0% found this document useful (0 votes)
205 views1 page

Home Solar Subsidy Guide

This document calculates the costs and returns for installing a 1 kW solar rooftop system for a home in India. It estimates that with available subsidies of 44% of the total project cost, the net investment would be Rs. 38,300. The system would generate 1825 units per year, saving Rs. 12775 annually with a payback period of 36.48 months and annual return on investment of 33.36%.

Uploaded by

Iren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
205 views1 page

Home Solar Subsidy Guide

This document calculates the costs and returns for installing a 1 kW solar rooftop system for a home in India. It estimates that with available subsidies of 44% of the total project cost, the net investment would be Rs. 38,300. The system would generate 1825 units per year, saving Rs. 12775 annually with a payback period of 36.48 months and annual return on investment of 33.36%.

Uploaded by

Iren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SOLAR ROOFTOP CALCULATION-DOMESTIC(FOR HOME)

(1) PLEASE ENTER YOUR INPUTS IN YELOW CELL TO REACH YOUR CALCULATION,YOU CAN PUT
MAX Rs.20,000/- SUBSIDY BY GEDA-(2) FOR 1 KW PUT Rs..10,000/- IN GEDA SUBSIDY
PREPARED BY :REAL MULTIPLE SOLUTIONS
Senction PGVCL Load in Electricity Bill ( KW ) 2
Solar permissible Load (50% of senctioned load) -(KW) 1
Project cost Rs. 69000/KW(Rs)=A
69000
Project cost paid by customer immediately after registration
MNRE Subsidy -30% of Project Cost (Rs)=A 20700
GEDA Subsidy Rs. 10000/KW (Rs)=B
10000
(Max up to 2 Kw Load)=RS.20,000/- MAX
Total Subsidy Available (Rs) 30700
TOTAL SUBSIDY IN PERCENTAGE( %) 44.49
Net Investment Rs.= (C)=A-B 38300

RETURN ON INVESTMENT(ROI)
Unit Generation by solar rooftop system per Day/KW (units) 5
Total Unit Generete /Day by solar rooftop system (units) 5
Total Unit Generated in a month by solar rooftop system (units) 150
Total Unit Generated in a year by solar rooftop system (units) 1825

Approx Rate of Unit in (Rs) 7


Monthly Amount Saved in (Rs) 1050
Yearly Amount Saved (Rs) 12775

Monthly Return on UR Net Invesment (%) 2.74

Yearly Return on UR Net Invesment (%) 33.36

Payback Time on Net Investment (Months) 36.48

NOTE : PRICING FIXED BY GOVERNMENT OF INDIA -MINISTRY OF NEW AND RENEWABLE ENERGY
UNDER PRICING VARIATION IS NOT POSSIBLE
PROJECT EXCLUSIONS:
(1) DD OF Rs..1150 (REGISTRATION FEE-1000+15%TAX )IN FAVOUR OF "GUJARAT ENERGY
DEVELOPMENT AGENCY"-PAYABLE AT AHMEDABAD/GANDHINAGAR
(2) INFRATRUCTURE AND FEBRICATION COST AS ACTUAL
(3) ALL TAXES AS APPLICABLE ARE EXTRA
(4) For Biedirectional New PGVCL meter applied charges as actual

You might also like