ROOF FLOOR
FROM HOT
WATER TANK
TO HOT
RECIRCULATING PUMP WATER TANK
(1 DUTY, 1 STANDBY)
FLOW RATE =1.0 l/s
HEAD = 10m
LIMIT OF CONTRACT
50 63
PIPE INSIDE CEILING
LEVEL SIX
32 DRV 25
20 32 32 40 40 40 40 40 32 20
SH SH SH SH SH SH SH SH SH
GV
20 25 25 25 25 25 25 25 25 20
MV MV MV MV MV MV MV MV MV
WB WB WB WB WB WB WB WB WB
SINK
AV AV AV AV AV AV AV 50 32 63 AV AV
BT BT BT BT BT BT BT AV BT
BT
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20
25
PIPE INSIDE CEILING GV
LEVEL FIVE
32 DRV 25
20 32 32 40 40 40 40 40 32 20
SH SH SH SH SH SH SH SH SH
GV
20 25 25 25 25 25 25 25 25 20
MV MV MV MV MV MV MV MV MV
WB WB WB WB WB WB WB WB WB
SINK
AV AV AV AV AV AV AV 50 40 50 AV
BT BT BT BT BT BT BT BT AV AV BT
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
25
GV
PIPE INSIDE CEILING
LEVEL FOUR
40 DRV 25
25 32 40 40 40 40 40 50 50 50 32 32
PRV
TS
SH SH SH SH SH SH SH SH SH SH SH SH SH SH SH SH SH GV SH SH SH
25 25 32
WB WB WB WB WB WB WB WB WB WB WB WB WB WB WB WB WB WB WB WB
SINK
MV AV MV AV AV MV MV AV AV MV MV AV AV MV MV AV AV MV MV AV MV AV AV MV MV AV AV MV MV AV AV MV MV AV AV AV MV MV AV AV MV
20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 20 BT 20 25 20 BT 20 20 BT 20 20 BT 20
20 25
GV
25 20 25 20 20 25 25 20 20 25 25 20 20 25 25 20 20 25 25 20 25 20 20 25 25 20 20 25 25 20 20 25 25 20 20 25 25 20 LEVEL THREE
SUPPLIED BY
SOLAR CONTRACTOR
LEGEND & ABBREVIATION
HOT WATER SUPPLY PIPE
HOT WATER RETURN PIPE
GV GATE VALVE
DRV DOUBLE REGULATING VALVE NOTES
PRV PRESSURE REDUCING VALVE 1. ALL PIPE SIZES GIVEN ARE NOMINAL OUTSIDE
TS TEMPERATURE SENSOR
PIPE INSULATION THICKNESS PIPE HANGING BRACKET SPACING
DIAMETERS.
WC WATER CLOSET 2. TEMPERATURE SENSOR SUPPLIED BY SOLAR
WB WASH BASIN PIPE DIAMETER 25 32 40 50 63 75 PIPE DIAMETER (mm) 20 25 32 40 50 63 75 CONTRACTOR.
SH SHOWER 3. PIPES SHALL BE INSULATED AND HANG UNDER
HORIZONTAL INSTALLATION 600 700 800 900 1000 1100 1200 SOFFIT OR WALL THROUGH THE STEEL BRACKETS
AV ANGLE VALVE INSULATION
19 19 19 25 25 32 AS DIRECTED BY ENGINEER.
MV MIX VALVE THICKNESS VERTICAL INSTALLATION 900 1000 1100 1300 1600 1800 2000
Client Title Designed CPK Recommended
CENTRAL ENGINEERING CONSULTANCY BUREAU THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
Drawn SSK
MINISTRY OF HEALTH, NUTRITION & Approved
Head Office Base office INDIGENOUS MEDICINE SCHEMATIC DIAGRAM OF Checked -
415, Bauddhaloka Mawatha, DGM - WP 2 HOT WATER SUPPLY SYSTEM Submitted Scale Date Status
Colombo-07, Sri Lanka. 11, Jawatta Road, Project
Tel. 0094-11-2668800, Fax. 0094-11-2687369 Colombo-05. CAD File - N.T.S. 05-04-2017 TEN
REFURBISHMENT OF HOT WATER PLUMBING SYSTEM
E-Mail cecb@slt.lk Tel. , Fax. 0094-11-2505501 SRI JAYAWARDENAPURA GENERAL HOSPITAL AND Sheet Size Drawing No. Rev. No.
POSTGRADUATE MEDICAL TRAINING CENTER EPC-WP/JPR/SLR-02 -
Rev. Date Desd. Description Drwn. Chk'd App'd A3