The document outlines a three-week schedule for the commissioning services related to the Dhahran Home Ownership 380/115/13.8 KV BSP S/S project, detailing planned activities, durations, and manpower requirements. It includes specific tests for various components of the electrical system, along with the project timeline and key personnel involved. The project is set to start on October 7, 2017, and is expected to be completed by December 31, 2017.

Uploaded by

Sathiya Seelan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

3WS 2

The document outlines a three-week schedule for the commissioning services related to the Dhahran Home Ownership 380/115/13.8 KV BSP S/S project, detailing planned activities, durations, and manpower requirements. It includes specific tests for various components of the electrical system, along with the project timeline and key personnel involved. The project is set to start on October 7, 2017, and is expected to be completed by December 31, 2017.

Uploaded by

Sathiya Seelan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Commissioning Services Department

Three Weeks Schedule


Project Title DHAHRAN HOME OWNERSHIP 380/115/13.8 KV BSP S/S
Main Contractor NCC Location
T&C Contractor
Contract No. 4400006064 Preparation Date
AL-FANAR T&C
Standard Activities as per SCAL Present Week No.26 Next Week No.27 Next Next Week No.28
2017 2017 2017

Duration in Days 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Sub-Activity Planned
S.N Per Unit Total

Fri
Sat

Fri

Sat
Sun

Mon
Tue

Wed

Thu

Sun

Mon

Tue
Wed

Sun

Mon

Tue
Thu
Test Code Quantity
Sub-Activity Name

1 EHV.GIS. AUX (20%) 380 KV GIS Auxilary Relay Test LCC Panel 236 0.063d 14.86
2 EHV.GIS. MCB (5%) 380 KV GIS MCB Test LCC Panel 80 0.01d 0.8
3 EHV.GIS. M (20%) 380 KV GIS Meter's Test LCC Panel 15 0.05d 1.5
4 EHV.GIS. CT Test (100%) 380 KV GIS CT Test 160 0.04d 7
5 EHV.GIS.SF6.DG Calibration Of SF6 Gas Density Gauge And Its Pressure Switch Test 560 0.063d 33.6
6 EHV.GIS.SF6.TEST SF6 Gas Purity And Dew Point Test 560 0.04d 22
Total Planned Per Day
2 2 2 2 2 2 2 2
CSD Manpower Details
Total Actual Per Day

CSD Engr. PMD Engr. Main Contractor Engr.

SIVA KUMAR
3.8 KV BSP S/S Project Start week 27
Location DHAHRAN AREA Project Start Date 10/7/2017
Preparation Date 6/7/2017 Project End Date 31/12/2017
Next Next Week No.28
Progress %
Remarks
Completed
Quantity

2017
CSD Engineer
T&C Contractor Engineer Name/ID
19 20 21 22 Name/ID
Fri

Sat
Wed
Thu

ASIF/FAN-336
CSD Engineer#1
Name/ID
JANARTHNAN/FAN-264

JANARTHNAN/FAN-264

JANARTHNAN/FAN-264

RAJRAM/FAN-034
CSD Engineer#2
Name/ID
KIRSHNAN/FAN-353

2 2 2

PLANNED ACTIVITY
ACTUAL ACTIVITY
NO ACTIVITY
T&C Engr. PROLONGED ACTIVITY

HEIBA CSD DAILY MANPOWER