0% found this document useful (0 votes)
27 views1 page

Daily Report On Internship Activites Carried Out at Pan Ocean Oil Corporation (Pooc) Nig. Ltd. - Ovade Ogharefe Facility

The document summarizes Victor Imeh's activities during his internship at Pan Ocean Oil Corporation on April 8, 2017. He worked with a contractor to source and mount level gauges and begin mounting a level controller. He also familiarized himself with the plant's equipment by learning about vibration and level switches. He faced issues mounting a level controller due to a missing nipple and plans to ensure proper dimensions and fittings are considered for future purchases.

Uploaded by

Victor Imeh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Daily Report On Internship Activites Carried Out at Pan Ocean Oil Corporation (Pooc) Nig. Ltd. - Ovade Ogharefe Facility

The document summarizes Victor Imeh's activities during his internship at Pan Ocean Oil Corporation on April 8, 2017. He worked with a contractor to source and mount level gauges and begin mounting a level controller. He also familiarized himself with the plant's equipment by learning about vibration and level switches. He faced issues mounting a level controller due to a missing nipple and plans to ensure proper dimensions and fittings are considered for future purchases.

Uploaded by

Victor Imeh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

DAILY REPORT ON INTERNSHIP ACTIVITES CARRIED OUT AT

PAN OCEAN OIL CORPORATION (POOC) NIG. LTD. OVADE


OGHAREFE FACILITY
DATE: SATURDAY, 8TH APRIL 2017
PREPARED BY: IMEH, VICTOR OKON
DEPARTMENT OF ELECTRICAL/ELECTRONIC ENGINEERING
AFE BABALOLA UNIVERSITY

PROGRESS:
Liaised with contractor(Abergyl) in carrying out the following:
Sourced for level gauge and level controller from the store house
Mounted level gauge with side glass (LG207A & LG207B) at skid
11(depropranizer skid)
Mounted level gauge with side glass(LG234) at skid 12
Began mounting of level controller at skid 3 (fuel gas scrubber skid)
Familiarization of Gas Processing Plant II (GPP II)
Identification and description of VSHH (Vibration Switch High High)
Identification and description of LSHH (Level Switch High High)
PROBLEMS:
Had issues mounting level controller due to absence of nipple
PLANS:
Proper dimensions should be taken into consideration when purchasing instruments
and proper fittings purchased.