100% found this document useful (1 vote)
120 views2 pages

Permit Work at Height

Uploaded by

Iwan Setiawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
120 views2 pages

Permit Work at Height

Uploaded by

Iwan Setiawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

MASTERS MASTERS/PMF/34

Permit - Work at Height


PROJECT NAME: Package Contractor:

Activity: Location: Package No.:

Start Date and time Estimated Finish Date and time:

Be sure to ask the following and review the job risks while Tick where any of the following are required:
working at height before starting the work in nights at heights, Personal Special equipment &
duly fill the format and get it approved by site in charge. protective Permits
equipment:
Have you walked the work area? Yes / No Fall Confined Space
Protection
Are there any barricades needed - around, above Yes / No Hearing Excavation
or below? protectio
n
Is work around live electrical equipment or Yes / No Footwear Energized Electrical
operating equipment? Work
Is all the emergency equipment identified - e.g. fire Yes / No Eye / face High Voltage
extinguisher, phones, chemical shower etc?

Are evacuation routes known and clear? Yes / No Respirato Hot Work
r
Have all the necessary people been contacted? Yes / No Dust

Has the safe work method been prepared? Yes / No Hand /


Arm
Is the area congested with other trades? Yes / No Knee
Pads
Are shop drawings at hand? Yes / No Full body

Are enough people assigned to the job to carry out Yes / No Rescue
the safety measures? equipmen
t
Does the task require special permits to work or Yes / No
procedures? Name and Signature of the Site
Engineer (Sub-Contractor):
Does the task require special training? What? Yes / No

Is the arrangement for task lighting sufficient and Yes / No


safe? Date:

Will weather conditions affect the safe conduct of Yes / No


the work?

Is work at height hazards identified for all stages of Yes / No


the task?

Are there adequate tools & materials for the job? Yes / No

Are there any wastes generated? Are any fluids Yes / No Comments:
flushed or spilt Do they require special disposal or
reuse?

Have all electrical equipment & cables been Yes / No Name and Signature of MMC Rep. :
inspected prior to use?

Have all workers been trained in the proper use of Yes / No


safety equipments

Page 1 of 2