Epil TS
Epil TS
FOR
VOLUME 2B
TECHNICAL SPECIFICATION
CONTENTS
2. Scope of Supply
4. Spares
Page1of10
  GENERAL
  The following Technical Specification shall be read in conjunction with General Technical
  Specification (GTS) of Bhilai Steel Plant, SAIL and General Specification. If there are
  any provisions in this Technical Specification, which are at variance with the provisions
  of General Technical Specification (GTS) of Bhilai Steel Plant, SAIL and General
  Specification, the provisions in this Technical Specification shall take precedence.
(ii) List of Commissioning spares and start-up spares with unit rates.
(iii) List with unit rates of special tools and tackles, if any required.
(iv) Price Schedule for supply & erection work as per the format enclosed.
          (v)       List of recommended spare parts for 3 (Three) years trouble free
                    operation and maintenance alongwith unit rates as per the format
                    enclosed in price schedule.
(vi) Technical data sheets duly filled by the vendor (blank data sheets enclosed).
(viii) Reference list of your Customers for the similar supply of items.
Page2of10
2.0                 SCOPE OF SUPPLY
The scope of the supply includes Design, engineering, manufacture, shop fabrication.
assembly, testing and inspection at manufacturers works, packing, dispatch,
transportation, delivery to site, receipt, required fabrication at site, installation, testing &
commissioning completion of facilities, performance guarantee testing, final painting at
site and handing over to Bhilai Steel Plant, SAIL/EPI of MOBILE TRIPPERS AND
ASSOCIATED WORKS as per specifications and scope defined in tender documents
complete with all accessories and drive, which are not mentioned specifically but are
required for the efficient and trouble free operation of the equipment/system.
(i)       Complete Mobile trippers including all the mechanical, electrical & Instrumentation
          items as per the details given in the specifications.
(ii)      Consumables like first fill of lubricating oils etc. for the initial operation of the
          equipment till handing over.
(iii) Commissioning spares and start-up spare parts.
(iv) Special tools & tackles, if any required.
(v)       Recommended spare parts for (3) three years trouble free O&M.
(vi) Painting of complete equipment (including final painting before handing over to the
     Employer).
(vii) Installation, testing & commissioning at site.
(viii) All drawings / documents along with operation and maintenance manuals as per
       requirement mentioned elsewhere in the tender document.
(ix) Getting approval of design/drawings and any other design calculation related to the
     equipment from BSP/MECON.
(x)       3 Ph, 415V, +10% & -15%, 50 Hz +4% & -6%, power supply shall be provided at
          Diverter gate terminal at one point through power cable.
(xi) Carrying out any modifications/ deletions /additions / alteration in design /
     drawings/ documents as required by client & Clients consultant and EPI for proper
     execution of works at site till completion and handing over of the project to the
     client.
(xii) Trailing / Flexible Cables as required for trippers shall be in bidders scope
          Exclusions:
(i)       Civil works including grouting.
Page3of10
b) Tenderer to note the following:
 (i)       Makes of gear box shall be Elecon/ NAW/ Flender/ Premium energy transmission/
           Shanthi gears.
 (ii)      BSP approved preferred make list shall be followed for Hydraulics & Pneumatics.
 (iii) All HT and LT AC / DC motors, actuators, brakes etc. as per technological and
       process requirement.
 (iv) Generally Squirrel Cage Induction Motor with DOL starter / VFD / Soft Starter will
      be provided. Use of Slip ring motor in general will be avoided. Suitable Rotor
      contactor panels and SS-grid Resistance Boxes will be provided for slip ring motors
      if inevitable
 (v)       Soft starter will be provided for LT motors of rating more than 75kW.
 (vi) All LT motors for conveyors will be S6 duty and will have class F insulation with
      temperature rise limited to class B. Inverter duty motors (used for VFD
      application) will have class H insulation with temperature rise limited to class F.
 (vii) Equipment selection and dating will generally be based on ambient temperature of
       + 50 Deg.C. For specific areas and shops, the ambient temperature conditions
       indicated above will be taken into consideration and equipment suitably derated
       wherever necessary.
 (viii) The equipment should be suitable for smooth, efficient and trouble free service in
        the tropical humid climate prevailing at plant site and under the ambient
        temperature conditions indicated elsewhere.
 (ix) Roller bearings will be provided at DE end for motor of rating 30KW and above
 (x)       Other Technical Data:
              Main Conveyor Z5-C1/C2/C3 Capacity                                                            :            1500 TPH (Rated) &
                                                                                                                          1800 TPH (Design)
                      Belt width of main conveyor Z5                                                        :            1400 mm
                      Belt speed of main conveyor Z5                                                        :            1.6 M/Sec
                      Material to be handled by the conveyor                                                :
                                                                              - Size of Raw Material
 Bulk density of raw material shall be considered as 2.2 t/m3 for power calculation/load
 data of structures and 1.6 t/m3 for volumetric capacity calculation of conveyor
Page4of10
3.0          TECHNICAL SPECIFICATIONS OF MOBILE TRIPPERS
3.2          Travel drive of trippers shall be individual wheel drive, independent of the main
             conveyor drive and shall be through electric motor, helical gear box etc. Chain
             drive shall not be used. Tripper shall be provided with D.C. electro-magnetic brake
             for stopping the same at desired location. Travel speed of trippers shall not exceed
             0.2 m/sec.
3.3          The traveling tripper shall consist of belt scrapper with adjustable rubber strip,
             rubber lagged head and bend pulleys complete with shaft bearings, chutes, stops
             and limit switches, brakes etc. The tripper shall have two-way discharge chute
             which shall be capable of discharging material into the bunker openings.
3.4          Traveling trippers shall be of adequate length with proper slope of conveyor idlers
             to match with the flow properties of material being handled. The maximum
             inclination of the conveyor belt on the tripper shall not be morethan 12.
3.5          Vertical and horizontal guide rollers shall be provided to control sway and uplift of
             the belt in unloaded condition. The tripper shall run on standard flat bottom Indian
             Rails at least of 60 lb/yd. Wheels shall be double flanged with parallel tread
             running on anti-friction bearings and shall have min hardness of 350 BHN. Material
             of wheel shall be forced steel / cast steel
3.6          Traveling trippers shall be equipped with manually operated rail clamps and rail
             cleaners and jacking pads.
3.7 Diverter gates on two way or three way chutes shall be electrically operated.
3.8          Power supply to the tripper shall be given through motorized cable reeling drum
             with trailing cables, cable trays for resting the trailing cables and end limit switches
             for protection against over travel of the tripper. The cable reeling drum and trailing
             cable of each tripper shall be suitable for the entire length of the bunker bay. The
             cables shall have copper conductors, proper insulating material and braided
             armoring in accordance with IS: 691.
3.9          Position indicators shall be provided as per requirement of control logic. Operating
             push buttons for local control and emergency stop shall be within easy reach of the
             operator on the main conveyor walk way.
3.10         All stipulation regarding belt pulley, belt scraper, idlers, safety guards, wind guard,
             access for maintenance etc. specified for belt conveyors, diverter gates and
             discharge chutes shall be applicable for the traveling tripper.
3.11         The rating of tripper travel motor shall be adequate to move the tripper smoothly
             either in forward or opposite direction to belt direction under fully loaded
             conditions. Coefficient of friction shall be taken as maximum 0.15.
3.12         Minimum two drive axles shall be provided for tripper travel. Arrangement shall be
             provided at the starting point of the tripper to avoid folding of belt.
3.13         Provision shall be kept for automatic tripping of bunker bay conveyor in event of
             traveling tripper getting dragged (.i.e. travel speed in excess of rated speed).
Page5of10
3.14         The supporting structures for the rails with necessary end stops shall also be
             supplied under this specification. Suitable belt hold down guide pulley shall be
             provided over the concave curve of belt over tripper.
3.15         The bunker sealing arrangement shall keep the bunkers sealed and prevent dust
             emission into tripper room.
3.16         Separate openings shall be provided on the bunker floor of each bunker to
             measure level of material in the bunker. Hinged door/ flaps shall be provided on
             these openings.
3.17         Suitable gratings are to be provided in between bunkers in the tripper travel zone.
             Opening size shall be decided during the detail engineering stage.
3.18         Suitable dust cover shall be provided over tripper head pulley. Serrated rubber
             seal shall be provided at open side to prevent dust nuisance. Suitable dust tight
             access doors shall be provided. Counter weighted type belt cleaner shall be
             provided below the tripper head pulley to cleaning the carrying side of the belt.
3.19         Suitable access platform of Chequered plate with ladders, hand railings and
             walkways on both sides shall be provided for access / maintenance of equipment
             on tripper. Also crossover platform shall be provided with tripper so that operator
             can cross the belt through the same.
3.20 Continuous deck plates shall be provided below carrying idlers on the trippers.
Page6of10
4.0          SPARES
      (B)           Consumables
                    The Bidder shall supply all consumables such as initial fill of lubricants, oils,
                    grease, chemicals, refractories, resins etc. as required to complete the plant
                    till commissioning and shall have a shelf life of minimum one year. The scope
                    of consumables shall include electrodes, shims, packings, bolts, nuts, gaskets,
                    rivets, washers etc. The Bidder shall fulfill the requirement given in SBD.
                    The Bidder shall also furnish Indian equivalent of oils, lubricants, refractories
                    and other consumables along with necessary specifications, drawings,
                    catalogues etc. to enable the Purchaser to procure them from indigenous
                    sources.
The Bidder shall indicate the annual requirement of all such consumables.
                 (1) The Bidder shall ensure the interchangeability of the parts wherever
                     possible. The Bidder shall furnish an itemized list of interchangeable spares
                     as given in SBD.
Page7of10
                 (3) Spares list giving complete list of the replaceable parts, fully illustrated, shall
                     be supplied. The list shall include the following information.
                                 Item designation
                                 Reference drawings
                                 Quantity installed
                                 Quantity recommended for two years normal operation including the
                                  insurance spares
                                 Weight of each spare part
                                 Supplier or sub-suppliers catalogue number
                                 Recommended minimum stock
                                 Expected replacement time
                                 Installation instruction in detail shall be supplied both for original
                                  installation and future, for replacement of major electrical equipment,
                                  circuit wiring diagram shall be provided.
                 (1) The Bidder shall supply a complete and unused wet of all the special tools
                     and tackles including required number of tool boxes as required for erection,
                     maintenance, overhaul or complete replacement of the equipment and
                     components required for the plant. The Bidder shall submit a list of such
                     special erection and maintenance tools and tackles.
                 (2) All the tools shall be supplied in separate containers clearly marked with the
                     name of the equipment for which they are intended.
                 (3) The Successful Bidder shall indicate list of construction machineries, handling
                     equipment and other facilities including tower crane or equivalent for
                     erection at high elevation required for the execution of work based on their
                     previous experience, considering site conditions and other considerations of
                     work and furnish resource deployment plan. The successful Bidder shall
                     mobilize these equipment at site for the execution of work and this is an
                     important requirement of the project. The availability of required facilities
                     shall be ensured for completeness of the project in time.
                 (4) For any fabrication / control assembly (necessary for erection) work to be
                     done in the plant premises the plan shall be indicated by the Bidder. The
                     necessary equipment such as plate bending machines, special purpose
                     welding machines, fixtures, tools & tackles and other equipment required for
                     fabrication shall be arranged by the successful Bidder.
                 (5) The successful Bidder shall carry out the testing of welded joints by
                     radiographic and ultrasonic methods. They must have only qualified /
                     certified welders with them for completing all the welding jobs.
                 (6) All the measuring instruments shall be calibrated having reference to NPL
                     (National Physics Laboratory).
Page8of10
                 (7) All tools and tackles, apparatus, special instruments required for erection,
                     testing, commissioning and establishment of the Performance Guarantee
                     Test, measurements required for establishing the pollution control norms
                     and such other instruments, as required, shall be arranged by the successful
                     Bidder. After commissioning, the successful Bidder shall handover all the
                     special tools & tackles to the Purchaser as per the requirement given in SBD.
                 (8) The successful Bidder shall supply all required consumables, initial fill, oil,
                     lubricants, construction and erection materials including but not limited to
                     shims, packing plates, joining compounds, kerosene, solvents, sealing
                     compounds, tapes, connectors, brazing and soldering materials, welding and
                     brazing gases and rods, electrodes and wires, erection bolts, nuts, rivets,
                     piano wire, packing sheet and packing compounds, temporary supports,
                     spacer templates, jute and cotton waste cloth, sand and emery paper etc.
                     for the commissioning of the plant.
             (9)       For load testing of handling equipment, loads shall have to be arranged by
                       the successful Bidder. Electrical/ operation tests, as per standard practice,
                       shall also be arranged and completed by them.
             (10) All materials, equipment, tools, tackles etc. brought at site by the successful
                  Bidder within the plant area shall not be removed without the written
                  permission of the Purchaser. Similarly, all enabling works built/erected
                  and/or acquired by them within the plant premises shall not be dismantled
                  and removed without the written permission of the Purchaser.
                    The list of Spares & consumables shall be furnished by the successful Bidder
                    as required in SBD. However, the successful Bidder shall furnish various
                    information regarding spares, consumables, tools & tackles etc. as per the
                    schedules indicated in chapter 12 of this Technical Specification.
Page9of10
5.0          TECHNICAL DATA SHEET (To be filled by the vendor)
Page10of10