Waste Reduction Plan
Waste Reduction Plan
Waste Reduction
              Plan
                              Corporate
                         Waste Reduction Plan
                                 1999
1999
Prepared by:
                       Tennessee Department of
                       Environment and Conservation
                                                 Phone: 615-532-8657
                                                  Fax: 615-532-4937
                                                   www.cis.utk.edu
September 1999
      The University of Tennessee does not discriminate on the basis of race, sex, color, religion, national origin, age,
handicap, or veteran status in provision of educational opportunities or employment opportunities and benefits.
      The University does not discriminate on the basis of sex or handicap in its educational programs and activities,
pursuant to requirements of Title IX of the EducationalAmendments of 1972, Public Law 92-318, and Section 504 of the
Rehabilitation Act of 1973, Public Law 93-112, and the Americans With Disabilities Act of 1990, Public Law 101-336,
respectively. This policy extends to both employment by and admission to the University.
      Inquiries concerning Title IX, Section 504, and the Americans With Disabilities Act of 1990 should be directed to
Mr. Gary W. Baskette, Director of Business Services, 109 Student Services and Administration Building, Knoxville,
Tennessee 37996-0212, (423) 974-6622. Charges of violation of the above policy should also be directed to Mr. Baskette.
                                                Contents
       This handbook will help you prepare a waste reduction plan for your business. By providing you
   with practical information on how to approach, plan and implement a hazardous waste reduction
   program, these pages should help you make the administrative, material and technology changes that
   result in less waste.
       As you proceed through each section, youll learn the steps for reviewing operations, identifying
   and assessing waste reduction options and implementing and measuring your progress. You should
   find answers to such questions as:
        How do waste reduction practices enhance regulatory compliance?
        Does Tennessees law include EPAs requirements for a waste minimization
         program-in-place?
        How do I conduct a waste reduction assessment?
        What steps are involved in implementing various waste reduction practices?
        What specific waste reduction practices are businesses successfully using?
        Where can I go with my questions on waste reduction?
       Because individual industries needs vary widely, we encourage you to modify the procedures
   discussed here to meet your own unique requirements. This book serves as a point of reference,
   rather than a set of rigid requirements.
                                                     4
                                                                                                      Introduction
Introduction
    In response to a growing concern that solid and hazardous waste problems needed more atten-
tion, the 1988 Tennessee General Assembly established a state waste reduction policy:
    Wherever feasible, the generation of hazardous waste is reduced or eliminated as expeditiously as
possible. Waste that is generated should, in order of priority, be reduced at its source, recovered and reused,
recycled, treated or disposed of so as to minimize the present and future threat to human health and the
environment.
    The Tennessee Hazardous Waste Reduction Act of 1990 (TCA 68-212-301 et. seq.) requires
that large and small quantity generators of hazardous waste develop a facility waste reduction plan.
The law encourages in-plant changes to reduce, avoid or eliminate hazardous wastes.
    The elements of a written facility plan (required by the Tennessee Hazardous Waste Reduction
Act of 1990) are based on federal guidelines. Tennessees program is based on EPAs voluntary
program-in-place. The program-in-place meets certification requirements found on the Hazard-
ous Waste Manifest.
    Large quantity generators of hazardous wastes (generating more than 1000 kg in any calendar
month) during the 1989 calendar year were required to develop a plan by January 1, 1992.
Small-quantity generators (generating more than 100 kg and less than 1000 kg in any calendar
month) had until January 1, 1994, to develop their plan. Hazardous waste streams created after
1989 do not require a waste reduction plan until at least three years after generation begins. Failure
to comply with the Act may result in fines of up to $10,000 per day.
    Although Tennessees waste reduction policy is based on environmental concerns, waste reduc-
tion also has positive incentives for industry. Waste in whatever form represents lost resources, lost
money and sometimes even lost labor. Therefore, reducing waste makes sense in todays competitive
marketplace. A well-designed waste reduction plan reduces operating costs, liability risks and waste
handling and disposal costs. It can also significantly enhance a companys public image and
strengthen its reputation as a responsible member of the community.
                                                       5
Writing a Waste Reduction Plan
                                                        6
                                                                                              Introduction
DO IT NOW!
                                                   7
Writing a Waste Reduction Plan
                             Steps to Writing a
                            Waste Reduction Plan
                                                     8
                                                              Steps to Writing a Waste Reduction Plan
    I.    [Company Name] advocates a clean and safe environment. Its policy is to minimize the
          generation of hazardous and nonhazardous solid wastes and, insofar as possible, to
          eliminate air and water pollutants. It seeks the help of all employees in achieving these
          objectives. Further, [Company] wants its employees to be fully aware of all hazardous
          and potentially dangerous chemicals or equipment used in the work place and to use
          them in a completely safe manner. Finally, it is [Company]s desire to operate in full
          compliance with all applicable environmental regulations.
    II.   [Company Name] is committed to excellence and leadership in protecting the environ-
          ment. In keeping with this policy, our objective is to reduce waste. We strive to mini-
          mize adverse impact on the air, water and land through excellence in waste reduction.
          By successfully reducing waste at its source, we can achieve cost savings, increase opera-
          tional efficiencies, improve the quality of our products and services and maintain a safe
          and healthy workplace for our employees. Also, [Company Name] promotes environ-
          mentally sound recycling, reuse and reclamation of all waste streams.
    III. At [Company Name], protecting the environment is a high priority. We are pledged to
         eliminate or reduce, wherever possible: 1. our use of toxic substances; 2. our release of
         toxic pollutants; and 3. our generation of hazardous and other wastes. When wastes or
         releases cannot be avoided, we are committed to recycling, treating and disposing these
         materials in ways that minimize undesirable impacts on the air, water and land.
    IV. [Company Name]s policy is to reduce all hazardous and nonhazardous waste to the
        minimum levels economically and technically practical and to be in full compliance with
        all federal and state waste regulations.
      V. As both a responsible citizen and [Company Name] employee, each individual is respon-
         sible for reducing waste during working hours, for complying fully with all waste reduc-
         tion program goals established by the company, and for not violating any federal or
         Ssate waste regulations. Employees are urged to come forth with suggestions for further
         reducing waste in their own work area and in any other areas about which they may
         have ideas.
    Once management signs and dates the policy statement, display it prominently and distribute it
widely. How you first distribute the written policy to employees indicates company commitment.
Posting it unexpectedly at workstations sends a negative message. Calling a special meeting to review
Tennessees hazardous waste reduction program, explaining and distributing copies of your
companys own policy, and asking for employee ideas and input all send a positive signal and im-
prove your chaces for success.
    Although a commitment to reducing waste should begin with management, employees often
suggest valuable improvements in day-to-day operations. Therefore, you should inform and involve
employees at each step in developing and implementing a program. Employee involvement will be
discussed later in this manual.
                                                  9
Writing a Waste Reduction Plan
                                                       10
                                                                Steps to Writing a Waste Reduction Plan
    Did you include any of the following waste types? While not mandatory for compliance with this
law, can you afford not to reduce these?
    Nonhazardous solid wastes.
    Universal wastes.
    Special wastes.
    Wastewaters.
    Air emissions.
    Energy wastes.
                                                   11
Writing a Waste Reduction Plan
       What are the objectives of your plan? Compliance with the law, of course, but do you want more
   from this effort? Saving money, reducing regulatory requirements and avoiding long-term liabilities
   are typical answers. Consider:
        Increasing employee participation.
        Using every available resource to reduce or eliminate your hazardous waste.
        The regular evaluation of technologies.
        The most effective use of policies and procedures.
        Improving employee training on environmental issues.
        Improving the waste reduction measurement methods.
        Improving the health and safety environment of the workplace.
        Encouraging a source reduction philosophy.
        Helping to meet the organizations economic and quality requirements.
                                                    12
                                                                Steps to Writing a Waste Reduction Plan
   If the reason for (source of) the waste is:        the standard unit of production might be:
    parts washer in maintenance department            number of work orders
    parts washer in maintenance department            hours of operation of the unit
    dry cleaner operation                             lbs of clothes washed
    byproduct from process                            lbs of product from process
    laboratory tests                                  number of tests conducted
    paint waste from coating your product             square footage of product coated
                                          Confidential
   The standard unit of production is confidential, but you should write it down in your plan as a
memory aid. To assist in the confidentiality of the unit, you are allowed to disguise the unit. For
example, instead of saying every work order, your unit could be every 1.5 work orders, or 100 work
orders, or 1000 divided by the year your company was started!
                                                 13
Writing a Waste Reduction Plan
                                                     14
                                                          Steps to Writing a Waste Reduction Plan
When planning for waste reduction, ask yourself these three questions:
 Who can help you understand your facility?
 Who can help you change how your facility operates?
 Who can help you maintain your waste reduction plan as old challenges are met and new
  opportunities arise?
                                             15
Writing a Waste Reduction Plan
                                                      16
                                                                    Steps to Writing a Waste Reduction Plan
                                                                                        Steel scrap
     Steel coils        Stamping & punching                Unfinished widgets
                                                                                       Water to POTW
Paint: Use 5,000 gals       Painting: use                          Wastewater           @ 500 gals/mo
                                                        
                                                                                       Nonhaz sludge @
                                                                                      10, 55-gal drums/yr
                                                                                        Waste xylene to
                                                                                      TSDF @ 300 gals/yr
                                                                                         PAINTED
                                                                                         WIDGETS
                                                  17
Writing a Waste Reduction Plan
                                                       18
                                                              Steps to Writing a Waste Reduction Plan
                                                  19
Writing a Waste Reduction Plan
Quantity _______________________________________________________________
    How much reduction is realistic? Over what period of time? (This is your waste reduction
    goal for this waste stream.)
List positive and negative impacts on the environment or on employee health and safety.
Products affected:
                                                         20
                                                              Steps to Writing a Waste Reduction Plan
                                                  21
Writing a Waste Reduction Plan
                                                     22
                                                                 Steps to Writing a Waste Reduction Plan
                                                     23
Writing a Waste Reduction Plan
                                          Waste #1                              Waste #2
                            Change to nonhazardous raw material        Improve inventory control
         Options            Reclaim waste on site                      Rotate stock
         available          Reclaim waste off site                     Return to vendor
                                                                        Change to water-based
       Once you have determined the most feasible options, you may go ahead and put them into use.
   Bear in mind, however, that as technology and economic conditions change, so may the feasibility
   and effectiveness of your waste reduction program. Therefore, you should keep all options open and
   review them on a regular basis.
                                                    24
                                                      Steps to Writing a Waste Reduction Plan
      DO IT NOW! Complete all items in the form below, then rank your waste
       reduction options.
Waste #1 Waste #2
2. Costs
4. Reduction options
5. Technical feasibility
6. Economic feasibility
7. Selected option(s)
8. Reduction goal
9. Target date
                                          25
Writing a Waste Reduction Plan
                                                        26
                                                               Steps to Writing a Waste Reduction Plan
                                                 27
Writing a Waste Reduction Plan
                                                       28
                                                                Steps to Writing a Waste Reduction Plan
in terms of the ratio of input materials consumption to production rate. These data are easier to
obtain although the measure is not direct.
    Measuring waste reduction with a ratio of waste quantity to material throughput or product
output is generally more meaningful for specific operations rather than for an entire facility. There-
fore, preserving the focus of the project when measuring and reporting progress is important. For
those operations without chemical reactions, measuring progress with the ratio of input material
quantity to material throughput or production rate may be helpful.
                                                  29
Writing a Waste Reduction Plan
                                                    30
                                                                   Updating Your Waste Reduction Plan
   The law requires all generators to review their waste reduction plan annually, and to complete a
waste reduction progress report. These will help you to:
    Analyze and quantify the progress made toward your goals.
    Amend your plan as needed, and explain any modifications made to the plan.
   The update must be completed by March 1 of each year, because this information is necessary to
complete the waste reduction questions in the Annual Report. Like your initial report, the annual
progress report is also considered confidential.
     Updating your plan is a bit like going through the original process, only in reverse:
         Step One:
            Review the employee involvement process. Is there a new waste reduction
            process that needs explaining? Are there new employees who need training? Are
            employees still actively involved in offering suggestions for waste reduction?
         Step Two:
            Conduct another waste assessment. Are there new hazardous wastes? Have any
            wastes been eliminated? Have the costs changed? Update the forms on pages 17,
            20 and 25.
         Step Three
            Reevaluate the options. Are there new options previously not considered? Are
            any of the options previously rejected now feasible?
         Step Four:
            Reexamine the scope of your plan. Have products, processes or waste streams
            changed significantly? Should your plan be broadened? Or should it be more
            focused?
         Step Five:
            Renew the management commitment. While it is not required that managers
            sign the policy statement again (unless there has been a change in leadership),
            their signature on the updated plan demonstrates their continued support.
                                                  31
Writing a Waste Reduction Plan
       In your annual update, you will calculate the amount of hazardous waste generated in the previ-
   ous calendar year. This amount will be reported in line 11 of the Annual Report of Hazardous Waste
   Activity that you file with the state of Tennessee. In line 12 of that report, you are asked to report the
   waste reduction ratio, the goal year ratio, and the goal year. These are calculated as follows:
           Actual Ratio:
                    total kilograms of this hazardous waste generated in previous year
                         number of standard units of production in the same year
           Goal Year Ratio:
                   estimated total kilograms of hazardous waste generated in goal year
                            estimated number of standard units of production
           Goal Year:
                                 the year you anticipate achieving this reduction
                                                 Examples
      A. Last year your company generated 2,393 kg of hazardous waste last year. Since the waste
         came from a cleanup process, you selected as your standard unit of production the number
         of cleanups. Last year, you conducted 23 cleanups. For a goal year of 2001, you expect to
         generate 2,000 kg of waste in he course of 30 cleanups.
              Actual Ratio:             2,393 kg                  = 104.4
                                       23 cleanups
              Goal Year Ratio:          2,000 kg                  =    66.7
                                       30 cleanups
              Goal Year:                 2001
      B. Your company generates a hazardous waste from a painting process. Last year, you gener-
         ated 5,000 kg of waste while painting 10,000 parts. Your goal in 2005 is to generate 5,500
         kg of waste while painting 17,000 parts. Your standard unit of production is the number
         of parts painted.
              Actual Ratio:                 5,000 kg              =     0.5
                                       10,000 parts painted
              Goal Year Ratio:              5,500 kg              =     0.3
                                       17,000 parts painted
              Goal Year:                      2005
                                                       32
                                                                                              Conclusion
Conclusion
    Congratulations! Youre well on your way to a waste reduction plan that can save your facility
significant money and resources while complying with regulations and safeguarding the environ-
ment. By following the steps outlined in this manual, you have also been following in the steps of
countless other Tennessee businesses that have seen the benefits of waste reduction planning.
   The Tennessee Hazardous Waste Reduction Act of 1990 may yet prove to be one of the most
beneficial laws ever written!
                                    Corporate
                               Waste Reduction Plan
                                      1999
                                App
                                   rov
                                      ed
                                                 33
Writing a Waste Reduction Plan
                   Appendix A:
                  The Tennessee
       Hazardous Waste Reduction Act of 1990
   This is an unofficial copy of the Tennessee Hazardous Waste Reduction Act of 1990 (TCA 68-212-301 et.
   seq.). This copy is provided for educational purposes only. For an official copy, contact TDEC or your legal
   counsel. The text of the law is available online at www.michie.com/resources/.
   AN ACT relative to hazardous waste reduction plans, and to amend Tennessee Code Annotated,
   Title 68, Chapter 212.
                                                        34
                                  Appendix A: The Tennessee Hazardous Waste Reduction Act of 1990
collected and treated in on-site wastewater treatment systems, the discharge of which is the subject of
a NPDES permit.
SECTION 68-212-303. As used in this act:
      (1) Board means the solid waste disposal control board as established by Tennessee Code
     Annotated, Section 68-31-111.
       (2) Commissioner means the Commissioner of Health and Environment or his authorized
       representative. (N.B., the commissioner of Health and Environment is now designated the
       Commissioner of Environment and Conservation.)
       (3) Department means the Department of Health and Environment. (N.B., the Depart-
       ment of Health and Environment is now the Department of Environment and Conservation.)
       (4) Large quantity generator means a generator who generates 2.2 pounds of acute hazard-
       ous waste, or two thousand two hundred (2,200) pounds or more of hazardous waste in any
       one (1) month.
       (5) Small quantity generator means any generator who generates between two hundred
       twenty (220) and two thousand two hundred (2,200) pounds of hazardous waste in any one
       (1) month.
       (6) Source reduction or waste reduction means the reduction or elimination of waste at
       the source, usually within a process, including process modifications, feedstock substitutions,
       improvements in feedstock purity, housekeeping and management practices, increases in the
       efficiency of machinery and on-site, closed-loop recycling, or any action that reduces the
       amount and toxicity of the waste exiting the production process.
       (7) Waste, or hazardous waste, or acute hazardous waste, means any hazardous waste as
       defined in Tennessee Code Annotated, Title 68, Chapter 212, Part 1, and the regulations
       promulgated pursuant thereto, and for which the generator is required to notify the depart-
       ment pursuant thereto, and for which the generator is required to notify the department
       pursuant to such regulations.
       However, for the purpose of this act only, these terms shall not include such wastes which
       result from the cleanup of contaminated sites or spills of hazardous material.
       (8) All other terms used in this part shall be defined as such terms are defined in Tennessee
       Code Annotated, Title 68, Chapter 212, Part 1 or in regulations promulgated pursuant to
       that part.
SECTION 68-212-304. (a) All large quantity generators shall complete a hazardous waste reduction
plan on or before January 1, 1992, and all small quantity generators shall complete a hazardous waste
reduction plan on or before January 1, 1994. Any generator first generating a hazardous waste stream
after December 31, 1989, or first becoming a hazardous waste generator after December 31, 1989,
shall determine whether he is a large quantity generator or a small quantity generator based on the
amounts generated during the initial twenty-four (24) months of generation of the hazardous waste
stream. Within the period ending twelve (12) months after this determination is made or by March
1 following the end of the twelve (12) month period, whichever is later, a hazardous waste reduction
plan shall be completed by large quantity generators (or until three-year period exceeds January 1,
1994, for small quantity generators). Upon completion of a plan, the generator shall maintain a
                                                  35
Writing a Waste Reduction Plan
   current copy of the plan at the generating facility. A generator shall determine whether he is a large
   quantity generator, based on the amount of waste generated during calendar year 1989.
   (b) For the purposes of this section and Section 305, a generator shall permit the commissioner or
   the commissioners designee to inspect the hazardous waste reduction plan. The generator shall
   permit any officer, employee or representative of the department at all reasonable times to have
   access to the plan. The generator shall furnish a copy of the plan upon request to the commissioner.
   SECTION 62-21-305. (a) A hazardous waste reduction plan shall include at least the following:
           (1) A dated and signed written policy articulating management support for the generators
           hazardous waste reduction plan;
           (2) The scope and objectives of the plan, including the evaluation of technologies, procedures
           and personnel training programs to insure that unnecessary waste is not generated and to
           encourage hazardous waste reduction. Specific goals shall be set for hazardous waste reduc-
           tion, as described in subsections (b) (c) and (d) of this section;
           (3) A description of technically and economically practical hazardous waste reduction op-
           tions to be implemented and a planned schedule for implementation. These options shall be
           based on an internal analysis of hazardous waste streams conducted to review individual
           processes or facilities and other activities where waste may be generated and identify opportu-
           nities to reduce or eliminate waste generation. Such analyses shall evaluate data on the types,
           amount and hazardous constituents of waste generated, where and why that waste was
           generated within production process or other operations, and potential hazardous waste
           reduction and recycling techniques applicable to those wastes;
           (4) A description of the hazardous waste accounting systems that identify waste management
           costs and factor in liability, compliance and oversight costs to the extent feasible;
           (5) A description of the employee awareness and training programs designed to involve
           employees to the maximum extent feasible in hazardous waste reduction planning and
           implementation;
           (6) A description of how the plan has been or will be incorporated into management prac-
           tices and procedures so as to insure an ongoing effort; and
           (7) Other information about generation of hazardous waste not requiring disclosure of
           proprietary information as the board may require by regulation.
   (b) As part of each plan developed under this act, a generator shall establish specific performance
   goals for the source reduction of each hazardous waste stream.
   (c) The specific performance goals established under subsection (b) of this section shall be quantita-
   tive goals, expressed in numeric terms. Whenever possible, the units of measurement should be in
   pounds (or tons) of waste generated per standard unit of production, as defined by the generator. If
   the establishment of numeric performance goals is not practical, the performance goals shall include
   a clearly stated list of actions designed to lead to the establishment of numeric goals as soon as
   practical.
   (d) As part of each plan developed under this act, each generator shall explain the rationale for each
   performance goal. Acts of God or other unforeseeable events beyond the control of the generator do
                                                      36
                                  Appendix A: The Tennessee Hazardous Waste Reduction Act of 1990
not have to be considered in setting goals. The rationale for a particular performance goal shall
address any impediments to hazardous waste reduction, including but not limited to the following:
       (1) The availability of technically practical hazardous waste reduction methods, including any
       anticipated changes in the future;
       (2) Previously implemented reductions of hazardous waste;
       (3) The economic practicability of available hazardous waste reduction may not be economi-
       cally practical include but are not limited to:
               (i) For valid reasons of prioritization, a particular company has chosen first to address
               other more serious hazardous waste reduction concerns;
               (ii) Necessary steps to reduce hazardous waste are likely to have significant adverse
               impacts on product quality; or
               (iii) Legal or contractual obligations interfere with the necessary step that would lead
               to hazardous waste reduction.
(e) The board, by rule, may provide for modifications and exclusions for small quantity generators
related to the kind of information to be included in the plan. The board may provide for exception
by rule for generators whose hazardous waste streams fluctuate widely due to contract work or
manufacturing orders.
(f ) A generator required to complete a hazardous waste reduction plan under subsection (a) of this
section may include as a preface to its initial plan:
       (1) An explanation and documentation regarding hazardous waste reduction efforts com-
       pleted or in progress before the first reporting date; and
       (2) An explanation and documentation regarding impediments to hazardous waste reduction
       specific to the individual facility.
SECTION 68-212-306. (a) All generators shall annually review their waste reduction plan and
complete a hazardous waste reduction progress report which shall:
       (1) Analyze and quantify progress made, if any, in hazardous waste reduction, relative to each
       performance goal established under Section 305(b); and
       (2) Set forth amendments, if needed, to the hazardous waste reduction plan and explain the
       need for the amendments.
(b) Except for the information reported to the department under Section 308, the annual progress
report shall be retained at the facility and shall not be considered a public record under Tennessee
Code Annotated, Title 10, Chapter 7, Part 5. However, the generator shall permit any officer, em-
ployee or representative of the department at all reasonable times to have access to the annual
progress report.
(c) Large quantity generators shall complete the first annual progress report required under subsec-
tion (a) of this section on or before March 1, 1993. Small quantity generators shall complete the first
annual progress report required under subsection (a) of this section on or before March 1, 1995.
                                                  37
Writing a Waste Reduction Plan
   SECTION 68-212-307. (a) The department may review a plan or an annual progress report to
   determine whether the plan or progress report reasonably contains the elements specified under Sections
   305 and 306 of this act. If a generator fails to complete a plan containing the elements required by
   Section 307, the department may notify the generator of the specific deficiencies. The department
   also may specify a reasonable time frame, of not less than ninety (90) days, within which the genera-
   tor shall modify the plan or progress report correcting the specified deficiencies.
   (b) If the Commissioner determines that a plan or progress report has not been modified to address
   the deficiencies identified, the commissioner may issue an order for correction to the responsible
   person, and this order shall be complied with within the time limit specified in the order. Such order
   shall be served by personal service or shall be sent by certified mail, return receipt requested. Investi-
   gations made in accordance with this section may be made on the initiative of the commissioner or
   board. Prior to issuance of any order or the execution of any other enforcement action, the commis-
   sioner may request the presence of the alleged violator of this part at a meeting to show cause why
   enforcement action ought not to be taken by the department.
   (c) Any order issued pursuant to subsection (b) of this section shall be subject to review in the same
   manner as for orders under Tennessee Code Annotated, Section 68-212-113.
   SECTION 68-212-308. (a) Based on the annual progress report prepared pursuant to Section 306
   of this act, each generator shall submit summary information on waste reduction activities to the
   department, as an element of the annual generator report submitted to the department.
   (b) The summary shall include:
           (1) For each hazardous waste stream, one of the following, as appropriate;
                   (A) A statement of specific performance goals, and a report on the progress made in
                   achieving these goals, and a report on the progress made in achieving these goals. The
                   results should be reported numeric terms, as set forth in Section 305(c) or goals; and
                   (B) A report on the actions taken toward establishing numeric goals.
           (2) A narrative explaining the reported data; and
           (3) A description of any impediments to reducing the generation of hazardous waste.
   (c) The board, by rule, shall develop uniform reporting requirements for the data required under this
   section.
   SECTION 68-212-309. Any generator or person who:
           (1) fails to file any reports, records or documents required pursuant to this act;
           (2) who fails, neglects or refuses to comply with any provision of this act or any order issued
           pursuant to this act; or
           (3) who knowingly gives or causes to be given any false information in any reports, records,
           or documents required pursuant to this act; shall be subject to a civil penalty of up to ten
           thousand dollars ($10,000). Any such penalty shall be assessed in the same manner as in
           Tennessee Code Annotated, 68-212-114. Each day such violation continues shall constitute a
           separate offense.
                                                       38
                                  Appendix A: The Tennessee Hazardous Waste Reduction Act of 1990
SECTION 68-212-310. Subject to available funding, the department may contract to make techni-
cal assistance available to assist generators and the department in carrying out the provisions of this
act. The assistance shall emphasize strategies to encourage hazardous waste reduction.
SECTION 68-212-311. A plan or annual progress report developed pursuant to this act and main-
tained at the generating facility shall not be considered a public record under Tennessee Code Anno-
tated, Title 10, Chapter 7, Part 5. The board shall establish procedures to insure that information
supplied to the department, as provided by this part, and defined as proprietary by regulation, is not
revealed to any person without the consent of the person supplying such information. However, the
summary information on waste reduction activities submitted to the department may be utilized by
the commissioner, the board, the department, the United States Environmental Protection Agency,
or any authorized representative of the commissioner or the board in connection with the responsi-
bilities of the department or board pursuant to this part or as necessary to comply with federal law.
SECTION 13. Tennessee Code Annotated, Section 68-212-205(d)(1) is amended by adding the
following as a new item to be appropriately designated:
() To review waste reduction plans prepared pursuant to this chapter;
SECTION 14. Tennessee Code Annotated, Section 68-212-205(b), is amended by deleting the
following language:
Provided, however, that such fund shall not be used for hiring personnel for continuing programs of
the Department of Health and Environment pursuant to part 1 of this chapter or for any long term
research activities.
SECTION 68-212-312. In addition to all other enumerated powers in Tennessee Code Annotated,
Title 68, Chapters 31 and 212, the board is authorized to promulgate rules and regulations to
effectuate the purpose of this act, and to hear appeals from orders or assessments issued by the
commissioner pursuant to this part. All such rules and regulations shall be promulgated in accor-
dance with the provisions of Tennessee Code Annotated, Title, Chapter 5.
SECTION 16. This act shall take effect on July 1, 1990, the public welfare requiring it.
                                                  39
Writing a Waste Reduction Plan
                           Appendix B:
                    Sample Waste Reduction Plan
                                           Company ABC
                                           Anytown, USA
                                  WASTE REDUCTION PLAN
                                                   Preface
      Company ABC is committed to protecting the environment. Following the enactment of the
   Tennessee Hazardous Waste Reduction Act, we at Company ABC implemented the following
   processes and procedures to reduce waste.
   Parts Cleaning
       In 1993, Company ABC installed a Hotsy aqueous washer to replace a large solvent dip tank.
   Until it was removed a few years ago, the dip tank was used to clean parts that were too large for the
   parts cleaning tanks. The new Hotsy washer uses a nonhazardous detergent and hot water. No
   hazardous waste is anticipated from the new process.
       The Hotsy cleans parts effectively and timely. Most parts can be cleaned within a 10-minute
   cycle. We have successfully cleaned engine blocks, engine parts, transmissions and many other parts.
       The Hotsy runs on a timer so that the washer is turned off nights and weekends and automati-
   cally starts heating up prior to opening.
      The washer also has an oil skimmer to remove oil from the water. We expect the water to last for
   approximately six months, at which time we will determine if it can be discharged to the sanitary
   sewer. The washer is topped off with fresh water and soap as needed.
   Painting
       In 1992, Company ABC switched from purchasing premixed paints to a paint mixing process.
   Due to the many color and batch variations among auto body paints, we bought a large amount of
   paint. Paint was often wasted when it did small jobs that required little paint.
      ABC now has a system that mixes any color or batch of paint to match the automobile paint. We
   mix paint in various amounts, thereby reducing excess waste.
       In 1992, we also installed a gun cleaner that recirculates the solvent. Prior to installing this
   cleaner, our painters used a bucket of solvent and manually cleaned guns.
                                                       40
                                                            Appendix B: Sample Waste Reduction Plan
                                         Company ABC
                            Waste Reduction Policy Statement
    Company ABC is committed to playing a leadership role in protecting the environment. When-
ever feasible, we will eliminate, reduce, or recycle our waste in full compliance with all Federal and
State Regulations. Our employees are urged to participate in all types of waste reduction.
1999 update:
2000 update:
2001 update:
2002 update:
                                                  41
Writing a Waste Reduction Plan
                                             Company ABC
                                    Waste Reduction Objectives
       To comply with the Tennessee Waste Reduction Act and improve the environment, all employees
   of Company ABC will be involved in waste reduction. RCRA hazardous waste will be our first
   priority for waste reduction.
       Our goal is to reduce hazardous waste streams to the technically feasible and economically
   practicable minimum by the timetable noted in the contents of the plan. We will achieve these
   reductions through waste reduction assessments, procedure improvements, equipment changes,
   material substitution, employee training and other reduction methods.
                                             Company ABC
                                 Waste Reduction Administration
       The day shift foreman will act as the waste reduction coordinator for Company ABC. The waste
   reduction coordinator will administer the plan, prepare the annual progress report and update the
   plan needed.
      Waste reduction options will be evaluated by all foremen, the service director, the plant manager
   and applicable employees.
       Waste reduction can be achieved only with the cooperation of employees who work in the areas
   and processes where waste is generated. Therefore, all employees will be made aware of the need for
   waste reduction. Training will be incorporated into the Hazard Communication training. Employees
   will also be trained on operator-dependent waste reduction techniques.
       Waste costs are computed from the following costs:
        Cost of raw material lost to waste (if applicable).
        Labor.
        Waste transportation/treatment/disposal.
        Laboratory fees (if applicable).
                                                      42
                                                            Appendix B: Sample Waste Reduction Plan
                                         Company ABC
                                    Waste Reduction Plan
                                                  43
Writing a Waste Reduction Plan
                                                      44
                                                            Appendix B: Sample Waste Reduction Plan
    1999                 0.85                 1997     Purchased new spray guns which are easier to
                                                       clean, requiring less solvent for cleanups.
    2000                 0.75
                                              1998     No changes.
    2001                 0.75                 1999     Lowered goal for 2000-2001 to 0.75; lowered
    2002                 0.70                          goal for 2002 to 0.70.
                                                45
Writing a Waste Reduction Plan
                                                       46
                                                           Appendix B: Sample Waste Reduction Plan
                                                 47
Writing a Waste Reduction Plan
                      Appendix C:
              Waste Reduction Plan Checklist
              An explanation or rationale for each performance goal and any specific impedi-
               ments to obtaining that goal.
              A description of your accounting system for tracking and managing waste man-
               agement costs (e.g., raw material loss, labor, compliance and liability costs).
                                                    48
                                                                   Appendix D: Waste Reduction Resources
                          Appendix D:
                   Waste Reduction Resources
                            University of Tennessee
                          Center for Industrial Services
                                           T.C. Parsons, Director
                                    Albert Tieche, Director
                              Waste Reduction Assistance Program
                                  226 Capitol Boulevard, Suite 606
                                     Nashville, TN 37219-1804
                                          Phone: (615) 532-8657
                                           Fax: (615) 532-4937
                                             www.cis.utk.edu
                                   Field Representatives
1.   Memphis Office                   2.    Jackson Office                 3.   Nashville Office
     Al Cash                                Russell Toone                       Norma Wilcox
     3606 Austin Peay Hwy., #200            605 Airways Blvd., Suite 109        226 Capitol Blvd., Ste. 606
     Memphis, TN 38128                      Jackson, TN 38305                   Nashville, TN 37219-1804
     Phone: (901) 387-1648                  Phone: (901) 423-3710               Phone: (615) 532-8657
     Fax: (901) 387-5466                    Fax: (901) 425-4771                 Fax: (615) 532-4937
                                                     49
                                                               Appendix D: Waste Reduction Resources
Bibliography
Georgia Tech Research Institute. Georgia Pollution Prevention Guide. Atlanta, GA: Georgia Tech Re-
       search Institute, 1990. 404-894-3806.
Minnesota Office of Waste Management. Minnesota Guide to Pollution Prevention. Saint Paul, MN:
      Minnesota Office of Waste Management, 1991. 612-649-5750.
North Carolina Pollution Prevention Pays Program. Developing and Implementing a Waste Reduction
      Program. Selected References on Developing a Waste Reduction Program. Raleigh, NC: De-
      partment of Natural Resources and Community Development, 1988. 800-476-8686.
Oregon Department of Environmental Quality. Benefiting from Toxic Substance and Hazardous Waste
      Reduction. Portland, OR: Oregon Department of Environmental Quality, 1990. 503-229-5913
United States Environmental Protection Agency. The EPA Manual for Waste Minimization Opportunity
       Assessments. EPA/600/2-88-025. Cincinnati, OH: US EPA ORD Pollution Prevention Research
       Branch, 1988. 513-569-7215.
United States Environmental Protection Agency. Waste Minimization: Environmental Quality with Eco-
       nomic Benefits. EPA/530-SW-87-026. Washington, DC: US EPA Office of Solid Waste and
       Emergency Response, 1987. 800-369-5888.
University of Tennessee Center for Industrial Services. Waste Reduction Assessment and Technology Trans-
       fer Training Manual, Second Edition. Nashville, TN: UT-CIS, 1989. 615-532-8657.
                                                   51
                                              NOTICE
    This handbook, Writing a Waste Reduction Plan, has been prepared by the Tennessee
Manufacturing Extension Program of The University of Tennessee Center for Industrial Services
(CIS). Neither the publishers of this handbook nor any persons acting on their behalf:
     a. make any warranty or representation, expressed or implied, with respect to the use of any
information, apparatus, method or process disclosed in this document; or
     b. assume any liability with respect to the use of, or from damages resulting from, the use of
any information, apparatus, method or process disclosed in this document.
      The material offered in this handbook is not intended to be a recommendation of any par-
ticular environmental compliance strategy. Rather, this handbook is offered for educational and
informational purposes and is advisory only. Compliance with environmental and occupational
safety and health laws is the responsibility of each individual business. When using this hand-
book or when making any decision concerning compliance or waste reduction, it is highly rec-
ommended that the particular facts and circumstances be reviewed by appropriately trained
professionals and consultants. This document does not necessarily reflect the views and policies
of CIS or the Tennessee Department of Environment and Conservation (TDEC). The use of
specific brand names or products should not be construed as an endorsement by CIS or TDEC.
     CIS and TDEC are equal opportunity, affirmative action employers. TDEC ensures the
benefits of its state-assisted programs are available to all eligible persons regardless of race,
color, national origin, handicap, age or veteran status.
    This material may be used, in whole or in part, without permission. As such, it may not be
copyrighted in any form. When copying, please include this NOTICE and acknowledge the
Tennessee Manufacturing Extension Program and the Tennessee Department of Environment and
Conservation.