Proof of Concept
Proof of Concept
Execution Guide
Product Cost Planning &
Actual Costing
Proof of Concept
Table of Contents
1. Product Cost Planning Execution Guide - Proof Of Concept........................4
1.1. Production of Raw Brine Essentials for Planning Cost................................4
2. POC - Organisation Structure..............................................................5
3. Creation of Master Records for Production..........................................6
3.1. Creation of Raw Material Masters..............................................................6
3.2. Creation of Finished Good Material Master................................................11
3.3. Creation of Bill of Material......................................................................14
3.4. Creation of Work Centers.......................................................................16
3.5. Creation of Routing...............................................................................17
4. Product Cost Planning-Determining Planned cost per unit................20
4.1. Planning Cost Element wise data in Cost Centers......................................20
4.2. Viewing Cost Centre Report....................................................................22
4.3. Planning of activities at Production cost centers........................................24
4.4. Planning Output of Service Department Activities......................................27
4.5. Calculation of Planned Activity Prices of Production & service Cost Centers
& Validation of calculated results.............................................................30
4.6. Planning consumption of Service Cost Centers Activity output by
Production Cost Centers.........................................................................37
4.7. Execution of Plan Reconciliation..............................................................40
4.8. Execution of Plan Distribution Cycle.........................................................48
4.9. Entering Statistical Key Figures for Plan Assessment Cycle.........................50
4.10. Execution of Plan Assessment Cycle........................................................52
4.11. Updating Planned RM/PM purchase prices in Material Master......................54
4.12. Running & saving of Cost Estimate..........................................................57
4.13. Marking & Releasing of Standard Cost Estimate........................................61
5. Product Costing- Determining Actual cost per unit............................66
5.1 Purchase of Raw Material.......................................................................66
5.2 Goods Receipt......................................................................................68
5.3 Creation of Production Order..................................................................70
5.4 Releasing, Scheduling & Costing the Production Order...............................72
5.5 Goods Issue to Production Order.............................................................77
5.6 Confirmation of Quantity & Activity for Operations....................................80
Product Costing Page 2 of 96
Proof of Concept
5.7 Goods Receipt of Finished Goods against Production Order.........................83
5.8 Creation of Sales Order..........................................................................86
5.9 Delivery of Finished Goods.....................................................................89
5.10 Picking of goods & Posting of Goods Issue................................................90
5.11 Billing..................................................................................................92
6. Glossary..............................................................................................93
Product Costing Page 3 of 96
Proof of Concept
1. Product Cost Planning Execution Guide - Proof Of
Concept
1.1. Production of Raw Brine Essentials for Planning Cost.
Raw Materials Required
1. Raw Salt
2. Sea Water
Operations Departments Performing Operations
(Production Cost Centers)
1. Dissolving ------ Dissolver
2. Refining ------ Refinery
Support Departments
(Service Cost Centers)
1. Accounts,
2. Canteen,
3. Facilities,
4. Security.
Expected Output in POC for Planned Cost of Raw Brine in Rs./ KG
Name Total Cost Fixed Variable
Raw Materials 140.00 0.00 140.00
Dissolver Production OHS 26.80 26.80 0.00
Refinery Production OHS 52.71 52.71 0.00
Service CC Cost 15.86 15.86 0.00
Total Cost of Production 235.37 95.37 140.00
Product Costing Page 4 of 96
Proof of Concept
2. POC - Organisation Structure
The following picture depicts the organization structure used for POC.
Product Costing Page 5 of 96
Proof of Concept
3. Creation of Master Records for Production
3.1.Creation of Raw Material Masters
Use
The Parameters for Creating Raw Materials Master are defined here.
Procedure
Access the activity using one of the following navigation options:
MM01
Transaction Code
SAP EASY Access Logistics /Material Management/Material
Master/Material/Create(General)/Immediately
Or
Logistics /Production/Master data
/Master/Material/Create(General)/Immediately
Field Name Values
Industry Sector Chemical Industry
Material Type Raw material
Plant SA(number)
Storage Location MIT(number)
Product Costing Page 6 of 96
Proof of Concept
Product Costing Page 7 of 96
Proof of Concept
Enter
Press Enter
Field Name Values
Views Basic Data 1, Basic Data2, Purchasing,
MRP1, MRP2, MRP3, Accounting 1,
Accounting 2, Cost estimate1, Costing 2,
Product Costing Page 8 of 96
Proof of Concept
Field Name Values Values
Name Raw Salt Sea Water
Basic Unit Measure KG L
SPI1 SP11
Material Group
Tab Sales: general/plant
Availability Check KP KP
Product Costing Page 9 of 96
Proof of Concept
Field Name Values Values
Trans Grp 0006 0006
Loading Grp 0003 0003
Tab MRP1
MRP Type PD PD
MRP Controller 001 001
Lot Size EX(Lot For Lot Order EX(Lot For Lot Order
Quantity) Quantity)
TAB MRP 2
000 000
Sched Margin Key
TAB MRP 3
KP (no Check) KP (no Check)
Availability Check
Tab Forecasting
N N
Forecast Model
Field Name Values Values
Tab Accounting 1
3000 3000
Valuation class
Price Unit 1 1
Product Costing Page 10 of 96
Proof of Concept
Field Name Values Values
Price Control V(moving Average Price) V(moving Average Price)
Tab Cost Estimate 1
With Qty Structure Check Check
Material origin Check Check
3.2.Creation of Finished Good Material Master.
Use
The Parameters for Creating Finished Goods are defined here.
Procedure
Access the activity using one of the following navigation options:
MM01
Transaction Code
IMG Menu Logistics /Material Management/Material
Master/Material/Create(General)/Immediately
Or
Logistics /Production/Master data
/Master/Material/Create(General)/Immediately
Field Name Values
Industry Sector Chemical Industry
Material Type Finished goods
Plant SA(number)
Storage Location MIT(number)
Product Costing Page 11 of 96
Proof of Concept
Field Name Values
Field Name Values
Material 123
Name Raw Brine
Basic Unit Measure Kg
SPI1
Material Group
Tab Accounting 1
7920
Valuation class
(Finished Goods)
Price Unit 1
ProductControl
Price Costing S(Standard Price) Page 12 of 96
Proof of Concept
Note: For all other views, enter the details as given in 3.1.1 above.
3.3.Creation of Bill of Material
Use
The Parameters for Creation of BOM are defined here.
Procedure
Access the activity using one of the following navigation options:
CS01
Transaction Code
SAP EASY Access Logistics/production/Master data/Bill of
Material/Material BOM /Create
Field Name Values
Material No 123(Purified Brine)
Plant SA(Soda Ash)
BOM usage 1( Production)
Product Costing Page 13 of 96
Proof of Concept
Press Enter.
Field Name Values Values
Item Category L(Stock Item) L(Stock Item)
Component 116(Raw salt) 120(Sea Water)
QTY 1 2
Product Costing Page 14 of 96
Proof of Concept
Go to Menu-Header and enter the base quantity (Quantity to which all component
quantities in a BOM relate.)
Field Name Values
Base Quantity 1 Kg
Save the BOM created.
3.4.Creation of Work Centers
Use
The Parameters for creation of Work Center are defined here.
Procedure
Access the activity using one of the following navigation options:
CR01
Transaction Code
Product Costing Page 15 of 96
Proof of Concept
SAP Easy Access Logistics/production/Master data/Work Centers/Work
Center/Create
Field Name Values Values
Work Center DISSOLVER Refinery
Work Center Category 001(Machine ) 001(Machine )
Person Responsible 001 001
Usage 001(Only routings) 001(Only routings)
Standard Value Key SAP1 SAP1
Product Costing Page 16 of 96
Proof of Concept
3.5.Creation of Routing
Use
The Parameters for Creation of routing for FG 123 (Purified Brine) are defined here.
Procedure
Access the activity using one of the following navigation options:
CA01
Transaction Code
SAP EASY Access Logistics/Production/Master
data/Routings/Routings/Standard Routings/Create
Field Name Values
Material No 123
Plant SA
Press Enter.
Product Costing Page 17 of 96
Proof of Concept
Assign the Operations in Routing as per the details given below:
Field Name Values Values
Work Center DISSOLVER REFINERY
Control Key PP01 PP01
Base Qty 10 10
Unit Kg Kg
Machine (ACT1) 10 -
Labour (ACT2) - 40
Unit H H
Product Costing Page 18 of 96
Proof of Concept
Product Costing Page 19 of 96
Proof of Concept
4. Product Cost Planning-Determining Planned cost
per unit
4.1. Planning Cost Element wise data in Cost Centers.
Use
The Parameters for Planning Cost Element wise data in Cost Centers are defined
here.
Procedure
Access the activity using one of the following navigation options:
KP06
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/Cost & Activity Inputs/Change
Field Name Values
Layout 1-101
Plan Version 0 (Zero)
From & to Periods 1 to 12
Year 2005
Cost Center (from to) *
Activity Type (from - to) *
Cost Element (from to) *
Entry Free (not Form based)
Click on the Overview Screen Icon (Top Left of the screen)
Product Costing Page 20 of 96
Proof of Concept
Entries are to be made as per layouts given below for each cost center.
To go to next Dept (i.e. Cost Center) use Black Down Arrow Icon (Third from Top
Left).
Product Costing Page 21 of 96
Proof of Concept
4.2. Viewing Cost Centre Report
The data prepared on excel as shown below needs to be checked with SAP
Report
Cost Center
Group ===> Production Service
Total
Cost Center DISSO REFINA SEC FACILI
===> LVER RY ACTTS CANT UR TIES
Cost Ele.
CE Descrpn
430000 Salary 5000 8000 3000 2000 500 100 18600
453000 Maintenance 300 900 100 1300
416300 Water 200 1500 100 200 25 2025
416400 Gas 1000 2000 500 3500
0
TOTAL Own
Cost 6500 12400 3100 2800 500 125 25425
S_ALR_87013611
Transaction Code
SAP EASY Access Accounting/Controlling /Cost Center Accounting
/Information System/ Reports for Cost Center
Accounting/Plan Actual Comparison/Cost Centers
Actual Plan Variance
Field Name Values
Controlling Area TCL
Fiscal Year 2005
From & To Periods 1 to 12
Plan Version 0
Cost Center Group Can be given if required
Cost Element Group Can be given if required
Execute.
Product Costing Page 22 of 96
Proof of Concept
Product Costing Page 23 of 96
Proof of Concept
4.3. Planning of activities at Production cost centers.
Use
The Parameters for Planning of activities (measurable Output) of Production Cost
Centers are defined here.
Procedure
Access the activity using one of the following navigation options:
KP26
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/ Activity Output Prices /Change
Field Name Values
Version 0
From Period 1
To Period 12
Fiscal Year 2005
Cost Center *
Activity type *
Entry Free
To go to next Dept (i.e. Cost Center) use Black Down Arrow Icon (Third from Top
Left). Enter the following data:
Product Costing Page 24 of 96
Proof of Concept
Cost Centre /Field Name Values
Dissolver/ Plan Activity Under Act1 300
Refinery/ Plan Activity Under Act2 250
Product Costing Page 25 of 96
Proof of Concept
4.4. Planning Output of Service Department Activities.
Use
The parameters for entering Plan Output Values of Service Departments Activities
are defined here.
(Note: Before starting this activity, it is necessary to complete the Cost Element wise
Planning for the relevant service cost centers thru transaction KP06 as explained in
3.1 above.)
Procedure
Access the activity using one of the following navigation options:
KP26
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/ Activity Output/Prices/ Change
Field Name Values
Version 0
From Period 1
To Period 12
Fiscal Year 2005
Cost Center or CC Group * Can be given as required
Activity type or Activity Type Group * Can be given as required
Entry Free
Product Costing Page 26 of 96
Proof of Concept
To go to next Dept (i.e. Cost Center) use Black Down Arrow Icon (Third from Top
Left). Once you arrive at the required production cost Center update as below,
Field Name Values
Cost centre Facilities
Activity Type Cups
Plan Activity 125
Product Costing Page 27 of 96
Proof of Concept
Product Costing Page 28 of 96
Proof of Concept
4.5. Calculation of Planned Activity Prices of Production & service
Cost Centers & Validation of calculated results
Use
The Parameters for Calculation of Planned Activity Prices of Production & Service
Cost Centers are defined here.
Procedure
Access the activity using one of the following navigation options:
KSPI
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/ Allocations/ Price Calculation
Field Name Values
All Cost Centers Production & Service CC group
(To be done separately for each)
Version 0
Period 1 to 12
Fiscal Year 2005
Test run First in Test Run and then post
Product Costing Page 29 of 96
Proof of Concept
a) Production Cost Centers
Product Costing Page 30 of 96
Proof of Concept
Go back. The system will ask whether to post these prices. If clicked on Yes, it will
post the prices (even though the report is executed in Test Run).
Product Costing Page 31 of 96
Proof of Concept
Similarly, execute the planned price calculation for Service cost Centers.
b) Service cost Centers
Product Costing Page 32 of 96
Proof of Concept
Product Costing Page 33 of 96
Proof of Concept
The Planned prices posted as above should be checked and validated through
transaction KP26. The relevant screen Shots are given below:
Product Costing Page 34 of 96
Proof of Concept
Product Costing Page 35 of 96
Proof of Concept
4.6. Planning consumption of Service Cost Centers Activity output
by Production Cost Centers
Use
The parameters for Planning Consumption of Service Cost Centers Activity Output in
Production Cost Centers are explained here.
Procedure
Access the activity using one of the following navigation options:
KP06
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/Cost & Activity inputs/ Change
After you press Enter, system shows, by default, the first layout i.e. 1-101.
Click on Next Layout Icon to select the layout 1-102.
Field Name Values
Layout 1-102
Plan Version 0 (Zero)
From & to Periods 1 to 12
Year 2005
Cost Center (from to) * Prod CC Group can be selected
Activity Type (from - to) * As required
Cost Element (from to) *
Entry Free (not Form based)
Click on Overview Screen Icon (on Top Left corner of the screen)
Product Costing Page 36 of 96
Proof of Concept
Enter the following values
Receiver Cost Centre Sender cost centre Planned Fixed
consumption
Dissolver Facilities 100
Refinery Facilities 50
Product Costing Page 37 of 96
Proof of Concept
Product Costing Page 38 of 96
Proof of Concept
4.7. Execution of Plan Reconciliation
Use
Plan Reconciliation is executed to identify and reconcile mismatches, if any, between
Sender CCs Output and Receiver CCs Input.
The procedure for executing Plan reconciliation is explained here.
Procedure
Access the activity using one of the following navigation options:
KPSI
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/Planning Aids / Plan Reconciliation
Field Name Values
All Cost Centers Select
Plan Version 0 (Zero)
From & to Periods 1 to 12
Year 2005
Test Run Do in Test Run First
Details List Select.
Product Costing Page 39 of 96
Proof of Concept
Execute.
Product Costing Page 40 of 96
Proof of Concept
If the Results are correct, then Save it. (System posts the data even if it is executed
in Test Run)
Once these results are posted, system will automatically post the Plan Cost of
Service Cost Centers to Production Cost Center based on the Activity Consumption
planned by them. See the Cost Center Report Screen Shots given below.
Product Costing Page 41 of 96
Proof of Concept
1. For all Cost Centers
Product Costing Page 42 of 96
Proof of Concept
2. For Service Cost Center (i.e. Sender)
Product Costing Page 43 of 96
Proof of Concept
3. For Production Cost Centers (Receivers)
Product Costing Page 44 of 96
Proof of Concept
NOTE: If there are any differences in Plan Data between the Output of Service Cost
Centers & consumption of Production Cost Centers, it will be reflected in the Plan
Reconciliation Report. If the data is posted after execution of KPSI, system will
automatically adjust the values of output of Service Cost so as to match with
consumption by production cost centers.
Screen Shots relevant for automatic matching of Sender & Receiver Activity
Quantities are given below
Product Costing Page 45 of 96
Proof of Concept
Product Costing Page 46 of 96
Proof of Concept
4.8. Execution of Plan Distribution Cycle
Use
The procedure for execution of plan Distribution Cycle is explained here.
After execution of distribution cycle, the sender cost centers cost will be allocated to
receivers cost centers, based on the criteria defined in the cycle. Ideally, the entire
cost of sender cost centre should be distributed to the receivers. In distribution,
sender cost centers cost is allocated to the receivers in the respective cost elements.
Hence, Secondary cost element is not required for distribution.
Procedure
Access the activity using one of the following navigation options:
KSVB
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/ Allocations/Distribution.
First execute in Test Run, analyze the results & then execute to post
Product Costing Page 47 of 96
Proof of Concept
First execute in Test Run, analyze the results & then execute to post .Click on the
number in sender/receiver column to see the details of distribution. For checking
whether entire cost of Service CC has been distributed to other cost centers, go to
the cost centre report (S_ALR_87013611).
Product Costing Page 48 of 96
Proof of Concept
4.9. Entering Statistical Key Figures for Plan Assessment Cycle
Use
The procedure for entering SKF for executing Plan Assessment Cycle is explained
here.
Procedure
Access the activity using one of the following navigation options:
KP46
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/ Statistical Key Figures/ Change
Give Parameters as per screen shots given below.
Product Costing Page 49 of 96
Proof of Concept
Product Costing Page 50 of 96
Proof of Concept
4.10. Execution of Plan Assessment Cycle
Use
The procedure for execution of plan Assessment Cycle is explained here.
After execution of assessment cycle, the sender cost centers cost will be allocated to
receivers cost centers based on the criteria defined in the cycle. Ideally, the entire
cost of sender cost centre should be distributed to the receivers. In assessment, it is
allocated through a single line item (secondary Cost element) in the receiver cost
centre.
Procedure
Access the activity using one of the following navigation options:
KSUB
Transaction Code
SAP EASY Access Accounting/Controlling/Cost Center Accounting
/Planning/ Allocations/Assessment
Enter the parameters as per the screen shot given below
First execute in Test Run, analyze the results & then execute in production run to
post .Click on the number in sender/receiver column to see the details of
assessment.
Product Costing Page 51 of 96
Proof of Concept
The result of the assessment cycle is as shown in the screen shot below. For
verification of the resultant output, go to the cost centre report (S_ALR_87013611).
Product Costing Page 52 of 96
Proof of Concept
4.11. Updating Planned RM/PM purchase prices in Material Master
Use
The Parameters for updating the planned RM/PM purchase prices in Material Master
are defined here.
Prerequisites
1. For all the RM/PM codes, planned purchase prices should be available from
Purchase Department. These planned prices should be with reference to price
unit in Accounting 1 view of the Material master of the respective material.
2. Before updating the planned price field, it is necessary to know beforehand
the costing variant which will be used for annual planning and the planned
price field (in RM/PM Material Master) to which it is linked through valuation
variant. In our example, we have used Costing Variant ZPC5 in which pricing
strategy for materials as per valuation variant (TCL _New Valuation Variant)
is Planned Price3 or Moving average Price.
The relevant screen shots are given below:
Click on Valuation variant and view the pricing strategy for materials.
Product Costing Page 53 of 96
Proof of Concept
Procedure
Access the activity using one of the following navigation options:
MM02
Transaction Code
SAP EASY Access Logistics/Materials management/Material Master
/Material/Change
Go to Costing 2 View of the material master and put the price in the planned price 3
field. Date should be first date of the year for which plan is to be prepared.
Product Costing Page 54 of 96
Proof of Concept
Save it & do the same for other raw materials. When the number of RM/PM is large,
in that case we can use LSMW for mass upload. However, LSMW needs to be
created.
Product Costing Page 55 of 96
Proof of Concept
4.12. Running & saving of Cost Estimate
Use
The Parameters for running & saving the Cost estimate for the material are defined
here.
The cost estimate determines what costs go into the standard price for the material.
Only those cost components, that are flagged as relevant for stock valuation, are
included in the standard price. A material cost estimate is used to calculate the
standard price which will be updated in the material master record.
Procedure
Access the activity using one of the following navigation options:
CK11n
Transaction Code
SAP EASY Access Logistics/Production-Process/Product Cost planning/
Material Costing/Cost Estimate with Qty
Structure/Create
Field Name Values
FG Material No. 123
Plant SA
Costing Variant ZPC5(as mentioned before)
Costing Version 1
Product Costing Page 56 of 96
Proof of Concept
Product Costing Page 57 of 96
Proof of Concept
Give the Costing dates, Qty Structure date & Valuation Date & press enter
Product Costing Page 58 of 96
Proof of Concept
Check the Standard Cost estimate results and verify it with the desired
result. Then Save it by clicking on the save icon.
The cost estimate must be executed with a costing variant (made for the specific
purpose like Annual Planning, Inventory Valuation, and Current Costing etc.) and
saved.
Once it is released thru transaction CK24, it will be updated in the Master record of
the FG/ SFG. Transaction CK24 is explained below.
Product Costing Page 59 of 96
Proof of Concept
4.13. Marking & Releasing of Standard Cost Estimate
Use
The Parameters for Marking & release of the standard Cost estimate for the material
are explained here.
Once the standard cost estimate is released, the standard price will appear in the
Accounting 1 & Costing 2 view of Material Master. To view the cost component
structure, double click on the current period field.
Procedure
Access the activity using one of the following navigation options:
CK24
Transaction Code
SAP EASY Access Logistics/Production-Process/Product Cost planning/
Material Costing/Price Update
First click on marking allowance to allow release of standard cost for the current
period. This is to be done only once at the beginning of the period.
Product Costing Page 60 of 96
Proof of Concept
Give the costing variant & version
Product Costing Page 61 of 96
Proof of Concept
Save and go back to the main screen.
Give the material number and execute in test run first. Check it & mark. It will show
the future price calculated.
Now go back and click on release. Following screen shot shows the released standard
cost estimate.
Product Costing Page 62 of 96
Proof of Concept
Check and save it. Cross check the updated price in the material master as shown in
the screen shot below.
Product Costing Page 63 of 96
Proof of Concept
(Note: Please consider the values shown in the screen shot as only the reference
values. Do not cross check the same with the desired output. The purpose is to show
the flow of activities.)
Product Costing Page 64 of 96
Proof of Concept
5. Product Costing- Determining Actual cost per unit
Purchase of Raw Material
Use
The Parameters for Purchase of Raw Materials are defined here.
Procedure
Access the activity using one of the following navigation options:
ME21N
Transaction Code
SAP EASY Access Logistics/ Materials Management / Purchasing /
Purchase Order / Create / Vendor /Supplying Plant
Known.
Field Name Values
Vendor 200000
Purchasing Org TCLP
Purc. Group SPI (SPI Purchase Group)
Company Code TCL
Material 116
PO Quantity 10 KG
Net Price 18
Material 120
PO Quantity 5L
Plant SA
Net Price 2
Delivery Date 30.08.2005
Press Enter.
Product Costing Page 65 of 96
Proof of Concept
Under Material Data Tab: Uncheck nfo Update field.
Now Confirm the Net Price entered is same as displayed, else re-enter.
Press Enter
Save
Goods Receipt
Use
Product Costing Page 66 of 96
Proof of Concept
The Parameters for Goods Receipt of Raw Materials are defined here.
Procedure
Access the activity using one of the following navigation options:
Transaction Code MIGO_GR (MIGO)
SAP EASY Access Logistics/ Materials Management / Purchasing /
Inventory Management / Goods Movement/ Goods
Receipt / Purchase Order / GR for Purchase Order.
Field Name Values
Purchase Order 4500000040
Posting & Document Date 25.11.2005
Press enter
Field Name Values
Stor Loc MIT
Check Item OK check box
Press Enter
Save
Product Costing Page 67 of 96
Proof of Concept
Product Costing Page 68 of 96
Proof of Concept
Creation of Production Order
Use
The Parameters for Creation of Production Order are defined here.
Procedure
Access the activity using one of the following navigation options:
CO01
Transaction Code
SAP Easy Access Logistics/Production/Production
Control/order/create/with material
Field Name Values
Material 123(Raw Brine)
Production Plant SA
Order Type PP01 (Standard Production Order)
Product Costing Page 69 of 96
Proof of Concept
Field Name Values
Total qty 10
Finish Date 07.10.2005
Releasing, Scheduling & Costing the Production Order
Release the Order
Product Costing Page 70 of 96
Proof of Concept
Scheduling
Product Costing Page 71 of 96
Proof of Concept
Carry out Costing
Product Costing Page 72 of 96
Proof of Concept
Check the planned cost calculated as follows
Product Costing Page 73 of 96
Proof of Concept
Check all the tabs on the main screen of the production order & save.
Product Costing Page 74 of 96
Proof of Concept
Goods Issue to Production Order
Use
The Parameters for Goods Issue to Production Order are defined here.
Procedure
Access the activity using one of the following navigation options:
MB1A
Transaction Code
SAP Easy Access Logistics/Production/Production Control/ Goods
Movement/ MB1A Goods Issue
Product Costing Page 75 of 96
Proof of Concept
Field Name Values
Document Date xx.xx.2005
Posting Date xx.xx.2005
Movement Type 261
Plant SA(number)
Product Costing Page 76 of 96
Proof of Concept
Enter the details as given below:
Product Costing Page 77 of 96
Proof of Concept
Click on the overview to check the issues made
Product Costing Page 78 of 96
Proof of Concept
Save the document.
Confirmation of Quantity & Activity for Operations
Use
The Parameters for Confirmation of Quantity & Activity for operations to Production
Order are defined here.
Procedure
Access the activity using one of the following navigation options:
CO11N
Transaction Code
SAP Easy Access Logistics/Production/Production Control/
Confirmation / Enter/ For Operation / Time Ticket
Product Costing Page 79 of 96
Proof of Concept
CO11N
Transaction Code
Product Costing Page 80 of 96
Proof of Concept
Field Name Values Values
Order 1000045 1000045
Ope/Acty 0030(Dissolver) 0040(Refinery)
Confirm type Final confirmation Final confirmation
Quantity Confirmation 10(Order qty) 10(Order qty)
Activity Confirmation
Machine 2 H
Labor 1H
Product Costing Page 81 of 96
Proof of Concept
Check the actual cost debited to the production order in the Cost Report.
Product Costing Page 82 of 96
Proof of Concept
Goods Receipt of Finished Goods against Production Order
Use
The Parameters for Creation of Production Order is defined here.
Procedure
Access the activity using one of the following navigation options:
MB31
Transaction Code
SAP Easy Access Logistics/Materials Mgt/Inventory mgt/Goods
Receipt/For order
Enter the details as given below
Product Costing Page 83 of 96
Proof of Concept
Save the document.
Product Costing Page 84 of 96
Proof of Concept
Go to the Production order cost report and see the cost analysis
Product Costing Page 85 of 96
Proof of Concept
Creation of Sales Order
Use
The Parameters for Creation of Sales Order are defined here.
Procedure
Access the activity using one of the following navigation options:
VA01
Transaction Code
SAP Easy Access Logistics/Sales & Distribution/Sales/Order/Create
Enter the details as given below
Field Name Values
Sold to party 48
PO number & Date xxx / xx.xx.2005
Payment terms As required
Item 0010
Product Costing Page 86 of 96
Proof of Concept
Material 123 (Material Code)
Order Qty /UOM As required
Item Category TAN
Plant /Storage Location As required
Press Enter. Select the Line item & go to Item conditions for Pricing
Enter the Pricing conditions as per example shown below
Product Costing Page 87 of 96
Proof of Concept
Save the sales order & note the order number.
Delivery of Finished Goods
Use
Product Costing Page 88 of 96
Proof of Concept
The Parameters for Creation of Sales Order are defined here.
Procedure
Access the activity using one of the following navigation options:
VL01N
Transaction Code
SAP Easy Access Logistics/Sales & Distribution/Shipping &
transportation/Outbound delivery/Create/Single
document/VL01n
Enter the details as shown in the example below
Product Costing Page 89 of 96
Proof of Concept
Save & note the delivery number.
Picking of goods & Posting of Goods Issue
Use
The Parameters for Picking of goods & Post Good issue are defined here.
Procedure
Access the activity using one of the following navigation options:
VL02N
Transaction Code
SAP Easy Access Logistics/Sales & Distribution/Shipping &
transportation/Outbound delivery/Change/VL02N
Put the delivery number and press enter
Go to the Tab for Picking & enter the quantity to be picked
Product Costing Page 90 of 96
Proof of Concept
Click on Post goods issue. The message will be displayed for Outbound Delivery
Saved.
Product Costing Page 91 of 96
Proof of Concept
Billing
Use
The Parameters for Creation of Billing Document (i.e. Invoice) are defined here.
Procedure
Access the activity using one of the following navigation options:
VF01
Transaction Code
SAP Easy Access Logistics/Logistics Execution /Outbound Process
/Goods Issue for Outbound delivery/Billing/ Billing
Document / Create
Enter the Details as per screen shot below.
Save the document & check the messages. If any errors are there, correct the same
& then Save. It will generate the Billing Document & also post the same in FI (i.e.
release of invoice to accounts).
Check the Accounting Document Posted.
Product Costing Page 92 of 96
Proof of Concept
6. Glossary
Sr.No Terminology Meaning / Concept
1 Material Master A data record containing all the basic
information required to manage a material.
This data is sorted according to various
criteria including data of a descriptive nature
(such as size, dimension and weight) and
data with a control function (such as
material type and industry sector). In
addition to this data, which can be directly
maintained by the user, it also contains data
that is automatically updated by the system
(such as stock levels).
2 BOM It is a complete & formally structured list of
components of a product.
3 Cost Centre (CC) An organizational unit within a controlling
area that represents a defined location of
cost incurrence.
4 Activity Type A unit in a controlling area that classifies the
activities performed in a cost center
5 Primary cost Element Replica of GL Codes in Co. It is a Bridge
between FI & CO.
6 Secondary Cost Element It exists only in CO & is used for transferring
costs from one CO Object to other.
7 Distribution A process used for transferring cost from
one CC to another in the same cost element.
8 Assessment A process used for transferring cost from
once CC to another by using a Secondary
Cost Element.
7 Routing It defines one or more sequences of
operations for the production of a material
Product Costing Page 93 of 96
Proof of Concept
To apply consumption accounting practice, the following will be the scheme of
accounting entries that will be configured in the system:
Transaction Accounting Entry
Purchase/Receipt of Inventory entry:
Goods
Material Inventory A/c Dr.
(Also considering Import
Cenvat Clearing A/c Dr.
purchase)
To GR/IR Inventory A/c
(Inventory value is booked
as per Purchase Order To Customs/Clg Provision A/c
terms) Purchase Statistical Entry:
Purchase Local/Import A/c Dr.
To Purchase Offset Loc/Imp A/c
Customs/Clg Purchase Local/Import A/c Dr.
To Customs/Clg Pur Offset Loc/Imp A/c
Logistic Invoice GR/IR Account Dr.
Verification
To Vendor Account
(Vendor Invoice)
Logistic Invoice Normal Entry
Verification
Customs/Clearing Provision A/c Dr.
(Customs/Clearing Invoice)
To Vendor Account
If Customs/Clg value > Pur Order Value
Material Inventory A/c Dr.
Cenvat Clearing A/c Dr.
To Customs/Clg provision account
Customs/Clg Purchase Local/Import A/c
Dr.
To Customs/Clg Pur Offset Loc/Imp A/c
If Customs/Clg value < Pur Order Value
Customs/Clg provision account Dr.
To Material Inventory A/c
To Cenvat Clearing A/c
Product Costing Page 94 of 96
Proof of Concept
Customs/Clg Pur Offset Loc/Imp A/c Dr.
To Customs/Clg Purchase Local/Import A/c
Excise Invoice Cenvat Deposit A/c Dr.
Verification
Cenvat Held A/c (In case of capital pur) Dr.
To Cenvat Clearing Account
Period-end closing
entries
GR/IR Account Clearing Goods Received but Invoice not received
GR/IR Adjustment A/c Dr.
To Outstanding Purchase A/c
Invoice booked but goods not received
Goods-in-transit Stock A/c Dr.
To GR/IR Adjustment A/c
(This entry is provisional and is reversed in the
next posting period.)
Issue of Material to
Material Consumption A/c (P&L) Dr.
Production
To Material Inventory A/c
(to Process Order)
Work-in-process Stock (B/S) A/c Dr.
Realization of Work-in-
To Work-in-process stock change A/c (P&L)
process at period-end
To Applied Overheads A/c
Finished Goods Stock A/c Dr.
Receipt of Finished
Goods in Finished Goods To Cost of Goods Manufactured A/c
Stores
To Applied Overheads A/c
Finished Goods Cost of Goods Sold A/c Dr.
Despatched to Customer
Product Costing Page 95 of 96
Proof of Concept
To Finished Goods Stock A/c
Sale of Finished Goods to Customer A/c Dr.
Customer To Sales A/c
Month-end entry for Price Variance A/c Dr/Cr
Variance calculation Cost of Goods Manufactured A/c Dr./Cr.
Monthly revaluation of Finished Goods Revaluation A/c Dr./Cr.
closing stock Finished Goods Stock A/c Dr/Cr.
Product Costing Page 96 of 96