20
        15.All                   15.All
        material                  material
        receivedat               receivedat
        ELS/GZBon                ELS/GZBon
        22.6.2015                 22.6.2015
        andadvised               andadvised
        toallrlys.to           toallrlys.to
        collectthe               collectthe
        materialfrom             materialfrom
        ELS/GZBon                ELS/GZBon
        23.6.2015.                 23.6.2015.
        1)Traction                1)Traction
        converter                 converter
        bus                       bus
        station(main)             station(main)
        converter                 converter
        Qty-02Sets,               Qty-02Sets,
        TOD                       TOD
        22.08.2013                22.08.2013
0   0   underTC&        0   0   underTC&        0   0
        2)Busstation             2)Busstation
        aux.                      aux.
        converter-PO              converter-PO
        placedDD-                 placedDD-
        31.03.2015(r               31.03.2015(r
        eceived,                  eceived,
        Dist-CR-1                 Dist-CR-1
        WR-1).                     WR-1).
1   1   Completed.       0   0   Completed.       0   0
        a)Total                 a)Total
        demand                  demand
        quantity=08           quantity=08
        nos.(WAG-7              nos.(WAG-7
        =04,WAP-4              =04,WAP-4
        =04).                   =04).
        b)WAG7:-                b)WAG7:-
        Supply:                Supply:
        Bogieframe-             Bogieframe-
0   0   03(SCR-          0   0   03(SCR-          0   0
        1,SECR-                  1,SECR-
        2),TM-                   2),TM-
        10(SCR-                  10(SCR-
        4,SECR-6).              4,SECR-6).
        c)WAP4:-                c)WAP4:-
        Supply:TM-             Supply:TM-
        12(NR-6,SR-              12(NR-6,SR-
        6),Wheelset-            6),Wheelset-
        6(NR-6).                 6(NR-6).
                                 Material
        Fullmaterial
6   0                    2   0   receivedon   6   0
        Recd
                                 24.03.09
                 Material
0   0   3    0               0   0
                 received.
                 Material
                 received
0   0   12   0   fromCLW   0   0
                 work
                 completd.
        POplaced               POplaced
        onCGL&                onCGL&
        SAINIfor55            SAINIfor55
        nos                     nos
        stator(Qty-55           stator(Qty-55
        received                received
        givento                givento
        ELW/BSL(C                ELW/BSL(C
        R)-13                   R)-13
        CR(AQ)-14               CR(AQ)-14
        CR(KYN)-10              CR(KYN)-10
        SR(RPM)-                 SR(RPM)-
        3,SCR-                   3,SCR-
        5,WCR-                   5,WCR-
        6,SECR-4,               6,SECR-4,
0   0                    0   0                    0   0
        uncovered               uncovered
        Qty-10,                 Qty-10,
        Distribution            Distribution
        Rotor-                   Rotor-
        65(Distributio           65(Distributio
        n-CR-45                n-CR-45
        (ELW-15AQ-              (ELW-15AQ-
        20KYN-10)              20KYN-10)
        NR-04,SCR-              NR-04,SCR-
        5,                      5,
        SECR(BIA)-               SECR(BIA)-
        4,SR-3                  4,SR-3
        WCR-4).                 WCR-4).
        work                    work
        completed                completed
        Asper
        directive,6
        Nostobe
        manufacture
3   3   d,3Nosfor    0   0                    3   3
        ER&3Nos
        forSECR.
        Fullmat
        supplied.
        a)Entryshall           a)Entryshall
        becorrected            becorrected
0   0   as12against   2   2   as12against   0   0
        13b)All                13b)All
        balance.                 balance.
        a)Supplied:            a)Supplied:
        29nos.                 29nos.
        (ECR-8,NR-              (ECR-8,NR-
        8,SCR-                  8,SCR-
        5,SECR-4,               5,SECR-4,
        WCR-4).b)              WCR-4).b)
0   0   Balance:10    6   0   Balance:10    0   0
        nos.(CR-                nos.(CR-
        10).c)                 10).c)
        Excess                  Excess
        supplyof02            supplyof02
        nos.to                 nos.to
        SECR/BIA.                SECR/BIA.
        9,SR-2),                9,SR-2),
        5)Aux.Comp              5)Aux.Comp
        SCR-4NR-4              SCR-4NR-4
        SECR-1,SR-               SECR-1,SR-
        2WCR-                   2WCR-
        4,ECR-6.                4,ECR-6.
        Procurement             Procurement
        status-                  status-
        1)Motorfor             1)Motorfor
        Scavanger               Scavanger
        blower(TM)-              blower(TM)-
        RT/TOD                  RT/TOD
        24.02.2015,             24.02.2015,
        2)Motorfor             2)Motorfor
        TMblower               TMblower
        -POplaced              -POplaced
        forQty-                 forQty-
        11(received)            11(received)
        DD-                      DD-
        31.05.2013,             31.05.2013,
        POplaced               POplaced
0   0                    5   5                    0   0
        forQty-                 forQty-
        26(received,             26(received,
        dist-SR-3               dist-SR-3
        SCR-4WR-2              SCR-4WR-2
        SECR-2NR-               SECR-2NR-
        4)DD-                   4)DD-
        10.08.2014,             10.08.2014,
        TOD                     TOD
        18.01.2016              18.01.2016
        forQty-37              forQty-37
        f,3)Motorfor           f,3)Motorfor
        Scavanger               Scavanger
        Blower(MR)-             Blower(MR)-
        RT/TOD                  RT/TOD
        19.01.2016,4             19.01.2016,4
        )Motorfor              )Motorfor
        Main                    Main
        compressor(              compressor(
        11received)            11received)
        -POplaced              -POplaced
        forQty-                 forQty-
0   0                    0   0                    0   0
0 0 0 0 0 0
        Centralized
        procurement
3   3   byCLW/CRJ      2   2                    0   0
        Materialnot
        yetreceived.
        Boardsletter           Boardsletter
8   8                    0   0                    0   0
        notreceived             notreceived
          a)Supply:                a)Supply:
          NILb)                     NILb)
0    0    Balance:04     0    0    Balance:04     0   0
          nos.(NR-                  nos.(NR-
          2,WR-2)                     2,WR-2)
          AsperRly                 AsperRly
          Bd.this                   Bd.this
          itemsistobe             itemsistobe
          fittedon                  fittedon
25   25                     10   10                     0   0
          CLWbuit                   CLWbuit
          locosonlyat              locosonlyat
          CLW,hence                 CLW,hence
          notsupplied.               notsupplied.
0 0 0 0 0 0
          Completefile              Completefile
          withindent                withindent
          sentto                    sentto
5    5    COS/HJP          12   12   COS/HJP          2   2
          .Procuremen                 .Procuremen
          tunder                    tunder
          progress.                   progress.
        Qty.fully             Qty.fully
0   0   supplied       0   0   supplied       0   0
        (NR-2,WR-3)             (NR-2,WR-3)
        a)Supply:            a)Supply:
        NILb)                 NILb)
        Balance:10           Balance:10
        nos.(CR-               nos.(CR-
        1,ECoR-                 1,ECoR-
1   1                   1   1                   1   1
        1,ECR-1,ER-             1,ECR-1,ER-
        1,SCR-                  1,SCR-
        1,SECR-                 1,SECR-
        1,SER-1,SR-             1,SER-1,SR-
        2,WCR-1)                2,WCR-1)
        a)Supply:            a)Supply:
        NIL.b)                NIL.b)
0   0                   0   0                   0   0
        Balance:02           Balance:02
        nos.(WR-2)             nos.(WR-2)
        a)Supply:            a)Supply:
        02(ECR-                 02(ECR-
        1,SER-01).             1,SER-01).
        b)Balance:           b)Balance:
        08nos.                08nos.
1   1                   1   1                   1   1
        (ECoR-1,ER-             (ECoR-1,ER-
        1,NCR-1,NR-             1,NCR-1,NR-
        1,SCR-1,SR-             1,SCR-1,SR-
        1,WCR-                  1,WCR-
        1,WR-1)                 1,WR-1)
0    0                     0   0   0   0
          Outof20
          Sets,3Sets
          procured
          fromtrade.6
          Sets
          suppliedby
          CLW.From
20   11   balance11      0   0   0   0
          Sets.PO
          placedfor9
          nosand
          Recd.
          Balance2
          nostobe
          procured.
          LOANo.
          EPD/W/Con/
          CAB/34/12-
          13Dt.26-12-
          13
30   27                    0   0   0   0
          issued.Work
          under
          execution,5
          nos
          completed.
                                  Workfor
                                  upgradation
         Fullmaterial
8    0                    8   0   Completed.p      5   5
         Recd.
                                  aymentdone
                                  in2013-14
         Tender                  Tender
         openedon               openedon
         13-08-13.               13-08-13.
         POplaced.              POplaced.
12   0                    0   0                    0   0
         50Nosat               50Nosat
         variouszonal           variouszonal
         Railways                Railways
         received.                received.
         Work                    Work
         completed               completed
         and                     and
0    0                    2   0                    0   0
         paid.Item               paid.Item
         maybe                  maybe
         deleted.                 deleted.
          a)Supplied:             a)Supplied:
          02nos.(NR-              02nos.(NR-
0    0    1,WR-1).b)    0    0   1,WR-1).b)   0    0
          Balance:01              Balance:01
          nos.(WR-1).              nos.(WR-1).
          a)Supplied:             a)Supplied:
          46nos.                  46nos.
          (ECR-6,ER-                (ECR-6,ER-
          10,NCR-                   10,NCR-
          1,NR-                     1,NR-
          4,SECR-                   4,SECR-
          5,SER-                    5,SER-
          10,WR-10).               10,WR-10).
          b)Balance:             b)Balance:
10   0    104nos.        10   0   104nos.       10   10
          (CR-                      (CR-
          25,ECoR-                  25,ECoR-
          10,ECR-                   10,ECR-
          4,NCR-                    4,NCR-
          14,NR-                    14,NR-
          6,SCR-                    6,SCR-
          15,SECR-                  15,SECR-
          5,SER-5,SR-               5,SER-5,SR-
          10,WCR-10)                10,WCR-10)
          Materialwill
          becentrally
          procuredand
20   20   suppliedbyS   0    0                   0    0
          RlyMaterial
          notyet
          supplied
        Tobe                     Tobe
        procureby                procureby
        ECR.LOA                  ECR.LOA
        issuedin                 issuedin
        favourofM/S             favourofM/S
        BT.Worknot              BT.Worknot
0   0                    18   18                    0   0
        started                   started
        Contract                  Contract
        terminated&              terminated&
        freshtender              freshtender
        workunder                workunder
        process.                   process.
        Complete.All             Complete.All
0   0                    25   0                     0   0
        Supplied.                  Supplied.
        a)Supplied:             a)Supplied:
        10nos.(ER-               10nos.(ER-
        2,NR-2,SCR-                2,NR-2,SCR-
        2,WCR-                     2,WCR-
        2,WR-2).b)               2,WR-2).b)
        Balance:04               Balance:04
1   1                    0    0                     0   0
        nos.(CR-1,               nos.(CR-1,
        NCR-1,                    NCR-1,
        SER-2).c)                SER-2).c)
        01no.                    01no.
        excess                    excess
        supplytoER.              supplytoER.
2   0   Allsupplied.    0    0   Allsupplied.    4   0
                                  Material
                                  received
0   0                    12   0   form            0   0
                                  CLW.Work
                                  complted.
        POplaced&              POplaced&
        material                 material
        receivedfor             receivedfor
        Qty-14                   Qty-14
0   0                    0    0                    0   0
        (Distribution-            (Distribution-
        CR(ELW)-                  CR(ELW)-
        14).BalQty-              14).BalQty-
        42.                       42.
        a)Supplied:            a)Supplied:
        02nos.                  02nos.
        (SECR-                    (SECR-
0   0                    0    0                    0   0
        1,WCR-1).b)             1,WCR-1).b)
        Balance:01              Balance:01
        no.(SR-1).               no.(SR-1).
        POplaced&             POplaced&
        material                material
        receivedfor            receivedfor
        Qty-4CR                Qty-4CR
        Qty-1                   Qty-1
        Balance                 Balance
        direct                  direct
0   0   deliveryto     2   2   deliveryto     0   0
        consignee(Di             consignee(Di
        stribution              stribution
        CR-1ECR-1              CR-1ECR-1
        SCR-1NR-                SCR-1NR-
        1).Qty-3                1).Qty-3
        RT/TOD                  RT/TOD
        awaited.                 awaited.
        Total                   Total
        centralised             centralised
        Qty-                     Qty-
        6,Material              6,Material
        receivedQty-            receivedQty-
0   0                    0   0                    0   0
        6(Distribuiton           6(Distribuiton
        -CR-2,SCR-             -CR-2,SCR-
        1,SECR-1,              1,SECR-1,
        WCR-2)-                  WCR-2)-
        Completed.               Completed.
        Work                    Work
0   0                    0   0                    0   0
        completed.               completed.
        Centralized             Centralized
        procurement             procurement
        madeby                 madeby
0   0   SCRand         0   0   SCRand         0   0
        paid.No                paid.No
        allotmentto            allotmentto
        SCR.                     SCR.
        T/Motor                T/Motor
        blower-                blower-
        RT/TOD                 RT/TOD
        18.01.2016,            18.01.2016,
        3)Motorfor            3)Motorfor
        Scavanger              Scavanger
        Blower(TM)           Blower(TM)
        -POQty-10             -POQty-10
        DD-                     DD-
        30.03.2012,            30.03.2012,
        POQty-                 POQty-
        11(received)           11(received)
        DD-                     DD-
        20.03.2014             20.03.2014
        andRT/TOD             andRT/TOD
        24.02.2015             24.02.2015
        forQty-47,            forQty-47,
        4)Motorfor            4)Motorfor
        Scavenger              Scavenger
        Blower(MR)-            Blower(MR)-
2   2   POQty-10      4   4   POQty-10      0   0
        DD-                     DD-
        20.11.2011,            20.11.2011,
        POQty-                 POQty-
        11(received)           11(received)
        DD-                     DD-
        31.10.2013,            31.10.2013,
        RT/TOD                 RT/TOD
        19.01.2016             19.01.2016
        Qty-47,               Qty-47,
        5)Machine              5)Machine
        RoomBlower            RoomBlower
        with                   with
        motor(Indent           motor(Indent
        splitedfor            splitedfor
        motor-                  motor-
        RT/TOD                 RT/TOD
        18.12.2015&           18.12.2015&
        blower-TOD             blower-TOD
        20.02.2014,            20.02.2014,
        underTC),            underTC),
        4,SR-                      4,SR-
        2,WCR-                     2,WCR-
        5,CR-                      5,CR-
        13.2)Setof               13.2)Setof
        Brake                     Brake
        electronics               electronics
        CR-8Direct               CR-8Direct
        deliveyto                deliveyto
        consignee                 consignee
        Qty-18,3)Air              Qty-18,3)Air
        DryerELW-6               DryerELW-6
        NR-5WCR-5                NR-5WCR-5
        SR-2,4)DC                SR-2,4)DC
        linkvoltage              linkvoltage
        sensorAQ-                 sensorAQ-
        68,Active                 68,Active
        speed                     speed
        sensorAq-                 sensorAq-
        204,5)Oil                204,5)Oil
        Cooler                    Cooler
0   0   radiatorAQ-4   5    0    radiatorAQ-4   0   0
        ELW-4direct              ELW-4direct
        deliveryto               deliveryto
        consigneeby              consigneeby
        firm,                     firm,
        6)Capacitor               6)Capacitor
        Bank                      Bank
        assembly                  assembly
        SCR-5,NR-                  SCR-5,NR-
        5,SECR-                    5,SECR-
        4,SR-                      4,SR-
        2,WCR-                     2,WCR-
        5.Procureme                5.Procureme
        ntstatus-                 ntstatus-
        1)Trade                   1)Trade
        brake                     brake
        arrangement                arrangement
        -POplaed&               -POplaed&
        material                  material
        receivedfor              receivedfor
        Qty-30,Bal               Qty-30,Bal
                                   Materialnot
                                   required.Lett
                                   ernos
                                   ECR/ELE/RS
0   0                    40   31   /052/605Dt     0   0
                                   01/04/15
                                   givento
                                   railway
                                   board.
0    0                     0    0                 0    0
                                    23nos
                                    material
          Outof25                received
          Sets,PO                payment
25   11   placedfor14   25   2   done.Rest    25   0
          Setsand                 02nos
          Recd.                     material
                                    under
                                    procurement
         LOANo.
         EPD/W/CON
         /CAB/34/13-
5    5   13Dt.26-12-    0    0                  0    0
         2013issued.
         Workunder
         execution.
                                   Workis
         LOAissued
                                   completed.P
         toM/sBT.,
15   0                    15   0   aymentdone   15   15
         Fullmaterial
                                   inmarch
         Recd.
                                   2015
                                   Tobe
                                   procureby
                                   KPA.
                                   Materialnot
                                   received.Urg
                                   encyletter
                                   givento
0   0                    20   20   CWM/KPA.Vi       0   0
                                   deletternos
                                   ECR/ELE/RS
                                   /052/2842dt
                                   26.11.14.
                                   Materialnot
                                   receivedtill
                                   date
        Centralized               Centralized
        procurement               procurement
        by                        by
        C.Rly..LOA                C.Rly..LOA
        issuedon                 issuedon
        M/sIndocen               M/sIndocen
        for61                    for61
        sets.Being                sets.Being
0   0   shortclosed     20   20   shortclosed     0   0
        forfewcards             forfewcards
        balance                   balance
        againstthe               againstthe
        contractas               contractas
        fresh                     fresh
        contract                  contract
        awardedwith              awardedwith
        lesserrates.              lesserrates.
          Nodal                      Nodal
          agency:NR                 agency:NR
          Allmaterial               Allmaterial
          receivedand               receivedand
0    0    suppliedto      0    0    suppliedto      0    0
          concern                    concern
          Railway.                   Railway.
          Work                       Work
          completed.                  completed.
          Nodal                      Nodal
          agency:NR                 agency:NR
          POplaced                  POplaced
          onCLWbY                  onCLWbY
          COS/NRon                  COS/NRon
0    0    18.6.2014.       0    0    18.6.2014.       0    0
          for5loco                 for5loco
          sets.                      sets.
          DP:23.6.201                 DP:23.6.201
          5.Material                 5.Material
          awaited.                    awaited.
          Centralized                Centralized
          procurement                procurement
          byERly.TC               byERly.TC
          No.                        No.
          10/13/6012,                10/13/6012,
          RTOTunder                RTOTunder
          processfor                processfor
50   50                     30   30                     55   55
          145Nos,                  145Nos,
          Allottedfund              Allottedfund
          withdrawn,                 withdrawn,
          casewill                  casewill
          processedin               processedin
          nextfinancial             nextfinancial
          year.                       year.
0   0                    0   0                    25   25
        a)Demand:             a)Demand:
        i)Auxiliary            i)Auxiliary
        converter-05            converter-05
        L/s.ii)                L/s.ii)
        Traction                Traction
        converter-05            converter-05
        L/s.b)                 L/s.b)
        Supply:i)             Supply:i)
        Aux.                    Aux.
        converter-             converter-
0   0                    0   0                    0    0
        NIL.ii)Tr.            NIL.ii)Tr.
        converter-               converter-
        NIL.c)                 NIL.c)
        Balance:i)            Balance:i)
        Aux.                    Aux.
        converter-05           converter-05
        L/s(CR-5)ii)           L/s(CR-5)ii)
        Tr.converter-           Tr.converter-
        05L/s(CR-               05L/s(CR-
        5).                      5).
        POplaced               POplaced
        onM/SLotus            onM/SLotus
        ,Directly               ,Directly
        deliveryto             deliveryto
        Consignee.C              Consignee.C
        onsigneeas             onsigneeas
        perPO                  perPO
        a)Sr.DEE(TR              a)Sr.DEE(TR
        S),Ajni,CRly=            S),Ajni,CRly=
        3sets,                 3sets,
0   0   b)Sr.DEE,Lal     4   4   b)Sr.DEE,Lal    0   0
        aguda,SCR=               aguda,SCR=
        3sets,                 3sets,
        c)Sr.DEE,Tat             c)Sr.DEE,Tat
        anagar,SER=              anagar,SER=
        1set,                  1set,
        d)Sr.DEE,Bhl             d)Sr.DEE,Bhl
        lai,SECR=1              lai,SECR=1
        set.                    set.
        Uncovered               Uncovered
        Qty-4.                   Qty-4.
        Orderplaced
        onM/s
        Titagarh
        Wagons
        Ltd/Kolkata
        videRlyBds
                                 Tobe
        letterNo.
                                 procureBy
        2010/RS(PF
7   0                    5   0   Rly.Material   0   0
        &EC)/951/Co
                                 received.Co
        -Co/2-TC,Dt.
                                 mpleted.
        04-05-12,
        Qty-7Nosfor
        HWH(E.Rly)
        7nos
        suppliedin
        13-14.
         Fullqty.               Fullqty.
12   0                    8   0                    8   0
         supplied.                supplied.
         Fullquantity           Fullquantity
         (90nos)                (90nos)
         supplied.               supplied.
12   0                    8   0
         (directly               (directly
         suppliedby             suppliedby
         firm).                   firm).
                                   Tobe
        Fullmaterial
                                   manufacture
        suppliedas
                                   byBSL
9   9   per               6   0                  6   0
                                   workshop.Ma
        Instructionof
                                   terial
        RlyBd.
                                   received.
        42Nos
                                   Tobe
        wheelsetsto
                                   manufacture
        be
                                   byKPA
3   3   manufacture        9   0                  0   0
                                   workshop.Ma
        dfordifferent
                                   terial
        Rlys.FullQty
                                   received.
        supplied.
        RSPbeing              RSPbeing
        operatedby            operatedby
        TMWNKRD               TMWNKRD
        forQty-                forQty-
        44(Qty                 44(Qty
        completed-              completed-
        17).ForQty-            17).ForQty-
        40,PO                 40,PO
3   3   placed&       0   0   placed&       0   0
        material               material
        receivedfor           receivedfor
        Qty-10,Bal            Qty-10,Bal
        Qty-30.                 Qty-30.
        (supplied              (supplied
        AQ-10ELW-              AQ-10ELW-
        6SR-5SCR-             6SR-5SCR-
        3WCR-4)                3WCR-4)
        RSPbeing              RSPbeing
        operatedby            operatedby
        TMWNKRD               TMWNKRD
        forQty-                forQty-
        44(Qty                 44(Qty
        completed-              completed-
        23).ForQty-            23).ForQty-
        40,PO                 40,PO
        placed&               placed&
        material               material
3   3                   0   0                   0   0
        receivedfor           receivedfor
        Qty-29,Bal            Qty-29,Bal
        Qty-11.                 Qty-11.
        (Supplied-              (Supplied-
        AQ-10ELW-              AQ-10ELW-
        17(ECR-5,              17(ECR-5,
        NR-5,AQ-               NR-5,AQ-
        1),SR-5              1),SR-5
        SCR-2NR-               SCR-2NR-
        5).                     5).
        Work                    Work
0   0   completed       0   0   completed       0   0
        andbillpaid.           andbillpaid.
        Tobe                   Tobe
        procured                procured
        centrallyby            centrallyby
        CRwith                 CRwith
        direct                  direct
        deliveryto             deliveryto
        consignee               consignee
        railways(CR-             railways(CR-
        5ER-4ECR-              5ER-4ECR-
        8ECOR-3                8ECOR-3
        NR-6,SR-4               NR-6,SR-4
4   4   SCR-4SER-       8   8   SCR-4SER-       3   3
        4SECR-4                4SECR-4
        WR-4WCR-                WR-4WCR-
        4).New                  4).New
        allotment               allotment
        (CR-3ER-5              (CR-3ER-5
        ECR-12                  ECR-12
        ECOR-2NR-               ECOR-2NR-
        4SR-2SCR-              4SR-2SCR-
        6SER-2                 6SER-2
        SECR-3WR-               SECR-3WR-
        9WCR-2).               9WCR-2).
        Tobe                   Tobe
        procured                procured
        centrallyby            centrallyby
        CRwith                 CRwith
        direct                  direct
        deliveryto             deliveryto
0   0   consignee       1   1   consignee       1   1
        railways(CR-             railways(CR-
        2ECR-1                 2ECR-1
        ECOR-1                  ECOR-1
        SCR-2SER-               SCR-2SER-
        2SECR-1                2SECR-1
        WCR-1).                  WCR-1).
        a)Supplied:            a)Supplied:
        07nos.(ER-            07nos.(ER-
        2,NR-1,SER-             2,NR-1,SER-
        1,SR-1,WR-            1,SR-1,WR-
2   2                   0   0                   0   0
        2).b)                 2).b)
        Balance:02            Balance:02
        nos.(SCR-1,           nos.(SCR-1,
        SECR-1).                SECR-1).
        a)Supplied:           a)Supplied:
        05nos.(ER-            05nos.(ER-
        1,NR-1,SCR-             1,NR-1,SCR-
        1,SR-1,WR-              1,SR-1,WR-
        1).b)                 1).b)
2   2                   0   0                   0   0
        Balance:04            Balance:04
        nos.(ER-               nos.(ER-
        1,SECR-                 1,SECR-
        1,SER-1,               1,SER-1,
        WCR-1).                 WCR-1).
        Central                Central
        procurement            procurement
        byECoR                byECoR
        withdirect            withdirect
        deliveryto            deliveryto
        consignee              consignee
        railways.18           railways.18
1   0                   2   2                   2   2
        Nosreceived           Nosreceived
        and                    and
        delivered.2           delivered.2
        NosP.O                NosP.O
        placedon              placedon
        Simplex                Simplex
        Engineering.            Engineering.
        Estimate
        vetted,
        VettedReqn
5   5   senttoHQ     0   0                   5   5
        for
        processing
        theCase.
        a)Supply:            a)Supply:
        10nos.(CR-            10nos.(CR-
        2,NR-2,SCR-             2,NR-2,SCR-
        4,SECR-2).             4,SECR-2).
        b)Balance:           b)Balance:
        08nos.(ER-            08nos.(ER-
        1,SER-1,SR-             1,SER-1,SR-
        2,WCR-4).c)           2,WCR-4).c)
1   1                   2   2                   0   0
        i)02nos              i)02nos
        allottedto            allottedto
        ECRisnot             ECRisnot
        requiredto            requiredto
        them.ii)02           them.ii)02
        nos.excess            nos.excess
        supplydone            supplydone
        toSCR.                 toSCR.
        Centralized            Centralized
        procurement            procurement
        byS.CRly.            byS.CRly.
        Material               Material
0   0                   1   0                   0   0
        receivedand           receivedand
        paid.Item              paid.Item
        maybe                 maybe
        deleted.                deleted.
        Qty-(6                   Qty-(6
        received),               received),
        remaining                remaining
        direct                   direct
        deliveryto              deliveryto
        consingee,               consingee,
        7)Blowerfor             7)Blowerfor
        Traction                 Traction
        motor                    motor
        (W/out                  (W/out
        motor)-SR-2              motor)-SR-2
        SCR-                      SCR-
        6.Procureme               6.Procureme
        ntstatus-                ntstatus-
        1)Motorfor              1)Motorfor
        Traction                 Traction
        motorblower             motorblower
        -RT/TOD                  -RT/TOD
        18.01.2016,              18.01.2016,
        2)Scavenger              2)Scavenger
        Blower                   Blower
1   1                     2   0                     0   0
        TM(Indent                TM(Indent
        splitedfor              splitedfor
        motor-PO                 motor-PO
        placedfor               placedfor
        Qty-                      Qty-
        15(received)             15(received)
        DD-                       DD-
        30.08.2014,              30.08.2014,
        POQty-                   POQty-
        15(received)             15(received)
        DD-                       DD-
        25.03.2015,B              25.03.2015,B
        alqty-6TOD             alqty-6TOD
        24.02.2015&             24.02.2015&
        blower-PO                blower-PO
        placedDD-                placedDD-
        21.10.2014(q              21.10.2014(q
        ty-9received,           ty-9received,
        BalQty-                  BalQty-
        27),3)Scaven              27),3)Scaven
        gerBlower               gerBlower
        Estimate
                                Requisition
        vettedand
                                sentto
        sanctioned.
                                COS/HJPon
        Requisition
                                18/4/13for
        under
                                procurement.
        process.
                                Workunder
4   4   Tendercases   4   4                   0   0
                                progress.
        under
                                Partil
        processat
                                material
        COS.
                                received&
        Material
                                restunder
        expectedin
                                process.
        16-17.
0   0                   0   0                   0   0
          LOAissued,
30   10                      0   0   5   5
          workcomp.
          Outof60
          Nos,PO
          placed47set
          andRecd47
60   13                      0   0   0   0
          set,
          Commissing
          workunder
          execution.
          Tendercase
          waitingfor
          clear
12   12   availabilityof   0   0   0   0
          fund.No
          fundallotted
          in15-16.
                                    Material
                                    received.pay
0   0                     20   0    ment             35   0
                                    done.Comple
                                    ted.
        a)Demand:                a)Demand:
        i)Auxiliary               i)Auxiliary
        converter-10               converter-10
        L/s.ii)Tr.               L/s.ii)Tr.
        converter-10              converter-10
        L/s.b)                    L/s.b)
        Supply:i)                Supply:i)
        Aux.                       Aux.
        converter-                 converter-
0   0   NILii)Tr.      0    0    NILii)Tr.      0    0
        converter-                  converter-
        NIL.c)                    NIL.c)
        Balance:i)               Balance:i)
        Aux.                       Aux.
        converter-10              converter-10
        L/s(CR-10)ii)             L/s(CR-10)ii)
        Tr.converter-             Tr.converter-
        10L/s(CR-                 10L/s(CR-
        10).                        10).
                                    Materialnot
                                    required,
                                    Letterno
                                    ECR/ELE/RS
                                    /065/1412dt
                                    06/06/14give
                                    nto
0   0                     20   20                     0    0
                                    COS/E.C.Rly
                                    &Letterno
                                    ECR/ELE/RS
                                    /052/609dt
                                    01/04/15give
                                    nto.Rly
                                    board.
          Work                      Work
0         completed       4         completed       0
          andpaid.                  andpaid.
                                     Caseunder
                                     procurement
          TCNo.                    by
          10/13/6012.               COS/HJP.P.
          Openedon                 O.issujedfor
          05-07-13.TC              08nostoM/S
          discharged                staslit,but
10   10                    10   2                     10   0
          bythe                    material
          Competent                 received.Pay
          Authority.RT              mentnot
          OTunder                  doneas
          process.                   commissioni
                                     ngwork
                                     ballance.
          a)Demand:               a)Demand:
          25L/s.(50               25L/s.(50
          nos.).b)                 nos.).b)
          Supply:NIL.             Supply:NIL.
          c)Balance:              c)Balance:
0    0                     10   10                    0    0
          25L/s.                   25L/s.
          (ECoR-                     (ECoR-
          8,SCR-                     8,SCR-
          3,SECR-                    3,SECR-
          7,SER-7).                  7,SER-7).
                                   i)01set
                                   procurement
                                   done(AAL
                                   make).Materi
                                   al
        POplaced                 received.pay
        for4Set.Full           mentdone.
4   3                      4   0                     4   0
        material                  ii)P.O.issued
        Recd.                      for01setto
                                   M/S
                                   Siemens.Mat
                                   erial
                                   received.Pay
                                   mentdone.
        a)Supply:               a)Supply:
        02nos.(NR-               02nos.(NR-
0   0   2).b)            0   0   2).b)           0   0
        Balance:08              Balance:08
        nos.(NR-8).               nos.(NR-8).
0   0                      0   0                     0   0
          Estimate
10   10   under            0    0                      0   0
          preparation.
          for81nos.                for81nos.
          wothoption                wothoption
          clouseto                  clouseto
          enhancethe                enhancethe
          qty.upto96              qty.upto96
          nos.P,O,no.               nos.P,O,no.
          1913501216                  1913501216
          0512                       0512
          dt.27.1.14                 dt.27.1.14
          DP:30.8.14                DP:30.8.14
          Totalcost                 Totalcost
          Rs.34020                 Rs.34020
          lacs.(Details             lacs.(Details
          of81sets--               of81sets--
          CR-13,ECR-                 CR-13,ECR-
          30,NR-23,                 30,NR-23,
          SCR-11,                    SCR-11,
          SER-4).                    SER-4).
          Amendment                  Amendment
          ssuedon                   ssuedon
          27.3.14upto              27.3.14upto
0    0                      35   35                     0   0
          96sets                    96sets
          17.4.14.DP:               17.4.14.DP:
          15.10.14.(ii)             15.10.14.(ii)
          P.O.placed                P.O.placed
          onM/s                     onM/s
          Laxeven                    Laxeven
          System,                    System,
          Hyderabad                  Hyderabad
          for04nos.                for04nos.
          P,O,no.                    P,O,no.
          1913501216                  1913501216
          0511                       0511
          dt.27.1.14                 dt.27.1.14
          DP:27.9.14                DP:27.9.14
          Totalcost                 Totalcost
          Rs.16.80                  Rs.16.80
          lacs.(Details             lacs.(Details
          of04sets--               of04sets--
          SCR-02&                   SCR-02&
          NR-02)All                 NR-02)All
          material                   material
          Centralised              Centralised
          procurement              procurement
          bySCR.                  bySCR.
          100%                     100%
0    0    material        90   0   material       0    0
          receivedand             receivedand
          paid.could              paid.could
          bedeleted               bedeleted
          from16-17.               from16-17.
                                    20nos
                                    materia
          Fullmaterial
10   10                    20   0   received       15   0
          recd.
                                    .Work
                                    Completed.
0   0                  0   0                   0   0
                               02nos
                               material
        POplaced             received
        for3Nos,           ,payment
3   3                  4   2                   3   0
        material              done.Rest02
        recd.                  Material
                               under
                               procurement
          Estimate
30   30   under         0   0   0   0
          preparation.
0    0                   0   0   0   0
          CLWhas                     CLWhas
          processed                   processed
0    0                       0    0                       0   0
          the                         the
          procurement.                 procurement.
          Caseno.                    Caseno.
          19135011                    19135011
          Tenderno.                  Tenderno.
          4119130605                  4119130605
          isopened                   isopened
          16.9.2013&                 16.9.2013&
          discharged                  discharged
          duetonone                 duetonone
          availabilityof             availabilityof
1    1    Funds.            1    1    Funds.            0   0
          Tender                      Tender
          OPENED                      OPENED
          ON                          ON
          09.1.2015.&                 09.1.2015.&
          TCfinalized                TCfinalized
          for04                      for04
          nos.andPO                  nos.andPO
          isunder                    isunder
          vetting.                     vetting.
10   10                      10   10                      0   0
                                   Procurement
                                   tobedone
                                   byCR.
                                   Partially
0   0                    80   80                   0   0
                                   Material
                                   received.Res
                                   tunder
                                   collection
        40nos                    40nos
        suppliedto               suppliedto
        zonal                     zonal
        Railways.                 Railways.
        The                       The
0   0                    9    9                    0   0
        performance               performance
        isunder                  isunder
        watchdueto              watchdueto
        problemsin               problemsin
        thefield.                 thefield.
        Tobe
        procuredby
        WRlywith
        direct
2   2   deliveryto     0    0                    2   0
        consignee.
        Fullmaterial
        recdon
        25/9/15.
         Material              Material
         received              received
         fromCLW.             fromCLW.
0    0                  0   0                  0   0
         Caseclosed           Caseclosed
         fromWCR              fromWCR
         side.                  side.
         Requisition
         sendtoHQ
15       on28-03-14   0                      0
         for
         procurement.
0    0                  0   0                  0   0
0   0                    0    0                    0    0
        100%                     100%
        Material                 Material
        receivedand             receivedand
        billfor                 billfor
        Rs.66.34                 Rs.66.34
        lacks                    lacks
        pending.                 pending.
        Fundmaybe              Fundmaybe
0   0                    65   0                    0    0
        providedon              providedon
        priority.                priority.
        Couldbe                 Couldbe
        deletedfrom             deletedfrom
        16-17iffull            16-17iffull
        fundsare                fundsare
        providedin              providedin
        15-16.                    15-16.
0   0                    0    0                    20   20
        a)Supply:            a)Supply:
        NIL.b)                NIL.b)
        Balance:08           Balance:08
        nos.(ER-               nos.(ER-
2   2                   0   0                   0   0
        2,SCR-                  2,SCR-
        1,SECR-                 1,SECR-
        1,SER-1,SR-             1,SER-1,SR-
        1,WCR-2).               1,WCR-2).
        Work                   Work
0   0                   0   0                   0   0
        completed               completed
        Work                   Work
1   1                   0   0                   0   0
        completed.              completed.
                                 Procurement
                                 under
                                 processby
                                 COS/HJP.P.
                                 Onotissued
        Poplacedfor
                                 duetofund
        3Sets,
3   3                    7   7   wasnot        0   0
        materialnot
                                 availablein
        yetRecd.
                                 RE14-15.
                                 AgainRe
                                 tendering
                                 Workunder
                                 process.
          LOAissued,
          workunder
          execution,               Caseunder
5    5    fullmaterial    5   5   processin   5   5
          expected                 COS/HJP.
          within
          Mar'16.
          Outof35
          Nos,PO
          placedfor22
          Nos.Tilldate
          22nos
          recd,For
          balance13
35   18                     0   0                 0   0
          NosReqn
          sendtoHQ
          on13-08-15
          withclear
          vettingRs.
          65L.TCNo
          10/13/6010.
          Tendercase
          under
          process,
          Reqnsentto
          HQduly
          certification
25   25                     0    0                    0   0
          offundof14-
          15.Butcase
          notfinalised.
          Nofund
          allottedin
          15-16.
          Tender                     Tender
          openedon                  openedon
          30.01.13for               30.01.13for
          30loco                    30loco
          sets                       sets
0    0    ,Contract        11   11   ,Contract      0   0
          awardedon                 awardedon
          M/s                        M/s
          Indocen.Wor                 Indocen.Wor
          kin                       kin
          progress.                   progress.
          Detailed                   Detailed
          estimateIS                estimateIS
          UNDER                      UNDER
1    1                      2    2                    0   0
          VETTINGIN                 VETTINGIN
          UNDER                      UNDER
          DIVISION.                   DIVISION.
        Material                  Material
0   0   under           0    0    under           0   0
        procurement                procurement
        Estimate                  Estimate
        sanctioned                sanctioned
1   1   andexcution    4    4    andexcution    0   0
        inprogress               inprogress
        atTMW.                    atTMW.
        Estimate                  Estimate
        sanctioned                sanctioned
3   3   andexcution    12   12   andexcution    0   0
        inprogress               inprogress
        atTMW.                    atTMW.
        a)Supply:               a)Supply:
        18L/s.(CR-               18L/s.(CR-
        10,NR-                     10,NR-
        3,WCR-5).b)              3,WCR-5).b)
        Balance:82              Balance:82
        L/s(CR-                   L/s(CR-
        10,ECR-                    10,ECR-
0   0   20,NR-           20   20   20,NR-           0   0
        12,SCR-                    12,SCR-
        25,SECR-                   25,SECR-
        10,WCR-5).                10,WCR-5).
        c)EachLoco              c)EachLoco
        setconsists              setconsists
        of02nos.of             of02nos.of
        DDU.                       DDU.
          All                       All
          pending.No                pending.No
          actionhas                actionhas
          beentaken                beentaken
0    0    assincethe    20   20   assincethe    0    0
          performance               performance
          ofearlier40             ofearlier40
          nosisstill              nosisstill
          underwatch                underwatch
          MSunder                  MSunder
0    0                     0    0                     1    1
          preparation                preparation
                                     Requisition
                                     of05setset
          PartqtyPO               toCOS/HJP
          placedand                on12/6/13
          recd.                     for
          BalancePO                procurement.
15   15   tobeplaced    10   10   Procuremnt      10
          in15-16.                 under
          Partmaterial             process.Parti
          expectedin               allyitem
          2016-17.                   tender
                                     done.Fund
                                     required
        All                    All
        pending.As             pending.As
        perRB's               perRB's
        L/No.                  L/No.
        2013/Elect.             2013/Elect.
        (TRS)/441/3            (TRS)/441/3
3   3   dt.-           1   1   dt.-           0   0
        08.11.2013             08.11.2013
        centralised            centralised
        procurement            procurement
        byWestern             byWestern
        Railway                Railway
        advised.                advised.
        a)Supply:            a)Supply:
        03nos.(NR-            03nos.(NR-
        2,WCR-1)b)            2,WCR-1)b)
        Balance:47           Balance:47
        nos.(CR-               nos.(CR-
6   6                   2   2                   0   0
        6,ECR-2,ER-             6,ECR-2,ER-
        6,NR-8,SCR-             6,NR-8,SCR-
        6,SER-6,SR-             6,SER-6,SR-
        6,WCR-                  6,WCR-
        3,WR-4).                3,WR-4).
0   0                   0   0                   0   0
30   0                   10   10                   10   10
         Indentbeing             Indentbeing
         senttoFA&             senttoFA&
0    0                   10   10                   20   20
         CAO/WST                  CAO/WST
         forvetting.              forvetting.
                                   Estimate
                                   value
                                   increaseby
                                   morethan
         Esttvetted
                                   100%.Case
         and
                                   keptunder
5    5   sanctioned.    15   15                   0    0
                                   pendingas
         WCunder
                                   60nosvalve
         process.,
                                   setwork
                                   under
                                   progressin
                                   revenue.
          a)Asper                 a)Asper
          advisedby               advisedby
          Rly.Bd.                 Rly.Bd.
          Procurement              Procurement
          processed                processed
          for200                  for200
75   75                   85   85                   85   75
          nos.only.b)             nos.only.b)
          Supply:15              Supply:15
          nos.(CR-                 nos.(CR-
          6,ECoR-                   6,ECoR-
          2,NR-6,SR-                2,NR-6,SR-
          1)                        1)
          a)Demand:              a)Demand:
          02nos.                  02nos.
          transformer              transformer
          forWAP-                  forWAP-
          5/WAP-7                  5/WAP-7
1    1    Loco.b)       0    0    Loco.b)       0    0
          Supply:01              Supply:01
          no.(ER-1).              no.(ER-1).
          c)Balance:             c)Balance:
          01no.(WR-               01no.(WR-
          1).                       1).
          a)Supply:              a)Supply:
          15nos.(CR-              15nos.(CR-
          2,ECoR-                   2,ECoR-
          3,ER-3,NR-                3,ER-3,NR-
3    0    3,SECR-         0    0    3,SECR-         3    0
          2,WCR-2).b)             2,WCR-2).b)
          Balance:05             Balance:05
          nos.(SCR-                nos.(SCR-
          2,SER-3).                 2,SER-3).
        Tenderno.               Tenderno.
        4119130068               4119130068
        openedon                openedon
        20.3.2013.&             20.3.2013.&
        Tender                   Tender
        finalized                finalized
        P.O.placed               P.O.placed
        onM/sBTIL.             onM/sBTIL.
        P.O.no.1910               P.O.no.1910
        5139160327               5139160327
        dt.22.8.2013             dt.22.8.2013
        DP:                      DP:
        30.11.2013               30.11.2013
2   2                     2   2                     0   0
        MaterialStill           MaterialStill
        awaited.                 awaited.
        EDP:31.7.20               EDP:31.7.20
        15.All                  15.All
        material                 material
        receivedat              receivedat
        ELS/GZB,on              ELS/GZB,on
        22.6.15and              22.6.15and
        advisedtoall           advisedtoall
        rlys.on                 rlys.on
        23.6.15to               23.6.15to
        collectthe              collectthe
        material.                 material.
        Tobe
        procured
        centrallyby
        WRlywith
1   1   direct           0   0                     0   0
        deliveryto
        consignee.
        Materialnot
        yetsupplied.
0   0                   0   0                   0   0
        Materials              Materials
0   0   under          0   0   under          0   0
        procurement.            procurement.
        SRisthe              SRisthe
        nodalagency           nodalagency
        for                    for
        centralised            centralised
        procurement.           procurement.
5   5   Estimate       5   5   Estimate       5   5
        sanctioned.            sanctioned.
        Indentsent            Indentsent
        toCOSfor             toCOSfor
        procurement.           procurement.
        underTCM.              underTCM.
        MSunder             MSunder
0   0                 0   0                 0   0
        preparation           preparation
0   0                 0   0                 0   0
          LOAissued,
          workunder                 Vetted
          execution,                 Estimate
          partqty                   sentto
10   10                     7    7                      0   0
          expectedin                COS.Procure
          15-16and                  mentunder
          balancein                 process..
          16-17.
          100%                       100%
          material                   material
          received.Bill             received.Bill
          of                         of
          Rs.21680(00                 Rs.21680(00
          0)pending                 0)pending
          forpayment                forpayment
7    7                      10   10                     0   0
          in15-16.                  in15-16.
          Couldbe                   Couldbe
          deletedfrom               deletedfrom
          16-17iffull              16-17iffull
          funds                      funds
          providedin                providedin
          15-16.                      15-16.
        a)Supply:              a)Supply:
        13L/s                   13L/s
        (SECR-                    (SECR-
        10,SR-1,WR-               10,SR-1,WR-
        02).                     02).
        b)Balance:              b)Balance:
        87L/s.(CR-              87L/s.(CR-
        10,ECR-                   10,ECR-
        10,ER-5,NR-               10,ER-5,NR-
5   5   10,SCR-         10   10   10,SCR-         0   0
        10,SECR-                  10,SECR-
        10,SER-                   10,SER-
        5,SR-                     5,SR-
        4,WCR-                    4,WCR-
        20,WR-3)c)              20,WR-3)c)
        EachLoco                EachLoco
        setconsists             setconsists
        of02nos.of             of02nos.of
        DDU)                      DDU)
        Caseno.22-              Caseno.22-
        16-5088                  16-5088
0   0                   0    0                    0   0
        TOD:30-05-                TOD:30-05-
        16                        16
          POplaced
          for16nos
          onlyasper                 Procurement
          availabilityof             under
          fund.and16                 processat
          nosrecd.                   COS/HJP.
30   30                      20   20                   35   0
          Fund                        TRdone
          certifiedfor               waitingfor
          balanceQty                 fund.Fund
          andsendto                 required.
          HQfor
          procurement.
          Tobe                       Tobe
          procured                    procured
          centrallyby                centrallyby
          C.Rlywith                  C.Rlywith
0    0                       14   14                   10   10
          direct                      direct
          deliveryto                 deliveryto
          consignee.T                  consignee.T
          ODawaited.                  ODawaited.
        Material                  Material
1   1   under           1    1    under           0   0
        procurement                procurement
        Nodal                     Nodal
        agency:NR                agency:NR
        Administrativ              Administrativ
        eapproval                eapproval
        advisedto                advisedto
5   5   ELS/GZB         15   15   ELS/GZB         0   0
        ON                        ON
        24.11.2014                24.11.2014
        andtenderis             andtenderis
        dueon                    dueon
        01.10.2015.                01.10.2015.
        Tobe                     Tobe
        procured                  procured
        centrallyby              centrallyby
        C.Rlyand                 C.Rlyand
        being                     being
        provideon                provideon
        locosby                  locosby
        ELW/BSL.TO                 ELW/BSL.TO
        D                         D
        09.03.2015.L               09.03.2015.L
        etter                     etter
        dt.16.02.201               dt.16.02.201
        5toRDSO                 5toRDSO
0   0                    0    0                     0   0
        foreligibity             foreligibity
        criteria.Copy             criteria.Copy
        ofletterto              ofletterto
        CMM/Cfor                 CMM/Cfor
        postponeof               postponeof
        ofabove                  ofabove
        tendertill               tendertill
        clarification             clarification
        fromRDSO.                fromRDSO.
        Letter                    Letter
        dt.17.03.201               dt.17.03.201
        5received                5received
        fromRDSO.                 fromRDSO.
                                     Workstarted
          Estimate                  04noswork
          vettedand                done.Rest
30   30   sanctioned,    30   26   under           64   11
          WCunder                  progress.
          process.                   Fund
                                     Required.
          4,GZB-8                   4,GZB-8
          dt.19.08.201               dt.19.08.201
          4,Bhillai-3               4,Bhillai-3
          dt.19.09.201               dt.19.09.201
          4.LGD-5                   4.LGD-5
          dt.15.09.201               dt.15.09.201
          4,RPM-1                   4,RPM-1
          dt.14.10.201               dt.14.10.201
          4,TKD-3                   4,TKD-3
          dt.10.11.201               dt.10.11.201
          4,GMO-7                   4,GMO-7
          dt.15.10.201               dt.15.10.201
          4,TATA-2                  4,TATA-2
          dt.03.11.201               dt.03.11.201
          4,BRC-1                   4,BRC-1
          dt.30.09.201               dt.30.09.201
          4,ER-12)For              4,ER-12)For
          POQty-                    POQty-
          34,Material               34,Material
          tobe                     tobe
          suppliedto               suppliedto
2    2                     17   17                    0    0
          Ultimate                  Ultimate
          Consignee                 Consignee
          asi]Sr.                 asi]Sr.
          DEE/TRS/Gh                 DEE/TRS/Gh
          aziabad,N.               aziabad,N.
          Rly=12                  Rly=12
          Nos.(Rec)ii]             Nos.(Rec)ii]
          Sr.DEE/TRS/                Sr.DEE/TRS/
          Bhilai,                   Bhilai,
          SEC.Rly=                 SEC.Rly=
          07Nos.(rec)              07Nos.(rec)
          iii]                      iii]
          Sr.DEE/TKD,               Sr.DEE/TKD,
          W.C.Rly=07              W.C.Rly=07
          Nos.(rec)iv]             Nos.(rec)iv]
          Sr.DEE/TRS/                Sr.DEE/TRS/
          Tatanagar,                Tatanagar,
          SER.Rly=                 SER.Rly=
          03Nos.v]                03Nos.v]
          Sr.DEE/TRS/                Sr.DEE/TRS/
          Royapuram,                Royapuram,
        Asper
        directives12
        NosWheel
        Setstobe
        supplied
                                   Material
3   3   (ER3,NR3,   3    0                  3   0
                                   Received.
        NCR3&
        SECR3.9
        Nossupplied
        toNR,NCR&
        SECR
        Nodal                     Nodal
        agency:NR                agency:NR
0   0   Tenderis       10   10   Tenderis    0   0
        dueon                    dueon
        17.9.2015.                 17.9.2015.
        a)Supply:            a)Supply:
        NILb)                 NILb)
        Balance:40           Balance:40
        nos.(CR-               nos.(CR-
        4,ECR-4,ER-             4,ECR-4,ER-
4   4                   4   4                   0   0
        4,NR-4,SCR-             4,NR-4,SCR-
        4,SECR-                 4,SECR-
        4,SER-4,SR-             4,SER-4,SR-
        4,WCR-                  4,WCR-
        4,WR-4).                4,WR-4).
                                Estimate&
                                requition
0   0                   4   4   vetted.Procur   0   0
                                ementunder
                                process.
          Estimate
          sanction,
          Requisition
20   20   under           0   0                    0   0
          processat
          COSfor
          procurement.
          Nodal                   Nodal
          agency:NR.             agency:NR.
          Administrativ            Administrativ
          eapproval              eapproval
          giventoshed           giventoshed
5    5                     5   5                    0   0
          on                      on
          17.4.2015.&            17.4.2015.&
          tenderisdue           tenderisdue
          on                      on
          28.9.2015.               28.9.2015.
          Tobecarried             Tobecarried
          outcentrally             outcentrally
          byCR                     byCR
          Rly.Estimate              Rly.Estimate
          sanctioned(C               sanctioned(C
          R-50ER-10                R-50ER-10
          ECR-50                    ECR-50
          ECOR-10                   ECOR-10
          NR-50SR-                  NR-50SR-
          10SCR-50                 10SCR-50
          SER-10                    SER-10
          SECR-20                   SECR-20
          WR-20                     WR-20
          WCR-20).                  WCR-20).
          POQty-                    POQty-
          20(Material               20(Material
          tobe                     tobe
          suppliedto               suppliedto
          Ultimate                  Ultimate
10   10                    50   50                    10   10
          Consignee                 Consignee
          asbelow:-1]             asbelow:-1]
          Sr.                       Sr.
          DEE/TRS/AJ                 DEE/TRS/AJ
          NI,C.Rly=              NI,C.Rly=
          10Nos.2]                10Nos.2]
          Sr.                       Sr.
          DEE/TRS/Ka                 DEE/TRS/Ka
          zipat,SC.Rly             zipat,SC.Rly
          =10Nos.                 =10Nos.
          TotalQty=               TotalQty=
          20Nos.)DD-               20Nos.)DD-
          31.07.2015,T               31.07.2015,T
          OD-                        OD-
          29.10.2015                29.10.2015
          for                       for
          Qty.75,Under              Qty.75,Under
          TC,Balqty-               TC,Balqty-
          205.                       205.
          COS/SC                    COS/SC
          Case                      Case
          No.25.16.50                No.25.16.50
1    1                     0    0                     1    1
          02dt.27-01-               02dt.27-01-
          16.isbeing              16.isbeing
          floated.                   floated.
        a)Demand:            a)Demand:
        03nos.                03nos.
        Transformer            Transformer
        forWAG-9              forWAG-9
        Loco.b)               Loco.b)
0   0                   0   0                   1   0
        Supply:02            Supply:02
        mo.(ECoR-               mo.(ECoR-
        1,SECR-1)c)           1,SECR-1)c)
        Balance:01           Balance:01
        nos.(CR-1).            nos.(CR-1).
        Esttsanc.
6   6   Reqnunder     0   0                   5   0
        process.
        Estimate               Estimate
0   0   under          0   0   under          0   0
        preparation.            preparation.
0 0 0 0 0 0
0   0                   0   0                   0   0
0   0                  0   0                  0   0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
        Nodal                 Nodal
        agency;NR            agency;NR
        Detailed              Detailed
2   2                  2   2                  2   2
        estimate              estimate
        under                 under
        preparation.           preparation.
0    0                    0   0                   0   0
0 0 0 0 0 0
          Nodal                  Nodal
          agency;NR             agency;NR
          Detailed               Detailed
10   10                   5   5                   5   5
          estimate               estimate
          under                  under
          preparation.            preparation.
          a)Supply:            a)Supply:
          NIL.b)                NIL.b)
          Balance:05           Balance:05
          nos.(CR-               nos.(CR-
0    0                    0   0                   1   1
          1,ECoR-                 1,ECoR-
          1,SER-                  1,SER-
          1,WCR-                  1,WCR-
          1,WR-1).                1,WR-1).
0   0                    0   0                    0   0
0 0 0 0 0 0
        COS/SC                  COS/SC
        case                    case
        No.25.16.50              No.25.16.50
2   2                    1   1                    1   1
        25for15               25for15
        Nos.isbeing           Nos.isbeing
        floated.                 floated.
        a)Demand:             a)Demand:
        05nos.                 05nos.
        Transformer             Transformer
        forWAG-9               forWAG-9
        Loco.b)                Loco.b)
        Supply:05             Supply:05
0   0   nos.(CR-        0   0   nos.(CR-        1   1
        1,ECoR-                  1,ECoR-
        1,SCR-                   1,SCR-
        1,SER-                   1,SER-
        1,WCR-1).c)            1,WCR-1).c)
        Balance:               Balance:
        NIL.                     NIL.
0   0                  0   0   0   0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
        KPAW/sto
        be
        Manufacture
        WAG9Nofor
        8NosforE
        CoRand
        WAP75Nos
5   5                  0   0   8   8
        forER&7
        Nosfor
        SECR.
        Estimate
        Sanc,Reqn
        under
        process
        Allsupplied.           Allsupplied.
0   0   Work             0   0   Work             0   0
        Completed                 Completed
        a)Supply:              a)Supply:
        08nos.(ER-               08nos.(ER-
        2,SECR-                   2,SECR-
        2,SER-                    2,SER-
        2,WCR-2).b)             2,WCR-2).b)
2   2   Balance:12     0   0   Balance:12     2   2
        nos.(CR-                 nos.(CR-
        1,ECoR-                   1,ECoR-
        2,NCR-2,NR-               2,NCR-2,NR-
        1,SCR-2,SR-               1,SCR-2,SR-
        2,WR-2).                  2,WR-2).
        a)Supply:01            a)Supply:01
        nos.(CR-1)               nos.(CR-1)
        b)Balance:             b)Balance:
1   1   04nos.          0   0   04nos.          1   1
        (ECoR-1,ER-               (ECoR-1,ER-
        1,SCR-                    1,SCR-
        1,WR-1).                  1,WR-1).
            NR                                       NCR
0 0 0 0
0 0 0 0
                  0           0                            0           0
                 0   0                    0   0
0 0 0 0
0 0 0 0
Allsupplied.
                         Allsupplied.           Allsupplied.Work
Work            2   0                    0   0
                         WorkCompleted           Completed
Completed
Notallotted.    0   0   Notallotted.        0   0   Notallotted.
Allare
                         Allarebalance,
balance,as
                         asCLWisnot
CLWisnot                                           Allarebalance,asCLWis
                         purchasingBus
purchasing                                           notpurchasingBusstation
                 0   0   station             0   0
Busstation                                          separately.b)Hencemaybe
                         separately.b)
separately.b)                                        diverted.
                         Hencemaybe
Hencemay
                         diverted.
bediverted.
Material
                         Materialreceived
receivedand                                         Materialreceivedandwork
                 2   0   andwork            0   0
work                                                 completed
                         completed
completed
a)Demand:-
06nos.b)
                         a)Demand:-06
Supply:-06
                         nos.b)Supply:-
nos.(CR-                                              a)Demand:-06nos.b)
                         06nos.(CR-
1,ER-1,NCR-                                           Supply:-06nos.(CR-1,ER-
                 0   0   1,ER-1,NCR-          1   0
1,SECR-                                               1,NCR-1,SECR-1,WCR-
                         1,SECR-1,WCR-
1,WCR-                                                1,WR-1)c)Balanc:-NIL.
                         1,WR-1)c)
1,WR-1)c)
                         Balanc:-NIL.
Balanc:-
NIL.
                          Allmaterial
                          receivedagainst
                 34   0                         0   0
                          P.O.placedand
                          workcompleted.
Allmaterial
                          Allmaterial
supplied.                                              Allmaterialsupplied.Work
                 10   0   supplied.Work       0   0
Work                                                   completed.
                          completed.
completed.
Notsupplied
                          Notsuppliedtill,
till,CLWis                                           Notsuppliedtill,CLWisnot
                          CLWisnot
notprocuring   0    0                         0   0   procuringvalavesets
                          procuringvalave
valavesets                                            seprately.
                          setsseprately.
seprately.
a)work
                         a)work
completed.
                         completed.(not
(notbyCLW)                                          a)workcompleted.(notby
                         byCLW)b)This
b)Thiswork                                           CLW)b)Thisworkwasnot
                         workwasnot
wasnot                                               allotedtoCLWthrough
                         allotedtoCLW
allotedto                                            Boardsletter.
                         throughBoards
CLWthrough
                         letter.
Boardsletter.
3sets(=6
Nos.)
                         3sets(=6Nos.)
supplied/Fitte
                         supplied/Fittedin           3sets(=6Nos.)
din
                         locomotives.                 supplied/Fittedin
locomotives.    0   0                         0   0
                         Restqty.notto             locomotives.Restqty.notto
Restqty.not
                         beprocuredby               beprocuredbyCLW
tobe
                         CLW
procuredby
CLW
                                                      LOAissuedbyRly.Boardto
                                                      asunder:(i)RlyBd'sLOA
                                                      No.
                                                      2008/RS(PF&EC)/951/Co-
                                                      Co/4dated28.02.08onM/s
                                                      BhilaiEngg.Works,Bhilai,
                                                      QtyallottedtoELS/JHS-10
                                                      Nos.forWAG-5Locos.All
                                                      10Bogiesreceivedon
                                                      28.01.09atELS/JHS.(ii)
                                                      RlyBd'sLOANo.2008/RS
                                                      (PF&EC)/951/Co-Co/3
                                                      dated28.02.08onM/s
                                                      SimplexEngg.Qtyallotted
Itemnot                Nodalagency:               toELS/JHS-01&
required.               Rly.Bd.02nos.             ELS/CNB-04Nosfor
Itemmaybe             bogieframes                WAG/7Locos.01Bogie
closed.                 (WAG-7)                     receivedatELS/JHSon
Requested               receivedfrom               11.08.08.(iii)RlyBd'sLOA
Boardfor               M/sSimplexat              No.2006/RS(PF&EC)/951/C
closurevide   12   7   ELS/LDHand3     27   15   o-Co/1dated29.01.08on
ECOR'slr.              nos.bogie                  M/STitagarhKolkata,Qty
No.                     frames(WAP-4)              allottedtoELS/JHS-1&
ECOR/EL/R                receivedfrom               ELS/CNB-01forWAP-4
SP/484/05/              M/sSimplexat              Locos.O1Bogiereceivedat
1186                    ELS/GZBduring              ELS/CNBon27.12.10.(iv)
dt.10.09.12.             2010-11.                     RlyBd'sLOA
                                                      No.2006/RS(PF&EC)/951/C
                                                      o-Co/1dated29.01.08on
                                                      M/sTitagarh.Qtyallottedto
                                                      ELS/JHS-22forWAG-5
                                                      Locos.Materialnotreceived
                                                      sofar.TotalQty=39Nosfor
                                                      NCR.Paymentmadeby
                                                      FA&CAO/RBC/ER.In
                                                      referencetoRlyBd'sletter
                                                      dt06.05.2015informtoRly
                                                      Bdvidethisofficeletterno
                                                      NCR/Elec/loco/19/BRSPdt
                                                      09.07.15thatitemmaybe
                                                      closed.
1)Wheel
sets
complete
withMSU
and
bearings,bull
gear,axle
boxwith
bearingsare
tobe
suppliedby
M/s.BHEL.
55wheel
setsreceived
fromBHEL
(Balance65
sets)2)
Gearcase
(120Nos.)-
Complete
                  0    0                    0   0
Received.3)
LOAfor"TM
Mechanical
conversionto
TAOchi"
issuedto
M/s.Kalyani
Engg.
Works/Gazia
badon
04.04.14.24
nos.
Completed.
Outof
balance96
nos,12Nos.
liftedon
7.11.2015&
underfirm
inspection.
COSfile
                            COSfile
No.47099011                                         COSfileNo.47099011,TOD
                  30   30   No.47099011,   0   0
,TOD                                              awaited.
                            TODawaited.
awaited.
A)POfor
100nosroof
mounted
DBRplaced
                           A)POfor100
withdirect
                           nosroofmounted
diliveryto
                           DBRplacedwith
consignee.                                                A)POfor100nosroof
                           directdiliveryto
Z.Rlysto                                                mountedDBRplacedwith
                           consignee.Z.
confirm.B)                                               directdiliverytoconsignee.
                           Rlystoconfirm.
For98nos                                                Z.Rlystoconfirm.B)For98
                           B)For98nos
vertical         20   0                          13   4   nosverticalDBR'sallofthe
                           verticalDBR'sall
DBR'sallof                                              98nos.weresupplied
                           ofthe98nos.
the98nos.                                               (ECoR-33,ECR-20,ER-
                           weresupplied
were                                                      25,WCR-20).C)Balance:-
                           (ECoR-33,ECR-
supplied                                                  NIL.
                           20,ER-25,WCR-
(ECoR-
                           20).C)
33,ECR-
                           Balance:-NIL.
20,ER-
25,WCR-20).
C)Balance:-
NIL.
POplaced
withdirect               POplacedwith
                                                           POplacedwithdirect
delieveryto              directdelieveryto
                  15   0                          4    0   delieverytoconsignee.
consignee.                consignee.Work
                                                           Workcompleted.
Work                      completed.
completed.
Board'sletter            Board'sletter
                  1    0                          0    0   Board'sletterrequired
required                   required
Notinthelist
                            Notinthelistof
ofCLW.
                            CLW.(Boards                   NotinthelistofCLW.
(Boards           1    1                         0     0
                            lettermaybe                  (Boardslettermaybesent)
lettermaybe
                            sent)
sent)
Thiswork
                            Thisworkwas
wasnot
                            notallotedto                 Thisworkwasnotallotedto
allotedto        80   0                         130   0
                            CLWthrough                    CLWthroughBoardsletter.
CLWthrough
                            Boardsletter.
Boardsletter.
0 0 0 0
Notinthelist
                            Notinthelistof
ofCLW.
                            CLW.(Boards                   NotinthelistofCLW.
(Boards           0    0                         0     0
                            lettermaybe                  (Boardslettermaybesent)
lettermaybe
                            sent)
sent)
07Bogie
frames,30
TMs&15               07Bogieframes,
wheelsets&           30TMs&15
Brake                  wheelsets&                07Bogieframes,30TMs&
riggings-3             Brakeriggings-3            15wheelsets&Brake
suppliedto            suppliedtoRlys.           riggings-3suppliedtoRlys.
                0   0                        2   2
Rlys.Rest             Restitemsare              Restitemsaredue(Bogie
itemsare              due(Bogieframe-             frame-4,TM-3,Wheelset-
due(Bogie              4,TM-3,Wheel               18,Brakerigging-8).
frame-4,TM-             set-18,Brake
3,Wheelset-           rigging-8).
18,Brake
rigging-8).
Work
                6   0   Workcompleted.      6   0   Workcompleted.
completed.
POplaced
withDDto             POplacedwith              POplacedwithDDto
consignee.     3   0   DDtoconsignee.    3   0   consignee.Work
Work                   Workcompleted.              completed.
completed.
                                                            Materialtobeprocuredby
                                                            CLW.01norecdfromM/s
                                                            Siemenson28.11.11,01no
                                                            recdfromM/sMedhaon
                  15   8                          25   13
                                                            14.5.12,02nosrecdfrom
                                                            M/sMedhaon14.5.15,06
                                                            noson01.02.16&03nos
                                                            M/sAAlmakeon11.02.16
LOAissued
for40rotor
and18stator             LOAissuedfor
onM/sSaini,             40rotorand18
all40rotor&            statoronM/s
                                                            LOAissuedfor40rotorand
18stators                Saini,all40rotor
                                                            18statoronM/sSaini,all40
completed.                &18stators
                                                            rotor&18stators
Re-Tender                 completed.Re-
                                                            completed.Re-Tender
openedon        10   0   Tenderopened         0    0
                                                            openedon06.12.2013for
06.12.2013                on06.12.2013
                                                            22stator.Tenderdischarged
for22                    for22
                                                            andtransferredto
stator.Tender             stator.Tender
                                                            TMW/NKRD.
discharged                dischargedand
and                       transferredto
transferredto            TMW/NKRD.
TMW/NKRD
.
                 0    0                        0   0
Itemnot
required.
Itemmaybe
closed.
                                                       Completedon
Requested                All10tap
                                                       24.07.2009.InformtoRlyBd
Boardfor                changershave
                                                       videthisofficeletterno
deletionvide   10   0   been                5   0
                                                       NCR/Elec/loco/19/BRSPdt
ECoR'slr.               rehabilitated.
                                                       25.11.14thatitemmaybe
No.                      Workcompleted.
                                                       deleted.
ECOR/EL/R
SP/484/05/11
86dt.
10.09.2012.
All40gear
caseshave               All40gearcases
been                     havebeen                   All40gearcaseshavebeen
                 10   0                        0   0
received.                received.Work              received.Workcompleted.
Work                     completed.
completed.
Supply:68
nos(ECoR-
                        Supply:68
10,ECR-8,
                        nos(ECoR-
NCR-12,                                             Supply:68nos(ECoR-
                        10,ECR-8,NCR-
SECR-                                                10,ECR-8,NCR-12,SECR-
                        12,SECR-
12,SR-         9    9                       12   5   12,SR-6,WCR-19&WR-1).
                        12,SR-6,WCR-
6,WCR-19&                                          ForbalalncenoRly
                        19&WR-1).For
WR-1).For                                         approached.
                        balalncenoRly
balalnceno
                        approached.
Rly
approached.
                        Allwork
               32   0                       0    0
                        completed.
a)
Distribution
of39Wheel
set:WAG-               a)Distributionof
7=15,WAP-               39Wheelset:
4=24.                   WAG-7=15,
b)WAG-7:               WAP-4=24.
                                                       a)Distributionof39Wheel
Supply-09               b)WAG-7:
                                                       set:WAG-7=15,WAP-
nos.(ECR-                Supply-09nos.
                                                       4=24.b)WAG-7:Supply-09
3,NCR-                   (ECR-3,NCR-
                                                       nos.(ECR-3,NCR-3,SER-3),
3,SER-3),               3,SER-3),
                6    0                         3   0   Balance-06nos.(CR-6).
Balance-06              Balance-06nos.
                                                       C)WAP-4:Supply-14nos.
nos.(CR-6).             (CR-6).C)WAP-4
                                                       (NR-6,SR-2,WCR-6),
C)WAP-4:               :Supply-14nos.
                                                       Balance:10nos.(ER-
Supply-14               (NR-6,SR-
                                                       3,SCR-3,SR-1,WR-3).
nos.(NR-                 2,WCR-6),
6,SR-                    Balance:10nos.
2,WCR-6),               (ER-3,SCR-
Balance:10            3,SR-1,WR-3).
nos.(ER-
3,SCR-3,SR-
1,WR-3).
i)POplaced
&material
receivedfor
                         i)POplaced&
Qty-29
                         materialreceived
.Supplied
                         forQty-29
Qty-CR-
                         .SuppliedQty-                i)POplaced&material
5,WCR-
                         CR-5,WCR-                     receivedforQty-29
7,NR-8,SCR-
                         7,NR-8,SCR-                   .SuppliedQty-CR-5,WCR-
15,SECR-
                         15,SECR-6.ii)Bal             7,NR-8,SCR-15,SECR-
6.ii)BalQty-   10   5                         0   0
                         Qty-27                       6.ii)BalQty-27processedas
27
                         processedasper             perScheme-II,POplaced&
processedas
                         Scheme-II,PO                 materialreceivedforQty-23,
perScheme-
                         placed&material            BaluncovredQty-4.
II,POplaced
                         receivedforQty-
&material
                         23,Baluncovred
receivedfor
                         Qty-4.
Qty-23,Bal
uncovred
Qty-4.
a)Demand:-
08nos.a)
                        a)Demand:-08
Supply:06
                        nos.a)Supply:            a)Demand:-08nos.a)
nos.(NR-
                        06nos.(NR-                 Supply:06nos.(NR-
1,SECR-
                1   0   1,SECR-2,SR-         0   0   1,SECR-2,SR-1,WCR-2).b)
2,SR-
                        1,WCR-2).b)                Balance:02nos.(SCR-
1,WCR-2).b)
                        Balance:02nos.           1,SR-1)
Balance:02
                        (SCR-1,SR-1)
nos.(SCR-
1,SR-1)
Work
completed
                        Workcompleted
and                                                 Workcompletedand
                0   0   andpaid.Item       0   0
paid.Item                                           paid.Itemmaybedeleted.
                        maybedeleted.
maybe
deleted.
a)Demand
qty:WAG-7
=3,WAP-
                        a)Demandqty:
4=9.
                        WAG-7=3,
b)Supplied
                        WAP-4=9.
qty:-WAG7:-                                         a)Demandqty:WAG-7=3,
                        b)Suppliedqty:-
Bogieframe-                                         WAP-4=9.b)Suppliedqty:-
                        WAG7:-Bogie
3,TM-9,                                            WAG7:-Bogieframe-3,TM-
                        frame-3,TM-9,
Wheelset-6.   0   0                        0   0   9,Wheelset-6.WAP-4:-
                        Wheelset-6.
WAP-4:-                                             Bogieframe-1,Brake
                        WAP-4:-Bogie
Bogieframe-                                         Rigging-1,Bolster-1,TM-
                        frame-1,Brake
1,Brake                                             21,wheelsets-9.
                        Rigging-
Rigging-
                        1,Bolster-1,TM-
1,Bolster-
                        21,wheelsets-9.
1,TM-21
,wheelsets-
9.
Allmaterial
                        Allmaterial
supplied.                                           Allmaterialsupplied.Work
                4   0   supplied.Work      6   0
Work                                                completed.
                        completed.
completed.
a)Entryshall
becorrected
as70against
76.(WAG9-
55,WAP7-                 a)Entryshallbe
12,WAP5-3)              correctedas70
b)FOR                   against76.
WAG9:-Out               (WAG9-
of55,9of             55,WAP7-
CR,6ofER,            12,WAP5-3)
5ofSCR,6             b)FORWAG9:-                 a)Entryshallbecorrected
ofSER                  Outof55,9of             as70against76.(WAG9-
balance.                CR,6ofER,5of           55,WAP7-12,WAP5-3)
c)WAP7:-                SCR,6ofSER               b)FORWAG9:-Outof55,9
Outof12               balance.                    ofCR,6ofER,5ofSCR,6
nos,6nos              c)WAP7:-Outof             ofSERbalance.c)WAP7:-
wheelset               12nos,6nos               Outof12nos,6noswheel
suppliedto     9   0   wheelset           0   0   setsuppliedtoECR,6nos.
ECR,6nos.             suppliedtoECR,            toNRd)WAP5:-Outof3
toNR                   6nos.toNR                nos,03nos.suppliedtoNR.
d)WAP5:-                d)WAP5:-Outof             d)Allthebalancewheelsets
Outof3                3nos,03nos.               tobecollectedfromKPAor
nos,03nos.             suppliedtoNR.             BSL.videRB'sletterNo.
suppliedto             d)Allthebalance           2008/Elect.(TRS)/720/1
NR.d)Allthe           wheelsetstobe            Dt.15.09.08
balance                 collectedfrom
wheelsetsto           KPAorBSL.vide
becollected            RB'sletterNo.
fromKPAor             2008/Elect.
BSL.vide               (TRS)/720/1
RB'sletter             Dt.15.09.08
No.
2008/Elect.
(TRS)/720/1
Dt.15.09.08
a)Entryshall
                         a)Entryshallbe
becorrected
                         correctedas14
as14against
                         against13.b)All           a)Entryshallbecorrected
13.b)Allare
                         arebalance,as             as14against13.b)Allare
balance,as
                         CLWisnot                  balance,asCLWisnot
CLWisnot      1   0                        0   0
                         purchasingBus              purchasingBusstation
purchasing
                         station                     separately.c)Hencemaybe
Busstation
                         separately.c)               diverted.
separately.c)
                         Hencemaybe
Hencemay
                         diverted.
bediverted.
Allbalance
                         Allbalanceas
asCLWis
                         CLWisnot
not                                                  AllbalanceasCLWisnot
                         purchasing
purchasing     10   0                        0   0   purchasingseparately.
                         separately.
separately.                                          Hencemaybediverted.
                         Hencemaybe
Hencemay
                         diverted.
bediverted.
Material
                         Materialreceived
received       5    3                        0   0   MaterialreceivedformCLW
                         formCLW
formCLW
Allmaterial            Allmaterial
                4    0                        4   2   Allmaterialsupplied.
supplied.                supplied.
a)Total
demand:09             a)Totaldemand:
nos.(NR-                 09nos.(NR-
                                                      a)Totaldemand:09nos.
7,WR-2).b)             7,WR-2).b)
                                                      (NR-7,WR-2).b)Supply:06
Supply:06    7    3   Supply:06nos.    0   0
                                                      nos.(NR-6).c)Balance:03
nos.(NR-6).            (NR-6).c)
                                                      nos.(NR-1,WR-2)
c)Balance:            Balance:03nos.
03nos.(NR-              (NR-1,WR-2)
1,WR-2)
                         Workisin
                         progressat
                         ELS/GZB&
                         administrative
                 3   3   approvalgiven   0   0
                         17.4.2015.
                         Tenderopened
                         on05.6.2015&
                         underTC.
Centralised             Centralised
procurement             procurementby           Centralisedprocurementby
bySR.PO       5   5   SR.POplaced.   5   0   SR.POplaced.all5nos
placed.all5           all5nos                received.
nosreceived.            received.
                                                 40nosreceivedon12.02.13
                                                 againstCOS/NCR'sP.O
                                                 No.20.12.5035.1.78020
                                                 dated29.01.13&50nos
                                                 receivedon30.04.13
                                                 againstP.ONo.
                                                 20.11.5041.1.78052dated
                                                 03.04.13fromM/SWestern
                                                 Electric&tradingCo.Delhi.
                     Allmaterial               WORKCOMPLETED.As
Material            receivedduring            peradviseofELS/CNB
            85   0                      90   0
received.            2012-13.Work              informtoRlyBdvidethis
                     completed.                  officeletterno
                                                 NCR/Elec/loco/19/BRSPdt
                                                 25.11.14thatitemmaybe
                                                 deleted.InreferencetoRly
                                                 Bd'sletterdt06.05.2015
                                                 informtoRlyBdvidethis
                                                 officeletterno
                                                 NCR/Elec/loco/19/BRSPdt
                                                 09.07.15thatitemmaybe
                                                 closed.
            5    5   Workcompleted.    0    0
Work
completed              Workcompleted
                                                   Workcompletedandpaid.
andpaid.     10   0   andpaid.Item    0   0
                                                   Itemmaybedeleted..
Itemmaybe            maybedeleted..
deleted..
               5    0                      0   0
                                                     Upgradationwillbedone
Materialnot                                        100%duringMTR/POHas
                         Tenderopened
required.                                           perschedule.(i)18nos
                         on1.9.2012.
Itemmaybe                                         ShuntingContactor
                         Contract
closed.                                             completewithlinkprovided
                         awardedtoM/s
Requested                                           onlocono23381ondated
                         ElcoEnterprises
Boardfor                                           22.02.10atMTR/DAHOD
                         Kolcattaon
deletionvide   5   3                       5   3   (ii)6nosShunting
                         14.5.2013.DP:
ECOR'slr.                                          ContactorprovidedLoco
                         31.1.2015.02
No.                                                 No.23411ondated30.09.11
                         nos.completed,
ECOR/EL/R                                            atPOH/BSL.06nos
                         forbalanceqty,
SP/484/05/11                                         S/contactorprovidedinloco
                         Workisin
86dt.                                              no23150ondated
                         progress.
10.09.2012.                                          18.12.14duringPOH
                                                     schedule
                 0   0                       0   0
a)Supply:
01no.(NR-               a)Supply:01no.
1).b)                   (NR-1).b)                    a)Supply:01no.(NR-1).b)
Balance:03     1    0   Balance:03nos.      0    0   Balance:03nos.(CR-1,ER-
nos.(CR-                  (CR-1,ER-                      1,SCR-1).
1,ER-1,SCR-               1,SCR-1).
1).
Materialnot                                            TenderawardedonM/S
required.                Contract                      AALondated17.02.12for
Itemmaybe              awardedtoM/s                rehabilitation.10Noshave
closed.                  BTIL                          beencompleted(02noson
Requested                on17.9.2011.12               dated27.07.12,04noson
Boardfor                nos.rehabiated               dated19.01.13,2noson
deletionvide   15   0   upto31.3.2013.     10   0   12.06.13&02noson
ECOR'slr.               Balance03nos.               03.03.2014).
No.                      hasbeen                      COMPLETED.InformtoRly
ECOR/EL/R                 rehabilitatedon              Bdvidethisofficeletterno
SP/484/05/11              25.7.2013.Work               NCR/Elec/loco/19/BRSPdt
86dt.                   completed.                     25.11.14thatitemmaybe
10.09.2012.                                              deleted.
                0   0                          0   0
a)Supply:
Nil.b)                a)Supply:Nil.b)
                                                       a)Supply:Nil.b)Balance:
Balance:02   1   1   Balance:02nos.      0   0
                                                       02nos.(NR-1,WR-1)
nos.(NR-                (NR-1,WR-1)
1,WR-1)
                0   0                          0   0
                                                          (i)RailwayBoardsLOAno.
                                                          2008/RS/(PF&EC)/951/Co-
                                                          Co/5dated22.04.09onM/s
                                                          TitagarhSteelLtd,Qty=10
                                                          Nos,andincreasedto23
                                                          NosforNCR.Quantity
                                                          furtherincreasedfrom23
                                                          nosto26nosvideRlyBd's
4Bogies                                                 amendmentletterno.
received.                                                2009/RS(PF&EC)/951/Co-
Balancenot               Nodalagency:                 Co/1dated25.03.2013.23
required.                 Rly.Bd.4bogies              nosreceivedatELS/JHS
Requested                 receivedand                  upto29.12.12fromM/S
Boardfor                 balancebogies                Titagarh.AsperELS/JHS
deletionvide   14   10   arenotrequired    51   1    03nosbogieshavealready
ECOR'slr.                asallWAG5                   beensuppliedtoBZA/SCR
No.                       locostransferred             beforeissuingamendment
ECOR/EL/R                  toother                      ofRlyBd'sPO(ii)RlyBds
SP/484/05/11               Railways.                      orderNo.
86dt.                                                   2010/RS(PF&EC)/951/Co-
10.09.2012.                                               Co/1dated10.02.10on
                                                          CLW/CRJ,Qty=88nos,
                                                          NCR=25Nos(17nos
                                                          againstPBNo850/08-09&
                                                          08nosagainstLawBook
                                                          No.244/07-08).24Nos
                                                          receivedupto20.01.14.01
                                                          norecdon04.02.16.Asper
                                                          ELS/JHSitemtobeclosed.
POpalaced
withDDto                POpalacedwith               POpalacedwithDDto
consignee.      20   0    DDtoconsignee.    35   25   consignee.Work
Work                      Workcompleted.                completed.
completed.
                2   0                        0   0
a)Supply:
07nos.(ER-            a)Supply:07
2,NR-                   nos.(ER-2,NR-
                                                     a)Supply:07nos.(ER-
1,SECR-2,              1,SECR-2,
                                                     2,NR-1,SECR-2,WCR-2).
WCR-2).b)     2   1   WCR-2).b)          0   0
                                                     b)Balance:05nos.(NR-
Balance:05            Balance:05nos.
                                                     1,SER-2,SR-2)
nos.(NR-               (NR-1,SER-
1,SER-2,SR-             2,SR-2)
2)
a)Supply:
01nos.(WR-            a)Supply:01
                                                     a)Supply:01nos.(WR-1).
1).b)                 nos.(WR-1).b)
                1   1                        0   0   b)Balance:02nos.(NR-
Balance:02           Balance:02nos.
                                                     1,WR-1).
nos.(NR-              (NR-1,WR-1).
1,WR-1).
a)Supply:
10nos.(ER-
                        a)Supply:10
2,NR-
                        nos.(ER-2,NR-                a)Supply:10nos.(ER-
2,SECR-2,
                        2,SECR-2,SR-                2,NR-2,SECR-2,SR-
SR-2,WCR-       2   0                        0   0
                        2,WCR-2).b)                2,WCR-2).b)Balance:02
2).b)
                        Balance:02nos.           nos.(SER-2).
Balance:02
                        (SER-2).
nos.(SER-
2).
Nodal
agency:NR
Tender
openedon
20.3.2013                 Nodalagency:
.Qty.has                 NRTender
been                      openedon
coveredon                20.3.2013.Qty.
dated                     hasbeen
22.8.2013in              coveredondated
P.O.no.                   22.8.2013in                   Nodalagency:NRTender
1910513916                 P.O.no.                        openedon20.3.2013.Qty.
0327dt.                  19105139160327                 hasbeencoveredondated
01.6.2012.                dt.01.6.2012.                 22.8.2013inP.O.no.
against30%               against30%                    19105139160327dt.
option.DP:               option.DP:                    01.6.2012.against30%
30.11.2013.le              30.11.2013.letter              option.DP:30.11.2013.letter
tterwrittento           writtentofirm&              writtentofirm&on
                   0   0                           0   0
firm&on                 on15.9.2014for               15.9.2014forriskpurchase.
15.9.2014for             riskpurchase.                 Materialstillawaited.
risk                      Materialstill                 EDP:31.7.2015.Allmaterial
purchase.                 awaited.                       receivedatELS/GZBon
Materialstill            EDP:31.7.2015.                 22.6.2015andadvisedtoall
awaited.                  Allmaterial                   rlys.tocollectthematerial
EDP:31.7.20                receivedat                    fromELS/GZBon
15.All                   ELS/GZBon                     23.6.2015.
material                  22.6.2015and
receivedat               advisedtoall
ELS/GZBon                rlys.tocollectthe
22.6.2015                 materialfrom
andadvised               ELS/GZBon
toallrlys.to           23.6.2015.
collectthe
materialfrom
ELS/GZBon
23.6.2015.
1)Traction
converter
bus                       1)Traction
station(main)             converterbus
converter                 station(main)
Qty-02Sets,               converterQty-                  1)Tractionconverterbus
TOD                       02Sets,TOD                    station(main)converterQty-
22.08.2013                22.08.2013                     02Sets,TOD22.08.2013
underTC&        0   0   underTC&             0   0   underTC&2)Busstation
2)Busstation             2)Busstation                  aux.converter-POplaced
aux.                      aux.converter-                 DD-31.03.2015(received,
converter-PO              POplacedDD-                   Dist-CR-1WR-1).
placedDD-                 31.03.2015(recei
31.03.2015(r               ved,Dist-CR-1
eceived,                  WR-1).
Dist-CR-1
WR-1).
Completed.       0   0   Completed.         0   0   Completed.
a)Total
demand
quantity=08
                         a)Totaldemand
nos.(WAG-7
                         quantity=08
=04,WAP-4
                         nos.(WAG-7=04,
=04).
                         WAP-4=04).               a)Totaldemandquantity=
b)WAG7:-
                         b)WAG7:-Supply           08nos.(WAG-7=04,WAP-4
Supply:
                         :Bogieframe-             =04).b)WAG7:-Supply:
Bogieframe-
                         03(SCR-                    Bogieframe-03(SCR-
03(SCR-          2   2                      0   0
                         1,SECR-2),TM-              1,SECR-2),TM-10(SCR-
1,SECR-
                         10(SCR-                    4,SECR-6).c)WAP4:-
2),TM-
                         4,SECR-6).                Supply:TM-12(NR-6,SR-
10(SCR-
                         c)WAP4:-Supply           6),Wheelset-6(NR-6).
4,SECR-6).
                         :TM-12(NR-
c)WAP4:-
                         6,SR-6),Wheel
Supply:TM-
                         set-6(NR-6).
12(NR-6,SR-
6),Wheelset-
6(NR-6).
                                                 (i)Indentfor3noswas
                                                 submittedtoCOS/NCR.P.O
                                                 No.20.09.5014.1.78072
                                                 dated31.03.10wasplaced
                                                 onM/sCGL,NDLSandDP
                                                 was07.10.10.Materialnot
                                                 suppliedbyfirm.PO
                                                 cancelledby
                    P.O.placedon
                                                 COS/NCR/ALD.(ii)Indent
                    M/sCGL.P.O.no.
                                                 No.168248157dated
                    19125123160413
Material                                        24.02.09for2nossentto
            5   0   dt.29.1.2013,       5   3
received.                                        CLWondated20.07.09.02
                    Materialreceived
                                                 TMsreceivedondated
                    on11.3.2013.
                                                 13.12.2014and05nosTM
                    Workcompleted.
                                                 receivedfromCLWon
                                                 31.03.2015Inreferenceto
                                                 RlyBd'sletterdt06.05.2015
                                                 informtoRlyBdvidethis
                                                 officeletterno
                                                 NCR/Elec/loco/19/BRSPdt
                                                 09.07.15thatitemmaybe
                                                 closed.
                                    IndentNo.168254903
                                    dated13.09.08senttoCLW
                                    ondated03.12.08.01no
                                    TMArmatureisreceivedon
         Nodalagency:             31.03.2015videCLWsale
         CLW.material             issuevoutureno.7/P/68dt
6    0   receivedon       1   1   27.03.2015Inreferenceto
         30.1.2013.Work           RlyBd'sletterdt06.05.2015
         completed.                 informtoRlyBdvidethis
                                    officeletterno
                                    NCR/Elec/loco/19/BRSPdt
                                    09.07.15thatitemmaybe
                                    closed.
         Nodalagency:
         ELW/BSL2nos.
         forWAP-5are
         awaited.Asper
         CR,thesewheel
12   2                      0   0
         setsareused
         duringPOHof
         ELS/GZB'sWAP-
         5locos.Work
         completed.
POplaced
onCGL&
SAINIfor55
nos
stator(Qty-55
                         POplacedon
received
                         CGL&SAINIfor
givento
                         55nos
ELW/BSL(C
                         stator(Qty-55
R)-13
                         receivedgivento           POplacedonCGL&SAINI
CR(AQ)-14
                         ELW/BSL(CR)-                 for55nosstator(Qty-55
CR(KYN)-10
                         13CR(AQ)-14                receivedgivento
SR(RPM)-
                         CR(KYN)-10                  ELW/BSL(CR)-13CR(AQ)-
3,SCR-
                         SR(RPM)-                     14CR(KYN)-10SR(RPM)-
5,WCR-
                         3,SCR-5,WCR-                 3,SCR-5,WCR-6,SECR-4,
6,SECR-4,
                 0   0   6,SECR-4,           0   0   uncoveredQty-10,
uncovered
                         uncoveredQty-               DistributionRotor-
Qty-10,
                         10,Distribution            65(Distribution-CR-45
Distribution
                         Rotor-                       (ELW-15AQ-20KYN-10)
Rotor-
                         65(Distribution-             NR-04,SCR-5,SECR(BIA)-
65(Distributio
                         CR-45(ELW-15              4,SR-3WCR-4).work
n-CR-45
                         AQ-20KYN-10)               completed
(ELW-15AQ-
                         NR-04,SCR-5,
20KYN-10)
                         SECR(BIA)-
NR-04,SCR-
                         4,SR-3WCR-4).
5,
                         workcompleted
SECR(BIA)-
4,SR-3
WCR-4).
work
completed
IndentNo.
02125031dt.
04.04.13
senttoKGP
                 0   0                        0   0
W/S.Indents
areunder
COS/SERfor
tendering.
a)Entryshall
                         a)Entryshallbe
becorrected                                         a)Entryshallbecorrected
                         correctedas12
as12against   2   0                        0   0   as12against13b)All
                         against13b)All
13b)All                                             balance.
                         balance.
balance.
a)Supplied:
29nos.
                         a)Supplied:29
(ECR-8,NR-
                         nos.(ECR-8,
8,SCR-
                         NR-8,SCR-                   a)Supplied:29nos.(ECR-
5,SECR-4,
                         5,SECR-4,                   8,NR-8,SCR-5,SECR-4,
WCR-4).b)
                         WCR-4).b)                  WCR-4).b)Balance:10
Balance:10    6   0                        0   0
                         Balance:10nos.           nos.(CR-10).c)Excess
nos.(CR-
                         (CR-10).c)                 supplyof02nos.to
10).c)
                         Excesssupplyof            SECR/BIA.
Excess
                         02nos.to
supplyof02
                         SECR/BIA.
nos.to
SECR/BIA.
9,SR-2),                blower(MR)-
5)Aux.Comp              ELW-11,4)Motor
                                                      Qtysupplied-1)Oilpumpfor
SCR-4NR-4              forScavenge
                                                      SRCR-10,NR-10,SCR-
SECR-1,SR-               blower-
                                                      12,SECR-8,WCR-12,ECR-
2WCR-                   11(ELW-9,SR-2),
                                                      12SR-2.2)OilpumpforTFP
4,ECR-6.                5)Aux.Comp
                                                      NR-10,SCR-12,SECR-
Procurement             SCR-4NR-4
                                                      8,WCR-12,ECR-12,SR-2,
status-                  SECR-1,SR-2
                                                      3)MotorforScavenger
1)Motorfor             WCR-4,ECR-6.
                                                      blower(MR)-ELW-
Scavanger               Procurement
                                                      11,4)MotorforScavenge
blower(TM)-              status-1)Motor
                                                      blower-11(ELW-9,SR-2),
RT/TOD                  forScavanger
                                                      5)Aux.CompSCR-4NR-4
24.02.2015,             blower(TM)-
                                                      SECR-1,SR-2WCR-4,ECR-
2)Motorfor             RT/TOD
                                                      6.Procurementstatus-
TMblower               24.02.2015,
                                                      1)MotorforScavanger
-POplaced              2)MotorforTM
                                                      blower(TM)-RT/TOD
forQty-                 blower-PO
                                                      24.02.2015,2)MotorforTM
11(received)            placedforQty-
                                                      blower-POplacedforQty-
DD-                      11(received)DD-
                                                      11(received)DD-
31.05.2013,             31.05.2013,PO
                                                      31.05.2013,POplacedfor
POplaced               placedforQty-
                 5   2                        0   0   Qty-26(received,dist-SR-3
forQty-                 26(received,dist-
                                                      SCR-4WR-2SECR-2NR-
26(received,             SR-3SCR-4
                                                      4)DD-10.08.2014,TOD
dist-SR-3               WR-2SECR-2
                                                      18.01.2016forQty-37
SCR-4WR-2              NR-4)DD-
                                                      f,3)MotorforScavanger
SECR-2NR-               10.08.2014,TOD
                                                      Blower(MR)-RT/TOD
4)DD-                   18.01.2016for
                                                      19.01.2016,4)MotorforMain
10.08.2014,             Qty-37f,3)Motor
                                                      compressor(11received)
TOD                     forScavanger
                                                      -POplacedforQty-
18.01.2016              Blower(MR)-
                                                      11(received)DD-
forQty-37              RT/TOD
                                                      30.09.2014,uncoveredQty-
f,3)Motorfor           19.01.2016,4)Mo
                                                      52(dist-SR-2SCR-4),
Scavanger               torforMain
                                                      5)MotorforMachineRoom
Blower(MR)-             compressor(11
                                                      Blower-POqty-11DD-
RT/TOD                  received)-PO
                                                      29.09.2012,POQty-11
19.01.2016,4             placedforQty-
                                                      (received)DD-31.08.2013,
)Motorfor              11(received)DD-
                                                      RT/TOD16.02.2015Qty-
Main                    30.09.2014,
                                                      52.POPlacedforQty.12,
compressor(              uncoveredQty-
                                                      DD-23.12.2015,BalQty.40.
11received)            52(dist-SR-2
                                                      NewTOD18.12.2015.
-POplaced              SCR-4),5)Motor
forQty-                 forMachine
                 0   0                        0   0
2 2 0 0
                         Nodalagency:
                 2   1   CLW01no.          0   0
                         awaited.
Boardsletter           Boardsletternot
                 0   0                        0   0   Boardsletternotreceived
notreceived             received
a)Supply:
NILb)                     a)Supply:NILb)
                                                             a)Supply:NILb)Balance:
Balance:04     2    2    Balance:04nos.     0    0
                                                             04nos.(NR-2,WR-2)
nos.(NR-                  (NR-2,WR-2)
2,WR-2)
AsperRly
Bd.this                   AsperRlyBd.
itemsistobe             thisitemsistobe             AsperRlyBd.thisitemsis
fittedon                  fittedonCLW                   tobefittedonCLWbuit
                  40   40                          10   10
CLWbuit                   buitlocosonlyat              locosonlyatCLW,hence
locosonlyat              CLW,hencenot                  notsupplied.
CLW,hence                 supplied.
notsupplied.
0 0 0 0
Completefile
withindent                Completefile
                                                             Completefilewithindent
sentto                    withindentsent
                                                             senttoCOS/HJP
COS/HJP          4    4    toCOS/HJP            0    0
                                                             .Procurementunder
.Procuremen                 .Procurement
                                                             progress.
tunder                    underprogress.
progress.
Qty.fully
                        Qty.fullysupplied           Qty.fullysupplied(NR-
supplied       2   2                          0   0
                        (NR-2,WR-3)                    2,WR-3)
(NR-2,WR-3)
a)Supply:
NILb)
                        a)Supply:NILb)
Balance:10
                        Balance:10nos.             a)Supply:NILb)Balance:
nos.(CR-
                        (CR-1,ECoR-                    10nos.(CR-1,ECoR-
1,ECoR-
                0   0   1,ECR-1,ER-            0   0   1,ECR-1,ER-1,SCR-
1,ECR-1,ER-
                        1,SCR-1,SECR-                  1,SECR-1,SER-1,SR-
1,SCR-
                        1,SER-1,SR-                    2,WCR-1)
1,SECR-
                        2,WCR-1)
1,SER-1,SR-
2,WCR-1)
a)Supply:
                        a)Supply:NIL.
NIL.b)                                               a)Supply:NIL.b)Balance:
                0   0   b)Balance:02       0   0
Balance:02                                          02nos.(WR-2)
                        nos.(WR-2)
nos.(WR-2)
a)Supply:
02(ECR-                 a)Supply:
1,SER-01).             02(ECR-1,SER-
                                                       a)Supply:02(ECR-1,SER-
b)Balance:           01).b)Balance:
                                                       01).b)Balance:08nos.
08nos.                08nos.(ECoR-
                1   1                          1   1   (ECoR-1,ER-1,NCR-1,NR-
(ECoR-1,ER-             1,ER-1,NCR-
                                                       1,SCR-1,SR-1,WCR-1,WR-
1,NCR-1,NR-             1,NR-1,SCR-
                                                       1)
1,SCR-1,SR-             1,SR-1,WCR-
1,WCR-                  1,WR-1)
1,WR-1)
5   5                        0   0
        P.O.placedon
        M/sMedha
        P.O.no.
        19125025165089
        dt.31.7.2013.DP:
5   0                        0   0
        31.1.2014.
        Materialreceived
        on
        19.10.2013.Work
        completed.
        Workcompleted
5   0                        0   0
        during2012-13.
Materialnot            Contract
required.               awardedonM/s                CompletedbyM/SAALon
Itemmaybe             BTIL.04tap                 18-07-2012.10%payment
closed.                 changeshave                  heldupwillbereleased
Requested               been                          afterguaranty/warranty
Boardfor               rehabilitated.Bala             period.InreferencetoRly
deletionvide   8   4   nceForbalance      10   0   Bd'sletterdt06.05.2015
ECOR'slr.              04nos.,workwill            informtoRlyBdvidethis
No.                     bedoneat                    officeletterno
ECOR/EL/R                CB/LKO.Tender                NCR/Elec/loco/19/BRSPdt
SP/484/05/11             openedon                     09.07.15thatitemmaybe
86dt.                  30.6.2015and                 closed.
10.09.2012.              underTC.
Tender
openedon               Tenderopened
13-08-13.               on13-08-13.PO               Tenderopenedon13-08-13.
POplaced.              placed.50Nosat             POplaced.50Nosat
                 0   0                         0    0
50Nosat               variouszonal                 variouszonalRailways
variouszonal           Railways                      received.
Railways                received.
received.
Work
completed
                         Workcompleted
and                                                    Workcompletedand
                 2   0   andpaid.Item        0    0
paid.Item                                              paid.Itemmaybedeleted.
                         maybedeleted.
maybe
deleted.
a)Supplied:
                          a)Supplied:02
02nos.(NR-                                          a)Supplied:02nos.(NR-1,
                          nos.(NR-1,WR-
1,WR-1).b)   1    0                       0    0   WR-1).b)Balance:01nos.
                          1).b)Balance:
Balance:01                                          (WR-1).
                          01nos.(WR-1).
nos.(WR-1).
a)Supplied:
46nos.
(ECR-6,ER-
10,NCR-                   a)Supplied:46
1,NR-                     nos.(ECR-6,ER-
4,SECR-                   10,NCR-1,NR-
5,SER-                    4,SECR-5,SER-               a)Supplied:46nos.(ECR-
10,WR-10).               10,WR-10).b)              6,ER-10,NCR-1,NR-
b)Balance:             Balance:104              4,SECR-5,SER-10,WR-10).
104nos.       10   0    nos.(CR-          15   0   b)Balance:104nos.(CR-
(CR-                      25,ECoR-                    25,ECoR-10,ECR-4,NCR-
25,ECoR-                  10,ECR-4,NCR-               14,NR-6,SCR-15,SECR-
10,ECR-                   14,NR-6,SCR-                5,SER-5,SR-10,WCR-10)
4,NCR-                    15,SECR-5,SER-
14,NR-                    5,SR-10,WCR-
6,SCR-                    10)
15,SECR-
5,SER-5,SR-
10,WCR-10)
                          Nodalagency:
                10   10   SRMaterial       0    0
                          awaited.
Tobe
procureby
ECR.LOA                  Tobeprocureby
issuedin                 ECR.LOAissued
                                                        TobeprocurebyECR.LOA
favourofM/S             infavourofM/S
                                                        issuedinfavourofM/SBT.
BT.Worknot              BT.Worknot
                 18   18                        0   0   WorknotstartedContract
started                   startedContract
                                                        terminated&freshtender
Contract                  terminated&
                                                        workunderprocess.
terminated&              freshtenderwork
freshtender              underprocess.
workunder
process.
Complete.All             Complete.All
                 25   0                         0   0   Complete.AllSupplied.
Supplied.                  Supplied.
a)Supplied:
10nos.(ER-
                           a)Supplied:10
2,NR-2,SCR-
                           nos.(ER-2,NR-
2,WCR-
                           2,SCR-2,WCR-                 a)Supplied:10nos.(ER-
2,WR-2).b)
                           2,WR-2).b)                 2,NR-2,SCR-2,WCR-2,WR-
Balance:04
                 2    0    Balance:04nos.    1   1   2).b)Balance:04nos.(CR-
nos.(CR-1,
                           (CR-1,NCR-1,               1,NCR-1,SER-2).c)01no.
NCR-1,
                           SER-2).c)01no.           excesssupplytoER.
SER-2).c)
                           excesssupplyto
01no.
                           ER.
excess
supplytoER.
Allsupplied.    0    0    Allsupplied.        0   0   Allsupplied.
                           Nodalagency:
                           CLWMaterial
                 12   0                         0   0
                           receivedand
                           workcompleted.
POplaced&
material                  POplaced&
receivedfor              materialreceived           POplaced&material
Qty-14                    forQty-14                  receivedforQty-14
                 10   10                        0   0
(Distribution-             (Distribution-               (Distribution-CR(ELW)-
CR(ELW)-                   CR(ELW)-14).Bal             14).BalQty-42.
14).BalQty-               Qty-42.
42.
a)Supplied:
                           a)Supplied:02
02nos.
                           nos.(SECR-                  a)Supplied:02nos.
(SECR-
                 0    0    1,WCR-1).b)        0   0   (SECR-1,WCR-1).b)
1,WCR-1).b)
                           Balance:01no.             Balance:01no.(SR-1).
Balance:01
                           (SR-1).
no.(SR-1).
POplaced&
material
receivedfor
                         POplaced&
Qty-4CR
                         materialreceived
Qty-1
                         forQty-4CRQty-            POplaced&material
Balance
                         1Balancedirect            receivedforQty-4CRQty-1
direct
                         deliveryto                 Balancedirectdeliveryto
deliveryto     1   1                        0   0
                         consignee(Distrib            consignee(DistributionCR-1
consignee(Di
                         utionCR-1ECR-              ECR-1SCR-1NR-1).Qty-3
stribution
                         1SCR-1NR-                  RT/TODawaited.
CR-1ECR-1
                         1).Qty-3RT/TOD
SCR-1NR-
                         awaited.
1).Qty-3
RT/TOD
awaited.
Total
centralised
                         Totalcentralised
Qty-
                         Qty-6,Material              TotalcentralisedQty-
6,Material
                         receivedQty-                6,MaterialreceivedQty-
receivedQty-
                 0   0   6(Distribuiton-      0   0   6(Distribuiton-CR-2,SCR-
6(Distribuiton
                         CR-2,SCR-1,               1,SECR-1,WCR-2)-
-CR-2,SCR-
                         SECR-1,WCR-                 Completed.
1,SECR-1,
                         2)-Completed.
WCR-2)-
Completed.
Work
                 0   0   Workcompleted.      0   0   Workcompleted.
completed.
Centralized
                         Centralized
procurement
                         procurement
madeby                                              Centralizedprocurement
                         madebySCR
SCRand         0   0                        0   0   madebySCRandpaid.No
                         andpaid.No
paid.No                                             allotmenttoSCR.
                         allotmentto
allotmentto
                         SCR.
SCR.
                        POplacedDD-
T/Motor
                        20.08.2014(recei
blower-
                        ved,Dist-SR-
RT/TOD
                        4,SCR-6WR-2
18.01.2016,                                         Variousitemsofaux.motors
                        SECR-8ECR-
3)Motorfor                                         areunderprocurement
                        8),2)Motorfor
Scavanger                                           action.Detailsareas:-
                        T/Motorblower-
Blower(TM)                                        1)BlowerforTractionmotor
                        RT/TOD
-POQty-10                                          (W/outmotor)-POplaced
                        18.01.2016,
DD-                                                  DD-
                        3)Motorfor
30.03.2012,                                         20.08.2014(received,Dist-
                        Scavanger
POQty-                                              SR-4,SCR-6WR-2SECR-8
                        Blower(TM)-PO
11(received)                                        ECR-8),2)MotorforT/Motor
                        Qty-10DD-
DD-                                                  blower-RT/TOD
                        30.03.2012,PO
20.03.2014                                          18.01.2016,3)Motorfor
                        Qty-11(received)
andRT/TOD                                          ScavangerBlower(TM)
                        DD-20.03.2014
24.02.2015                                          -POQty-10DD-30.03.2012,
                        andRT/TOD
forQty-47,                                         POQty-11(received)DD-
                        24.02.2015for
4)Motorfor                                         20.03.2014andRT/TOD
                        Qty-47,4)Motor
Scavenger                                           24.02.2015forQty-47,
                        forScavenger
Blower(MR)-                                         4)MotorforScavenger
                        Blower(MR)-PO
POQty-10      5   5                        0   0   Blower(MR)-POQty-10DD-
                        Qty-10DD-
DD-                                                  20.11.2011,POQty-
                        20.11.2011,PO
20.11.2011,                                         11(received)DD-
                        Qty-11(received)
POQty-                                              31.10.2013,RT/TOD
                        DD-31.10.2013,
11(received)                                        19.01.2016Qty-47,
                        RT/TOD
DD-                                                  5)MachineRoomBlower
                        19.01.2016Qty-
31.10.2013,                                         withmotor(Indentsplitedfor
                        47,5)Machine
RT/TOD                                              motor-RT/TOD18.12.2015
                        RoomBlower
19.01.2016                                          &blower-TOD20.02.2014,
                        withmotor(Indent
Qty-47,                                            underTC),6)Motorfor
                        splitedformotor-
5)Machine                                           OCBunitincluding
                        RT/TOD
RoomBlower                                         impeller(Indentsplitedfor
                        18.12.2015&
with                                                motor-POplacedDD-
                        blower-TOD
motor(Indent                                        31.03.2015(received,Dist-
                        20.02.2014,
splitedfor                                         ECR-8SCR-5)&blower-PO
                        underTC),
motor-                                               placedDD-15.06.2014(Qty-
                        6)MotorforOCB
RT/TOD                                              36received,Dist-SR-2ECR-
                        unitincluding
18.12.2015&                                        8SCR-2WR-2,BalQty-32)
                        impeller(Indent
blower-TOD
                        splitedformotor-
20.02.2014,
                        POplacedDD-
underTC),
                        31.03.2015(recei
4,SR-
2,WCR-
5,CR-                    Qtysupplied-
13.2)Setof             1)Master
Brake                   controllerSCR-
electronics             5,NR-5,SECR-
CR-8Direct             4,SR-2,WCR-
deliveyto              5,CR-13.2)Setof
consignee               Brakeelectronics
Qty-18,3)Air            CR-8Direct
DryerELW-6             deliveyto                  Qtysupplied-1)Master
NR-5WCR-5              consigneeQty-               controllerSCR-5,NR-
SR-2,4)DC              18,3)AirDryer              5,SECR-4,SR-2,WCR-
linkvoltage            ELW-6NR-5                  5,CR-13.2)SetofBrake
sensorAQ-               WCR-5SR-2,                 electronicsCR-8Direct
68,Active               4)DClinkvoltage           deliveytoconsigneeQty-
speed                   sensorAQ-                   18,3)AirDryerELW-6NR-5
sensorAq-               68,Activespeed             WCR-5SR-2,4)DClink
204,5)Oil              sensorAq-204,              voltagesensorAQ-68,Active
Cooler                  5)OilCooler                speedsensorAq-204,5)Oil
radiatorAQ-4   5   1   radiatorAQ-4       0   0   CoolerradiatorAQ-4ELW-4
ELW-4direct            ELW-4direct                directdeliverytoconsignee
deliveryto             deliveryto                 byfirm,6)CapacitorBank
consigneeby            consigneeby                assemblySCR-5,NR-
firm,                   firm,6)Capacitor           5,SECR-4,SR-2,WCR-
6)Capacitor             Bankassembly               5.Procurementstatus-
Bank                    SCR-5,NR-                    1)Tradebrakearrangement-
assembly                5,SECR-4,SR-                 POplaed&material
SCR-5,NR-                2,WCR-                       receivedforQty-30,BalQty-
5,SECR-                  5.Procurement               6,2)BrakeElectronics-Qty-8
4,SR-                    status-1)Trade              uncovered.
2,WCR-                   brake
5.Procureme              arrangement-PO
ntstatus-               plaed&material
1)Trade                 receivedforQty-
brake                   30,BalQty-
arrangement              6,2)Brake
-POplaed&             Electronics-Qty-8
material                uncovered.
receivedfor
Qty-30,Bal
                 0   0                        0   0
                0    0                        0    0
                                                       ProcuredbyNCR.upto
                                                       15.03.2013,
                         P.O.placedon
                                                       COMPLETED.5%payment
                         M/sMedha
                                                       heldup.Billpreparedand
                         P.O.no.
25Nos                                                submittedtoDiv.financeon
                         19125025165089
material                                              dt.28.02.2015.Inreference
                25   9   dt.31.7.2013.qty-   25   0
received.                                             toRlyBd'sletterdt
                         16nos.&
Billspassed.                                          06.05.2015informtoRlyBd
                         received.
                                                       videthisofficeletterno
                         Balanceqty.is
                                                       NCR/Elec/loco/19/BRSPdt
                         notrequired.
                                                       09.07.15thatitemmaybe
                                                       closed.
                         Workcompleted
                 5   0                     0   0
                         during2012-13
Itemisnot
requiredby
ECoR.Board
hasbeen
requestedto
divertthe
itemtoother   0   0                     0   0
Railwayvide
letterNo.
ECoR/EL/RS
P/484/05/242
2dt.
10.09.12.
                          Nodalagency:
                 5    5   ERMaterial       0   0
                          awaited.
Centralized
procurement
by                       Centralized
C.Rly..LOA               procurementby
issuedon                C.Rly..LOA
M/sIndocen              issuedonM/s             Centralizedprocurementby
for61                   Indocenfor61            C.Rly..LOAissuedonM/s
sets.Being               sets.Being                Indocenfor61sets.Being
shortclosed     20   0   shortclosedfor   0   0   shortclosedforfewcards
forfewcards            fewcards                 balanceagainstthecontract
balance                  balanceagainst           asfreshcontractawarded
againstthe              thecontractas           withlesserrates.
contractas              freshcontract
fresh                    awardedwith
contract                 lesserrates.
awardedwith
lesserrates.
Nodal
agency:NR
                            Nodalagency:
Allmaterial
                            NRAllmaterial               Nodalagency:NRAll
receivedand
                            receivedand                  materialreceivedand
suppliedto      9    0                         0    0
                            suppliedto                   suppliedtoconcernRailway.
concern
                            concernRailway.              Workcompleted.
Railway.
                            Workcompleted.
Work
completed.
Nodal
agency:NR
POplaced                  Nodalagency:
onCLWbY                  NRPOplacedon               Nodalagency:NRPO
COS/NRon                  CLWbYCOS/NR                 placedonCLWbYCOS/NR
18.6.2014.       9    9    on18.6.2014.for   0    0    on18.6.2014.for5loco
for5loco                 5locosets.                  sets.DP:23.6.2015.Material
sets.                      DP:23.6.2015.Ma                awaited.
DP:23.6.201                 terialawaited.
5.Material
awaited.
Centralized
procurement                Centralized
byERly.TC               procurementby
No.                        ERly.TCNo.
                                                           Centralizedprocurementby
10/13/6012,                10/13/6012,RT
                                                           ERly.TCNo.10/13/6012,
RTOTunder                OTunder
                                                           RTOTunderprocessfor
processfor                processfor145
                  30   30                        60   60   145Nos,Allottedfund
145Nos,                  Nos,Allotted
                                                           withdrawn,casewill
Allottedfund              fundwithdrawn,
                                                           processedinnextfinancial
withdrawn,                 casewill
                                                           year.
casewill                  processedin
processedin               nextfinancial
nextfinancial             year.
year.
                           Rly.Bd.have
                           clarifiedon
                           18.3.2014that
                           thesubjectRSPs
                           aretobeused
                           forretrofottment
                           ofWAG-7type
                           tapchanger
                           locomotives
                           providedwith
                           MPCS
                           (Specificationno.
                           ELRS/SPEC/MP
Pending.         40   40   C-FDS/0001Rev.       0   0
                           2)ESMON
                           &VCDwith
                           RAMAN-ELfor
                           realtime
                           monitoringof
                           vitaldata,UORs
                           andconfiguration
                           databythe
                           respectiveloco
                           sheds.&same
                           advisedto
                           shed.Version'3'
                           tobevalidated.
a)Demand:
i)Auxiliary
converter-05
L/s.ii)
                           a)Demand:i)
Traction
                           Auxiliary
converter-05
                           converter-05L/s.
L/s.b)                                                  a)Demand:i)Auxiliary
                           ii)Traction
Supply:i)                                              converter-05L/s.ii)Traction
                           converter-05L/s.
Aux.                                                     converter-05L/s.b)Supply:
                           b)Supply:i)Aux.
converter-                                              i)Aux.converter-NIL.ii)Tr.
                 0    0    converter-NIL.      0   0
NIL.ii)Tr.                                             converter-NIL.c)Balance:
                           ii)Tr.converter-
converter-                                                i)Aux.converter-05
                           NIL.c)Balance:
NIL.c)                                                  L/s(CR-5)ii)Tr.converter-
                           i)Aux.converter
Balance:i)                                             05L/s(CR-5).
                           -05L/s(CR-5)ii)
Aux.
                           Tr.converter-05
converter-05
                           L/s(CR-5).
L/s(CR-5)ii)
Tr.converter-
05L/s(CR-
5).
POplaced
onM/SLotus
,Directly
deliveryto            POplacedon
Consignee.C             M/SLotus
                                                      POplacedonM/SLotus
onsigneeas            ,Directlydelivery
                                                      ,Directlydeliveryto
perPO                 to
                                                      Consignee.Consigneeas
a)Sr.DEE(TR             Consignee.Consi
                                                      perPO
S),Ajni,CRly=           gneeasperPO
                                                      a)Sr.DEE(TRS),Ajni,CRly=3
3sets,                a)Sr.DEE(TRS),A
                                                      sets,
b)Sr.DEE,Lal    0   0   jni,CRly=3sets,     0   0
                                                      b)Sr.DEE,Lalaguda,SCR=3
aguda,SCR=              b)Sr.DEE,Lalagu
                                                      sets,
3sets,                da,SCR=3sets,
                                                      c)Sr.DEE,Tatanagar,SER=1
c)Sr.DEE,Tat            c)Sr.DEE,Tatana
                                                      set,
anagar,SER=             gar,SER=1set,
                                                      d)Sr.DEE,Bhllai,SECR=1
1set,                 d)Sr.DEE,Bhllai,
                                                      set.UncoveredQty-4.
d)Sr.DEE,Bhl            SECR=1set.
lai,SECR=1             UncoveredQty-4.
set.
Uncovered
Qty-4.
                                                      CentralizedprocuredbyRly.
                                                      Board.RlyBdsP.O.No.
                                                      2012/RS(FP&EC)/951/Co-
                                                      Codated04.05.12issuedto
                                                      M/STitagarhKolkatawith
                                                      DP-90daysfromthedateof
                                                      issueofPurchaseOrder.
                                                      DPextendedupto
                                                      30.04.2014.02nosbogies
                                                      receivedatELS/CNBon
                                                      dated03.01.14&03nos
                                                      receivedondated
                        Nodalagency:
                                                      07.06.2014fromM/S
                6   0   Rly.Bd.Material     5   0
                                                      Titagarh,Kolkata.
                        received.
                                                      COMPLETED.Asperadvise
                                                      ofELS/CNBinformtoRly
                                                      Bdvidethisofficeletterno
                                                      NCR/Elec/loco/19/BRSPdt
                                                      25.11.14thatitemmaybe
                                                      deleted.InreferencetoRly
                                                      Bd'sletterdt06.05.2015
                                                      informtoRlyBdvidethis
                                                      officeletterno
                                                      NCR/Elec/loco/19/BRSPdt
                                                      09.07.15thatitemmaybe
                                                      closed.
Fullqty.
                 9   0   Fullqty.supplied.   0   0   Fullqty.supplied.
supplied.
Fullquantity
(90nos)                Fullquantity(90
                                                       Fullquantity(90nos)
supplied.               nos)supplied.
                 9   0                         0   0   supplied.(directlysupplied
(directly               (directlysupplied
                                                       byfirm).
suppliedby             byfirm).
firm).
                                                        Lettersentto
                                                        CWM/ELW/BSL,by
                                                        Sr.DEE/RS/CNBon
                                                        19.01.11withreminderon
                                                        dated04.10.11&30.10.12
FullQty                                               formanufacture&supplyof
received.                                              wheelsets.03wheelset
Thisitem                                              collectedbyELS/JHSfrom
maybe                                                 CWM/BSLon28.04.2014
closed.                                                fromCNB'sQuata.Asper
Requested                                              DyCWM/BSLletterno-
                         Nodalagency:
Boardfor                                              ELW/BSL/RSP/WHEEL
                 6   6   CB/LKOMaterial      12   9
deletionvide                                          SET/2014-15DT.
                         awaited.
ECOR'slr.                                             04.08.2014,ELS/JHShas
No.                                                    collected03noswheelset
ECOR/EL/R                                               ondt.21.03.2013,03noson
SP/484/05/11                                            15.02.2013&03noson
86dt.                                                 dt.06.04.2013.Inreference
10.09.2012.                                             toRlyBd'sletterdt
                                                        06.05.2015informtoRlyBd
                                                        videthisofficeletterno
                                                        NCR/Elec/loco/19/BRSPdt
                                                        09.07.15thatitemmaybe
                                                        closed.
                         Nodalagency:
                         ELW/BSLVide
                         Rly.Bd.letterno.
                         2009/Elect(TRS)
                 0   0   /720/1dated         0    0
                         10.02.2014,Qty.
                         ofNRhasbeen
                         changedfrom15
                         toNil.
RSPbeing
operatedby
TMWNKRD                 RSPbeing
forQty-                  operatedby
44(Qty                   TMWNKRDfor
completed-                Qty-44(Qty                  RSPbeingoperatedby
17).ForQty-              completed-                   TMWNKRDforQty-44(Qty
40,PO                   17).ForQty-40              completed-17).ForQty-
placed&       15   15   ,POplaced&        0   0   40,POplaced&material
material                 materialreceived           receivedforQty-10,BalQty-
receivedfor             forQty-10,Bal             30.(suppliedAQ-10ELW-6
Qty-10,Bal              Qty-30.(supplied            SR-5SCR-3WCR-4)
Qty-30.                   AQ-10ELW-6
(supplied                SR-5SCR-3
AQ-10ELW-                WCR-4)
6SR-5SCR-
3WCR-4)
RSPbeing
operatedby
TMWNKRD
forQty-                  RSPbeing
44(Qty                   operatedby
completed-                TMWNKRDfor
23).ForQty-              Qty-44(Qty                  RSPbeingoperatedby
40,PO                   completed-                   TMWNKRDforQty-44(Qty
placed&                 23).ForQty-40,             completed-23).ForQty-40,
material                 POplaced&                 POplaced&material
                15   15                        0   0
receivedfor             materialreceived           receivedforQty-29,BalQty-
Qty-29,Bal              forQty-29,Bal             11.(Supplied-AQ-10ELW-
Qty-11.                   Qty-11.(Supplied-            17(ECR-5,NR-5,AQ-1),
(Supplied-                AQ-10ELW-                   SR-5SCR-2NR-5).
AQ-10ELW-                17(ECR-5,NR-5,
17(ECR-5,                AQ-1),SR-5
NR-5,AQ-                 SCR-2NR-5).
1),SR-5
SCR-2NR-
5).
Work
                         Workcompleted             Workcompletedandbill
completed       0   0                       0   0
                         andbillpaid.              paid.
andbillpaid.
Tobe
procured
centrallyby
CRwith                 Tobeprocured
direct                  centrallybyCR
deliveryto             withdirect
consignee               deliveryto
                                                     Tobeprocuredcentrallyby
railways(CR-             consignee
                                                     CRwithdirectdeliveryto
5ER-4ECR-              railways(CR-5
                                                     consigneerailways(CR-5
8ECOR-3                ER-4ECR-8
                                                     ER-4ECR-8ECOR-3NR-
NR-6,SR-4               ECOR-3NR-
                                                     6,SR-4SCR-4SER-4
SCR-4SER-       6   6   6,SR-4SCR-4       0   0
                                                     SECR-4WR-4WCR-
4SECR-4                SER-4SECR-4
                                                     4).Newallotment(CR-3ER-
WR-4WCR-                WR-4WCR-
                                                     5ECR-12ECOR-2NR-4
4).New                  4).Newallotment
                                                     SR-2SCR-6SER-2SECR-
allotment               (CR-3ER-5
                                                     3WR-9WCR-2).
(CR-3ER-5              ECR-12ECOR-2
ECR-12                  NR-4SR-2SCR-
ECOR-2NR-               6SER-2SECR-3
4SR-2SCR-              WR-9WCR-2).
6SER-2
SECR-3WR-
9WCR-2).
Tobe
procured
                         Tobeprocured
centrallyby
                         centrallybyCR
CRwith
                         withdirect
direct                                              Tobeprocuredcentrallyby
                         deliveryto
deliveryto                                         CRwithdirectdeliveryto
                         consignee
consignee       0   0                       0   0   consigneerailways(CR-2
                         railways(CR-2
railways(CR-                                         ECR-1ECOR-1SCR-2
                         ECR-1ECOR-1
2ECR-1                                             SER-2SECR-1WCR-1).
                         SCR-2SER-2
ECOR-1
                         SECR-1WCR-
SCR-2SER-
                         1).
2SECR-1
WCR-1).
a)Supplied:
                        a)Supplied:07
07nos.(ER-
                        nos.(ER-2,NR-
2,NR-1,SER-                                         a)Supplied:07nos.(ER-
                        1,SER-1,SR-1,
1,SR-1,WR-                                        2,NR-1,SER-1,SR-1,WR-
                1   0   WR-2).b)          0   0
2).b)                                             2).b)Balance:02nos.
                        Balance:02nos.
Balance:02                                        (SCR-1,SECR-1).
                        (SCR-1,SECR-
nos.(SCR-1,
                        1).
SECR-1).
a)Supplied:
05nos.(ER-            a)Supplied:05
1,NR-1,SCR-             nos.(ER-1,NR-
1,SR-1,WR-              1,SCR-1,SR-                 a)Supplied:05nos.(ER-
1).b)                 1,WR-1).b)                1,NR-1,SCR-1,SR-1,WR-1).
                1   0                       0   0
Balance:04            Balance:04nos.           b)Balance:04nos.(ER-
nos.(ER-               (ER-1,SECR-                 1,SECR-1,SER-1,WCR-1).
1,SECR-                 1,SER-1,WCR-
1,SER-1,               1).
WCR-1).
Central
procurement
                        Central
byECoR
                        procurementby
withdirect
                        ECoRwithdirect
deliveryto                                        Centralprocurementby
                        deliveryto
consignee                                          ECoRwithdirectdeliveryto
                        consignee
railways.18                                       consigneerailways.18Nos
                2   2   railways.18Nos   2   2
Nosreceived                                       receivedanddelivered.2
                        receivedand
and                                                NosP.OplacedonSimplex
                        delivered.2Nos
delivered.2                                       Engineering.
                        P.Oplacedon
NosP.O
                        Simplex
placedon
                        Engineering.
Simplex
Engineering.
Storecase
No.0215701
6.POcould
                 0   0                         0   0
notbeissued
onwantof
funds.
a)Supply:
10nos.(CR-
                         a)Supply:10
2,NR-2,SCR-
                         nos.(CR-2,NR-
4,SECR-2).
                         2,SCR-4,SECR-
b)Balance:                                          a)Supply:10nos.(CR-
                         2).b)Balance:
08nos.(ER-                                           2,NR-2,SCR-4,SECR-2).b)
                         08nos.(ER-
1,SER-1,SR-                                            Balance:08nos.(ER-
                         1,SER-1,SR-
2,WCR-4).c)                                          1,SER-1,SR-2,WCR-4).c)i)
                 2   0   2,WCR-4).c)i)      0   0
i)02nos                                             02nosallottedtoECRis
                         02nosallottedto
allottedto                                           notrequiredtothem.ii)02
                         ECRisnot
ECRisnot                                            nos.excesssupplydoneto
                         requiredtothem.
requiredto                                           SCR.
                         ii)02nos.excess
them.ii)02
                         supplydoneto
nos.excess
                         SCR.
supplydone
toSCR.
Centralized
procurement             Centralized
byS.CRly.             procurementby               Centralizedprocurementby
Material                S.CRly.Material            S.CRly.Materialreceived
                 1   0                         0   0
receivedand            receivedand                 andpaid.Itemmaybe
paid.Item               paid.Itemmaybe             deleted.
maybe                  deleted.
deleted.
Qty-(6
                          ECR(GMO)-6                  consingee,2)AuxAircomp
received),
                          SR-2NR-6,                  SCR-6,NR-5,SECR-3,SR-
remaining
                          6)OCBmotor-CR              2,WCR-6,3)SRoilpump
direct
                          Qty-(6received),           NR-6SCR-4SECR-1SR-2
deliveryto
                          remainingdirect            WCR-4,4)TFPoilPumpNR-
consingee,
                          deliveryto                 6SCR-6SECR-2SR-2
7)Blowerfor
                          consingee,                  WCR-6.5)Impellerforoil
Traction
                          7)Blowerfor                cooling-CR(AQ)-3,
motor
                          Tractionmotor              SCR(LGD)-6,WCR(TKD)-6,
(W/out
                          (W/outmotor)-              SER-2ECR(GMO)-6SR-2
motor)-SR-2
                          SR-2SCR-                    NR-6,6)OCBmotor-CR
SCR-
                          6.Procurement               Qty-(6received),remaining
6.Procureme
                          status-1)Motor              directdeliverytoconsingee,
ntstatus-
                          forTraction                7)BlowerforTractionmotor
1)Motorfor
                          motorblower                (W/outmotor)-SR-2SCR-
Traction
                          -RT/TOD                     6.Procurementstatus-
motorblower
                          18.01.2016,                 1)MotorforTractionmotor
-RT/TOD
                          2)Scavenger                 blower-RT/TOD
18.01.2016,
                          Blower                      18.01.2016,2)Scavenger
2)Scavenger
                          TM(Indentsplited           BlowerTM(Indentsplitedfor
Blower
                  2   1   formotor-PO        0   0   motor-POplacedforQty-
TM(Indent
                          placedforQty-              15(received)DD-
splitedfor
                          15(received)DD-             30.08.2014,POQty-
motor-PO
                          30.08.2014,PO              15(received)DD-
placedfor
                          Qty-15(received)            25.03.2015,Balqty-6TOD
Qty-
                          DD-                          24.02.2015&blower-PO
15(received)
                          25.03.2015,Bal              placedDD-21.10.2014(qty-9
DD-
                          qty-6TOD                   received,BalQty-
30.08.2014,
                          24.02.2015&                27),3)ScavengerBlowerfor
POQty-
                          blower-PO                   M/cRoom(Indentsplitedfor
15(received)
                          placedDD-                   motor-POplacedforQty-
DD-
                          21.10.2014(qty-9            17(recieved)DD-
25.03.2015,B
                          received,Bal               10.10.2014,uncoveredQty-
alqty-6TOD
                          Qty-                         19TOD-19.01.2016forQty-
24.02.2015&
                          27),3)Scavenger             36&blower-POplacedfor
blower-PO
                          BlowerforM/c              Qty-12DD-20.11.2014,Bal
placedDD-
                          Room(Indent                 Qty-24TOD18.12.2014DA
21.10.2014(q
                          splitedformotor-           case)&4)M/croom
ty-9received,
                          POplacedfor               Blower(Indentsplitedfor
BalQty-
                          Qty-17(recieved)            motor-RT/TOD16.02.2015
27),3)Scaven
                          DD-10.10.2014,              underTC,newTOD
gerBlower
        For10radiators,
        poplacedon
        04.12.2014on
        M/sKessler,DP:
        15.5.2015
        Materialreceived
        on30.4.2014.
        ForBUR
        electronics,PO
        placedOnm/s
5   5   CGL,DP:31.8.20       0   0
        15.Material
        receivedon
        24.6.15.For
        othermisc.item,
        POplaced&
        Material
        received.Tender
        openedfor
        dampers&under
        TC.
0   0                        0   0
Itemmaybe
closed.Requ
estedBoard
fordeletion
videECOR's
                0   0                        0   0
lr.No.
ECOR/EL/R
SP/484/05/11
86dt.
10.09.2012.
0 0 0 0
                        P.O.placedon
                        18.3.2013DP:
                        15.7.2013.
                6   0                        0   0
                        Materialreceived
                        .Work
                        completed.
Material
received.
100%
payment          0   0                         0   0
made.Item
maybe
closed.
a)Demand:
i)Auxiliary
converter-10
L/s.ii)Tr.             a)Demand:i)
converter-10            Auxiliary
L/s.b)                  converter-10L/s.
                                                        a)Demand:i)Auxiliary
Supply:i)              ii)Tr.converter-
                                                        converter-10L/s.ii)Tr.
Aux.                     10L/s.b)
                                                        converter-10L/s.b)
converter-               Supply:i)Aux.
                                                        Supply:i)Aux.converter-
NILii)Tr.      0   0   converter-NILii)   0   0
                                                        NILii)Tr.converter-NIL.c)
converter-                Tr.converter-NIL.
                                                        Balance:i)Aux.converter-
NIL.c)                  c)Balance:i)
                                                        10L/s(CR-10)ii)Tr.
Balance:i)             Aux.converter-
                                                        converter-10L/s(CR-10).
Aux.                     10L/s(CR-10)ii)
converter-10            Tr.converter-10
L/s(CR-10)ii)           L/s(CR-10).
Tr.converter-
10L/s(CR-
10).
                  0   0                         0   0
Work
                          Workcompleted
completed       10                             0         Workcompletedandpaid.
                          andpaid.
andpaid.
                                                          IndentNo.036717841dated
                                                          27.08.13submittedtoHQ
                          P.O.placedon
                                                          ondated19.10.13by
                          12.4.2013.DP:
                                                          Sr.DEE/RS/JHS.HQ
Material                 24.10.2013
                 10   0                         10   10   returnedthecasebackwith
received.                 Material
                                                          somequries.Thecaseis
                          received.Work
                                                          pendingatELS/JHS,due
                          completed.
                                                          poorperformanceofsuch
                                                          reversers,MakeSteasalit.
a)Demand:
25L/s.(50
                          a)Demand:25
nos.).b)
                          L/s.(50nos.).b)
Supply:NIL.                                            a)Demand:25L/s.(50
                          Supply:NIL.c)
c)Balance:                                             nos.).b)Supply:NIL.c)
                 0    0   Balance:25L/s.    0    0
25L/s.                                                  Balance:25L/s.(ECoR-
                          (ECoR-8,SCR-
(ECoR-                                                    8,SCR-3,SECR-7,SER-7).
                          3,SECR-7,SER-
8,SCR-
                          7).
3,SECR-
7,SER-7).
                                                       AsperHQadvise,02Indent
                         (i)P.O.placedon
                                                       No.036717846dated
                         M/sSiemensfor
                                                       03.02.04&Indent
                         01set.P.O.no.
                                                       No.036717847dated
                         19125050165077
                                                       03.02.14submittedtoHQ
                         dt.15.7.2013.DP:
                                                       ondated07.03.14by
                         21.10.2014.
                                                       Sr.DEE/RS/JHSfor04sets
                         Materialawaited.
Material                                              ofspares.Indentsfurther
                4    1   (ii)P.O.placedon   4   4
received.                                              submittedtoCOS/NCRon
                         M/sAAL.P.O.no.
                                                       dated25.08.14for
                         19125051165075
                                                       procurement.Casefile
                         .dt.10.7.2013.
                                                       No.20.14.5023&
                         Qty.-01set.DP:
                                                       20.14.5024respectively
                         15.3.2013.
                                                       havebeenopened.02setof
                         Materialreceived
                                                       materialrecdon18.02.16.
                         on24.2.2014.
                                                       UnderTIinspection.
a)Supply:
                         a)Supply:02
02nos.(NR-
                         nos.(NR-2).b)              a)Supply:02nos.(NR-2).
2).b)         10   9                         0   0
                         Balance:08nos.            b)Balance:08nos.(NR-8).
Balance:08
                         (NR-8).
nos.(NR-8).
                0    0                         0   0
                            Approvalfor
                            Non-ACgivenon
                            01.4.15.Tender
                  10   10                          0   0
                            openedon
                            9.6.2015&under
                            TC.
for81nos.
wothoption
clouseto
enhancethe                Nodalagency:N
qty.upto96              (i)P.O.placedon
nos.P,O,no.               M/sAAL,Noida
1913501216                  for81nos.woth
0512                       optionclouseto
dt.27.1.14                 enhancetheqty.
DP:30.8.14                upto96nos.
                                                           Nodalagency:N(i)P.O.
Totalcost                 P,O,no.
                                                           placedonM/sAAL,Noida
Rs.34020                 19135012160512
                                                           for81nos.wothoption
lacs.(Details             dt.27.1.14DP:
                                                           clousetoenhancetheqty.
of81sets--               30.8.14Totalcost
                                                           upto96nos.P,O,no.
CR-13,ECR-                 Rs.34020lacs.
                                                           19135012160512dt.27.1.14
30,NR-23,                 (Detailsof81
                                                           DP:30.8.14TotalcostRs.
SCR-11,                    sets--CR-13,
                                                           34020lacs.(Detailsof81
SER-4).                    ECR-30,NR-23,
                                                           sets--CR-13,ECR-30,NR-
Amendment                  SCR-11,SER-4).
                                                           23,SCR-11,SER-4).
ssuedon                   Amendment
                                                           Amendmentssuedon
27.3.14upto              ssuedon27.3.14
                  30   0                           0   0   27.3.14upto96sets
96sets                    upto96sets
                                                           17.4.14.DP:15.10.14.(ii)
17.4.14.DP:               17.4.14.DP:
                                                           P.O.placedonM/sLaxeven
15.10.14.(ii)             15.10.14.(ii)P.O.
                                                           System,Hyderabadfor04
P.O.placed                placedonM/s
                                                           nos.P,O,no.
onM/s                     LaxevenSystem,
                                                           19135012160511dt.27.1.14
Laxeven                    Hyderabadfor04
                                                           DP:27.9.14TotalcostRs.
System,                    nos.P,O,no.
                                                           16.80lacs.(Detailsof04
Hyderabad                  19135012160511
                                                           sets--SCR-02&NR-02)All
for04nos.                dt.27.1.14DP:
                                                           materialsuppliedbyfirmto
P,O,no.                    27.9.14Totalcost
                                                           concernedRlys.Work
1913501216                  Rs.16.80lacs.
                                                           completed.
0511                       (Detailsof04
dt.27.1.14                 sets--SCR-02&
DP:27.9.14                NR-02)All
Totalcost                 materialsupplied
Rs.16.80                  byfirmto
lacs.(Details             concernedRlys.
of04sets--               Workcompleted.
SCR-02&
NR-02)All
material
Centralised
procurement             Centralised
bySCR.                 procurementby
                                                        Centralisedprocurementby
100%                    SCR.100%
                                                        SCR.100%material
material       95   0   materialreceived   0    0
                                                        receivedandpaid.couldbe
receivedand            andpaid.could
                                                        deletedfrom16-17.
paid.could             bedeletedfrom
bedeleted              16-17.
from16-17.
                                                        (i)ELS/CNB:Detailed
                                                        estimateaftervettingby
                                                        divisionalfinancesentto
                                                        DRM/ALDforsanctionof
                                                        variation.Indent
                                                        No.168245466issubmitted
                                                        toA/con28.04.2015.Indent
                                                        resubmittedtoaccountson
                                                        17/6/15afterclear
                                                        observation.A/cvetted
                                                        Indentsubmittedtostore
                                                        on08.9.15.Caseno
Material                                               20155050withCOS/ALD.
received.Wor                                            Tenderopenon12.02.16(ii)
kcompleted    0    0                        10   10   ELS/JHS:5noshasbeen
andtobe                                              surrenderedtoBoardvide
deleted.                                                thisofficeletterNo.
                                                        NCR/EL/Loco/19/BRSP
                                                        dated25/26.07.13.Re-write
                                                        letterNo.
                                                        NCR/EL/Loco/19/BRSP
                                                        dated08.11.2013.In
                                                        referencetoRlyBd'sletter
                                                        dt06.05.2015informtoRly
                                                        Bdvidethisofficeletterno
                                                        NCR/Elec/loco/19/BRSPdt
                                                        09.07.15thatitemof
                                                        ELS/JHS(05nos)maybe
                                                        closed.
               0   0                        0   0
                                                    IndentNo.036717810dated
                                                    20.03.12re-submittedto
                       P.O.placedon               CMM/C/NCRondated
                       M/sMedha                   26.12.13forprocurement.
                       P.O.no.                     CaseNo.2013.50.41
Material              19125025165089              openedinCOS.Tender
receivedon   4   0   dt.31.7.2013.DP:   5   5   openedon11.03.14.POno
04.01.14.              31.1.2014.                  2013.5041.1.81042dt
                       Materialreceived           16/7/15isplacedon
                       on19.10.2013.              M/sHindRectifier/Mumbai.
                       Workcompleted.              DPis20/10/15.05nosrecd
                                                    on04.8.15.95%billsentto
                                                    A/con27.8.15forpayment
0   0   0   0
0   0   0   0
CLWhas
                             CLWhas
processed                                                 CLWhasprocessedthe
                   0    0    processedthe      0    0
the                                                       procurement.
                             procurement.
procurement.
Caseno.
19135011
Tenderno.
                             Caseno.
4119130605
                             19135011Tender
isopened
                             no.4119130605
16.9.2013&
                             isopened                    Caseno.19135011Tender
discharged
                             16.9.2013&                  no.4119130605isopened
duetonone
                             dischargeddue               16.9.2013&dischargeddue
availabilityof
                             tonone                      tononeavailabilityof
Funds.            4    4                        0    0
                             availabilityof              Funds.TenderOPENEDON
Tender
                             Funds.Tender                09.1.2015.&TCfinalizedfor
OPENED
                             OPENEDON                    04nos.andPOisunder
ON
                             09.1.2015.&TC               vetting.
09.1.2015.&
                             finalizedfor04
TCfinalized
                             nos.andPOis
for04
                             undervetting.
nos.andPO
isunder
vetting.
                   10   10                       10   10
                0    0                        0   0
40nos
suppliedto
                          40nossupplied
zonal
                          tozonal
Railways.                                            40nossuppliedtozonal
                          Railways.The
The                                                  Railways.Theperformance
                10   10   performanceis     0   0
performance                                          isunderwatchdueto
                          underwatchdue
isunder                                             problemsinthefield.
                          toproblemsin
watchdueto
                          thefield.
problemsin
thefield.
                          Nodalagency:
Material
                          WRAsperWR,
receivedon    2    2                        0   0
                          Maybecollected
24.06.15
                          fromCLW.
Material
received              Materialreceived
                                                    MaterialreceivedfromCLW.
fromCLW.             fromCLW.Case
               0   0                        0   0   CaseclosedfromWCR
Caseclosed           closedfrom
                                                    side.
fromWCR              WCRside.
side.
0 0
               0   0                        0   0
                 0    0                          0   0
100%
Material
receivedand
                           100%Material
billfor
                           receivedandbill
Rs.66.34
                           forRs.66.34
lacks                                                   100%Materialreceivedand
                           lackspending.
pending.                                                billforRs.66.34lacks
                           Fundmaybe
Fundmaybe                                             pending.Fundmaybe
                 70   70   providedon          0   0
providedon                                             providedonpriority.Could
                           priority.Couldbe
priority.                                               bedeletedfrom16-17iffull
                           deletedfrom16-
Couldbe                                                fundsareprovidedin15-16.
                           17iffullfunds
deletedfrom
                           areprovidedin
16-17iffull
                           15-16.
fundsare
providedin
15-16.
                           Tender
                           no.4119150816
pending.         25   25                         0   0
                           isdueon
                           11.9.2015.
a)Supply:
NIL.b)
                        a)Supply:NIL.
Balance:08                                       a)Supply:NIL.b)Balance:
                        b)Balance:08
nos.(ER-                                           08nos.(ER-2,SCR-
                0   0   nos.(ER-2,SCR-     0   0
2,SCR-                                              1,SECR-1,SER-1,SR-
                        1,SECR-1,SER-
1,SECR-                                             1,WCR-2).
                        1,SR-1,WCR-2).
1,SER-1,SR-
1,WCR-2).
Work
                0   0   Workcompleted      0   0   Workcompleted
completed
Work
                0   0   Workcompleted.     0   0   Workcompleted.
completed.
          Caseisunder
10   10                       0   0
          processinstore.
                                                       (i)ELS/CNB=3nos.Theqty
                                                       includedinrunningcontract
                                                       byoperatingquantity
Itemisnot
                                                       variationclausevideLOA
requiredby
                                                       issuedon05.02.14.M/S
ECoR.Board
                                                       AALhasrehabilitated03
hasbeen
                                                       Nosandsuppliedto
requestedto
                                                       ELS/CNBondated
divertthe
                                                       11.10.14.Completed.(ii)
itemtoother   5    5   Notrequired.        5   3
                                                       ELS/JHS=02noshasbeen
Railwayvide
                                                       completedon03.03.14.In
letterNo.
                                                       referencetoRlyBd'sletter
ECoR/EL/RS
                                                       dt06.05.2015informtoRly
P/484/05/242
                                                       Bdvidethisofficeletterno
2dt.
                                                       NCR/Elec/loco/19/BRSPdt
10.09.12.
                                                       09.07.15thatitemof
                                                       ELS/JHS(02nos)maybe
                                                       closed.
                          POplaced&
                          materialreceived
                 10   0                        0   0
                          during2013-14.
                          workcompleted.
                          (i)POplacedon
                          M/sMedhafor8
                          nos.PO
                          no.16145096178
                          047dt.8.7.2015
                          DP:05.1.16Total
                          costofRs.136.42
                20   20                        0   0
                          lacs.Material
                          awaited.(ii)PO
                          placedonM/s
                          Safeelectronics.
                          for02nos.Cost
                          ofRs.24.12lacs
                          Materialawaited.
Tender
openedon
30.01.13for             Tenderopened
30loco                  on30.01.13for
                                                       Tenderopenedon30.01.13
sets                     30locosets
                                                       for30locosets,Contract
,Contract      6    6    ,Contract           0   0
                                                       awardedonM/s
awardedon               awardedonM/s
                                                       Indocen.Workinprogress.
M/s                      Indocen.Workin
Indocen.Wor               progress.
kin
progress.
Detailed
                          Detailedestimate
estimateIS
                          ISUNDER                    DetailedestimateIS
UNDER
                4    4    VETTINGIN          0   0   UNDERVETTINGIN
VETTINGIN
                          UNDER                       UNDERDIVISION.
UNDER
                          DIVISION.
DIVISION.
Material
                           Materialunder
under           0                             0   0   Materialunderprocurement
                           procurement
procurement
Estimate                  Estimate
sanctioned                sanctionedand             Estimatesanctionedand
andexcution    4    4    excutionin        0   0   excutioninprogressat
inprogress               progressat                TMW.
atTMW.                    TMW.
Estimate                  Estimate
sanctioned                sanctionedand             Estimatesanctionedand
andexcution    12   12   excutionin        0   0   excutioninprogressat
inprogress               progressat                TMW.
atTMW.                    TMW.
a)Supply:
18L/s.(CR-
10,NR-                     a)Supply:18
3,WCR-5).b)              L/s.(CR-10,NR-
Balance:82              3,WCR-5).b)               a)Supply:18L/s.(CR-
L/s(CR-                   Balance:82L/s           10,NR-3,WCR-5).b)
10,ECR-                    (CR-10,ECR-                 Balance:82L/s(CR-
20,NR-           15   15   20,NR-12,SCR-       0   0   10,ECR-20,NR-12,SCR-
12,SCR-                    25,SECR-                    25,SECR-10,WCR-5).c)
25,SECR-                   10,WCR-5).c)              EachLocosetconsistsof
10,WCR-5).                EachLocoset              02nos.ofDDU.
c)EachLoco              consistsof02
setconsists              nos.ofDDU.
of02nos.of
DDU.
All
pending.No                  Allpending.No
actionhas                  actionhasbeen
                                                              Allpending.Noactionhas
beentaken                  takenassince
                                                              beentakenassincethe
assincethe      15   15   theperformance       0    0
                                                              performanceofearlier40
performance                 ofearlier40nos
                                                              nosisstillunderwatch
ofearlier40               isstillunder
nosisstill                watch
underwatch
MSunder                    MSunder
                   0                                1    1    MSunderpreparation
preparation                  preparation
                             (i)For01setAAL              (i)ELS/CNB=5nos.(Indent
                             make,POplaced                  No.168258736dated
                             onM.sAAL,                     18.09.14for1setM/S
                             Noida.PO                       SiemensMake,IndentNo.
                             no.19135136165                   168258737dated18.09.14
                             009dated9.4.14.               for1setM/SMedha
Material                    Qty.-01set.Total             Make,IndentNo.168258738
received:i)                cost-Rs.21.29                 dated16.09.14for1setM/S
Chopper                     lacs.DP:                       AALMake-Gentype,Indent
gatedriver                 25.11.14.                       No.168258739dated
card,Qty-2.                Material                        16.09.14for1setM/SAAL
ii)PSPCB                  recieved.(ii)For              Make-Kit-2type,&Indent
Assembly,                   01setHind                     No.168258740dated
Qty-2.iii)                Recctfiermake,                 17.09.14for1setM/SAAL
MCUcard,                   P.O.no.                         Make-Kit-3type.Indent
Qty-2.                      19135127165136                  vettedbyDivfinanceis
iv)Voltage                  dt.19.11.2013.                  submittedtoHQon
sencer,Qty-                 M/sWestren                     04.03.2015isunderaccount
2.v)             10   6    Electric&            10   10   vetting.ResubmitedtoHQ
Assembled                   TradingCo.Delhi               on30.04.15aftercertifying
PCBTT,Qty-                 .DP:29.4.2014.                 fund2015-16.casewas
2:vi)3                    Cost.Rs.17.97                  resubmittedagaintoHQon
Phaseoutput                lacs.Material                  17.06.2015afterclearsome
filter                      receivedon                     querry.(a)case
Capacitor,                  26.2.2014.(iii)                no20155035PACtender
vii)Thyristerf             .For02set                     openon27.8.15(b)case
firingcard&               Medha                           no20155036PACtender
Sibcosviii)                make,P.O.placed                 openon01.9.15(c)case
PM4gate                   onM.sMedha..                 no20155037PACtender
driveix)PM1               POno.                          openon01.9.15(d)case
IGBTModule                  19135248165199                  no20155038PACtender
                             dated24.3.14.                  openon01.9.15(e)case
                             Qey.-02sets,DP:               no20155039PACtender
                             30.6.14Total                   openon01.9.15(ii)
                             cost:Rs.11.31                  ELS/JHS=05Nos.:Detailed
                             lacs.Material                  estimateisunder
                             recieved.                        preparation.
All
pending.As
perRB's                 Allpending.As
L/No.                    perRB'sL/No.
2013/Elect.               2013/Elect.                  Allpending.AsperRB's
(TRS)/441/3              (TRS)/441/3dt.-            L/No.2013/Elect.
dt.-           1    1    08.11.2013          0   0   (TRS)/441/3dt.-08.11.2013
08.11.2013               centralised                 centralisedprocurementby
centralised              procurementby              WesternRailwayadvised.
procurement              WesternRailway
byWestern               advised.
Railway
advised.
a)Supply:
                          a)Supply:03
03nos.(NR-
                          nos.(NR-
2,WCR-1)b)
                          2,WCR-1)b)                 a)Supply:03nos.(NR-
Balance:47
                          Balance:47nos.           2,WCR-1)b)Balance:47
nos.(CR-
                10   10   (CR-6,ECR-           0   0   nos.(CR-6,ECR-2,ER-
6,ECR-2,ER-
                          2,ER-6,NR-                   6,NR-8,SCR-6,SER-6,SR-
6,NR-8,SCR-
                          8,SCR-6,SER-                 6,WCR-3,WR-4).
6,SER-6,SR-
                          6,SR-6,WCR-
6,WCR-
                          3,WR-4).
3,WR-4).
                0                              0   0
                5    5                         8   5
Indentbeing             Indentbeingsent
senttoFA&             toFA&                     IndentbeingsenttoFA&
                0    0                         0   0
CAO/WST                  CAO/WSTfor                 CAO/WSTforvetting.
forvetting.              vetting.
                          Tenderopened
                15   15   on5.8.2015&       0   0
                          underTC.
a)Asper
advisedby
Rly.Bd.                 a)Asperadvised
Procurement              byRly.Bd.
                                                         a)AsperadvisedbyRly.Bd.
processed                Procurement
                                                         Procurementprocessedfor
for200                  processedfor
                85   66                        85   85   200nos.only.b)Supply:15
nos.only.b)             200nos.only.b)
                                                         nos.(CR-6,ECoR-2,NR-
Supply:15              Supply:15nos.
                                                         6,SR-1)
nos.(CR-                 (CR-6,ECoR-
6,ECoR-                   2,NR-6,SR-1)
2,NR-6,SR-
1)
a)Demand:
02nos.
transformer              a)Demand:02
forWAP-                  nos.transformer              a)Demand:02nos.
5/WAP-7                  forWAP-5/WAP-                 transformerforWAP-
Loco.b)       0    0    7Loco.b)Supply   0    0    5/WAP-7Loco.b)Supply:
Supply:01              :01no.(ER-1).              01no.(ER-1).c)Balance:
no.(ER-1).              c)Balance:01               01no.(WR-1).
c)Balance:             no.(WR-1).
01no.(WR-
1).
a)Supply:
15nos.(CR-              a)Supply:15
2,ECoR-                   nos.(CR-                      a)Supply:15nos.(CR-
3,ER-3,NR-                2,ECoR-3,ER-                   2,ECoR-3,ER-3,NR-
3,SECR-         3    3    3,NR-3,SECR-         0    0    3,SECR-2,WCR-2).b)
2,WCR-2).b)             2,WCR-2).b)                  Balance:05nos.(SCR-
Balance:05             Balance:05nos.             2,SER-3).
nos.(SCR-                (SCR-2,SER-3).
2,SER-3).
Tenderno.
4119130068
openedon                Tenderno.
20.3.2013.&             4119130068
Tender                   openedon
finalized                20.3.2013.&
P.O.placed               Tenderfinalized
                                                      Tenderno.4119130068
onM/sBTIL.             P.O.placedon
                                                      openedon20.3.2013.&
P.O.no.1910               M/sBTIL.
                                                      TenderfinalizedP.O.placed
5139160327               P.O.no.19105139
                                                      onM/sBTIL.
dt.22.8.2013             160327
                                                      P.O.no.19105139160327
DP:                      dt.22.8.2013DP:
                                                      dt.22.8.2013DP:
30.11.2013               30.11.2013
                  0   0                       0   0   30.11.2013MaterialStill
MaterialStill           MaterialStill
                                                      awaited.EDP:31.7.2015.All
awaited.                 awaited.
                                                      materialreceivedat
EDP:31.7.20               EDP:31.7.2015.
                                                      ELS/GZB,on22.6.15and
15.All                  Allmaterial
                                                      advisedtoallrlys.on
material                 receivedat
                                                      23.6.15tocollectthe
receivedat              ELS/GZB,on
                                                      material.
ELS/GZB,on              22.6.15and
22.6.15and              advisedtoall
advisedtoall           rlys.on23.6.15
rlys.on                 tocollectthe
23.6.15to               material.
collectthe
material.
                  0   0                       0   0
                0    0                       0   0
Materials
                          Materialsunder           Materialsunder
under          0    0                       0   0
                          procurement.               procurement.
procurement.
SRisthe
                          SRisthenodal
nodalagency
                          agencyfor
for
                          centralised
centralised                                         SRisthenodalagencyfor
                          procurement.
procurement.                                        centralisedprocurement.
                          Estimate
Estimate       10   10                      5   5   Estimatesanctioned.Indent
                          sanctioned.
sanctioned.                                         senttoCOSfor
                          Indentsentto
Indentsent                                         procurement.underTCM.
                          COSfor
toCOSfor
                          procurement.
procurement.
                          underTCM.
underTCM.
MSunder             MSunder
              3   3                 0   0   MSunderpreparation
preparation           preparation
              8   8                 0   0
                                                         Tenderforrehabilitation
                                                         openedondated
                                                         25.06.2014.LOAissuedto
                                                         M/SAAL,Noidaondated
                                                         15.10.14.03nosTap
                                                         Changershavebeen
                                                         rehabilatedbyfirmon
                  0    0                         9   9
                                                         30/03/15.Further02nostap
                                                         changerhavebeenissued
                                                         on23.9.15for
                                                         rehabilitation.Balance
                                                         quantityyettobeissued.
                                                         Samerecdafter
                                                         rehabilitationon22.12.15
100%
material
received.Bill             100%material
of                         received.Billof
Rs.21680(00                 Rs.21680(000)
                                                         100%materialreceived.Bill
0)pending                 pendingfor
                                                         ofRs.21680(000)pending
forpayment                paymentin15-
                  15   15                        0   0   forpaymentin15-16.Could
in15-16.                  16.Couldbe
                                                         bedeletedfrom16-17iffull
Couldbe                   deletedfrom16-
                                                         fundsprovidedin15-16.
deletedfrom               17iffullfunds
16-17iffull              providedin15-
funds                      16.
providedin
15-16.
a)Supply:
13L/s
(SECR-
10,SR-1,WR-               a)Supply:13L/s
02).                     (SECR-10,SR-
b)Balance:              1,WR-02).
                                                        a)Supply:13L/s(SECR-
87L/s.(CR-              b)Balance:87
                                                        10,SR-1,WR-02).b)Balance
10,ECR-                   L/s.(CR-
                                                        :87L/s.(CR-10,ECR-
10,ER-5,NR-               10,ECR-10,ER-
                                                        10,ER-5,NR-10,SCR-
10,SCR-         10   10   5,NR-10,SCR-          0   0
                                                        10,SECR-10,SER-5,SR-
10,SECR-                  10,SECR-
                                                        4,WCR-20,WR-3)c)Each
10,SER-                   10,SER-5,SR-
                                                        Locosetconsistsof02
5,SR-                     4,WCR-20,WR-
                                                        nos.ofDDU)
4,WCR-                    3)c)EachLoco
20,WR-3)c)              setconsistsof02
EachLoco                nos.ofDDU)
setconsists
of02nos.of
DDU)
Caseno.22-
                          Caseno.22-16-
16-5088                                                Caseno.22-16-5088
                1    1    5088TOD:30-05-       0   0
TOD:30-05-                                              TOD:30-05-16
                          16
16
                                                         IndentNo.168258705
                                                         dated19.05.2014submitted
                                                         toHQon18.07.14.HQ
                                                         returnedthecaseto
                         POplacedon                   ELS/CNBon30.09.14for
                         M/sWestern                    somequires.ELS/CNBhas
Material                Electronicson                 submittedIndenttostoreon
receivedon    25   0   29.10.2014&         20   20   26.02.2015after
30.06.15                 materialreceived              approval.Caseisunder
                         on05.2.2015.                  waitingforfund2015-16.
                         Workcompleted.                 Afterapprovaloffundcase
                                                         resubmittedon06.05.15.
                                                         Caseno20155019dueon
                                                         04/8/15.Tenderopenon
                                                         12.02.16
Tobe
procured                Tobeprocured
centrallyby            centrallybyC.Rly
                                                         Tobeprocuredcentrallyby
C.Rlywith              withdirect
                0    0                         0    0    C.Rlywithdirectdeliveryto
direct                  deliveryto
                                                         consignee.TODawaited.
deliveryto             consignee.TOD
consignee.T              awaited.
ODawaited.
Material
                           Materialunder
under           1    1                          0   0   Materialunderprocurement
                           procurement
procurement
Nodal
agency:NR
                           Nodalagency:
Administrativ
                           NR
eapproval                                              Nodalagency:NR
                           Administrative
advisedto                                              Administrativeapproval
                           approvaladvised
ELS/GZB         25   25                         0   0   advisedtoELS/GZBON
                           toELS/GZBON
ON                                                      24.11.2014andtenderis
                           24.11.2014and
24.11.2014                                              dueon01.10.2015.
                           tenderisdueon
andtenderis
                           01.10.2015.
dueon
01.10.2015.
Tobe
procured
centrallyby
C.Rlyand
                           Tobeprocured
being
                           centrallybyC.Rly
provideon
                           andbeing
locosby
                           provideonlocos
ELW/BSL.TO
                           by                           Tobeprocuredcentrallyby
D
                           ELW/BSL.TOD                  C.Rlyandbeingprovideon
09.03.2015.L
                           09.03.2015.Lette              locosbyELW/BSL.TOD
etter
                           rdt.16.02.2015              09.03.2015.Letter
dt.16.02.201
                           toRDSOfor                  dt.16.02.2015toRDSOfor
5toRDSO
                 5    5    eligibity            0   0   eligibitycriteria.Copyof
foreligibity
                           criteria.Copyof             lettertoCMM/Cfor
criteria.Copy
                           lettertoCMM/C              postponeofofabovetender
ofletterto
                           forpostponeofof           tillclarificationfromRDSO.
CMM/Cfor
                           abovetendertill            Letterdt.17.03.2015
postponeof
                           clarificationfrom           receivedfromRDSO.
ofabove
                           RDSO.Letter
tendertill
                           dt.17.03.2015
clarification
                           receivedfrom
fromRDSO.
                           RDSO.
Letter
dt.17.03.201
5received
fromRDSO.
                           GMhasgiven
                           administrative
                           approvalforthis
LOAissued
                           workon                       .AsperELS/CNBdetailed
onM/s.
                           02.4.2014.and                estimatevettedby
Stesalit.53
                           sameadvisedto               Div.Financeissubmittedon
Nos.fitted.    27   27                        10   10
                           Shedon                       31.01.2014.Caseisunder
Balance11
                           04.4.2014&                   Tendercommittee.Caseis
Nosliftedon
                           underprocessin              underretendering
22.01.16.
                           shed.Tenderis
                           opened&LOAis
                           underissued.
4,GZB-8                   20.(Dist-1)forPO
dt.19.08.201               Qty-36,AQ-5
4,Bhillai-3               dt.04.08.2014,GZ
dt.19.09.201               B-8
                                                          Tobeprocuredcentrallyby
4.LGD-5                   dt.19.08.2014,Bh
                                                          C.Rlywithdirectdeliveryto
dt.15.09.201               illai-3
                                                          consignee.POplaced&
4,RPM-1                   dt.19.09.2014.LG
                                                          materialforQty-80,Bal
dt.14.10.201               D-5
                                                          uncoveredQty-20.(Dist-
4,TKD-3                   dt.15.09.2014,RP
                                                          1)forPOQty-36,AQ-5
dt.10.11.201               M-1
                                                          dt.04.08.2014,GZB-8
4,GMO-7                   dt.14.10.2014,TK
                                                          dt.19.08.2014,Bhillai-3
dt.15.10.201               D-3
                                                          dt.19.09.2014.LGD-5
4,TATA-2                  dt.10.11.2014,G
                                                          dt.15.09.2014,RPM-1
dt.03.11.201               MO-7
                                                          dt.14.10.2014,TKD-3
4,BRC-1                   dt.15.10.2014,TA
                                                          dt.10.11.2014,GMO-7
dt.30.09.201               TA-2
                                                          dt.15.10.2014,TATA-2
4,ER-12)For              dt.03.11.2014,BR
                                                          dt.03.11.2014,BRC-1
POQty-                    C-1
                                                          dt.30.09.2014,ER-12)For
34,Material               dt.30.09.2014,ER
                                                          POQty-34,Materialtobe
tobe                     -12)ForPOQty-
                                                          suppliedtoUltimate
suppliedto               34,Materialtobe
                 20   20                        0    0    Consigneeasi]Sr.
Ultimate                  suppliedto
                                                          DEE/TRS/Ghaziabad,N.
Consignee                 Ultimate
                                                          Rly=12Nos.(Rec)ii]
asi]Sr.                 Consigneeasi]
                                                          Sr.DEE/TRS/Bhilai,SEC.Rly
DEE/TRS/Gh                 Sr.
                                                          =07Nos.(rec)iii]
aziabad,N.               DEE/TRS/Ghazia
                                                          Sr.DEE/TKD,W.C.Rly=07
Rly=12                  bad,N.Rly=12
                                                          Nos.(rec)iv]
Nos.(Rec)ii]             Nos.(Rec)ii]
                                                          Sr.DEE/TRS/Tatanagar,
Sr.DEE/TRS/                Sr.DEE/TRS/Bhil
                                                          SER.Rly=03Nos.v]
Bhilai,                   ai,SEC.Rly=07
                                                          Sr.DEE/TRS/Royapuram,S.
SEC.Rly=                 Nos.(rec)iii]
                                                          Rly=02Nos.vi]
07Nos.(rec)              Sr.DEE/TKD,
                                                          Sr.DEE/TRS/BRC,W.Rly=
iii]                      W.C.Rly=07
                                                          02Nos.(rec)vii]
Sr.DEE/TKD,               Nos.(rec)iv]
                                                          Sr.DEE/TRS/HowrahE.Rly
W.C.Rly=07              Sr.DEE/TRS/Tata
                                                          =01No.(rec),3)ForPOQty-
Nos.(rec)iv]             nagar,SER.Rly=
                                                          10,Consignee:
Sr.DEE/TRS/                03Nos.v]
                                                          Sr.DEE/TRS/Gomoh,E.C.
Tatanagar,                Sr.DEE/TRS/Roy
                                                          Rly.)
SER.Rly=                 apuram,S.Rly=
03Nos.v]                02Nos.vi]
Sr.DEE/TRS/                Sr.DEE/TRS/BR
Royapuram,                C,W.Rly=02
                                                    MaterialreceivedfromKPA
                                                    WorkshopatELS/JHSon
                                                    dated15.12.2014.
                                                    Completed.Inreferenceto
                        Nodalagency:
Materials                                          RlyBd'sletterdt06.05.2015
              3    3    KPAMaterial       3   0
received.                                           informtoRlyBdvidethis
                        awaited.
                                                    officeletterno
                                                    NCR/Elec/loco/19/BRSPdt
                                                    09.07.15thatitemmaybe
                                                    closed.
Nodal
agency:NR             Nodalagency:
                                                    Nodalagency:NRTenderis
Tenderis    60   60   NRTenderisdue   0   0
                                                    dueon17.9.2015.
dueon                 on17.9.2015.
17.9.2015.
a)Supply:
NILb)
                        a)Supply:NILb)
Balance:40
                        Balance:40nos.            a)Supply:NILb)Balance:
nos.(CR-
                        (CR-4,ECR-                    40nos.(CR-4,ECR-4,ER-
4,ECR-4,ER-
                4   4   4,ER-4,NR-            0   0   4,NR-4,SCR-4,SECR-
4,NR-4,SCR-
                        4,SCR-4,SECR-                 4,SER-4,SR-4,WCR-4,WR-
4,SECR-
                        4,SER-4,SR-                   4).
4,SER-4,SR-
                        4,WCR-4,WR-4).
4,WCR-
4,WR-4).
                                                      Actionisbeingtakento
                0                             3   3   processthecase.Under
                                                      estimation
                      Tenderisdueon
                 10                        0   0
                      11.9.2015.
Nodal
agency:NR.          Nodalagency:
Administrativ         NR.
                                                   Nodalagency:NR.
eapproval           Administrative
                                                   Administrativeapproval
giventoshed        approvalgivento
                 7                         0   0   giventoshedon17.4.2015.
on                   shedon
                                                   &tenderisdueon
17.4.2015.&         17.4.2015.&
                                                   28.9.2015.
tenderisdue        tenderisdueon
on                   28.9.2015.
28.9.2015.
Tobecarried
outcentrally
byCR
Rly.Estimate
sanctioned(C
R-50ER-10
ECR-50                    Tobecarriedout
ECOR-10                   centrallybyCR
NR-50SR-                  Rly.Estimate
10SCR-50                 sanctioned(CR-
SER-10                    50ER-10ECR-
SECR-20                   50ECOR-10NR-               Tobecarriedoutcentrally
WR-20                     50SR-10SCR-                byCRRly.Estimate
WCR-20).                  50SER-10                   sanctioned(CR-50ER-10
POQty-                    SECR-20WR-20               ECR-50ECOR-10NR-50
20(Material               WCR-20).PO                 SR-10SCR-50SER-10
tobe                     Qty-20(Material             SECR-20WR-20WCR-20).
suppliedto               tobesuppliedto           POQty-20(Materialtobe
Ultimate                  Ultimate                    suppliedtoUltimate
                 50   50                        5   5
Consignee                 Consigneeas                Consigneeasbelow:-1]Sr.
asbelow:-1]             below:-1]Sr.              DEE/TRS/AJNI,C.Rly=10
Sr.                       DEE/TRS/AJNI,               Nos.2]Sr.
DEE/TRS/AJ                 C.Rly=10Nos.            DEE/TRS/Kazipat,SC.Rly=
NI,C.Rly=              2]Sr.                      10Nos.TotalQty=20Nos.)
10Nos.2]                DEE/TRS/Kazipa               DD-31.07.2015,TOD-
Sr.                       t,SC.Rly=10              29.10.2015forQty.75,Under
DEE/TRS/Ka                 Nos.TotalQty=            TC,Balqty-205.
zipat,SC.Rly             20Nos.)DD-
=10Nos.                 31.07.2015,TOD-
TotalQty=               29.10.2015for
20Nos.)DD-               Qty.75,UnderTC,
31.07.2015,T               Balqty-205.
OD-
29.10.2015
for
Qty.75,Under
TC,Balqty-
205.
COS/SC
Case                      COS/SCCase
                                                        COS/SCCase
No.25.16.50                No.25.16.5002
                 2    2                         0   0   No.25.16.5002dt.27-01-16.
02dt.27-01-               dt.27-01-16.is
                                                        isbeingfloated.
16.isbeing              beingfloated.
floated.
a)Demand:
03nos.                a)Demand:03
Transformer            nos.Transformer
                                                     a)Demand:03nos.
forWAG-9              forWAG-9Loco.
                                                     TransformerforWAG-9
Loco.b)               b)Supply:02
                0   0                        0   0   Loco.b)Supply:02mo.
Supply:02            mo.(ECoR-
                                                     (ECoR-1,SECR-1)c)
mo.(ECoR-               1,SECR-1)c)
                                                     Balance:01nos.(CR-1).
1,SECR-1)c)           Balance:01nos.
Balance:01           (CR-1).
nos.(CR-1).
Material
receivedon    6   6                        0   0
07.08.2015.
Estimate
                        Estimateunder
under          0   0                        0   0   Estimateunderpreparation.
                        preparation.
preparation.
0 0 0 0
                0   0                        0   0
               0   0                     0   0
0 0 0 0
0 0 0 0
0 0 0 0
Nodal
agency;NR            Nodalagency;
Detailed              NRDetailed              Nodalagency;NRDetailed
               2   2                     0   0
estimate              estimateunder           estimateunderpreparation.
under                 preparation.
preparation.
                0    0                        0   0
0 0 0 0
Nodal
agency;NR               Nodalagency;
Detailed                 NRDetailed                Nodalagency;NRDetailed
                10   10                       0   0
estimate                 estimateunder             estimateunderpreparation.
under                    preparation.
preparation.
a)Supply:
NIL.b)
                          a)Supply:NIL.
Balance:05
                          b)Balance:05            a)Supply:NIL.b)Balance:
nos.(CR-
                0    0    nos.(CR-           0   0   05nos.(CR-1,ECoR-
1,ECoR-
                          1,ECoR-1,SER-               1,SER-1,WCR-1,WR-1).
1,SER-
                          1,WCR-1,WR-1).
1,WCR-
1,WR-1).
                 0   0                       0   0
0 0 0 0
COS/SC
case                    COS/SCcase
                                                     COS/SCcase
No.25.16.50              No.25.16.5025
                 2   2                       0   0   No.25.16.5025for15Nos.
25for15               for15Nos.is
                                                     isbeingfloated.
Nos.isbeing           beingfloated.
floated.
a)Demand:
05nos.
Transformer             a)Demand:05
forWAG-9               nos.Transformer
Loco.b)                forWAG-9Loco.            a)Demand:05nos.
Supply:05             b)Supply:05             TransformerforWAG-9
nos.(CR-        0   0   nos.(CR-           0   0   Loco.b)Supply:05nos.
1,ECoR-                  1,ECoR-1,SCR-               (CR-1,ECoR-1,SCR-1,SER-
1,SCR-                   1,SER-1,WCR-                1,WCR-1).c)Balance:NIL.
1,SER-                   1).c)Balance:
1,WCR-1).c)            NIL.
Balance:
NIL.
                0   0   0   0
0 0 0 0
0 0 0 0
0 0 0 0
Consignee
details
submittedto   0   0   0   0
KPAW/Son
18.06.2015.
Allsupplied.
                          Allsupplied.              Allsupplied.Work
Work             0   0                        0   0
                          WorkCompleted               Completed
Completed
a)Supply:
08nos.(ER-               a)Supply:08
2,SECR-                   nos.(ER-
2,SER-                    2,SECR-2,SER-                a)Supply:08nos.(ER-
2,WCR-2).b)             2,WCR-2).b)                2,SECR-2,SER-2,WCR-2).
Balance:12     1   1   Balance:12nos.   2   2   b)Balance:12nos.(CR-
nos.(CR-                 (CR-1,ECoR-                  1,ECoR-2,NCR-2,NR-
1,ECoR-                   2,NCR-2,NR-                  1,SCR-2,SR-2,WR-2).
2,NCR-2,NR-               1,SCR-2,SR-
1,SCR-2,SR-               2,WR-2).
2,WR-2).
a)Supply:01
nos.(CR-1)               a)Supply:01
b)Balance:             nos.(CR-1)b)               a)Supply:01nos.(CR-1)b)
04nos.          0   0   Balance:04nos.   0   0   Balance:04nos.(ECoR-
(ECoR-1,ER-               (ECoR-1,ER-                  1,ER-1,SCR-1,WR-1).
1,SCR-                    1,SCR-1,WR-1).
1,WR-1).
SR                                    SCR                                    SER
0 0 0 0 0 0
0 0 0 0 0 0
     0           0                          0           0                          0           0
0   0                    0   0                    0   0
0 0 0 0 0 0
0 0 0 0 0 0
        Allsupplied.           Allsupplied.
0   0   Work            1   0   Work            0   0
        Completed                Completed
0   0   Notallotted.    0   0   Notallotted.    0   0
        Allare                 Allare
        balance,as             balance,as
        CLWisnot              CLWisnot
        purchasing              purchasing
0   0                    0   0                    0   0
        Busstation             Busstation
        separately.b)           separately.b)
        Hencemay               Hencemay
        bediverted.             bediverted.
        Material                Material
        receivedand            receivedand
0   0                    0   0                    0   0
        work                    work
        completed                completed
        a)Demand:-            a)Demand:-
        06nos.b)              06nos.b)
        Supply:-06            Supply:-06
        nos.(CR-                 nos.(CR-
        1,ER-1,NCR-              1,ER-1,NCR-
0   0                    1   1                    0   0
        1,SECR-                  1,SECR-
        1,WCR-                   1,WCR-
        1,WR-1)c)              1,WR-1)c)
        Balanc:-               Balanc:-
        NIL.                     NIL.
          Procurement
          isbeing
          processedat
          COS/PERfor
46   12   thebalance     0   0                    46   0
          13Nos.PO
          placedon
          M/s.DRI.1
          No.received.
          Allmaterial            Allmaterial
          supplied.               supplied.
3    0                     3   0                    3    0
          Work                    Work
          completed.               completed.
0 0 Completed. 0 0 Completed. 0 0
          Notsupplied            Notsupplied
          till,CLWis            till,CLWis
0    0    notprocuring   0   0   notprocuring   0    0
          valavesets             valavesets
          seprately.               seprately.
        a)work                  a)work
        completed.               completed.
        (notbyCLW)            (notbyCLW)
        b)Thiswork             b)Thiswork
        wasnot                 wasnot
        allotedto              allotedto
        CLWthrough             CLWthrough
        Boardsletter.           Boardsletter.
        3sets(=6               3sets(=6
        Nos.)                   Nos.)
        supplied/Fitte           supplied/Fitte
        din                    din
0   0   locomotives.    3   2   locomotives.    3   3
        Restqty.not           Restqty.not
        tobe                   tobe
        procuredby             procuredby
        CLW                      CLW
                               Material
         Work                 received.Ite
11   1                16   0                  15   0
         completed.            mmaybe
                               deleted.
                                      15Nos.of
                                      eligiblelocos
                                      TAOCHI
                                      Conversion
         5wheelsets
                                      completed
         completed.
                                      withwheel
         AsperBd's
                                      set
         advise30
                                      assistance
         Nosofrough
                                      from
         axles,29
                                      PER/Other
         setsofMSU
                                      Shops.Rly.
         and18sets
10                          15   0    Boardhad        34   14
         oftaperroller
                                      placedPO
         bearingsent
                                      for24wheel
         toKPA/ER.
                                      sets.Contract
         Workmaybe
                                      awardedfor
         deleted.
                                      Mechanical
         (Workunder
                                      rehabilitation
         review/closur
                                      toM/s.
         eitem)
                                      KalyanEngg.
                                      Works.
                                      Debitstobe
                                      received.
         COSfile                    COSfile
         No.47099011                  No.47099011
0    0                      20   12                     0    0
         ,TOD                       ,TOD
         awaited.                     awaited.
          A)POfor                A)POfor
          100nosroof             100nosroof
          mounted                  mounted
          DBRplaced               DBRplaced
          withdirect              withdirect
          diliveryto              diliveryto
          consignee.               consignee.
          Z.Rlysto               Z.Rlysto
          confirm.B)              confirm.B)
          For98nos               For98nos
28   19   vertical         0   0   vertical         20   0
          DBR'sallof             DBR'sallof
          the98nos.              the98nos.
          were                     were
          supplied                 supplied
          (ECoR-                    (ECoR-
          33,ECR-                   33,ECR-
          20,ER-                    20,ER-
          25,WCR-20).              25,WCR-20).
          C)Balance:-            C)Balance:-
          NIL.                      NIL.
          POplaced                POplaced
          withdirect              withdirect
          delieveryto             delieveryto
48   0                      6   3                     49   0
          consignee.               consignee.
          Work                     Work
          completed.                completed.
          Board'sletter           Board'sletter
1    1                      1   1                     1    1
          required                  required
          Notinthelist             Notinthelist
          ofCLW.                     ofCLW.
1     1   (Boards           1     1   (Boards           1    1
          lettermaybe               lettermaybe
          sent)                        sent)
          Thiswork                   Thiswork
          wasnot                     wasnot
110   0   allotedto        100   0   allotedto        90   0
          CLWthrough                 CLWthrough
          Boardsletter.               Boardsletter.
          Allmaterial
          requiredfor
          conversion
          received.
          Procurement
                                       Material
          isunder
                                       received.Ite
10    5   processat        30    0                      0    0
                                       mmaybe
          COS/PERfor
                                       deleted.
          5Nos.PO
          Placedon
          M/s.DRI.5
          Nos
          received.
          Notinthelist             Notinthelist
          ofCLW.                     ofCLW.
1     1   (Boards           0     0   (Boards           1    1
          lettermaybe               lettermaybe
          sent)                        sent)
        07Bogie               07Bogie
        frames,30             frames,30
        TMs&15               TMs&15
        wheelsets&           wheelsets&
        Brake                  Brake
        riggings-3             riggings-3
        suppliedto            suppliedto
1   1                   1   0                   0   0
        Rlys.Rest             Rlys.Rest
        itemsare              itemsare
        due(Bogie              due(Bogie
        frame-4,TM-             frame-4,TM-
        3,Wheelset-           3,Wheelset-
        18,Brake               18,Brake
        rigging-8).             rigging-8).
        Work                   Work
6                       9   0                   6   6
        completed.              completed.
        POplaced              POplaced
        withDDto             withDDto
6   0   consignee.     6   0   consignee.     0   0
        Work                   Work
        completed.              completed.
         Work
20   0                     20   0                     20   20
         completed.
         LOAissued                LOAissued
         for40rotor              for40rotor
         and18stator             and18stator
         onM/sSaini,             onM/sSaini,
         all40rotor&            all40rotor&
         18stators                18stators
         completed.                completed.
         Re-Tender                 Re-Tender
0    0   openedon        0    0   openedon        0    0
         06.12.2013                06.12.2013
         for22                    for22
         stator.Tender             stator.Tender
         discharged                discharged
         and                       and
         transferredto            transferredto
         TMW/NKRD                  TMW/NKRD
         .                          .
          Tendertobe
          floated.Kept
          pendingdue
          tonon
          availabilityof
          locos.
20   20                      0    0                  0    0
          Railway
          Boardhave
          been
          requestedto
          closethe
          item.
                                      Work
                                      completed
          Work
25   0                       15   0   andpaid.     15   0
          completed.
                                      Itemmaybe
                                      deleted.
          All40gear                All40gear
          caseshave                 caseshave
          been                       been
0    0                       0    0                  0    0
          received.                  received.
          Work                       Work
          completed.                  completed.
          Supply:68             Supply:68
          nos(ECoR-               nos(ECoR-
          10,ECR-8,              10,ECR-8,
          NCR-12,                NCR-12,
          SECR-                   SECR-
12   8    12,SR-         15   0   12,SR-         15   15
          6,WCR-19&             6,WCR-19&
          WR-1).For            WR-1).For
          balalnceno            balalnceno
          Rly                    Rly
          approached.             approached.
          work
32   15                  0    0                  0    0
          completed.
        a)                      a)
        Distribution            Distribution
        of39Wheel             of39Wheel
        set:WAG-               set:WAG-
        7=15,WAP-               7=15,WAP-
        4=24.                   4=24.
        b)WAG-7:               b)WAG-7:
        Supply-09               Supply-09
        nos.(ECR-                nos.(ECR-
        3,NCR-                   3,NCR-
        3,SER-3),               3,SER-3),
3   1                   3    3                   3   3
        Balance-06              Balance-06
        nos.(CR-6).             nos.(CR-6).
        C)WAP-4:               C)WAP-4:
        Supply-14               Supply-14
        nos.(NR-                 nos.(NR-
        6,SR-                    6,SR-
        2,WCR-6),               2,WCR-6),
        Balance:10            Balance:10
        nos.(ER-                 nos.(ER-
        3,SCR-3,SR-              3,SCR-3,SR-
        1,WR-3).                 1,WR-3).
        i)POplaced             i)POplaced
        &material              &material
        receivedfor            receivedfor
        Qty-29                  Qty-29
        .Supplied               .Supplied
        Qty-CR-                  Qty-CR-
        5,WCR-                   5,WCR-
        7,NR-8,SCR-              7,NR-8,SCR-
        15,SECR-                 15,SECR-
0   0   6.ii)BalQty-   15   4   6.ii)BalQty-   0   0
        27                      27
        processedas            processedas
        perScheme-              perScheme-
        II,POplaced            II,POplaced
        &material              &material
        receivedfor            receivedfor
        Qty-23,Bal             Qty-23,Bal
        uncovred                uncovred
        Qty-4.                   Qty-4.
        a)Demand:-           a)Demand:-
        08nos.a)             08nos.a)
        Supply:06            Supply:06
        nos.(NR-               nos.(NR-
        1,SECR-                 1,SECR-
2   0                   1   0                   0   0
        2,SR-                   2,SR-
        1,WCR-2).b)           1,WCR-2).b)
        Balance:02           Balance:02
        nos.(SCR-             nos.(SCR-
        1,SR-1)                 1,SR-1)
        Work                   Work
        completed              completed
        and                    and
0   0                   1   0                   0   0
        paid.Item              paid.Item
        maybe                 maybe
        deleted.                deleted.
        a)Demand               a)Demand
        qty:WAG-7            qty:WAG-7
        =3,WAP-                =3,WAP-
        4=9.                   4=9.
        b)Supplied             b)Supplied
        qty:-WAG7:-            qty:-WAG7:-
        Bogieframe-            Bogieframe-
        3,TM-9,               3,TM-9,
2   2   Wheelset-6.   2   0   Wheelset-6.   2   2
        WAP-4:-                WAP-4:-
        Bogieframe-            Bogieframe-
        1,Brake                1,Brake
        Rigging-                Rigging-
        1,Bolster-              1,Bolster-
        1,TM-21                1,TM-21
        ,wheelsets-            ,wheelsets-
        9.                      9.
        Allmaterial           Allmaterial
        supplied.              supplied.
7   0                   6   0                   9   9
        Work                   Work
        completed.              completed.
        a)Entryshall            a)Entryshall
        becorrected             becorrected
        as70against            as70against
        76.(WAG9-                 76.(WAG9-
        55,WAP7-                  55,WAP7-
        12,WAP5-3)               12,WAP5-3)
        b)FOR                    b)FOR
        WAG9:-Out                WAG9:-Out
        of55,9of              of55,9of
        CR,6ofER,             CR,6ofER,
        5ofSCR,6              5ofSCR,6
        ofSER                   ofSER
        balance.                 balance.
        c)WAP7:-                 c)WAP7:-
        Outof12                Outof12
        nos,6nos               nos,6nos
        wheelset                wheelset
0   0   suppliedto     10   0   suppliedto     6   6
        ECR,6nos.              ECR,6nos.
        toNR                    toNR
        d)WAP5:-                 d)WAP5:-
        Outof3                 Outof3
        nos,03nos.              nos,03nos.
        suppliedto              suppliedto
        NR.d)Allthe            NR.d)Allthe
        balance                  balance
        wheelsetsto            wheelsetsto
        becollected             becollected
        fromKPAor              fromKPAor
        BSL.vide                BSL.vide
        RB'sletter              RB'sletter
        No.                      No.
        2008/Elect.               2008/Elect.
        (TRS)/720/1              (TRS)/720/1
        Dt.15.09.08               Dt.15.09.08
        a)Entryshall            a)Entryshall
        becorrected             becorrected
        as14against            as14against
        13.b)Allare            13.b)Allare
        balance,as              balance,as
0   0   CLWisnot      2    2   CLWisnot      0   0
        purchasing               purchasing
        Busstation              Busstation
        separately.c)            separately.c)
        Hencemay                Hencemay
        bediverted.              bediverted.
        Allbalance            Allbalance
        asCLWis              asCLWis
        not                    not
0   0   purchasing     0   0   purchasing     0   0
        separately.            separately.
        Hencemay              Hencemay
        bediverted.            bediverted.
        Material               Material
0   0   received       0   0   received       0   0
        formCLW                formCLW
        Allmaterial           Allmaterial
4   0                   4   0                   4   0
        supplied.               supplied.
        a)Total               a)Total
        demand:09            demand:09
        nos.(NR-                nos.(NR-
        7,WR-2).b)            7,WR-2).b)
0   0   Supply:06    0   0   Supply:06    0   0
        nos.(NR-6).           nos.(NR-6).
        c)Balance:           c)Balance:
        03nos.(NR-             03nos.(NR-
        1,WR-2)                 1,WR-2)
                                 Work
                                 completed
0   0                    3   0   andpaid.       2   2
                                 Itemmaybe
                                 deleted.
        Centralised             Centralised
        procurement             procurement
5   0   bySR.PO       5   0   bySR.PO       5   0
        placed.all5           placed.all5
        nosreceived.            nosreceived.
          Detailed
          estimate
                                   Material
          sanctioned.
                                   receivedand
          Indentis
90   90                  100   0   Paid.Item      95   95
          being
                                   maybe
          processed
                                   deleted.
          for
          procurement.
                                   Work
                                   completed
0    0                   10    0   andpaid.      5    5
                                   Itemmaybe
                                   deleted.
         Work                    Work
         completed               completed
0    0   andpaid.      12   0   andpaid.     0    0
         Itemmaybe             Itemmaybe
         deleted..                deleted..
         COSplaced
         POonCLW.
         Sofar24
30   6   Nosreceived   0    0                  25   25
         from
         M/s.Siemens
         .
                                     COS/SC
                                     placedPOs.
                                     1.PO
        Tendertobe
                                     No.25.15.50
        floated.Kept
                                     02.1.29174
        pendingdue
                                     dt.3-7-15for
        tonon
                                     4Nos.on
        availabilityof
                                     M/s.ELCO.
        locos.
5   5                      10   10   DD12-3-16.      5   0
        Railway
                                     2.PO
        Boardhave
                                     No.25.15.50
        been
                                     02.1.29175
        requestedto
                                     dt.3-7-15for
        closethe
                                     6Nos.on
        item.
                                     M/s.Stesalit.
                                     DD12-03-
                                     16.
0   0                      0    0                      0   0
         a)Supply:            a)Supply:
         01no.(NR-             01no.(NR-
         1).b)                 1).b)
0    0   Balance:03   1    1   Balance:03   0    0
         nos.(CR-                nos.(CR-
         1,ER-1,SCR-             1,ER-1,SCR-
         1).                     1).
                                 Work
                                 completed
         Work
25   0                  15   0   andpaid.     20   0
         completed.
                                 Itemmaybe
                                 deleted.
          Sofar7.5              Work
          Locowheel              completed
30   22   sets(45       20   0   andpaid.      30   0
          wheelsets)             Itemmaybe
          completed.               deleted.
          a)Supply:             a)Supply:
          Nil.b)                 Nil.b)
0    0    Balance:02   0    0   Balance:02   0    0
          nos.(NR-                 nos.(NR-
          1,WR-1)                  1,WR-1)
          Tobe
          suppliedby
          BSL.
3                         3    0                   3    3
          Materialyet
          tobe
          received.
                                Material
                                received.Ite
0    0                 28   0                  18   0
                                mmaybe
                                deleted.
         POpalaced            POpalaced
         withDDto            withDDto
25   0   consignee.   30   0   consignee.    30   0
         Work                  Work
         completed.             completed.
0   0                   0   0                   0   0
        a)Supply:            a)Supply:
        07nos.(ER-            07nos.(ER-
        2,NR-                   2,NR-
        1,SECR-2,              1,SECR-2,
2   2   WCR-2).b)     0   0   WCR-2).b)     2   2
        Balance:05            Balance:05
        nos.(NR-               nos.(NR-
        1,SER-2,SR-             1,SER-2,SR-
        2)                      2)
        a)Supply:            a)Supply:
        01nos.(WR-            01nos.(WR-
        1).b)                 1).b)
0   0                   0   0                   0   0
        Balance:02           Balance:02
        nos.(NR-              nos.(NR-
        1,WR-1).                1,WR-1).
        a)Supply:            a)Supply:
        10nos.(ER-             10nos.(ER-
        2,NR-                   2,NR-
        2,SECR-2,              2,SECR-2,
2   0   SR-2,WCR-       0   0   SR-2,WCR-       2   2
        2).b)                 2).b)
        Balance:02           Balance:02
        nos.(SER-              nos.(SER-
        2).                     2).
        Nodal                     Nodal
        agency:NR                agency:NR
        Tender                    Tender
        openedon                 openedon
        20.3.2013                 20.3.2013
        .Qty.has                 .Qty.has
        been                      been
        coveredon                coveredon
        dated                     dated
        22.8.2013in              22.8.2013in
        P.O.no.                   P.O.no.
        1910513916                 1910513916
        0327dt.                  0327dt.
        01.6.2012.                01.6.2012.
        against30%               against30%
        option.DP:               option.DP:
        30.11.2013.le              30.11.2013.le
        tterwrittento           tterwrittento
1   1                      1   1                      1   1
        firm&on                 firm&on
        15.9.2014for             15.9.2014for
        risk                      risk
        purchase.                 purchase.
        Materialstill            Materialstill
        awaited.                  awaited.
        EDP:31.7.20                EDP:31.7.20
        15.All                   15.All
        material                  material
        receivedat               receivedat
        ELS/GZBon                ELS/GZBon
        22.6.2015                 22.6.2015
        andadvised               andadvised
        toallrlys.to           toallrlys.to
        collectthe               collectthe
        materialfrom             materialfrom
        ELS/GZBon                ELS/GZBon
        23.6.2015.                 23.6.2015.
        1)Traction                1)Traction
        converter                 converter
        bus                       bus
        station(main)             station(main)
        converter                 converter
        Qty-02Sets,               Qty-02Sets,
        TOD                       TOD
        22.08.2013                22.08.2013
0   0   underTC&        0   0   underTC&        0   0
        2)Busstation             2)Busstation
        aux.                      aux.
        converter-PO              converter-PO
        placedDD-                 placedDD-
        31.03.2015(r               31.03.2015(r
        eceived,                  eceived,
        Dist-CR-1                 Dist-CR-1
        WR-1).                     WR-1).
0   0   Completed.       0   0   Completed.       0   0
        a)Total                 a)Total
        demand                  demand
        quantity=08           quantity=08
        nos.(WAG-7              nos.(WAG-7
        =04,WAP-4              =04,WAP-4
        =04).                   =04).
        b)WAG7:-                b)WAG7:-
        Supply:                Supply:
        Bogieframe-             Bogieframe-
1   1   03(SCR-          0   0   03(SCR-          2   2
        1,SECR-                  1,SECR-
        2),TM-                   2),TM-
        10(SCR-                  10(SCR-
        4,SECR-6).              4,SECR-6).
        c)WAP4:-                c)WAP4:-
        Supply:TM-             Supply:TM-
        12(NR-6,SR-              12(NR-6,SR-
        6),Wheelset-            6),Wheelset-
        6(NR-6).                 6(NR-6).
        Work
2   0                0   0   4   4
        completed.
                              Materialyet
        Work
3   0                6        tobe          3   3
        completed.
                              collected.
                              12Nos.
        Work
6   0                12   0   received       0   0
        completed.
                              fromKPA.
        POplaced               POplaced
        onCGL&                onCGL&
        SAINIfor55            SAINIfor55
        nos                     nos
        stator(Qty-55           stator(Qty-55
        received                received
        givento                givento
        ELW/BSL(C                ELW/BSL(C
        R)-13                   R)-13
        CR(AQ)-14               CR(AQ)-14
        CR(KYN)-10              CR(KYN)-10
        SR(RPM)-                 SR(RPM)-
        3,SCR-                   3,SCR-
        5,WCR-                   5,WCR-
        6,SECR-4,               6,SECR-4,
0   0                    5   5                    0   0
        uncovered               uncovered
        Qty-10,                 Qty-10,
        Distribution            Distribution
        Rotor-                   Rotor-
        65(Distributio           65(Distributio
        n-CR-45                n-CR-45
        (ELW-15AQ-              (ELW-15AQ-
        20KYN-10)              20KYN-10)
        NR-04,SCR-              NR-04,SCR-
        5,                      5,
        SECR(BIA)-               SECR(BIA)-
        4,SR-3                  4,SR-3
        WCR-4).                 WCR-4).
        work                    work
        completed                completed
        Tobe
                                 Indent
        manufacture
                                 placedon
        byLW/PER.
                                 CWM/PER
        OutofPO
3   3                    3   3   for             3   3
        releasedfor
                                 manufacture
        8items,6
                                 andsupplyof
        items
                                 thematerial.
        received.
        a)Entryshall           a)Entryshall
        becorrected            becorrected
2   2   as12against   1   0   as12against   0   0
        13b)All                13b)All
        balance.                 balance.
        a)Supplied:            a)Supplied:
        29nos.                 29nos.
        (ECR-8,NR-              (ECR-8,NR-
        8,SCR-                  8,SCR-
        5,SECR-4,               5,SECR-4,
        WCR-4).b)              WCR-4).b)
4   4   Balance:10    5   0   Balance:10    0   0
        nos.(CR-                nos.(CR-
        10).c)                 10).c)
        Excess                  Excess
        supplyof02            supplyof02
        nos.to                 nos.to
        SECR/BIA.                SECR/BIA.
        9,SR-2),                9,SR-2),
        5)Aux.Comp              5)Aux.Comp
        SCR-4NR-4              SCR-4NR-4
        SECR-1,SR-               SECR-1,SR-
        2WCR-                   2WCR-
        4,ECR-6.                4,ECR-6.
        Procurement             Procurement
        status-                  status-
        1)Motorfor             1)Motorfor
        Scavanger               Scavanger
        blower(TM)-              blower(TM)-
        RT/TOD                  RT/TOD
        24.02.2015,             24.02.2015,
        2)Motorfor             2)Motorfor
        TMblower               TMblower
        -POplaced              -POplaced
        forQty-                 forQty-
        11(received)            11(received)
        DD-                      DD-
        31.05.2013,             31.05.2013,
        POplaced               POplaced
2   2                    6   1                    0   0
        forQty-                 forQty-
        26(received,             26(received,
        dist-SR-3               dist-SR-3
        SCR-4WR-2              SCR-4WR-2
        SECR-2NR-               SECR-2NR-
        4)DD-                   4)DD-
        10.08.2014,             10.08.2014,
        TOD                     TOD
        18.01.2016              18.01.2016
        forQty-37              forQty-37
        f,3)Motorfor           f,3)Motorfor
        Scavanger               Scavanger
        Blower(MR)-             Blower(MR)-
        RT/TOD                  RT/TOD
        19.01.2016,4             19.01.2016,4
        )Motorfor              )Motorfor
        Main                    Main
        compressor(              compressor(
        11received)            11received)
        -POplaced              -POplaced
        forQty-                 forQty-
0   0                    0   0                    3   3
0 0 0 0 0 0
        CLWto                  Material
        supply.                 received.
1   1   Materialyet    2   0   Couldbe        1   1
        tobe                   deletedfrom
        received.                16-17.
        Boardsletter           Boardsletter
0   0                    0   0                    0   0
        notreceived             notreceived
          a)Supply:              a)Supply:
          NILb)                   NILb)
0    0    Balance:04     0   0   Balance:04     0    0
          nos.(NR-                nos.(NR-
          2,WR-2)                   2,WR-2)
          AsperRly               AsperRly
          Bd.this                 Bd.this
          itemsistobe           itemsistobe
          fittedon                fittedon
45   45                     0   0                     10   0
          CLWbuit                 CLWbuit
          locosonlyat            locosonlyat
          CLW,hence               CLW,hence
          notsupplied.             notsupplied.
0 0 0 0 0 0
          Completefile            Completefile
          withindent              withindent
          sentto                  sentto
2    2    COS/HJP          6   6   COS/HJP          2    2
          .Procuremen               .Procuremen
          tunder                  tunder
          progress.                 progress.
        Qty.fully             Qty.fully
0   0   supplied       0   0   supplied       0   0
        (NR-2,WR-3)             (NR-2,WR-3)
        a)Supply:            a)Supply:
        NILb)                 NILb)
        Balance:10           Balance:10
        nos.(CR-               nos.(CR-
        1,ECoR-                 1,ECoR-
2   2                   1   1                   1   1
        1,ECR-1,ER-             1,ECR-1,ER-
        1,SCR-                  1,SCR-
        1,SECR-                 1,SECR-
        1,SER-1,SR-             1,SER-1,SR-
        2,WCR-1)                2,WCR-1)
        a)Supply:            a)Supply:
        NIL.b)                NIL.b)
0   0                   0   0                   0   0
        Balance:02           Balance:02
        nos.(WR-2)             nos.(WR-2)
        a)Supply:            a)Supply:
        02(ECR-                 02(ECR-
        1,SER-01).             1,SER-01).
        b)Balance:           b)Balance:
        08nos.                08nos.
1   1                   1   1                   1   1
        (ECoR-1,ER-             (ECoR-1,ER-
        1,NCR-1,NR-             1,NCR-1,NR-
        1,SCR-1,SR-             1,SCR-1,SR-
        1,WCR-                  1,WCR-
        1,WR-1)                 1,WR-1)
0    0                    0   0   0    0
          InitiallyPO
          placedon
          CLWhas
          been
          cancelled
          andthe
          samehas
          been
15   15                   0   0   10   8
          processedat
          COS/S.Rly.
          Railway
          Boardhave
          been
          requestedto
          closethe
          item.
          LOAissued.
          CFC-3loco
          completed.
          PU-15loco
15   12                   0   0   15   15
          completed.
          SSpipe-15
          loco
          completed.
                                   Work
                                   completed
         Work                     and
8    0                    10   0                    10   0
         completed.                paid.Item
                                   maybe
                                   deleted.
         Tender                   Tender
         openedon                openedon
         13-08-13.                13-08-13.
         POplaced.               POplaced.
10   0                    5    0                    15   8
         50Nosat                50Nosat
         variouszonal            variouszonal
         Railways                 Railways
         received.                 received.
         Work                     Work
         completed                completed
         and                      and
1    0                    1    0                    0    0
         paid.Item                paid.Item
         maybe                   maybe
         deleted.                  deleted.
          a)Supplied:            a)Supplied:
          02nos.(NR-             02nos.(NR-
0    0    1,WR-1).b)   0    0   1,WR-1).b)   0    0
          Balance:01             Balance:01
          nos.(WR-1).             nos.(WR-1).
          a)Supplied:            a)Supplied:
          46nos.                 46nos.
          (ECR-6,ER-               (ECR-6,ER-
          10,NCR-                  10,NCR-
          1,NR-                    1,NR-
          4,SECR-                  4,SECR-
          5,SER-                   5,SER-
          10,WR-10).              10,WR-10).
          b)Balance:            b)Balance:
10   0    104nos.       15   0   104nos.       15   0
          (CR-                     (CR-
          25,ECoR-                 25,ECoR-
          10,ECR-                  10,ECR-
          4,NCR-                   4,NCR-
          14,NR-                   14,NR-
          6,SCR-                   6,SCR-
          15,SECR-                 15,SECR-
          5,SER-5,SR-              5,SER-5,SR-
          10,WCR-10)               10,WCR-10)
          Tender
          discharged.
          Railway
20   20   Boardhave     0    0                   20   20
          beenadvised
          toclosethe
          item.
        Tobe                    Tobe
        procureby               procureby
        ECR.LOA                 ECR.LOA
        issuedin                issuedin
        favourofM/S            favourofM/S
        BT.Worknot             BT.Worknot
0   0                    4    4                    0   0
        started                  started
        Contract                 Contract
        terminated&             terminated&
        freshtender             freshtender
        workunder               workunder
        process.                  process.
        Complete.All            Complete.All
0   0                    20   0                    0   0
        Supplied.                 Supplied.
        a)Supplied:            a)Supplied:
        10nos.(ER-              10nos.(ER-
        2,NR-2,SCR-               2,NR-2,SCR-
        2,WCR-                    2,WCR-
        2,WR-2).b)              2,WR-2).b)
        Balance:04              Balance:04
0   0                    2    0                    2   0
        nos.(CR-1,              nos.(CR-1,
        NCR-1,                   NCR-1,
        SER-2).c)               SER-2).c)
        01no.                   01no.
        excess                   excess
        supplytoER.             supplytoER.
8   0   Allsupplied.    0    0    Allsupplied.    0   0
        CLWto
        supply.                   Material
        Materialyet              received.Ite
6   6                    6    0                     0   0
        tobe                     mmaybe
        received                  deleted.
        fromCLW.
        POplaced&               POplaced&
        material                  material
        receivedfor              receivedfor
        Qty-14                    Qty-14
0   0                    15   11                    0   0
        (Distribution-             (Distribution-
        CR(ELW)-                   CR(ELW)-
        14).BalQty-               14).BalQty-
        42.                        42.
        a)Supplied:             a)Supplied:
        02nos.                   02nos.
        (SECR-                     (SECR-
1   1                    0    0                     0   0
        1,WCR-1).b)              1,WCR-1).b)
        Balance:01               Balance:01
        no.(SR-1).                no.(SR-1).
        POplaced&             POplaced&
        material                material
        receivedfor            receivedfor
        Qty-4CR                Qty-4CR
        Qty-1                   Qty-1
        Balance                 Balance
        direct                  direct
0   0   deliveryto     1   1   deliveryto     0   0
        consignee(Di             consignee(Di
        stribution              stribution
        CR-1ECR-1              CR-1ECR-1
        SCR-1NR-                SCR-1NR-
        1).Qty-3                1).Qty-3
        RT/TOD                  RT/TOD
        awaited.                 awaited.
        Total                   Total
        centralised             centralised
        Qty-                     Qty-
        6,Material              6,Material
        receivedQty-            receivedQty-
0   0                    1   0                    0   0
        6(Distribuiton           6(Distribuiton
        -CR-2,SCR-             -CR-2,SCR-
        1,SECR-1,              1,SECR-1,
        WCR-2)-                  WCR-2)-
        Completed.               Completed.
        Work                    Work
0   0                    1   0                    0   0
        completed.               completed.
        Centralized             Centralized
        procurement             procurement
        madeby                 madeby
1   0   SCRand         0   0   SCRand         0   0
        paid.No                paid.No
        allotmentto            allotmentto
        SCR.                     SCR.
        T/Motor                T/Motor
        blower-                blower-
        RT/TOD                 RT/TOD
        18.01.2016,            18.01.2016,
        3)Motorfor            3)Motorfor
        Scavanger              Scavanger
        Blower(TM)           Blower(TM)
        -POQty-10             -POQty-10
        DD-                     DD-
        30.03.2012,            30.03.2012,
        POQty-                 POQty-
        11(received)           11(received)
        DD-                     DD-
        20.03.2014             20.03.2014
        andRT/TOD             andRT/TOD
        24.02.2015             24.02.2015
        forQty-47,            forQty-47,
        4)Motorfor            4)Motorfor
        Scavenger              Scavenger
        Blower(MR)-            Blower(MR)-
2   2   POQty-10      5   5   POQty-10      1   1
        DD-                     DD-
        20.11.2011,            20.11.2011,
        POQty-                 POQty-
        11(received)           11(received)
        DD-                     DD-
        31.10.2013,            31.10.2013,
        RT/TOD                 RT/TOD
        19.01.2016             19.01.2016
        Qty-47,               Qty-47,
        5)Machine              5)Machine
        RoomBlower            RoomBlower
        with                   with
        motor(Indent           motor(Indent
        splitedfor            splitedfor
        motor-                  motor-
        RT/TOD                 RT/TOD
        18.12.2015&           18.12.2015&
        blower-TOD             blower-TOD
        20.02.2014,            20.02.2014,
        underTC),            underTC),
        4,SR-                     4,SR-
        2,WCR-                    2,WCR-
        5,CR-                     5,CR-
        13.2)Setof              13.2)Setof
        Brake                    Brake
        electronics              electronics
        CR-8Direct              CR-8Direct
        deliveyto               deliveyto
        consignee                consignee
        Qty-18,3)Air             Qty-18,3)Air
        DryerELW-6              DryerELW-6
        NR-5WCR-5               NR-5WCR-5
        SR-2,4)DC               SR-2,4)DC
        linkvoltage             linkvoltage
        sensorAQ-                sensorAQ-
        68,Active                68,Active
        speed                    speed
        sensorAq-                sensorAq-
        204,5)Oil               204,5)Oil
        Cooler                   Cooler
2   0   radiatorAQ-4   5    5   radiatorAQ-4   0   0
        ELW-4direct             ELW-4direct
        deliveryto              deliveryto
        consigneeby             consigneeby
        firm,                    firm,
        6)Capacitor              6)Capacitor
        Bank                     Bank
        assembly                 assembly
        SCR-5,NR-                 SCR-5,NR-
        5,SECR-                   5,SECR-
        4,SR-                     4,SR-
        2,WCR-                    2,WCR-
        5.Procureme               5.Procureme
        ntstatus-                ntstatus-
        1)Trade                  1)Trade
        brake                    brake
        arrangement               arrangement
        -POplaed&              -POplaed&
        material                 material
        receivedfor             receivedfor
        Qty-30,Bal              Qty-30,Bal
                                  Material
0   0                    40   0   receivedand    0   0
                                  paid.
0    0                0    0                   0    0
                               Material
         Work                 receivedand
25   0                25   0                   25   9
         completed.            paid.Itemto
                               bedeleted.
          Indentsfor
          accessories
          senttoCOS
          for
          procurement.
          LOAfor
          works
10   10   contract       0    0                   10   10
          issued.So
          farPU
          completed
          on-4locos
          &SSpiping
          completed
          on10locos
                                   Work
                                   Physically
                                   completed
0    0                    15   0   andpaid.      10   10
                                   Couldbe
                                   deletedfrom
                                   16-17.
                                   Itemrequired
                                   bySCRifitis
                                   amodified
                                   MSU
                                   arrangement
                                   without
                                   wheelset
                                   assembly
                                   andbelongs
                                   toWAP4
                                   locosorifit
                                   iswith
                                   complete
0   0                    30   30   wheelset         0   0
                                   assembly,it
                                   isrequired
                                   foralltypeof
                                   locos(WAP-
                                   4,WAG-9,
                                   WAP-7).
                                   Estimate
                                   under
                                   accounts
                                   vetting.
                                   Indenttobe
                                   placedon
                                   ELW/KPA.
        Centralized               Centralized
        procurement               procurement
        by                        by
        C.Rly..LOA                C.Rly..LOA
        issuedon                 issuedon
        M/sIndocen               M/sIndocen
        for61                    for61
        sets.Being                sets.Being
0   0   shortclosed     0    0    shortclosed       0   0
        forfewcards             forfewcards
        balance                   balance
        againstthe               againstthe
        contractas               contractas
        fresh                     fresh
        contract                  contract
        awardedwith              awardedwith
        lesserrates.              lesserrates.
          Nodal                      Nodal
          agency:NR                 agency:NR
          Allmaterial               Allmaterial
          receivedand               receivedand
0    0    suppliedto      0    0    suppliedto      0    0
          concern                    concern
          Railway.                   Railway.
          Work                       Work
          completed.                  completed.
          Nodal                      Nodal
          agency:NR                 agency:NR
          POplaced                  POplaced
          onCLWbY                  onCLWbY
          COS/NRon                  COS/NRon
0    0    18.6.2014.       0    0    18.6.2014.       0    0
          for5loco                 for5loco
          sets.                      sets.
          DP:23.6.201                 DP:23.6.201
          5.Material                 5.Material
          awaited.                    awaited.
          Centralized                Centralized
          procurement                procurement
          byERly.TC               byERly.TC
          No.                        No.
          10/13/6012,                10/13/6012,
          RTOTunder                RTOTunder
          processfor                processfor
40   40                     40   20                     60   60
          145Nos,                  145Nos,
          Allottedfund              Allottedfund
          withdrawn,                 withdrawn,
          casewill                  casewill
          processedin               processedin
          nextfinancial             nextfinancial
          year.                       year.
                                   Estimate
0   0                    25   25                    10   10
                                   sanctioned.
        a)Demand:               a)Demand:
        i)Auxiliary              i)Auxiliary
        converter-05              converter-05
        L/s.ii)                  L/s.ii)
        Traction                  Traction
        converter-05              converter-05
        L/s.b)                   L/s.b)
        Supply:i)               Supply:i)
        Aux.                      Aux.
        converter-               converter-
0   0                    0    0                     0    0
        NIL.ii)Tr.              NIL.ii)Tr.
        converter-                 converter-
        NIL.c)                   NIL.c)
        Balance:i)              Balance:i)
        Aux.                      Aux.
        converter-05             converter-05
        L/s(CR-5)ii)             L/s(CR-5)ii)
        Tr.converter-             Tr.converter-
        05L/s(CR-                 05L/s(CR-
        5).                        5).
         POplaced              POplaced
         onM/SLotus           onM/SLotus
         ,Directly              ,Directly
         deliveryto            deliveryto
         Consignee.C             Consignee.C
         onsigneeas            onsigneeas
         perPO                 perPO
         a)Sr.DEE(TR             a)Sr.DEE(TR
         S),Ajni,CRly=           S),Ajni,CRly=
         3sets,                3sets,
0    0   b)Sr.DEE,Lal    6   3   b)Sr.DEE,Lal    2   2
         aguda,SCR=              aguda,SCR=
         3sets,                3sets,
         c)Sr.DEE,Tat            c)Sr.DEE,Tat
         anagar,SER=             anagar,SER=
         1set,                 1set,
         d)Sr.DEE,Bhl            d)Sr.DEE,Bhl
         lai,SECR=1             lai,SECR=1
         set.                   set.
         Uncovered              Uncovered
         Qty-4.                  Qty-4.
                                 Material
         Work                   received.Ite
10   0                   7   0                   5   5
         completed.              mmaybe
                                 deleted.
        Fullqty.               Fullqty.
9   0                    8   0                    0   0
        supplied.                supplied.
        Fullquantity           Fullquantity
        (90nos)                (90nos)
        supplied.               supplied.
9   0                    8   0                    0   0
        (directly               (directly
        suppliedby             suppliedby
        firm).                   firm).
                              06Nos.
                              WAP-4
                              received&3
                              Nos.WAG-7
        Work
9                    9    3   toELS/KZJ     9   9
        completed.
                              tobe
                              suppliedby
                              PER
                              Workshop.
        Work                 Material
6   0                18   0                   6   6
        completed.            received
        RSPbeing                RSPbeing
        operatedby              operatedby
        TMWNKRD                 TMWNKRD
        forQty-                  forQty-
        44(Qty                   44(Qty
        completed-                completed-
        17).ForQty-              17).ForQty-
        40,PO                   40,PO
9   2   placed&       18   15   placed&       6   6
        material                 material
        receivedfor             receivedfor
        Qty-10,Bal              Qty-10,Bal
        Qty-30.                   Qty-30.
        (supplied                (supplied
        AQ-10ELW-                AQ-10ELW-
        6SR-5SCR-               6SR-5SCR-
        3WCR-4)                  3WCR-4)
        RSPbeing                RSPbeing
        operatedby              operatedby
        TMWNKRD                 TMWNKRD
        forQty-                  forQty-
        44(Qty                   44(Qty
        completed-                completed-
        23).ForQty-              23).ForQty-
        40,PO                   40,PO
        placed&                 placed&
        material                 material
9   1                   18   12                   6   6
        receivedfor             receivedfor
        Qty-29,Bal              Qty-29,Bal
        Qty-11.                   Qty-11.
        (Supplied-                (Supplied-
        AQ-10ELW-                AQ-10ELW-
        17(ECR-5,                17(ECR-5,
        NR-5,AQ-                 NR-5,AQ-
        1),SR-5                1),SR-5
        SCR-2NR-                 SCR-2NR-
        5).                       5).
        Work                    Work
1   0   completed       1   1   completed       1   1
        andbillpaid.           andbillpaid.
        Tobe                   Tobe
        procured                procured
        centrallyby            centrallyby
        CRwith                 CRwith
        direct                  direct
        deliveryto             deliveryto
        consignee               consignee
        railways(CR-             railways(CR-
        5ER-4ECR-              5ER-4ECR-
        8ECOR-3                8ECOR-3
        NR-6,SR-4               NR-6,SR-4
4   4   SCR-4SER-       4   4   SCR-4SER-       4   4
        4SECR-4                4SECR-4
        WR-4WCR-                WR-4WCR-
        4).New                  4).New
        allotment               allotment
        (CR-3ER-5              (CR-3ER-5
        ECR-12                  ECR-12
        ECOR-2NR-               ECOR-2NR-
        4SR-2SCR-              4SR-2SCR-
        6SER-2                 6SER-2
        SECR-3WR-               SECR-3WR-
        9WCR-2).               9WCR-2).
        Tobe                   Tobe
        procured                procured
        centrallyby            centrallyby
        CRwith                 CRwith
        direct                  direct
        deliveryto             deliveryto
0   0   consignee       2   2   consignee       2   2
        railways(CR-             railways(CR-
        2ECR-1                 2ECR-1
        ECOR-1                  ECOR-1
        SCR-2SER-               SCR-2SER-
        2SECR-1                2SECR-1
        WCR-1).                  WCR-1).
        a)Supplied:            a)Supplied:
        07nos.(ER-            07nos.(ER-
        2,NR-1,SER-             2,NR-1,SER-
        1,SR-1,WR-            1,SR-1,WR-
1   0                   1   1                   1   0
        2).b)                 2).b)
        Balance:02            Balance:02
        nos.(SCR-1,           nos.(SCR-1,
        SECR-1).                SECR-1).
        a)Supplied:           a)Supplied:
        05nos.(ER-            05nos.(ER-
        1,NR-1,SCR-             1,NR-1,SCR-
        1,SR-1,WR-              1,SR-1,WR-
        1).b)                 1).b)
1   0                   1   0                   1   1
        Balance:04            Balance:04
        nos.(ER-               nos.(ER-
        1,SECR-                 1,SECR-
        1,SER-1,               1,SER-1,
        WCR-1).                 WCR-1).
        Central                Central
        procurement            procurement
        byECoR                byECoR
        withdirect            withdirect
        deliveryto            deliveryto
        consignee              consignee
        railways.18           railways.18
1   1                   1   1                   2   2
        Nosreceived           Nosreceived
        and                    and
        delivered.2           delivered.2
        NosP.O                NosP.O
        placedon              placedon
        Simplex                Simplex
        Engineering.            Engineering.
        Estimate
                                  Estimate
        sanctioned.
                                  sanctioned.
5   5   Indentsent    15   15                   15   15
                                  Indentunder
        toCOSfor
                                  vetting.
        procurement.
        a)Supply:              a)Supply:
        10nos.(CR-              10nos.(CR-
        2,NR-2,SCR-               2,NR-2,SCR-
        4,SECR-2).               4,SECR-2).
        b)Balance:             b)Balance:
        08nos.(ER-              08nos.(ER-
        1,SER-1,SR-               1,SER-1,SR-
        2,WCR-4).c)             2,WCR-4).c)
2   2                   2    0                    1    1
        i)02nos                i)02nos
        allottedto              allottedto
        ECRisnot               ECRisnot
        requiredto              requiredto
        them.ii)02             them.ii)02
        nos.excess              nos.excess
        supplydone              supplydone
        toSCR.                   toSCR.
        Centralized              Centralized
        procurement              procurement
        byS.CRly.              byS.CRly.
        Material                 Material
1   0                   1    0                    1    0
        receivedand             receivedand
        paid.Item                paid.Item
        maybe                   maybe
        deleted.                  deleted.
        Qty-(6                   Qty-(6
        received),               received),
        remaining                remaining
        direct                   direct
        deliveryto              deliveryto
        consingee,               consingee,
        7)Blowerfor             7)Blowerfor
        Traction                 Traction
        motor                    motor
        (W/out                  (W/out
        motor)-SR-2              motor)-SR-2
        SCR-                      SCR-
        6.Procureme               6.Procureme
        ntstatus-                ntstatus-
        1)Motorfor              1)Motorfor
        Traction                 Traction
        motorblower             motorblower
        -RT/TOD                  -RT/TOD
        18.01.2016,              18.01.2016,
        2)Scavenger              2)Scavenger
        Blower                   Blower
1   1                     3   1                     1   1
        TM(Indent                TM(Indent
        splitedfor              splitedfor
        motor-PO                 motor-PO
        placedfor               placedfor
        Qty-                      Qty-
        15(received)             15(received)
        DD-                       DD-
        30.08.2014,              30.08.2014,
        POQty-                   POQty-
        15(received)             15(received)
        DD-                       DD-
        25.03.2015,B              25.03.2015,B
        alqty-6TOD             alqty-6TOD
        24.02.2015&             24.02.2015&
        blower-PO                blower-PO
        placedDD-                placedDD-
        21.10.2014(q              21.10.2014(q
        ty-9received,           ty-9received,
        BalQty-                  BalQty-
        27),3)Scaven              27),3)Scaven
        gerBlower               gerBlower
        Fire
        detection
        unit;cap
        bank;Master
        controller;
        Radiatorunit;
        treadbrake;             Work
        tractionbus             completed
2   2   bar&Push       5   0   andpaid.     2   2
        pullrod                 Itemmaybe
        received.                deleted.
        Balance
        itemsare
        under
        various
        stagesof
        procurement.
0   0                     0   0                  0   0
                                    6Nos.taken
                                    upunder
                                    25%
                                    variationto
                                    existing
          Work                     contract.3
15   0                    15   15                   35   35
          completed.                Nos.
                                    completed
                                    andpaid.3
                                    Nos.tobe
                                    takenupby
                                    firm.
          Indentsent
          toCOS.
          Tender
          discharged.R
40   40   ailwayBoard   0    0                    40   0
          havebeen
          requestedto
          closethe
          item.
          Work
10   0                    0    0                    10   10
          completed.
                                      10Nos.
          Estimate
                                      procuredand
          sanctioned.
                                      paid.20Nos.
15   15   Indentsent      30   20                     30   0
                                      under
          toCOSfor
                                      procurement
          procurement.
                                      forELS/LGD.
          a)Demand:                a)Demand:
          i)Auxiliary               i)Auxiliary
          converter-10               converter-10
          L/s.ii)Tr.               L/s.ii)Tr.
          converter-10              converter-10
          L/s.b)                    L/s.b)
          Supply:i)                Supply:i)
          Aux.                       Aux.
          converter-                 converter-
0    0    NILii)Tr.      0    0    NILii)Tr.      0    0
          converter-                  converter-
          NIL.c)                    NIL.c)
          Balance:i)               Balance:i)
          Aux.                       Aux.
          converter-10              converter-10
          L/s(CR-10)ii)             L/s(CR-10)ii)
          Tr.converter-             Tr.converter-
          10L/s(CR-                 10L/s(CR-
          10).                        10).
                                      Material
                                      receivedand
0    0                      20   0    paid.Item        5    0
                                      maybe
                                      deleted.
         Work                      Work
0        completed       12        completed        0
         andpaid.                  andpaid.
         Sofar19
         Nos
         received.(1
         setcontains
         2Nos).
                                    Itemnot
         Balance1
                                    requiredmay
         No.tobe
10   0                    10   10   beallottedto   10   10
         received.
                                    otherzonal
         Railway
                                    railways.
         Boardhave
         been
         requestedto
         closethe
         item.
         a)Demand:               a)Demand:
         25L/s.(50               25L/s.(50
         nos.).b)                 nos.).b)
         Supply:NIL.             Supply:NIL.
         c)Balance:              c)Balance:
0    0                    6    4                      8    8
         25L/s.                   25L/s.
         (ECoR-                     (ECoR-
         8,SCR-                     8,SCR-
         3,SECR-                    3,SECR-
         7,SER-7).                  7,SER-7).
                                Material
                                receivedand
        Work
4   0                   5   0   paid.Item     4   4
        completed.
                                maybe
                                deleted.
        a)Supply:            a)Supply:
        02nos.(NR-            02nos.(NR-
0   0   2).b)         0   0   2).b)         0   0
        Balance:08           Balance:08
        nos.(NR-8).            nos.(NR-8).
0   0                   0   0                   0   0
          Estimate
          sanctioned.
          Tenderfor
10   10   works            0    0                     10   10
          contract
          under
          preparation.
          for81nos.               for81nos.
          wothoption               wothoption
          clouseto                 clouseto
          enhancethe               enhancethe
          qty.upto96             qty.upto96
          nos.P,O,no.              nos.P,O,no.
          1913501216                 1913501216
          0512                      0512
          dt.27.1.14                dt.27.1.14
          DP:30.8.14               DP:30.8.14
          Totalcost                Totalcost
          Rs.34020                Rs.34020
          lacs.(Details            lacs.(Details
          of81sets--              of81sets--
          CR-13,ECR-                CR-13,ECR-
          30,NR-23,                30,NR-23,
          SCR-11,                   SCR-11,
          SER-4).                   SER-4).
          Amendment                 Amendment
          ssuedon                  ssuedon
          27.3.14upto             27.3.14upto
0    0                      15   0                     5    0
          96sets                   96sets
          17.4.14.DP:              17.4.14.DP:
          15.10.14.(ii)            15.10.14.(ii)
          P.O.placed               P.O.placed
          onM/s                    onM/s
          Laxeven                   Laxeven
          System,                   System,
          Hyderabad                 Hyderabad
          for04nos.               for04nos.
          P,O,no.                   P,O,no.
          1913501216                 1913501216
          0511                      0511
          dt.27.1.14                dt.27.1.14
          DP:27.9.14               DP:27.9.14
          Totalcost                Totalcost
          Rs.16.80                 Rs.16.80
          lacs.(Details            lacs.(Details
          of04sets--              of04sets--
          SCR-02&                  SCR-02&
          NR-02)All                NR-02)All
          material                  material
         Centralised             Centralised
         procurement             procurement
         bySCR.                 bySCR.
         100%                    100%
0    0   material       90   0   material       0    0
         receivedand            receivedand
         paid.could             paid.could
         bedeleted              bedeleted
         from16-17.              from16-17.
                                  15
                                  Nos.received
                                  &100%
         Work
10   0                   15   0   payment        15   0
         completed.
                                  arrangedto
                                  M/s.AAL/Noi
                                  da.
0   0                0   0                  0   0
                             COS/SC
                             Case
                             No.25.15.50
        Work
4   0                5   5   37dt.31-08-   5   1
        completed.
                             15.Re-
                             tenderdue
                             on16-02-16.
          Detailed
          estimate
          sanctioned.
          Tenderunder
20   20   preparation    0   0   20   20
          forworks
          contract.
          Indentunder
          process.
0    0                    0   0   0    0
         CLWhas                    CLWhas
         processed                  processed
0    0                      0    0                      50   50
         the                        the
         procurement.                procurement.
         Caseno.                   Caseno.
         19135011                   19135011
         Tenderno.                 Tenderno.
         4119130605                 4119130605
         isopened                  isopened
         16.9.2013&                16.9.2013&
         discharged                 discharged
         duetonone                duetonone
         availabilityof            availabilityof
0    0   Funds.            2    2   Funds.            0    0
         Tender                     Tender
         OPENED                     OPENED
         ON                         ON
         09.1.2015.&                09.1.2015.&
         TCfinalized               TCfinalized
         for04                     for04
         nos.andPO                 nos.andPO
         isunder                   isunder
         vetting.                    vetting.
10   0                      10   0                      10   10
                                  740Nos.
                                  Compensatin
                                  gplatefor
                                  secondary
                                  spring,74
                                  Setsof
                                  Insulating
0   0                   74   74                   4   4
                                  baseand04
                                  setsof
                                  Dampers
                                  receivedon
                                  26-12-14
                                  from
                                  ELS/BSL.
        40nos                   40nos
        suppliedto              suppliedto
        zonal                    zonal
        Railways.                Railways.
        The                      The
5   5                   5    5                    2   2
        performance              performance
        isunder                 isunder
        watchdueto             watchdueto
        problemsin              problemsin
        thefield.                thefield.
                                  Material
                                  received.
0   0                   2    0                    2   2
                                  Itemtobe
                                  deleted.
         Material               Material
         received               received
         fromCLW.              fromCLW.
0    0                   0   0                  0    0
         Caseclosed            Caseclosed
         fromWCR               fromWCR
         side.                   side.
         POplaced
         onCLW.
         Materialyet
         tobe
         received.
10                       0                      10   1
         Railway
         Boardhave
         beenadvised
         toclosethe
         item.
0    0                   0   0                  0    0
0   0                    0    0                     0    0
        100%                      100%
        Material                  Material
        receivedand              receivedand
        billfor                  billfor
        Rs.66.34                  Rs.66.34
        lacks                     lacks
        pending.                  pending.
        Fundmaybe               Fundmaybe
0   0                    60   0                     0    0
        providedon               providedon
        priority.                 priority.
        Couldbe                  Couldbe
        deletedfrom              deletedfrom
        16-17iffull             16-17iffull
        fundsare                 fundsare
        providedin               providedin
        15-16.                     15-16.
                                   Estimate
0   0                    20   20                    10   10
                                   sanctioned.
        a)Supply:            a)Supply:
        NIL.b)                NIL.b)
        Balance:08           Balance:08
        nos.(ER-               nos.(ER-
1   1                   1   1                   1   1
        2,SCR-                  2,SCR-
        1,SECR-                 1,SECR-
        1,SER-1,SR-             1,SER-1,SR-
        1,WCR-2).               1,WCR-2).
        Work                   Work
0   0                   0   0                   1   1
        completed               completed
        Work                   Work
1   0                   0   0                   0   0
        completed.              completed.
        Work
8   0                0   0   8   0
        completed.
                                  Tender
0    0                    5   5                 5    5
                                  discharged.
          Estimate
          sanctioned.
          Indentunder
          preparation.
          Railway
35   35                   0   0                 35   35
          Boardhave
          been
          requestedto
          closethe
          item.
          Tender
          discharged.
          New
          D.No.26/14/5
          029.RT
          under
25   25   process.       0   0                   25   25
          Railway
          Boardhave
          been
          requestedto
          closethe
          item.
          Tender                 Tender
          openedon              openedon
          30.01.13for           30.01.13for
          30loco                30loco
          sets                   sets
0    0    ,Contract      4   0   ,Contract      1    1
          awardedon             awardedon
          M/s                    M/s
          Indocen.Wor             Indocen.Wor
          kin                   kin
          progress.               progress.
          Detailed               Detailed
          estimateIS            estimateIS
          UNDER                  UNDER
1    1                    4   4                   1    1
          VETTINGIN             VETTINGIN
          UNDER                  UNDER
          DIVISION.               DIVISION.
        Material                  Material
0   0   under           0    0    under           0   0
        procurement                procurement
        Estimate                  Estimate
        sanctioned                sanctioned
1   1   andexcution    3    3    andexcution    1   1
        inprogress               inprogress
        atTMW.                    atTMW.
        Estimate                  Estimate
        sanctioned                sanctioned
3   3   andexcution    9    9    andexcution    3   3
        inprogress               inprogress
        atTMW.                    atTMW.
        a)Supply:               a)Supply:
        18L/s.(CR-               18L/s.(CR-
        10,NR-                     10,NR-
        3,WCR-5).b)              3,WCR-5).b)
        Balance:82              Balance:82
        L/s(CR-                   L/s(CR-
        10,ECR-                    10,ECR-
0   0   20,NR-           25   25   20,NR-           0   0
        12,SCR-                    12,SCR-
        25,SECR-                   25,SECR-
        10,WCR-5).                10,WCR-5).
        c)EachLoco              c)EachLoco
        setconsists              setconsists
        of02nos.of             of02nos.of
        DDU.                       DDU.
          All                       All
          pending.No                pending.No
          actionhas                actionhas
          beentaken                beentaken
0    0    assincethe    25   25   assincethe    0    0
          performance               performance
          ofearlier40             ofearlier40
          nosisstill              nosisstill
          underwatch                underwatch
          MSunder                  MSunder
0    0                     0    0                     0    0
          preparation                preparation
                                     Indentsfor
          Estimate
                                     10items
          revisedand
                                     placedon
          sanctioned.
                                     COS/SC(1
15   15   Indentis       10   10                    10   10
                                     item
          udner
                                     received,8
          consolidation
                                     itemsPO
          .
                                     released.
        All                    All
        pending.As             pending.As
        perRB's               perRB's
        L/No.                  L/No.
        2013/Elect.             2013/Elect.
        (TRS)/441/3            (TRS)/441/3
1   1   dt.-           1   1   dt.-           1   1
        08.11.2013             08.11.2013
        centralised            centralised
        procurement            procurement
        byWestern             byWestern
        Railway                Railway
        advised.                advised.
        a)Supply:            a)Supply:
        03nos.(NR-            03nos.(NR-
        2,WCR-1)b)            2,WCR-1)b)
        Balance:47           Balance:47
        nos.(CR-               nos.(CR-
6   6                   6   6                   6   6
        6,ECR-2,ER-             6,ECR-2,ER-
        6,NR-8,SCR-             6,NR-8,SCR-
        6,SER-6,SR-             6,SER-6,SR-
        6,WCR-                  6,WCR-
        3,WR-4).                3,WR-4).
0   0                   0   0                   0   0
15   15                   10   10                    0    0
          Indentbeing             Indentbeing
          senttoFA&             senttoFA&
0    0                    20   20                    15   15
          CAO/WST                  CAO/WST
          forvetting.              forvetting.
                                    Work
                                    physically
          Estimate                 completed.
          sanctioned.              Finalbillto
5    5                    15   0                     5    5
          Tenderunder             bepaid.
          preparation.              Couldbe
                                    deletedfrom
                                    2016-17.
          a)Asper                 a)Asper
          advisedby               advisedby
          Rly.Bd.                 Rly.Bd.
          Procurement              Procurement
          processed                processed
          for200                  for200
85   75                   85   70                   85   85
          nos.only.b)             nos.only.b)
          Supply:15              Supply:15
          nos.(CR-                 nos.(CR-
          6,ECoR-                   6,ECoR-
          2,NR-6,SR-                2,NR-6,SR-
          1)                        1)
          a)Demand:              a)Demand:
          02nos.                  02nos.
          transformer              transformer
          forWAP-                  forWAP-
          5/WAP-7                  5/WAP-7
0    0    Loco.b)       0    0    Loco.b)       0    0
          Supply:01              Supply:01
          no.(ER-1).              no.(ER-1).
          c)Balance:             c)Balance:
          01no.(WR-               01no.(WR-
          1).                       1).
          a)Supply:              a)Supply:
          15nos.(CR-              15nos.(CR-
          2,ECoR-                   2,ECoR-
          3,ER-3,NR-                3,ER-3,NR-
0    0    3,SECR-         2    2    3,SECR-         3    3
          2,WCR-2).b)             2,WCR-2).b)
          Balance:05             Balance:05
          nos.(SCR-                nos.(SCR-
          2,SER-3).                 2,SER-3).
        Tenderno.               Tenderno.
        4119130068               4119130068
        openedon                openedon
        20.3.2013.&             20.3.2013.&
        Tender                   Tender
        finalized                finalized
        P.O.placed               P.O.placed
        onM/sBTIL.             onM/sBTIL.
        P.O.no.1910               P.O.no.1910
        5139160327               5139160327
        dt.22.8.2013             dt.22.8.2013
        DP:                      DP:
        30.11.2013               30.11.2013
2   2                     2   2                     2   2
        MaterialStill           MaterialStill
        awaited.                 awaited.
        EDP:31.7.20               EDP:31.7.20
        15.All                  15.All
        material                 material
        receivedat              receivedat
        ELS/GZB,on              ELS/GZB,on
        22.6.15and              22.6.15and
        advisedtoall           advisedtoall
        rlys.on                 rlys.on
        23.6.15to               23.6.15to
        collectthe              collectthe
        material.                 material.
0   0                     0   0                     0   0
0    0                    0    0                    0    0
          Materials                Materials
0    0    under          0    0    under          0    0
          procurement.              procurement.
          SRisthe                SRisthe
          nodalagency             nodalagency
          for                      for
          centralised              centralised
          procurement.             procurement.
25   25   Estimate       10   10   Estimate       10   10
          sanctioned.              sanctioned.
          Indentsent              Indentsent
          toCOSfor               toCOSfor
          procurement.             procurement.
          underTCM.                underTCM.
        MSunder             MSunder
0   0                 0   0                 0   0
        preparation           preparation
0   0                 0   0                 0   0
        Estimate
        sanctioned.
        Tenderfor
        works                     Tender
7   7                     9    9                     0   0
        contract                  discharged.
        openedon2-
        2-16andis
        underTCM.
        100%                      100%
        material                  material
        received.Bill            received.Bill
        of                        of
        Rs.21680(00                Rs.21680(00
        0)pending                0)pending
        forpayment               forpayment
2   0                     10   0                     2   2
        in15-16.                 in15-16.
        Couldbe                  Couldbe
        deletedfrom              deletedfrom
        16-17iffull             16-17iffull
        funds                     funds
        providedin               providedin
        15-16.                     15-16.
        a)Supply:              a)Supply:
        13L/s                   13L/s
        (SECR-                    (SECR-
        10,SR-1,WR-               10,SR-1,WR-
        02).                     02).
        b)Balance:              b)Balance:
        87L/s.(CR-              87L/s.(CR-
        10,ECR-                   10,ECR-
        10,ER-5,NR-               10,ER-5,NR-
5   3   10,SCR-         10   10   10,SCR-         5   5
        10,SECR-                  10,SECR-
        10,SER-                   10,SER-
        5,SR-                     5,SR-
        4,WCR-                    4,WCR-
        20,WR-3)c)              20,WR-3)c)
        EachLoco                EachLoco
        setconsists             setconsists
        of02nos.of             of02nos.of
        DDU)                      DDU)
        Caseno.22-              Caseno.22-
        16-5088                  16-5088
0   0                   0    0                    0   0
        TOD:30-05-                TOD:30-05-
        16                        16
                                   COS/SC
                                   case
                                   No.25.15.50
                                   30.1.29015
                                   dt.29-01-16
         Work
15   0                   15   15   onM/s.        25   25
         completed.
                                   Schneider
                                   Electric,
                                   Vadodara.
                                   D.D13-04-
                                   16.
         Tobe                    Tobe
         procured                 procured
         centrallyby             centrallyby
         C.Rlywith               C.Rlywith
0    0                   10   10                   0    0
         direct                   direct
         deliveryto              deliveryto
         consignee.T               consignee.T
         ODawaited.               ODawaited.
        Material                  Material
1   1   under           1    1    under           1   1
        procurement                procurement
        Nodal                     Nodal
        agency:NR                agency:NR
        Administrativ              Administrativ
        eapproval                eapproval
        advisedto                advisedto
5   5   ELS/GZB         20   20   ELS/GZB         5   5
        ON                        ON
        24.11.2014                24.11.2014
        andtenderis             andtenderis
        dueon                    dueon
        01.10.2015.                01.10.2015.
        Tobe                     Tobe
        procured                  procured
        centrallyby              centrallyby
        C.Rlyand                 C.Rlyand
        being                     being
        provideon                provideon
        locosby                  locosby
        ELW/BSL.TO                 ELW/BSL.TO
        D                         D
        09.03.2015.L               09.03.2015.L
        etter                     etter
        dt.16.02.201               dt.16.02.201
        5toRDSO                 5toRDSO
0   0                    2    2                     0   0
        foreligibity             foreligibity
        criteria.Copy             criteria.Copy
        ofletterto              ofletterto
        CMM/Cfor                 CMM/Cfor
        postponeof               postponeof
        ofabove                  ofabove
        tendertill               tendertill
        clarification             clarification
        fromRDSO.                fromRDSO.
        Letter                    Letter
        dt.17.03.201               dt.17.03.201
        5received                5received
        fromRDSO.                 fromRDSO.
                                     Works
                                     contract
          Estimate                  awarded
          under                     under
          Finance                   revenue.
          vetting.                  Hence,this
          Railway                   worknot
45   45                    26   26                     60   60
          Boardhave                requiredby
          been                      SCR.
          requestedto              Quantitymay
          closethe                 be
          item.                      transferredto
                                     other
                                     railways.
          4,GZB-8                   4,GZB-8
          dt.19.08.201               dt.19.08.201
          4,Bhillai-3               4,Bhillai-3
          dt.19.09.201               dt.19.09.201
          4.LGD-5                   4.LGD-5
          dt.15.09.201               dt.15.09.201
          4,RPM-1                   4,RPM-1
          dt.14.10.201               dt.14.10.201
          4,TKD-3                   4,TKD-3
          dt.10.11.201               dt.10.11.201
          4,GMO-7                   4,GMO-7
          dt.15.10.201               dt.15.10.201
          4,TATA-2                  4,TATA-2
          dt.03.11.201               dt.03.11.201
          4,BRC-1                   4,BRC-1
          dt.30.09.201               dt.30.09.201
          4,ER-12)For              4,ER-12)For
          POQty-                    POQty-
          34,Material               34,Material
          tobe                     tobe
          suppliedto               suppliedto
3    0                     15   0                      5    5
          Ultimate                  Ultimate
          Consignee                 Consignee
          asi]Sr.                 asi]Sr.
          DEE/TRS/Gh                 DEE/TRS/Gh
          aziabad,N.               aziabad,N.
          Rly=12                  Rly=12
          Nos.(Rec)ii]             Nos.(Rec)ii]
          Sr.DEE/TRS/                Sr.DEE/TRS/
          Bhilai,                   Bhilai,
          SEC.Rly=                 SEC.Rly=
          07Nos.(rec)              07Nos.(rec)
          iii]                      iii]
          Sr.DEE/TKD,               Sr.DEE/TKD,
          W.C.Rly=07              W.C.Rly=07
          Nos.(rec)iv]             Nos.(rec)iv]
          Sr.DEE/TRS/                Sr.DEE/TRS/
          Tatanagar,                Tatanagar,
          SER.Rly=                 SER.Rly=
          03Nos.v]                03Nos.v]
          Sr.DEE/TRS/                Sr.DEE/TRS/
          Royapuram,                Royapuram,
        Estimate                  Vettedindent
        sanctioned.               submittedto
        Indentfor8              CWM/PER
4   4   itemssentto   3    3    for             4   4
        COS/PER.5                 manufacture
        items                     andsupplyof
        received.                  thematerial.
        Nodal                     Nodal
        agency:NR                agency:NR
0   0   Tenderis       10   10   Tenderis       0   0
        dueon                    dueon
        17.9.2015.                 17.9.2015.
        a)Supply:            a)Supply:
        NILb)                 NILb)
        Balance:40           Balance:40
        nos.(CR-               nos.(CR-
        4,ECR-4,ER-             4,ECR-4,ER-
4   4                   4   4                   4   4
        4,NR-4,SCR-             4,NR-4,SCR-
        4,SECR-                 4,SECR-
        4,SER-4,SR-             4,SER-4,SR-
        4,WCR-                  4,WCR-
        4,WR-4).                4,WR-4).
0   0                   0   0                   5   5
          Tobe
          procuredand
          providedby
20   20   Workshops.      0   0                    20   20
          Estimate
          under
          preparation.
          Nodal                   Nodal
          agency:NR.             agency:NR.
          Administrativ            Administrativ
          eapproval              eapproval
          giventoshed           giventoshed
3    3                     5   5                    5    5
          on                      on
          17.4.2015.&            17.4.2015.&
          tenderisdue           tenderisdue
          on                      on
          28.9.2015.               28.9.2015.
          Tobecarried             Tobecarried
          outcentrally             outcentrally
          byCR                     byCR
          Rly.Estimate              Rly.Estimate
          sanctioned(C               sanctioned(C
          R-50ER-10                R-50ER-10
          ECR-50                    ECR-50
          ECOR-10                   ECOR-10
          NR-50SR-                  NR-50SR-
          10SCR-50                 10SCR-50
          SER-10                    SER-10
          SECR-20                   SECR-20
          WR-20                     WR-20
          WCR-20).                  WCR-20).
          POQty-                    POQty-
          20(Material               20(Material
          tobe                     tobe
          suppliedto               suppliedto
          Ultimate                  Ultimate
10   10                    50   50                    10   10
          Consignee                 Consignee
          asbelow:-1]             asbelow:-1]
          Sr.                       Sr.
          DEE/TRS/AJ                 DEE/TRS/AJ
          NI,C.Rly=              NI,C.Rly=
          10Nos.2]                10Nos.2]
          Sr.                       Sr.
          DEE/TRS/Ka                 DEE/TRS/Ka
          zipat,SC.Rly             zipat,SC.Rly
          =10Nos.                 =10Nos.
          TotalQty=               TotalQty=
          20Nos.)DD-               20Nos.)DD-
          31.07.2015,T               31.07.2015,T
          OD-                        OD-
          29.10.2015                29.10.2015
          for                       for
          Qty.75,Under              Qty.75,Under
          TC,Balqty-               TC,Balqty-
          205.                       205.
          COS/SC                    COS/SC
          Case                      Case
          No.25.16.50                No.25.16.50
1    1                     1    1                     0    0
          02dt.27-01-               02dt.27-01-
          16.isbeing              16.isbeing
          floated.                   floated.
        a)Demand:            a)Demand:
        03nos.                03nos.
        Transformer            Transformer
        forWAG-9              forWAG-9
        Loco.b)               Loco.b)
0   0                   0   0                   0   0
        Supply:02            Supply:02
        mo.(ECoR-               mo.(ECoR-
        1,SECR-1)c)           1,SECR-1)c)
        Balance:01           Balance:01
        nos.(CR-1).            nos.(CR-1).
        Work
3   0                   6   6                   6   6
        completed.
        Estimate               Estimate
0   0   under          0   0   under          0   0
        preparation.            preparation.
0 0 0 0 0 0
0   0                   0   0                   0   0
0   0                  0   0                  0   0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
        Nodal                 Nodal
        agency;NR            agency;NR
        Detailed              Detailed
2   2                  2   2                  2   2
        estimate              estimate
        under                 under
        preparation.           preparation.
0    0                    0    0                    0    0
0 0 0 0 0 0
          Nodal                    Nodal
          agency;NR               agency;NR
          Detailed                 Detailed
10   10                   10   10                   10   10
          estimate                 estimate
          under                    under
          preparation.              preparation.
          a)Supply:              a)Supply:
          NIL.b)                  NIL.b)
          Balance:05             Balance:05
          nos.(CR-                 nos.(CR-
0    0                    0    0                    1    1
          1,ECoR-                   1,ECoR-
          1,SER-                    1,SER-
          1,WCR-                    1,WCR-
          1,WR-1).                  1,WR-1).
0   0                    0   0                    0   0
0 0 0 0 0 0
        COS/SC                  COS/SC
        case                    case
        No.25.16.50              No.25.16.50
1   1                    2   2                    1   1
        25for15               25for15
        Nos.isbeing           Nos.isbeing
        floated.                 floated.
        a)Demand:             a)Demand:
        05nos.                 05nos.
        Transformer             Transformer
        forWAG-9               forWAG-9
        Loco.b)                Loco.b)
        Supply:05             Supply:05
0   0   nos.(CR-        1   1   nos.(CR-        1   1
        1,ECoR-                  1,ECoR-
        1,SCR-                   1,SCR-
        1,SER-                   1,SER-
        1,WCR-1).c)            1,WCR-1).c)
        Balance:               Balance:
        NIL.                     NIL.
0   0                   0   0   0   0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
        Tobe
        manufacture
        dbyBSL
        workshopas
5   5                   5   5   8   8
        WAP7type.
        Materialyet
        tobe
        received.
        Allsupplied.           Allsupplied.
2   0   Work             0   0   Work             2   2
        Completed                 Completed
        a)Supply:              a)Supply:
        08nos.(ER-               08nos.(ER-
        2,SECR-                   2,SECR-
        2,SER-                    2,SER-
        2,WCR-2).b)             2,WCR-2).b)
2       Balance:12     2   2   Balance:12     2   2
        nos.(CR-                 nos.(CR-
        1,ECoR-                   1,ECoR-
        2,NCR-2,NR-               2,NCR-2,NR-
        1,SCR-2,SR-               1,SCR-2,SR-
        2,WR-2).                  2,WR-2).
        a)Supply:01            a)Supply:01
        nos.(CR-1)               nos.(CR-1)
        b)Balance:             b)Balance:
0   0   04nos.          1   1   04nos.          0   0
        (ECoR-1,ER-               (ECoR-1,ER-
        1,SCR-                    1,SCR-
        1,WR-1).                  1,WR-1).
             SECR                                   WR                                      WCR
Status/Remarks
              QtyAllotted QtyBalance Status/Remarks
                                                     QtyAllotted QtyBalance Status/Remarks
                                                                                            QtyAllotted
0 0 0 0 0
0 0 0 0 0
                  0             0                         0            0                          0
                 0   0                    0   0                    0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Work
completed              Work                   Work
               15   0                  20   0                  35
andmaybe             completed               completed
deleted
               0    0                  0    0                   0
a)                      a)                     a)
Distribution            Distribution           Distribution
of39Wheel             of39Wheel            of39Wheel
set:WAG-               set:WAG-              set:WAG-
7=15,WAP-               7=15,WAP-              7=15,WAP-
4=24.                   4=24.                  4=24.
b)WAG-7:               b)WAG-7:              b)WAG-7:
Supply-09               Supply-09              Supply-09
nos.(ECR-                nos.(ECR-               nos.(ECR-
3,NCR-                   3,NCR-                  3,NCR-
3,SER-3),               3,SER-3),              3,SER-3),
                0    0                   3   0                   6
Balance-06              Balance-06             Balance-06
nos.(CR-6).             nos.(CR-6).            nos.(CR-6).
C)WAP-4:               C)WAP-4:              C)WAP-4:
Supply-14               Supply-14              Supply-14
nos.(NR-                 nos.(NR-                nos.(NR-
6,SR-                    6,SR-                   6,SR-
2,WCR-6),               2,WCR-6),              2,WCR-6),
Balance:10            Balance:10           Balance:10
nos.(ER-                 nos.(ER-                nos.(ER-
3,SCR-3,SR-              3,SCR-3,SR-             3,SCR-3,SR-
1,WR-3).                 1,WR-3).                1,WR-3).
                            Estimate
                            sanctioned
                            on02.08.11.
Estimate
                            Worknot
sanctioned.
                  15   15   requiredas     0    0                10
Awaiting
                            rotorare
arisingofTM
                            beingsentto
                            Nasikfor
                            repair.
Work                   Work                   Work
completed              completed              completed
andpaid.      0   0   andpaid.     0    0   andpaid.     12
Itemmaybe            Itemmaybe            Itemmaybe
deleted..               deleted..               deleted..
Indentlying
withCLW
FROM
                0   0                  40   0                  0
9/1/09.WOrk
maybe
deleted.
                    Modification
                    shouldbe
                    done100%
                    atMTR&
                    POH.RDSO
                    should
                    prepare
                    spec.forcab
Work                                        Work
            5   5   modification   15   0               10
completed                                    completed
                    tobedone
                    duringPOH
                    videRly.
                    Boardletter
                    No.2008/Ele
                    ct.
                    (TRS)/441/5,
                    Dt:21.05.08.
            0   0                   0    0               0
a)Supply:            a)Supply:               a)Supply:
01no.(NR-             01no.(NR-                01no.(NR-
1).b)                 1).b)                    1).b)
Balance:03   0    0   Balance:03      0    0   Balance:03   0
nos.(CR-                nos.(CR-                   nos.(CR-
1,ER-1,SCR-             1,ER-1,SCR-                1,ER-1,SCR-
1).                     1).                        1).
                        10nos.
                        receivedon
                        01.03.2012&
                        15.10.2012.
Work                   fromBTIL                 Work
               15   0                     25   0                  45
completed               after                     completed
                        rehabilitation
                        &05nos
                        receivedon
                        01.04.13.
                                                    Work
Fullqtyofall                                    completed
theitems         0   0                   60   0   (Finanacial       0
recd.                                               liabilitiesare
                                                    balance)
                   3   0                   3    3                      3
Includedin
Bd's
                        Material              Work
contract.     16                     10   0                 64
                        received.              completed
Workmaybe
closed.
                           06noswheel
                           setsreceived
                           on21.05.13.
                  9   -3   06nos          0   0   12
                           received
                           on15.07.13
                           fromKPA.
POplaced               POplaced               POplaced
onCGL&                onCGL&                onCGL&
SAINIfor55            SAINIfor55            SAINIfor55
nos                     nos                     nos
stator(Qty-55           stator(Qty-55           stator(Qty-55
received                received                received
givento                givento                givento
ELW/BSL(C                ELW/BSL(C                ELW/BSL(C
R)-13                   R)-13                   R)-13
CR(AQ)-14               CR(AQ)-14               CR(AQ)-14
CR(KYN)-10              CR(KYN)-10              CR(KYN)-10
SR(RPM)-                 SR(RPM)-                 SR(RPM)-
3,SCR-                   3,SCR-                   3,SCR-
5,WCR-                   5,WCR-                   5,WCR-
6,SECR-4,               6,SECR-4,               6,SECR-4,
                 5   1                    0   0                    10
uncovered               uncovered               uncovered
Qty-10,                 Qty-10,                 Qty-10,
Distribution            Distribution            Distribution
Rotor-                   Rotor-                   Rotor-
65(Distributio           65(Distributio           65(Distributio
n-CR-45                n-CR-45                n-CR-45
(ELW-15AQ-              (ELW-15AQ-              (ELW-15AQ-
20KYN-10)              20KYN-10)              20KYN-10)
NR-04,SCR-              NR-04,SCR-              NR-04,SCR-
5,                      5,                      5,
SECR(BIA)-               SECR(BIA)-               SECR(BIA)-
4,SR-3                  4,SR-3                  4,SR-3
WCR-4).                 WCR-4).                 WCR-4).
work                    work                    work
completed                completed                completed
Procurement
ofsparesis
goingonin
KGP-                                              Work
                 3   0                    3   0                    3
W/Shop,                                          completed
beingof
priceless
than15lac.
                                                   Material
                 0   0                     2   2   awaitedfrom    0
                                                   BSL/C.Rly
                         Tobe
                         suppliedby
                         CLWasper
                         Railway
Centralised             Board'sletter
                                                   Material
procurement             no.2013/Elec
                 2   1                     1   1   awaitedfrom    2
byCLW.Not             t(TRS)/441/1
                                                   CLW
recdyet.                ,dated-
                         01.05.2013.
                         Oneset
                         receivedon
                         17.07.14.
                                                     Workin
                  0   0                     50   0                     0
                                                     progress
wORK
                                    Work
COMPLETE           0   0   20   0                 0
                                    completed
D
Itemsare
under
procurement
bystores.Till
dt5locos
havebeen         0   0   0    0                 0
completedby
thisRly.
Balance
under
progress
Work                    work                    Work
                 5   0                    8   0                    10
completed                completed                completed
Centralised
procurement
byS           0    0                   0    0                   0
Rly.Material
notrecd.
Tobe                   Tobe                   Tobe
procureby              procureby              procureby
ECR.LOA                ECR.LOA                ECR.LOA
issuedin               issuedin               issuedin
favourofM/S           favourofM/S           favourofM/S
BT.Worknot            BT.Worknot            BT.Worknot
                 0   0                    0   0                    0
started                 started                 started
Contract                Contract                Contract
terminated&            terminated&            terminated&
freshtender            freshtender            freshtender
workunder              workunder              workunder
process.                 process.                 process.
                           Tobe
                           manufacture
                           dand
                           suppliedby
                           CLWasper
                 12   12   RlyBd's        0   0                    10
                           letterno.
                           2009/Elect(T
                           RS)/720/1,
                           dated-
                           13.07.12.
                         Material
                 5   0   receivedon     0   0                    20
                         08.12.2011.
                                                Workin
                 0    0                60   0               0
                                                progress
16nos
procured.
Storehas
beenadvised             work                 Work
                 10   0                40   0               10
totenderfor            completed.            completed
balance9
nos.Fund
reqdforPO
Casewas
tendered.
Buthadto
nbe
discharged
becauseof
highrate.Re   0    0                   0    0                  0
tendering
under
process.Fun
dreqdin16-
17to
process
Clubbedwith
PBno191.
10nos
completedso              Case
far.8NOS                droppeddue
liftedbyM/S             toless                 Workunder
                 30   30                  20   13                 50
B.T.fullqty             quantityof             progress
executedin               WAM-4and
15-16.                    WAG-5
payment
MADE.work
Completed
                         Tobe
                         suppliedby
                         KPA
                         Workshop/E
                         RvideRly.
                 5   5   Board'sletter   0   0                    20
                         No.2010/Ele
                         ct.
                         (TRS)/441/1,
                         Dt:04.06.201
                         0.
Centralised
procurement
byBd.Work    0   0                   7   7                   4
maybe
closed.
Fullqty.               Fullqty.                Fullqty.
                 6   0                    12   0                    12
supplied.                supplied.                 supplied.
                         09wheel
                         setsreceived
                         on
ELS/BSLis              05.11.13from
procuring.No    12   0   KPA,           0   0               15
tyetrecd.              Balancedon
                         3noswheel
                         setsreceived
                         on20.12.13.
RSPbeing              RSPbeing              RSPbeing
operatedby            operatedby            operatedby
TMWNKRD               TMWNKRD               TMWNKRD
forQty-                forQty-                forQty-
44(Qty                 44(Qty                 44(Qty
completed-              completed-              completed-
17).ForQty-            17).ForQty-            17).ForQty-
40,PO                 40,PO                 40,PO
placed&       6   6   placed&       0   0   placed&       15
material               material               material
receivedfor           receivedfor           receivedfor
Qty-10,Bal            Qty-10,Bal            Qty-10,Bal
Qty-30.                 Qty-30.                 Qty-30.
(supplied              (supplied              (supplied
AQ-10ELW-              AQ-10ELW-              AQ-10ELW-
6SR-5SCR-             6SR-5SCR-             6SR-5SCR-
3WCR-4)                3WCR-4)                3WCR-4)
                                                     Workin
                0   0                       40   0                  0
                                                     progress
FundofRs
120lac
available.
Tendering
                0   0   0   0   0
willbedone
in16-17.
Fundwillbe
required
work
                0   0   0   0   0
completed
Indentrecd
atH/Q.
Under          0   0   0   0   0
processfor
procurement.
                                                       Workisnot
Work
                  0    0                     35   35   requiredby      0
completed
                                                       W.Rly
                           Material
Work
                  10   0   receivedon      0    0                      20
completed.
                           11.03.2013.
Work                      Work                      Work
completed       0         completed       0         completed       12
andpaid.                  andpaid.                  andpaid.
                           09nos.from
                           M/sStesalit
                           receivedon
                           04.03.2013                Workisnot
Itemnotreqd
                 10   0    01no.from     10   10   requiredby     15
atpresent.
                           M/sELCO                  W.Rly
                           enterprise
                           receivedon
                           22.03.2013.
                                                  Workin
                 0   0                   38   0                   0
                                                  progress.
Estimate
Sanctioned
by
CWM/KGP.
ERS/POH/K
GPadvised
                  0   0                     0   0                     0
totakeupthe
caseon
priority.Fund
reqdto
tenderforthe
case.
Orderedon
B.T.Fullqty
                                                   Work
recdand        0    0                   25   0                   15
                                                   completed
payment
made.
                   0   0                   0   0                0
POfor4nos
issuedasper
availabilityof
fund.4nos               01noABB
recd(AAL-                  makeSIV               Tender
3,Medha-1         4   3   received.03   3   3   openedon   5
no).Work                 nosUnder              25-05-15.
maybe                    process.
treatedas
complete
andclosed.
Indents
underA/C
vetting.
Consignee
                  0   0   0   0   0
advisedto
processon
priority.Fund
reqdtostart
                  0   0   0   0   0
CLWhas                   CLWhas                    CLWhas
processed                 processed                  processed
                   0   0                      0    0                      0
the                       the                        the
procurement.               procurement.                procurement.
                   0   0                      10   0                      10
SERhas
beenalloted   0   0                                           0
nillqty.
Centralised
procurement
byWRLyW
                                                Materialis
Rly            0   0                   2   2                   0
                                                awaited.
requestedto
collectfrom
CLW.
Material                Material                Material
received                received                received
fromCLW.               fromCLW.               fromCLW.
                 0   0                  1    0                   1
Caseclosed             Caseclosed             Caseclosed
fromWCR                fromWCR                fromWCR
side.                    side.                    side.
Materialrecd
-And
                 0                      0                        0
payment
made.
                                                  Material
                 0   0                  50   50   under         0
                                                  procurement
                                                     Workin
                 0    0                     50   0                    0
                                                     progress
Estimate
under
preparation     0    0                     0    0                    0
at
ELS/Bndm.
a)Supply:            a)Supply:            a)Supply:
NIL.b)                NIL.b)                NIL.b)
Balance:08           Balance:08           Balance:08
nos.(ER-               nos.(ER-               nos.(ER-
                1   1                   0   0                   2
2,SCR-                  2,SCR-                  2,SCR-
1,SECR-                 1,SECR-                 1,SECR-
1,SER-1,SR-             1,SER-1,SR-             1,SER-1,SR-
1,WCR-2).               1,WCR-2).               1,WCR-2).
POcouldbe
issuedfor8
nosonlyas
per
availabilityof
fund.(SIL-
2,KB-
2,Faiveley-4      0   0   0   0                 0
nos).Total49
olacs@6lac
each.
Material
recd.Work
maybe
closed
Atpresent
notreqd.Will
betakenup
afterwards.N
Rlyadvised      0   0                   0   0                   0
on11/11/14
notto
procurefor
S.E.Rly
                           10set
Work                      received.03             Work
                 10   4                     15   0                    15
completed.                 setsPO                  completed
                           issued.
All                    All                    All
pending.As             pending.As             pending.As
perRB's               perRB's               perRB's
L/No.                  L/No.                  L/No.
2013/Elect.             2013/Elect.             2013/Elect.
(TRS)/441/3            (TRS)/441/3            (TRS)/441/3
dt.-           1   1   dt.-           1   1   dt.-           1
08.11.2013             08.11.2013             08.11.2013
centralised            centralised            centralised
procurement            procurement            procurement
byWestern             byWestern             byWestern
Railway                Railway                Railway
advised.                advised.                advised.
                0   0                   0   0                   0
                0    0                    42   30                    5
                                                    LOAissued
workwillbe
                          Work                     andworkin
takenupin    10   0                    5    5                     10
                          completed                 progress.(1
W/C.
                                                    no.withfirm)
a)Asper                 a)Asper                 a)Asper
advisedby               advisedby               advisedby
Rly.Bd.                 Rly.Bd.                 Rly.Bd.
Procurement              Procurement              Procurement
processed                processed                processed
for200                  for200                  for200
                75   50                   85   85                   85
nos.only.b)             nos.only.b)             nos.only.b)
Supply:15              Supply:15              Supply:15
nos.(CR-                 nos.(CR-                 nos.(CR-
6,ECoR-                   6,ECoR-                   6,ECoR-
2,NR-6,SR-                2,NR-6,SR-                2,NR-6,SR-
1)                        1)                        1)
                                                    Tender
                  0   0                     1   1   openedon        0
                                                    18-05-15
                        Material
                                                  Work
                1   0   receivedon    1    0                    0
                                                  completed
                        31.10.2015.
                                              Material
              0   0                 12   12   under        0
                                              procurement
                           Sactioned
                                                      Work
                           detail
                                                      completed
                           estimate
                  4    4                     10   0   (Financial        12
                           submittedto
                                                      liabilitiesare
                           HQfor
                                                      balance)
                           outsourcing.
Indentunder
                                                POplaced.4
under
                                                nos.received
preparation    0   0                   5   1                    4
                                                fundrequires
at
                                                urgently.
ELS/BNDM
keptin                                           Work
                 0   0                    10   0                    0
abeyance.                                          completed
6 6 0 0 6
0 0 0 0 0
                0   0                   0    0                    0
               0   0                  0   0                  0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
7   7   0   0   7
Allsupplied.           Allsupplied.           Allsupplied.
Work             2   0   Work             0   0   Work             2
Completed                 Completed                 Completed
0 0 0
0 0 0
           0                          0           0
0                    0   0
0 0 0
0 0 0
    Allsupplied.
0   Work            5   0
    Completed
0   Notallotted.    0   0
    Allare
    balance,as
    CLWisnot
    purchasing
0                    2   2
    Busstation
    separately.b)
    Hencemay
    bediverted.
    Material
    receivedand
0                    4   2
    work
    completed
    a)Demand:-
    06nos.b)
    Supply:-06
    nos.(CR-
    1,ER-1,NCR-
0                    6   1
    1,SECR-
    1,WCR-
    1,WR-1)c)
    Balanc:-
    NIL.
0                    200   12
    Allmaterial
    supplied.
2                    40    7
    Work
    completed.
0 Completed. 2 0
    Notsupplied
    till,CLWis
0   notprocuring    4    4
    valavesets
    seprately.
    a)work
    completed.
    (notbyCLW)
    b)Thiswork
    wasnot
    allotedto
    CLWthrough
    Boardsletter.
    3sets(=6
    Nos.)
    supplied/Fitte
    din
0   locomotives.    6   5
    Restqty.not
    tobe
    procuredby
    CLW
    Total18nos.
6   received        174   78
    caseclosed
     1dtd.
     25/08/2015
     2.For
     Mechanical
     Rehab.of
     TMstator
     ,LOAissued
     onM/s
     Kalyani
     Engineering
     Works,GZB
     on30.09.13,
     totalvalue
     Rs.422
     lakhs,DP
     29.09.15.Till
     date53
     statorsof
     ELS/TKD
     and40of
     ELS/EThave
80                     251
     been
     rehabilitated.
     Contractof
     M/sKlyani
     hasbeen
     terminated.A
     freshtender
     forthework
     hasbeen
     awardedto
     M/sSuper
     Tec
     Engg.LOA
     dtd.
     10/2/2016.3.
     Electrical
     Rehab.of
     TMLOA
     issuedon
     M/sStesalit,
     Kolkataon
     COSfile
     No.47099011
0                      120   112
     ,TOD
     awaited.
    A)POfor
    100nosroof
    mounted
    DBRplaced
    withdirect
    diliveryto
    consignee.
    Z.Rlysto
    confirm.B)
    For98nos
8   vertical         186   13
    DBR'sallof
    the98nos.
    were
    supplied
    (ECoR-
    33,ECR-
    20,ER-
    25,WCR-20).
    C)Balance:-
    NIL.
    POplaced
    withdirect
    delieveryto
0                     350   5
    consignee.
    Work
    completed.
    Board'sletter
0                      8    6
    required
    Notinthelist
    ofCLW.
1   (Boards           10     10
    lettermaybe
    sent)
    Thiswork
    wasnot
0   allotedto        1150   103
    CLWthrough
    Boardsletter.
0 100 23
    Notinthelist
    ofCLW.
0   (Boards            5     4
    lettermaybe
    sent)
    07Bogie
    frames,30
    TMs&15
    wheelsets&
    Brake
    riggings-3
    suppliedto
1                   11   8
    Rlys.Rest
    itemsare
    due(Bogie
    frame-4,TM-
    3,Wheelset-
    18,Brake
    rigging-8).
    Work
4                   63
    completed.
    POplaced
    withDDto
0   consignee.     32   9
    Work
    completed.
0                     250   66
    LOAissued
    for40rotor
    and18stator
    onM/sSaini,
    all40rotor&
    18stators
    completed.
    Re-Tender
0   openedon        50    22
    06.12.2013
    for22
    stator.Tender
    discharged
    and
    transferredto
    TMW/NKRD
    .
0                  100   42
    Work
    completed,
0   caseclosed   200   25
    fromWCR
    side.
    All40gear
    caseshave
    been
0                  10    0
    received.
    Work
    completed.
    Supply:68
    nos(ECoR-
    10,ECR-8,
    NCR-12,
    SECR-
0   12,SR-         150   75
    6,WCR-19&
    WR-1).For
    balalnceno
    Rly
    approached.
0                  64    15
    a)
    Distribution
    of39Wheel
    set:WAG-
    7=15,WAP-
    4=24.
    b)WAG-7:
    Supply-09
    nos.(ECR-
    3,NCR-
    3,SER-3),
0                   39   16
    Balance-06
    nos.(CR-6).
    C)WAP-4:
    Supply-14
    nos.(NR-
    6,SR-
    2,WCR-6),
    Balance:10
    nos.(ER-
    3,SCR-3,SR-
    1,WR-3).
    i)POplaced
    &material
    receivedfor
    Qty-29
    .Supplied
    Qty-CR-
    5,WCR-
    7,NR-8,SCR-
    15,SECR-
5   6.ii)BalQty-   56   24
    27
    processedas
    perScheme-
    II,POplaced
    &material
    receivedfor
    Qty-23,Bal
    uncovred
    Qty-4.
    a)Demand:-
    08nos.a)
    Supply:06
    nos.(NR-
    1,SECR-
0                   8    0
    2,SR-
    1,WCR-2).b)
    Balance:02
    nos.(SCR-
    1,SR-1)
    Work
    completed
    and
0                   3    0
    paid.Item
    maybe
    deleted.
    a)Demand
    qty:WAG-7
    =3,WAP-
    4=9.
    b)Supplied
    qty:-WAG7:-
    Bogieframe-
    3,TM-9,
0   Wheelset-6.   12   8
    WAP-4:-
    Bogieframe-
    1,Brake
    Rigging-
    1,Bolster-
    1,TM-21
    ,wheelsets-
    9.
    Allmaterial
    supplied.
4                   64   17
    Work
    completed.
    a)Entryshall
    becorrected
    as70against
    76.(WAG9-
    55,WAP7-
    12,WAP5-3)
    b)FOR
    WAG9:-Out
    of55,9of
    CR,6ofER,
    5ofSCR,6
    ofSER
    balance.
    c)WAP7:-
    Outof12
    nos,6nos
    wheelset
0   suppliedto     76   18
    ECR,6nos.
    toNR
    d)WAP5:-
    Outof3
    nos,03nos.
    suppliedto
    NR.d)Allthe
    balance
    wheelsetsto
    becollected
    fromKPAor
    BSL.vide
    RB'sletter
    No.
    2008/Elect.
    (TRS)/720/1
    Dt.15.09.08
    a)Entryshall
    becorrected
    as14against
    13.b)Allare
    balance,as
2   CLWisnot      13   12
    purchasing
    Busstation
    separately.c)
    Hencemay
    bediverted.
    Allbalance
    asCLWis
    not
0   purchasing     28   18
    separately.
    Hencemay
    bediverted.
    Material
0   received       20   3
    formCLW
    Allmaterial
0                   50   15
    supplied.
    a)Total
    demand:09
    nos.(NR-
    7,WR-2).b)
0   Supply:06    7    3
    nos.(NR-6).
    c)Balance:
    03nos.(NR-
    1,WR-2)
    Detail
    estimate
    sanctioned
    by
    CEE/WCR.
3                    20   11
    Tender
    openedon
    07/1/2016
    UnderTCat
    ELS/TKD.
    Centralised
    procurement
0   bySR.PO       50   15
    placed.all5
    nosreceived.
     POissued
     for95nos.to
     M/sElmac
     Com.,
0                      1000   245
     MumbaiFull
     quantity
     received.
     caseclosed
     Notrequired
     byTKDvide
     Sr
     DEE/TRS/TK
     D'sL.No.
     EL/03/G/07
     dtd.
10   27/01/2015.I      50     40
     nformedRly
     Bdvide
     LetterNo.
     WCR/L/05/2
     348dtd.
     09/02/2015
     caseclosed.
    Work
    completed
0   andpaid.     50    0
    Itemmaybe
    deleted..
0                  200   102
    8Nos
    completedby
    DHD
    W/shop.2
2                   100   64
    nosbalance
    asondate
    onDHD
    W/shop.
0                   20    20
    a)Supply:
    01no.(NR-
    1).b)
0   Balance:03       4    3
    nos.(CR-
    1,ER-1,SCR-
    1).
    InBG2015-
    16fund
    allotted
    againstthis
    itemvide
    Rly.Bd.L.No.
    2015/Elect.
    (TRS)/441/1
    dtd.
    27/5/2015
    was
    Rs.95,00,000
    /-against
    whichfund
    Rs.27.16
    Lacsfor03
    nostap
0                     250   30
    changerof
    M/sRiver
    Engghas
    beenbooked
    inyear2015-
    16.Butvide
    Rlybd'slettr
    no.
    2015/Elect(T
    RS)/441/1
    dtd.
    01/10/2015
    fundrevised
    toRs.0/-.
    Physicalyall
    work
    completed,
0                   650   30
    a)Supply:
    Nil.b)
0   Balance:02    2    2
    nos.(NR-
    1,WR-1)
0                   24
     (47recd.&
     17
     balance).PO
     issuedbyRB
     toM/s
     Titagrhvide
     POno.
     2009/RS(PF
     &EC)/951/Co
     -Co/5TCdt.
     22.04.09,26
     nossupplied
17                    273
     byfirmat
     TKD&13
     nossupplied
     byfirmat
     NKJ.Asper
     RBdirectives
     balancewill
     besupplied
     byCLW.8
     nosrecd.at
     ELS/NKJ
     fromCLW.
     POpalaced
     withDDto
0    consignee.      310   45
     Work
     completed.
0                   6    3
    a)Supply:
    07nos.(ER-
    2,NR-
    1,SECR-2,
0   WCR-2).b)     12   5
    Balance:05
    nos.(NR-
    1,SER-2,SR-
    2)
    a)Supply:
    01nos.(WR-
    1).b)
0                   3    1
    Balance:02
    nos.(NR-
    1,WR-1).
    a)Supply:
    10nos.(ER-
    2,NR-
    2,SECR-2,
0   SR-2,WCR-       12   2
    2).b)
    Balance:02
    nos.(SER-
    2).
    Nodal
    agency:NR
    Tender
    openedon
    20.3.2013
    .Qty.has
    been
    coveredon
    dated
    22.8.2013in
    P.O.no.
    1910513916
    0327dt.
    01.6.2012.
    against30%
    option.DP:
    30.11.2013.le
    tterwrittento
0                      6   4
    firm&on
    15.9.2014for
    risk
    purchase.
    Materialstill
    awaited.
    EDP:31.7.20
    15.All
    material
    receivedat
    ELS/GZBon
    22.6.2015
    andadvised
    toallrlys.to
    collectthe
    materialfrom
    ELS/GZBon
    23.6.2015.
    1)Traction
    converter
    bus
    station(main)
    converter
    Qty-02Sets,
    TOD
    22.08.2013
0   underTC&        2   2
    2)Busstation
    aux.
    converter-PO
    placedDD-
    31.03.2015(r
    eceived,
    Dist-CR-1
    WR-1).
0   Completed.       3    2
    a)Total
    demand
    quantity=08
    nos.(WAG-7
    =04,WAP-4
    =04).
    b)WAG7:-
    Supply:
    Bogieframe-
0   03(SCR-          19   5
    1,SECR-
    2),TM-
    10(SCR-
    4,SECR-6).
    c)WAP4:-
    Supply:TM-
    12(NR-6,SR-
    6),Wheelset-
    6(NR-6).
    04Nos.bal
4                  38   11
    forELS/NKJ.
    02Nos.bal
3   forELS/NKJ.   38
    1balforET.
    TKDqty.(12
    Nos.)
    Received.ca
0                   75   -1
    seclosed
    fromWCR
    side.
    POplaced
    onCGL&
    SAINIfor55
    nos
    stator(Qty-55
    received
    givento
    ELW/BSL(C
    R)-13
    CR(AQ)-14
    CR(KYN)-10
    SR(RPM)-
    3,SCR-
    5,WCR-
    6,SECR-4,
2                    65   8
    uncovered
    Qty-10,
    Distribution
    Rotor-
    65(Distributio
    n-CR-45
    (ELW-15AQ-
    20KYN-10)
    NR-04,SCR-
    5,
    SECR(BIA)-
    4,SR-3
    WCR-4).
    work
    completed
    Allmaterial
0   received        27   15
    caseclosed
    a)Entryshall
    becorrected
2   as12against   12   7
    13b)All
    balance.
    a)Supplied:
    29nos.
    (ECR-8,NR-
    8,SCR-
    5,SECR-4,
    WCR-4).b)
0   Balance:10    37   4
    nos.(CR-
    10).c)
    Excess
    supplyof02
    nos.to
    SECR/BIA.
    9,SR-2),
    5)Aux.Comp
    SCR-4NR-4
    SECR-1,SR-
    2WCR-
    4,ECR-6.
    Procurement
    status-
    1)Motorfor
    Scavanger
    blower(TM)-
    RT/TOD
    24.02.2015,
    2)Motorfor
    TMblower
    -POplaced
    forQty-
    11(received)
    DD-
    31.05.2013,
    POplaced
6                    37   29
    forQty-
    26(received,
    dist-SR-3
    SCR-4WR-2
    SECR-2NR-
    4)DD-
    10.08.2014,
    TOD
    18.01.2016
    forQty-37
    f,3)Motorfor
    Scavanger
    Blower(MR)-
    RT/TOD
    19.01.2016,4
    )Motorfor
    Main
    compressor(
    11received)
    -POplaced
    forQty-
3                    6    6
0 4 4
    2balanceto
    besupplyby
    CLWfor
    ELS/TKD.
    Allotmentto
    WCRis
2   madevide       18   14
    Bd'sletter
    no.
    2013/Elect.
    (TRS)/441/1
    dt.
    01.05.2013.
    Boardsletter
0                    8    8
    notreceived
    a)Supply:
    NILb)
0   Balance:04      4    4
    nos.(NR-
    2,WR-2)
    AsperRly
    Bd.this
    itemsistobe
    fittedon
5                     160   150
    CLWbuit
    locosonlyat
    CLW,hence
    notsupplied.
0 50 0
    Completefile
    withindent
    sentto
2   COS/HJP          50    50
    .Procuremen
    tunder
    progress.
    Qty.fully
0   supplied       5    2
    (NR-2,WR-3)
    a)Supply:
    NILb)
    Balance:10
    nos.(CR-
    1,ECoR-
1                   10   10
    1,ECR-1,ER-
    1,SCR-
    1,SECR-
    1,SER-1,SR-
    2,WCR-1)
    a)Supply:
    NIL.b)
0                   2    2
    Balance:02
    nos.(WR-2)
    a)Supply:
    02(ECR-
    1,SER-01).
    b)Balance:
    08nos.
1                   10   10
    (ECoR-1,ER-
    1,NCR-1,NR-
    1,SCR-1,SR-
    1,WCR-
    1,WR-1)
0   10    10
0 100 36
0   100   54
    LOAissued
    toM/s
    AAL/Noida
    forGanz
    maketap
    changersfor
    12nos.CA
    vetted.Total
    3nos
    completedin
    FY13-14.(1
    noofTKD&
    2nosofNKJ
    complete
    andpayment
    alsodoneby
    Mar14.)&6
    inFY14-15.
    (3TKD+3ET).
    1balanceto
0                    100   9
    belifted.
    payment
    done13-14
    for3nos.
    (TKD=1,NKJ
    =2)Payment
    madein
    2014-15for6
    nos.(TKD=
    3,ET=3).
    AALAAL02
    nosinAdd
    02nosof
    1116/10-11
    underqty
    variation
    clauseand
    03nos.of
    1165/13-14
    closed
    Tender
    openedon
    13-08-13.
    POplaced.
0                    47    8
    50Nosat
    variouszonal
    Railways
    received.
    Work
    completed
    and
0                    10    2
    paid.Item
    maybe
    deleted.
    a)Supplied:
    02nos.(NR-
0   1,WR-1).b)    3    0
    Balance:01
    nos.(WR-1).
    a)Supplied:
    46nos.
    (ECR-6,ER-
    10,NCR-
    1,NR-
    4,SECR-
    5,SER-
    10,WR-10).
    b)Balance:
0   104nos.       150   10
    (CR-
    25,ECoR-
    10,ECR-
    4,NCR-
    14,NR-
    6,SCR-
    15,SECR-
    5,SER-5,SR-
    10,WCR-10)
0                   100   100
    Tobe
    procureby
    ECR.LOA
    issuedin
    favourofM/S
    BT.Worknot
0                    46    46
    started
    Contract
    terminated&
    freshtender
    workunder
    process.
    Complete.All
0                    100   20
    Supplied.
    a)Supplied:
    10nos.(ER-
    2,NR-2,SCR-
    2,WCR-
    2,WR-2).b)
    Balance:04
0                    13    4
    nos.(CR-1,
    NCR-1,
    SER-2).c)
    01no.
    excess
    supplytoER.
2   Allsupplied.    29   2
    6received
    on22.07.13
    atELS/TKD
    fromCLW.
4                    68   22
    04No
    BalanceNOT
    REQDby
    TKDshed
    POplaced&
    material
    receivedfor
    Qty-14
2                    56   32
    (Distribution-
    CR(ELW)-
    14).BalQty-
    42.
    a)Supplied:
    02nos.
    (SECR-
0                    3    1
    1,WCR-1).b)
    Balance:01
    no.(SR-1).
    POplaced&
    material
    receivedfor
    Qty-4CR
    Qty-1
    Balance
    direct
1   deliveryto     7   6
    consignee(Di
    stribution
    CR-1ECR-1
    SCR-1NR-
    1).Qty-3
    RT/TOD
    awaited.
    Total
    centralised
    Qty-
    6,Material
    receivedQty-
0                    6   1
    6(Distribuiton
    -CR-2,SCR-
    1,SECR-1,
    WCR-2)-
    Completed.
    Work
0                    3   0
    completed.
    Centralized
    procurement
    madeby
1   SCRand         3   1
    paid.No
    allotmentto
    SCR.
    T/Motor
    blower-
    RT/TOD
    18.01.2016,
    3)Motorfor
    Scavanger
    Blower(TM)
    -POQty-10
    DD-
    30.03.2012,
    POQty-
    11(received)
    DD-
    20.03.2014
    andRT/TOD
    24.02.2015
    forQty-47,
    4)Motorfor
    Scavenger
    Blower(MR)-
5   POQty-10      35   35
    DD-
    20.11.2011,
    POQty-
    11(received)
    DD-
    31.10.2013,
    RT/TOD
    19.01.2016
    Qty-47,
    5)Machine
    RoomBlower
    with
    motor(Indent
    splitedfor
    motor-
    RT/TOD
    18.12.2015&
    blower-TOD
    20.02.2014,
    underTC),
    4,SR-
    2,WCR-
    5,CR-
    13.2)Setof
    Brake
    electronics
    CR-8Direct
    deliveyto
    consignee
    Qty-18,3)Air
    DryerELW-6
    NR-5WCR-5
    SR-2,4)DC
    linkvoltage
    sensorAQ-
    68,Active
    speed
    sensorAq-
    204,5)Oil
    Cooler
5   radiatorAQ-4   34    23
    ELW-4direct
    deliveryto
    consigneeby
    firm,
    6)Capacitor
    Bank
    assembly
    SCR-5,NR-
    5,SECR-
    4,SR-
    2,WCR-
    5.Procureme
    ntstatus-
    1)Trade
    brake
    arrangement
    -POplaed&
    material
    receivedfor
    Qty-30,Bal
    Fullquantity
    received
    fromM/s
    AdvanceRail
    ControlPvt.
    Ltd.,
0   Bangloreat     150   31
    totalcostof
    Rs.
    10701306/-.
    caseclosed
    fromWCR
    side.
0                    60    0
    Basedon
    fund
    procurement
    ofonly8nos
    possible.
    hencePO
2   issuedfor8    300   33
    nosandfull
    quantity
    received.
    Caseclosed
    fromWCR
    side.
0                     50    45
     2nosGanz
     maketoM/s
     AAL/Noida.
     CAA/cvetted
     and9nos
     covered
     under
     running
     contractof
     M/sBTILby
     quantity
     variation
     clauseoutof
     which6nos
     lifted&
     completedat
     ET.M/sAAL
     forBTmake
     Tap
     ch.completed
     43nos
-4                    200   64
     (ET=10,NKJ
     =17&
     TKD=16)and
     payment
     done13-14
     for9nos.
     (TKD=5,NKJ
     =4)Payment
     madein
     2014-15for8
     nos.(ET=4,
     NKJ=4).Pay
     mentmade
     in2015-16
     for22nos.
     Qtyvariation
     clause
     operatedand
     contractqty
     incresed
     from39to
     Tobe
     procuredby
     KPA
     workshop
20   E.Rly.          100   100
     Material
     awaited.No
     progressat
     KPA
     Centralized
     procurement
     by
     C.Rly..LOA
     issuedon
     M/sIndocen
     for61
     sets.Being
0    shortclosed     101   20
     forfewcards
     balance
     againstthe
     contractas
     fresh
     contract
     awardedwith
     lesserrates.
     Nodal
     agency:NR
     Allmaterial
     receivedand
0    suppliedto      10    0
     concern
     Railway.
     Work
     completed.
     Nodal
     agency:NR
     POplaced
     onCLWbY
     COS/NRon
0    18.6.2014.       10    10
     for5loco
     sets.
     DP:23.6.201
     5.Material
     awaited.
     Centralized
     procurement
     byERly.TC
     No.
     10/13/6012,
     RTOTunder
     processfor
45                     500   480
     145Nos,
     Allottedfund
     withdrawn,
     casewill
     processedin
     nextfinancial
     year.
0                    100   100
    a)Demand:
    i)Auxiliary
    converter-05
    L/s.ii)
    Traction
    converter-05
    L/s.b)
    Supply:i)
    Aux.
    converter-
0                     5    5
    NIL.ii)Tr.
    converter-
    NIL.c)
    Balance:i)
    Aux.
    converter-05
    L/s(CR-5)ii)
    Tr.converter-
    05L/s(CR-
    5).
    POplaced
    onM/SLotus
    ,Directly
    deliveryto
    Consignee.C
    onsigneeas
    perPO
    a)Sr.DEE(TR
    S),Ajni,CRly=
    3sets,
0   b)Sr.DEE,Lal     20   10
    aguda,SCR=
    3sets,
    c)Sr.DEE,Tat
    anagar,SER=
    1set,
    d)Sr.DEE,Bhl
    lai,SECR=1
    set.
    Uncovered
    Qty-4.
    Fullquantity
    received
    againstPO
    issuedbyRB
    toM/sBhilai
0                    60   12
    Engg.
    Corporation.
    caseclosed
    fromWCR
    side.
    Fullqty.
2                    90   8
    supplied.
    Fullquantity
    (90nos)
    supplied.
1
    (directly
    suppliedby
    firm).
    9balancefor
    ELS/NKJ.
9   Materialnot    96
    requiredto
    ELS/NKJ
    RlyBoard
    videletter
    no.
    2009/Elect(T
    RS)/720/1dt.
    10.12.2014
    hasrevised
    thequantity
0                    81   9
    from15to18
    nos.(15-
    WAG9&3-
    WAP7).
    12Nos
    (WAG-9)
    recd,03
    WAP7Recd.
     RSPbeing
     operatedby
     TMWNKRD
     forQty-
     44(Qty
     completed-
     17).ForQty-
     40,PO
15   placed&       84   63
     material
     receivedfor
     Qty-10,Bal
     Qty-30.
     (supplied
     AQ-10ELW-
     6SR-5SCR-
     3WCR-4)
     RSPbeing
     operatedby
     TMWNKRD
     forQty-
     44(Qty
     completed-
     23).ForQty-
     40,PO
     placed&
     material
13                   84   56
     receivedfor
     Qty-29,Bal
     Qty-11.
     (Supplied-
     AQ-10ELW-
     17(ECR-5,
     NR-5,AQ-
     1),SR-5
     SCR-2NR-
     5).
    Work
0   completed       4    2
    andbillpaid.
    Tobe
    procured
    centrallyby
    CRwith
    direct
    deliveryto
    consignee
    railways(CR-
    5ER-4ECR-
    8ECOR-3
    NR-6,SR-4
4   SCR-4SER-       50   50
    4SECR-4
    WR-4WCR-
    4).New
    allotment
    (CR-3ER-5
    ECR-12
    ECOR-2NR-
    4SR-2SCR-
    6SER-2
    SECR-3WR-
    9WCR-2).
    Tobe
    procured
    centrallyby
    CRwith
    direct
    deliveryto
1   consignee       10   10
    railways(CR-
    2ECR-1
    ECOR-1
    SCR-2SER-
    2SECR-1
    WCR-1).
    a)Supplied:
    07nos.(ER-
    2,NR-1,SER-
    1,SR-1,WR-
1                   9    4
    2).b)
    Balance:02
    nos.(SCR-1,
    SECR-1).
    a)Supplied:
    05nos.(ER-
    1,NR-1,SCR-
    1,SR-1,WR-
    1).b)
1                   9    5
    Balance:04
    nos.(ER-
    1,SECR-
    1,SER-1,
    WCR-1).
    Central
    procurement
    byECoR
    withdirect
    deliveryto
    consignee
    railways.18
0                   20   15
    Nosreceived
    and
    delivered.2
    NosP.O
    placedon
    Simplex
    Engineering.
    Materialnot
    requiredby
5   WCRmaybe     50   50
    allottedto
    otherRly.
    a)Supply:
    10nos.(CR-
    2,NR-2,SCR-
    4,SECR-2).
    b)Balance:
    08nos.(ER-
    1,SER-1,SR-
    2,WCR-4).c)
4                   18   10
    i)02nos
    allottedto
    ECRisnot
    requiredto
    them.ii)02
    nos.excess
    supplydone
    toSCR.
    Centralized
    procurement
    byS.CRly.
    Material
0                   9    1
    receivedand
    paid.Item
    maybe
    deleted.
    Qty-(6
    received),
    remaining
    direct
    deliveryto
    consingee,
    7)Blowerfor
    Traction
    motor
    (W/out
    motor)-SR-2
    SCR-
    6.Procureme
    ntstatus-
    1)Motorfor
    Traction
    motorblower
    -RT/TOD
    18.01.2016,
    2)Scavenger
    Blower
3                     18   13
    TM(Indent
    splitedfor
    motor-PO
    placedfor
    Qty-
    15(received)
    DD-
    30.08.2014,
    POQty-
    15(received)
    DD-
    25.03.2015,B
    alqty-6TOD
    24.02.2015&
    blower-PO
    placedDD-
    21.10.2014(q
    ty-9received,
    BalQty-
    27),3)Scaven
    gerBlower
    recdfrom
    PPS
    international
    iii)05No
    FDUrecd
    fromTrolex
    iv)05No
    Capacitor
    bankrecd
    fromElmec,
    Mumbaiv)
    05No
    Display
    screenrecd
    fromM/sAAL
    vi)Radiator
    recdfrom
    M/sApollo
    vii)Master
    Controller
0   recdfrom       36   26
    M/sWoama,
    viii)Filter
    assdly1No
    recdfrom
    M/sFilter
    Mfg.Tender
    20.13.8006.
    openedfor
    04Noon
    15.09.15.To
    be
    retendered
    ix)05No
    TBUunit
    recdfrom
    M/sFTILx)5
    setofckt
    breakers
    recdfrom
    M/sTrinity.
0                    40   0
0   100   65
0 200 53
0   50    22
0                     200   70
    a)Demand:
    i)Auxiliary
    converter-10
    L/s.ii)Tr.
    converter-10
    L/s.b)
    Supply:i)
    Aux.
    converter-
0   NILii)Tr.      10    10
    converter-
    NIL.c)
    Balance:i)
    Aux.
    converter-10
    L/s(CR-10)ii)
    Tr.converter-
    10L/s(CR-
    10).
    Caseclosed
0   fromWCR         100   23
    side.
    Work
    completed       50
    andpaid.
    POissuedto
    M/sElco
    Insulator,
    Kolkatavides
    PONO.
    2013.1824.1.
    61075DTD
    11/12/14DP
0   30/04/15Qty    125   62
    30
    nos.Material
    receivedon
    date
    28/02/2015.
    Qty-15
    Nos.Caseto
    beclosed.
    a)Demand:
    25L/s.(50
    nos.).b)
    Supply:NIL.
    c)Balance:
0                    44    42
    25L/s.
    (ECoR-
    8,SCR-
    3,SECR-
    7,SER-7).
    POissuedto
    M/sSiemens
    for2nosfor
    ELS/ETand
    receivedin
    Nov-2012..
    POplaced
    onM/s
    Medhaservo
    Ltd.
    Hyderabad
    videPOno.
    20.13.8019.1
    .41450dt.
    26.03.14for
    oneno.@
    Rs.571600
2   forELS/TKD.    50   14
    Material
    receivedat
    ELS/TKDon
    26.7.2014
    ForELS/NKJ
    PONo.
    2013.8017.1.
    41353
    placedon
    M/sWestern
    Elect.dtd.
    18.12.2014
    for02sets
    AmountRs.
    23,56,962/-
    DP
    30/3/2016
    a)Supply:
    02nos.(NR-
0   2).b)          10   9
    Balance:08
    nos.(NR-8).
0                    38   0
0                     50    50
    for81nos.
    wothoption
    clouseto
    enhancethe
    qty.upto96
    nos.P,O,no.
    1913501216
    0512
    dt.27.1.14
    DP:30.8.14
    Totalcost
    Rs.34020
    lacs.(Details
    of81sets--
    CR-13,ECR-
    30,NR-23,
    SCR-11,
    SER-4).
    Amendment
    ssuedon
    27.3.14upto
0                     100   37
    96sets
    17.4.14.DP:
    15.10.14.(ii)
    P.O.placed
    onM/s
    Laxeven
    System,
    Hyderabad
    for04nos.
    P,O,no.
    1913501216
    0511
    dt.27.1.14
    DP:27.9.14
    Totalcost
    Rs.16.80
    lacs.(Details
    of04sets--
    SCR-02&
    NR-02)All
    material
     Centralised
     procurement
     bySCR.
     100%
0    material        400   0
     receivedand
     paid.could
     bedeleted
     from16-17.
     COSfileno
     20138004
     tender
     openingdate
     02.04.2013.
     POplaced
     onM/s
     Autometer
15   AllianceLtd,   150   35
     Noidaon
     22.11.13.DP
     28.02.14.PO
     valueRs.
     4459568.
     Material
     received.Cas
     eclosed
0                    9    0
    Fullquantity
    suppliedby
0   firm.Case      50   22
    closedfrom
    WCRside.
0   100   100
0    8    8
     CLWhas
     processed
0                       50    50
     the
     procurement.
     Caseno.
     19135011
     Tenderno.
     4119130605
     isopened
     16.9.2013&
     discharged
     duetonone
     availabilityof
0    Funds.            10    10
     Tender
     OPENED
     ON
     09.1.2015.&
     TCfinalized
     for04
     nos.andPO
     isunder
     vetting.
10                      100   70
0
    40nos
    suppliedto
    zonal
    Railways.
    The
5                   50   50
    performance
    isunder
    watchdueto
    problemsin
    thefield.
0                   12   8
    Material
    received
    fromCLW.
1                   2    1
    Caseclosed
    fromWCR
    side.
50
0                  100   100
0                    50    0
    100%
    Material
    receivedand
    billfor
    Rs.66.34
    lacks
    pending.
    Fundmaybe
0                    300   90
    providedon
    priority.
    Couldbe
    deletedfrom
    16-17iffull
    fundsare
    providedin
    15-16.
0                    75    75
    a)Supply:
    NIL.b)
    Balance:08
    nos.(ER-
2                   8   8
    2,SCR-
    1,SECR-
    1,SER-1,SR-
    1,WCR-2).
    Work
0                   2   1
    completed
    Work
0                   2   1
    completed.
    NewDelhi
    videPONo.
    20.13.8011.1
    .41174dt.
    30.08.13.PO
    valueRs.
    20174238.
    DP
    15.11.2013.
    5noseach
    receivedat
    NKJ&ETon
    21/22.09.13.
    ELS/ET
    processing
    the
    requisitionof
    04nos.PO
    No.
    20158005.1.
4   41153dtd.        75   46
    31/7/15
    placedon
    M/sHind
    Rectifiersfor
    03nos.DP=
    15/10/15with
    clausethat
    Quantitymay
    beincreased
    byone
    Numberonly
    during
    financialyear
    2015-16
    subjectto
    availabilityof
    clearfunds.
    Additionfund
    sanctioned
    byRlyBd
    Qty-05Nos.
    addedin
    contractNo.
    WCR.Elect.L
    oco.T.02.201
    2DT
    01.05.2013(
    BTtype)
    awardedto
5                     50    44
    M/sAAL,
    Noida.
    Material
    receivedon
    date
    01.07.15&
    billsubmitted
    ondate
    05.11.2015
0                     150   88
0                   120   95
    Tender
    openedon
    30.01.13for
    30loco
    sets
1   ,Contract      30    26
    awardedon
    M/s
    Indocen.Wor
    kin
    progress.
    Detailed
    estimateIS
    UNDER
2                   21    21
    VETTINGIN
    UNDER
    DIVISION.
    Material
0   under           10
    procurement
    Estimate
    sanctioned
3   andexcution    25    25
    inprogress
    atTMW.
    Estimate
    sanctioned
9   andexcution    75    75
    inprogress
    atTMW.
    a)Supply:
    18L/s.(CR-
    10,NR-
    3,WCR-5).b)
    Balance:82
    L/s(CR-
    10,ECR-
2   20,NR-           100   92
    12,SCR-
    25,SECR-
    10,WCR-5).
    c)EachLoco
    setconsists
    of02nos.of
    DDU.
     All
     pending.No
     actionhas
     beentaken
10   assincethe    100   100
     performance
     ofearlier40
     nosisstill
     underwatch
     MSunder
0                      3
     preparation
     Estimate
     sanctioned.
     Material
     under
15   Centralized     145
     procurement
     processby
     ELS/ETfor
     WCR.
    All
    pending.As
    perRB's
    L/No.
    2013/Elect.
    (TRS)/441/3
1   dt.-           12   12
    08.11.2013
    centralised
    procurement
    byWestern
    Railway
    advised.
    a)Supply:
    03nos.(NR-
    2,WCR-1)b)
    Balance:47
    nos.(CR-
4                   50   50
    6,ECR-2,ER-
    6,NR-8,SCR-
    6,SER-6,SR-
    6,WCR-
    3,WR-4).
0                   0
5                    150   105
     Indentbeing
     senttoFA&
0                    80    80
     CAO/WST
     forvetting.
     Tender
10   openedon      100   75
     16/11/2015
     a)Asper
     advisedby
     Rly.Bd.
     Procurement
     processed
     for200
70                   1000   886
     nos.only.b)
     Supply:15
     nos.(CR-
     6,ECoR-
     2,NR-6,SR-
     1)
     a)Demand:
     02nos.
     transformer
     forWAP-
     5/WAP-7
0    Loco.b)        2     2
     Supply:01
     no.(ER-1).
     c)Balance:
     01no.(WR-
     1).
     a)Supply:
     15nos.(CR-
     2,ECoR-
     3,ER-3,NR-
2    3,SECR-         20     10
     2,WCR-2).b)
     Balance:05
     nos.(SCR-
     2,SER-3).
    Tenderno.
    4119130068
    openedon
    20.3.2013.&
    Tender
    finalized
    P.O.placed
    onM/sBTIL.
    P.O.no.1910
    5139160327
    dt.22.8.2013
    DP:
    30.11.2013
0                     18   14
    MaterialStill
    awaited.
    EDP:31.7.20
    15.All
    material
    receivedat
    ELS/GZB,on
    22.6.15and
    advisedtoall
    rlys.on
    23.6.15to
    collectthe
    material.
0                     3    3
0                     3    0
     Materials
0    under          70    42
     procurement.
     SRisthe
     nodalagency
     for
     centralised
     procurement.
10   Estimate       100   100
     sanctioned.
     Indentsent
     toCOSfor
     procurement.
     underTCM.
    MSunder
0                 5    5
    preparation
0                 20   20
     03
     nos.covered
     under
     quantity
     variation
     clausein
     existing
     contract
     GANZmake
     ofM/sAAL
     (846/08-09)
     09covered
     under
     quantity
12   variation        75    65
     clausein
     existing
     contractBT
     makeofM/s
     AAL
     (1116/10-11)
     closed.Full
     qtyalready
     coveredin
     existing
     contractsby
     operating
     variation
     clause
     100%
     material
     received.Bill
     of
     Rs.21680(00
     0)pending
     forpayment
30                     100   87
     in15-16.
     Couldbe
     deletedfrom
     16-17iffull
     funds
     providedin
     15-16.
     a)Supply:
     13L/s
     (SECR-
     10,SR-1,WR-
     02).
     b)Balance:
     87L/s.(CR-
     10,ECR-
     10,ER-5,NR-
20   10,SCR-         100   98
     10,SECR-
     10,SER-
     5,SR-
     4,WCR-
     20,WR-3)c)
     EachLoco
     setconsists
     of02nos.of
     DDU)
     Caseno.22-
     16-5088
0                     3    3
     TOD:30-05-
     16
     COSfileno.
     20138021,
     POissued
     for12nosto
     M/s
     Schneider,
     Vadodara
     dtd.DP=
     15/10/2014,
     Qty=12recd
     atNKJshed
     on25-9-
25                     250   147
     14.NKJvide
     L.No.
     NKJ/TRS/S-
     10dtd
     12/5/15
     statedthat
     balance04
     nosDP
     expiredand
     theitemisno
     more
     required.
     Tobe
     procured
     centrallyby
     C.Rlywith
0                      56    56
     direct
     deliveryto
     consignee.T
     ODawaited.
     Material
1    under           10    10
     procurement
     Nodal
     agency:NR
     Administrativ
     eapproval
     advisedto
15   ELS/GZB         130   115
     ON
     24.11.2014
     andtenderis
     dueon
     01.10.2015.
     Tobe
     procured
     centrallyby
     C.Rlyand
     being
     provideon
     locosby
     ELW/BSL.TO
     D
     09.03.2015.L
     etter
     dt.16.02.201
     5toRDSO
0                      8    8
     foreligibity
     criteria.Copy
     ofletterto
     CMM/Cfor
     postponeof
     ofabove
     tendertill
     clarification
     fromRDSO.
     Letter
     dt.17.03.201
     5received
     fromRDSO.
     Materialnot
25   requiredby     355   298
     WCR.
     4,GZB-8
     dt.19.08.201
     4,Bhillai-3
     dt.19.09.201
     4.LGD-5
     dt.15.09.201
     4,RPM-1
     dt.14.10.201
     4,TKD-3
     dt.10.11.201
     4,GMO-7
     dt.15.10.201
     4,TATA-2
     dt.03.11.201
     4,BRC-1
     dt.30.09.201
     4,ER-12)For
     POQty-
     34,Material
     tobe
     suppliedto
0                     100   67
     Ultimate
     Consignee
     asi]Sr.
     DEE/TRS/Gh
     aziabad,N.
     Rly=12
     Nos.(Rec)ii]
     Sr.DEE/TRS/
     Bhilai,
     SEC.Rly=
     07Nos.(rec)
     iii]
     Sr.DEE/TKD,
     W.C.Rly=07
     Nos.(rec)iv]
     Sr.DEE/TRS/
     Tatanagar,
     SER.Rly=
     03Nos.v]
     Sr.DEE/TRS/
     Royapuram,
    Tobe
    manufacture
    dcentrallyby
    DHDW/sfor
3   WCR              38    23
    quantity.
    Materialnot
    requiredto
    ELS/NKJ.
    Nodal
    agency:NR
0   Tenderis        100   100
    dueon
    17.9.2015.
    a)Supply:
    NILb)
    Balance:40
    nos.(CR-
    4,ECR-4,ER-
4                    40   40
    4,NR-4,SCR-
    4,SECR-
    4,SER-4,SR-
    4,WCR-
    4,WR-4).
    has
    processed
    thecasefor
    04nos.File
    No.
    20158007
    TO
    21/7/2015.2)
    POplaced
    onM/sHind
    RectifierPO
    No.
    20158007.1.
    41323dtd.
    11/12/15
    ValueRs.
    25,81,031/-
    forQty=01.
    Material
    receivedon
    29/12/15.3*
4                    25
    RlyBdvide
    L.No.
    2015/Elect(T
    RS)/441/1
    dtd.
    01/10/2015
    provided
    fundof
    Rs.1,04,00,0
    00/-.4)PO
    placedon
    M/sAALPO
    No.
    20158007.1.
    41324dtd.
    11/12/15
    Value
    Rs.77,43,094
    /-forQty=
    03,Material
    receivedon
0                    100
    Nodal
    agency:NR.
    Administrativ
    eapproval
    giventoshed
5                    50
    on
    17.4.2015.&
    tenderisdue
    on
    28.9.2015.
     Tobecarried
     outcentrally
     byCR
     Rly.Estimate
     sanctioned(C
     R-50ER-10
     ECR-50
     ECOR-10
     NR-50SR-
     10SCR-50
     SER-10
     SECR-20
     WR-20
     WCR-20).
     POQty-
     20(Material
     tobe
     suppliedto
     Ultimate
15                    300   295
     Consignee
     asbelow:-1]
     Sr.
     DEE/TRS/AJ
     NI,C.Rly=
     10Nos.2]
     Sr.
     DEE/TRS/Ka
     zipat,SC.Rly
     =10Nos.
     TotalQty=
     20Nos.)DD-
     31.07.2015,T
     OD-
     29.10.2015
     for
     Qty.75,Under
     TC,Balqty-
     205.
     COS/SC
     Case
     No.25.16.50
1                     10    10
     02dt.27-01-
     16.isbeing
     floated.
    a)Demand:
    03nos.
    Transformer
    forWAG-9
    Loco.b)
0                   3    2
    Supply:02
    mo.(ECoR-
    1,SECR-1)c)
    Balance:01
    nos.(CR-1).
6 50 42
    Estimate
0   under          65   65
    preparation.
0 0 0
0                   0    0
0                  0    0
0 0 0
0 0 0
0 0 0
    Nodal
    agency;NR
    Detailed
2                  20   20
    estimate
    under
    preparation.
0                     0    0
0 0 0
     Nodal
     agency;NR
     Detailed
10                   100   100
     estimate
     under
     preparation.
     a)Supply:
     NIL.b)
     Balance:05
     nos.(CR-
1                     5    5
     1,ECoR-
     1,SER-
     1,WCR-
     1,WR-1).
0                    0    0
0 0 0
    COS/SC
    case
    No.25.16.50
2                    15   15
    25for15
    Nos.isbeing
    floated.
    a)Demand:
    05nos.
    Transformer
    forWAG-9
    Loco.b)
    Supply:05
0   nos.(CR-        5    4
    1,ECoR-
    1,SCR-
    1,SER-
    1,WCR-1).c)
    Balance:
    NIL.
0   0    0
0 0 0
0 0 0
0 0 0
7   50   50
    Allsupplied.
0   Work             8    2
    Completed
    a)Supply:
    08nos.(ER-
    2,SECR-
    2,SER-
    2,WCR-2).b)
2   Balance:12     20
    nos.(CR-
    1,ECoR-
    2,NCR-2,NR-
    1,SCR-2,SR-
    2,WR-2).
    a)Supply:01
    nos.(CR-1)
    b)Balance:
0   04nos.          5    5
    (ECoR-1,ER-
    1,SCR-