Standard Operating Procedures (Sop) Edm Wire Cut

The standard operating procedures document outlines the 9 step process for operating an EDM wire cut machine. The steps include: 1) closing the wire cutter to the workpiece, 2) adjusting the platform and pedals until the workpiece is tightly secured, 3) covering the workpiece to prevent debris, 4) covering the machine, 5) setting up the workpiece profile, 6) setting the design, 7) selecting the workpiece material, and 8) pressing various buttons to select settings and start the cutting process.

Uploaded by

muhammad afnan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
4K views3 pages

Standard Operating Procedures (Sop) Edm Wire Cut

The standard operating procedures document outlines the 9 step process for operating an EDM wire cut machine. The steps include: 1) closing the wire cutter to the workpiece, 2) adjusting the platform and pedals until the workpiece is tightly secured, 3) covering the workpiece to prevent debris, 4) covering the machine, 5) setting up the workpiece profile, 6) setting the design, 7) selecting the workpiece material, and 8) pressing various buttons to select settings and start the cutting process.

Uploaded by

muhammad afnan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

STANDARD OPERATING PROCEDURES (SOP) EDM WIRE CUT

No Description Picture
.
1
Push arrow button at the controller to move
the wire cutter closed at least 2-5mm to the
work piece.

2 Next,use the manual controlled the platform


until the ruler shows 40 at pedal and
A
steering at the machine until closed the
workpiece. If the platform very tight,
adjust the pedal that shows A and turn the
steering slowly.

3 Take the rubber cover and tight the clip at


the machine for cover the workpiece when
the work run move from water spread
small piece cut.

4 Put the outer cover to covered the machine.


5 Push the button workpiece setup and this
setup shows in the screen.Next, press the
button M2 and M6 and press button enter
and start. Must be wait until the tool
automatic setting owned to workpiece.

6 Press the blue button at the board twice to


set the design on the screen.

7 Push the button esper and screen show the


setting to put the workpiece substance.
Next, choose steel and press enter and M2.

8 Press the button 25 or 31.After that, push


button M8 two times and M4, M7 and
press M1 twice, M3 press twice and M8.
9 Press the arrow on the board for choose
adjustment on the screen. After finish, push
start and wait the process cut the workpiece
begin.