This document provides information on the status of drawings for four metro stations: Gurukul Road Station, Doordarshan Kendra Station, Thaltej Station, and Thaltej Gam Station. It includes details on the submission dates for steel roof drawings, general arrangement drawings, platform and concourse level drawings and design reports, pile and pile cap drawings, and pier dowel drawings. All stations have typical drawings for steel roof and platform/concourse levels.

Uploaded by

pravin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Submission Record

This document provides information on the status of drawings for four metro stations: Gurukul Road Station, Doordarshan Kendra Station, Thaltej Station, and Thaltej Gam Station. It includes details on the submission dates for steel roof drawings, general arrangement drawings, platform and concourse level drawings and design reports, pile and pile cap drawings, and pier dowel drawings. All stations have typical drawings for steel roof and platform/concourse levels.

Uploaded by

pravin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

METRO STATIONS-MEGA-EW-REACH-2

GURUKUL ROAD DOORDARSHAN THALTEJ GAM


STATION KENDRA STATION THALTEJ STATIOM STATION REMARKS
Component

Typical Drawings
common for all
4 (Typical) 4 (Typical) 4 (Typical) 4 (Typical)
Steel Roof stations, submitted
along with design

20/10/2016 7/11/2016 7/11/2016 7/11/2016


14 14 14 14
GA Drawings
20/8/2016 20/8/2016 20/8/2016 20/8/2016

Platform and 38 38 38 38 Typical Design


Concourse level Notes Submitted
drawings and
design report 14/10/2016 & 14/10/2016 & 14/10/2016 & 14/10/2016 &
21/10/2016 21/10/2016 21/10/2016 21/10/2016

Pile & Pile Cap & 3 3


Pier dowels
9/11/2016 5/11/2016
1
Pier
4/3/2017