0% found this document useful (0 votes)
76 views1 page

Rooftop Hydroponics Project Plan

The document outlines the bill of materials and costs for a roof top hydroponic plant system project. It involves 17 items including site preparation, an arcade, shed, pond, coffee shop, mechanical room, collector roof, entrance, plumbing works, electrical works, hydroponic structures, water pump, solar panels, painting, permaculture garden, and bamboo garden. The total material cost is 1,689,241.13 PHP and total labor cost is 760,158.51 PHP for a total construction cost of 2,417,099.64 PHP.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views1 page

Rooftop Hydroponics Project Plan

The document outlines the bill of materials and costs for a roof top hydroponic plant system project. It involves 17 items including site preparation, an arcade, shed, pond, coffee shop, mechanical room, collector roof, entrance, plumbing works, electrical works, hydroponic structures, water pump, solar panels, painting, permaculture garden, and bamboo garden. The total material cost is 1,689,241.13 PHP and total labor cost is 760,158.51 PHP for a total construction cost of 2,417,099.64 PHP.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project : SP Roof Top Hydroponic Plant System

Location : SP Building City Hall Compound


Responsible Agency : ECOTourism

BILL OF MATERIALS
UNIT AMOUNT COST
PARTICULARS QTY. UNIT UNIT
PRICE COST ITEM
I. SITE PREPARATION
Clearing andGrubbing 1 Ls. P 2,200.00 per Ls. P 2,200.00
TOTAL COST FOR THIS ITEM P 2,200.00
II. PATHWALK STEPS & CONCRETING
1. .05x.40x.60 concrete steps (147 pcs.) P 10,401.00
LABOR COST P 4,680.45
TOTAL COST FOR THIS ITEM P 15,081.45
III. ARCADE
Lally Columns P 31,293.33
Pedestal (0.5 cu.m.) P 4,240.80
Pathwalk Concrete (1.7 cu.m) P 14,558.00
Roof and trusses P 153,010.00
LABOR COST P 91,395.96
TOTAL COST FOR THIS ITEM P 294,498.09
IV. SHED
Columns and Beams P 21,210.00
Roof P 20,000.00
LABOR COST P 18,544.50
TOTAL COST FOR THIS ITEM P 59,754.50
V. POND / WATER CULTURE
Peremeter Wall P 8,290.00
Peremeter conc. Bench P 11,020.00
Water profing materials P 25,000.00
LABOR COST P 19,939.50
TOTAL COST FOR THIS ITEM P 64,249.50
VI. COFFEE SHOP
Roof ,Beams,Columns P 50,000.00
Counter, Kitchen and Accessories, Chairs P 25,500.00
LABOR COST P 33,975.00
TOTAL COST FOR THIS ITEM P 109,475.00
VII. MECHANICAL ROOM
Roof ,Beams,Columns,Walls P 15,500.00
Water Tank and accessories P 10,000.00
LABOR COST P 13,275.00
TOTAL COST FOR THIS ITEM P 38,775.00
VIII. COLLECTOR ROOF
Roof, Truss, Pedestal, Columns P 383,718.00
LABOR COST P 172,673.10
TOTAL COST FOR THIS ITEM P 556,391.10
IX. ENTRANCE
Entrance Concreting and Wall Garden P 25,500.00
LABOR COST P 15,000.00
TOTAL COST FOR THIS ITEM P 40,500.00
X. PLUMBING WORKS
Irrigation supply Pipes P 60,000.00
LABOR COST P 27,000.00
TOTAL COST FOR THIS ITEM P 87,000.00
XI. ELECTRICAL
Lighting and Accessories P 45,000.00
LABOR COST P 20,250.00
TOTAL COST FOR THIS ITEM P 65,250.00
XII. HYDROPONIC STRUCTURE & FLATFORMS
A Shape and Drip Structures P 426,000.00
LABOR COST P 191,700.00
TOTAL COST FOR THIS ITEM P 617,700.00
XIII. Water Pump
Self Priming Pump (horizontal Distribution) P 10,000.00
LABOR COST P 4,500.00
TOTAL COST FOR THIS ITEM P 14,500.00
XIV. Solar panels
Monocrystalline Solar Panels-60w P 50,000.00
LABOR COST P 22,500.00
TOTAL COST FOR THIS ITEM P 72,500.00
XV. Painting Works
Painting Works P 75,000.00
LABOR COST P 33,750.00
TOTAL COST FOR THIS ITEM P 108,750.00
XVI. Permaculture Circular Garden
Circular garden, Benches and Table P 110,000.00
LABOR P 20,000.00
TOTAL COST FOR THIS ITEM P 130,000.00
XVII. BAMBOO GARDEN
Bamboo,artificial Rocks,Sand,Free Standing Bamboo Blinds P 100,000.00
LABOR P 20,000.00
TOTAL COST FOR THIS ITEM P 120,000.00

Material Cost 1,689,241.13


Labor Cost 760,158.51

Total Construction Cost 2,417,099.64