Quality Management & Planning
(7M or 7MP) Tools
Kerry Donelan CSSBB
Meegan Dowling CSSBB
1
The Seven Quality Management (7M) Tools
Affinity diagrams:
organizes ideas into meaningful categories by recognizing
underlying similarity. It is a means of data reduction in
that it organizes a large number of qualitative inputs into a
smaller number of major dimensions, constructs, or
categories.
Tree diagrams:
breaks down or stratifies ideas in progressively greater
detail. The objective is to partition a big idea or problem
into its smaller components.
2
7M Tools (contd)
Process Decision Program charts (PDPC):
designed to help prepare contingency plans. The emphasis
of PDPC is the impact of problems or issues on the project.
Matrix diagrams:
constructed to analyze the correlations between two
groups of data.
Interrelationship digraph (ID):
designed as a means of organizing disparate ideas by
arranging related ideas into groups in an attempt to define
the ways in which the ideas influence one another.
3
7M Tool (contd)
Prioritization matrices:
used to help decision makers determine the order of
importance of the activities or goals being considered.
Activity Network diagram:
used to determine which activities are to be performed,
when they must be performed, and in what order.
4
Affinity Diagram
Affinity diagram is a way to organize a large
set of ideas
Very helpful for any team with a
brainstorming session, when analyzing
information
Encourages the participation of all in the
group
Similar items can be categorized and central
themes emerge
5
Affinity Exercise
Each person write out 5 post it notes quickly
with requirements you have for your next
vacation. Do not discuss with others in your
group
After everyone has 5 done put them out on
the table or flip chart
As a group organize them into clusters
Apply a heading to each cluster/group
Affinity Diagram
Tree Diagram
A systematic method to outline all the
details needed to complete a given
objective.
Partition a big idea or problem into its
smaller components.
8
Internet search
Tree Diagram
Identify Make hotel
Plan vacation Make decision Choose hotel
locations reservation
Get family buy
in
Clothing and
shoes
Pack Get suitcases toilettries
Activities and
games
work
Get time off
school
Go on family
Prepare
vacation Hold at post
Mail office
Take Care of
pets Get pet sitter
house
newspapers Turn off
delivery
car maintenance Get gas
Transportation taxi
plane
Open vacation
Budget $ Save Direct deposit
account
Process Decision Program Chart
(PDPC)
Used to chart the course of events that
will take us from a start point to our final
complex goal.
Designed to help prepare contingency
plans.
The emphasis of PDPC is the impact of
the failures (problems) on project
schedules.
10
Internet search
PDPC Chart
Identify Make hotel
Plan vacation Make decision Choose hotel
locations reservation
Get family buy
in
Clothing and Shorts dont
shoes fit
Go
Pack Get suitcases toilettries
shopping
Need
Activities and shampoo
games
work
Get time off
school
Go on family
Prepare
vacation Hold at post Use
Mail office kennel
Take Care of Sitter not
pets Get pet sitter avail
house
newspapers Turn off
delivery
Do
car Get gas
maintenance
Transportation taxi
Dont have
plane time
Call
garage
Open vacation
Budget $ Save Direct deposit
account
Not enough
$
Get Credit
Matrix Diagram
Is used to show the relationship between
objectives and methods, results and causes,
tasks and people, etc.
Used to determine strength of
relationships between a grid of rows and
columns
Can identify key aspects based on
relationships
12
Matrix diagram -- relationship
Location / travel
Safety Cost Climate activities accommodations
time
planning
budgeting
preparing
strong relationship
relationship
possible relationship
Matrix diagram -- resources
Resources: Mom Dad Kids
Tasks
shop
car maintenance
pack clothing
stop mail
pack games
save
Primary responsibility
Team member
Resource
Interrelationship Digraph
Interrelationship digraph (ID): designed as a
means of evaluating the ways in which
disparate ideas influence one another. Used
to identify the critical issues and key drivers
of a problem.
Often uses input from other tools: affinity
diagram or fishbone.
15
in 0
out 2 in 1
Interrelationship
out 3
Digraph driver
Distance Current
in 1 (cause)
Events
out 4
in 1 Environmental
out 2 Concerns Temperature
Planning
Work in 1
Time
Schedules out 1
in 1
out 0
Satisfying
School in 1
All
Schedules out 0
in 4
out 0
Cost
outcome Safety
in 2
(effect) out 0 in 2
out 2
Prioritization Matrix
Prioritization matrices: used to help
decision makers determine the order
of importance of the activities or
goals being considered.
17
Steps to Create Solution Prioritization Matrix:
#1: Create a list of 'want' criteria (CTQs)
#2: Weight the list of 'want' criteria (CTQs) on a scale of 1 to 10
#3: Compare the list of solutions to the weighted criteria (CTQs) and score on a scale of 1, 3, or 9
#4: Multiply the weight by the score for each criteria to get the weighted score for each criteria (CTQs)
#5: Compute and discuss the total scores for each solution
Criteria and Weights
1 2 3 4 5 6
Location / Accommodations -
Cost less Climate warm, Family travel time less - pool, food,
Potential Criteria Safety than 2.5K not hot Activities than 5 hours comfort
Solutions CTQ Weight (1-10) Total
Atlantis in the Bahamas 0
Lake George 0
Outer Banks, NC 0
Niagara Falls 0
Cruise to Caribbean 0
0
Rate each Solution to the weighted Criteria on a scale of 1, 3, or 9
1 = low, 3 = moderate, 9 = high
Steps to Create Solution Prioritization Matrix:
#1: Create a list of 'want' criteria (CTQs)
#2: Weight the list of 'want' criteria (CTQs) on a scale of 1 to 10
#3: Compare the list of solutions to the weighted criteria (CTQs) and score on a scale of 1, 3, or 9
#4: Multiply the weight by the score for each criteria to get the weighted score for each criteria (CTQs)
#5: Compute and discuss the total scores for each solution
Criteria and Weights
1 2 3 4 5 6
Location / travel
Cost less Climate warm, Family time less than 5 Accommodations --
Potential Criteria ? Safety than 2.5K not hot Activities hours pool, food, comfort
Solutions CTQ Weight (1-10) ? 3 9 6 10 6 8 Total
Atlantis in the Bahamas 1 1 1 3 9 9 174
Lake George 9 3 9 9 9 9 324
Outer Banks, NC 3 3 1 9 1 9 210
Niagara Falls 3 3 9 3 1 3 150
Cruise to Caribbean 3 1 3 9 3 9 216
Rate each Solution to the weighted Criteria on a scale of 1, 3, or 9
1 = low, 3 = moderate, 9 = high
Activity Network Diagram
Graphic project time-line
Identifies critical tasks to be monitored
Team can identify resources, bottlenecks,
and timetables
20
Activity Network
Diagram
Plan Prepare
60 00 60 21 60 81
days 00 60
days 120 141
Execute
7 81 88
Go on
Vacation days 141 148
Budget
75 00 75
days 00 75
Time ES EF
LS LF
Summary
The Affinity Diagram is a useful brainstorming tool and will
energize your team.
The Interrelationship Digraph comes in handy when the team
needs to agree on the most likely cause(s) and effect(s)
contributors.
The Prioritization, Matrix, PDPC, Tree and Activity Network
Diagrams are effective planning tools as they help the team
build consensus on priorities, relationships and identify the
elements required for effective execution of a given plan.
Start by taking small steps with the Affinity Diagram and the
Interrelationship Diagraph. They are both fun tools to use.
22