PT. MB.
RIZKY SUKSES Job No Rev
Provision Welding & Cold Cutting Services PT.MBRS
4600004461 Part
Ref
Job Title : Hanging Scaffolding (Blasting & Painting Maintenance) By: Ismail Prasetya Date : 11 Okt 2017
Client TOTAL EP INDONESIE Chd
File Hanging Scaffolding
3 Mtr
3 Mtr
3 Mtr
2Mtr
Metal Deck 3mtr
3Mtr
40 cm
60 cm
Brace 3 mtr
PT. MB. RIZKY SUKSES Job No Rev
Provision Welding & Cold Cutting Services PT.MBRS
4600004461 Part
Ref
Job Title : Hanging Scaffolding (Blasting & Painting Maintenance) By: Ismail Prasetya Date : 11 Okt 2017
Client TOTAL EP INDONESIE Chd
File Hanging Scaffolding
DEAD LOAD
NO Item Description Length Diameter Quantity Weight Remark
1 Floor Dead Load
- Scaffold Pipe 3 M 48,3 mm 12 Ea 145.8 Kg
- Scaffold Pipe 2 M 48,3 mm 2 Ea 16.2 Kg
- Scaffold Pipe 0.6 M 48,3 mm 10 Ea 24.3 Kg
- ToeBoard 3 M L : 30 cm 4 Ea 21.2 Kg
- Metal Deck 3 M L : 30 cm 4 Ea 18.8 Kg
2 Support & Brace
- Scaffold Pipe 3 M 48.3 mm 11 133.65 Kg
Total Dead Load 359.95 KG
LIVE LOAD
Load Min Ht. Max Ht. Min X Max X Min Y Max Y
2
(N/mm ) (m) (m) (m) (m) (m) (m)
-0.000 3.000 3.000 3.000 3.000 3.000 3.000
Live Load Quantity Weight Total
1. Personnel 4 80 320 Kg
PT. MB. RIZKY SUKSES Job No Rev
Provision Welding & Cold Cutting Services PT.MBRS
4600004461 Part
Ref
Job Title : Hanging Scaffolding (Blasting & Painting Maintenance) By: Ismail Prasetya Date : 11 Okt 2017
Client TOTAL EP INDONESIE Chd
File Hanging Scaffolding
Calculation
3 Mtr
Beam Clamp
3 Mtr
3 Mtr
2Mtr
Metal Deck 3mtr
3Mtr
40 cm
60 cm
Brace 3 mtr
Safety Factor
Item of Description Quantity Total Safety Factor (8)
Beam Clamp Rendez@30 8 32000 Kg 32000/8 = 4000 Kg
KN = 3000 Kg
Dead Load Live Load Safety Factor
359,95 Kg 320 Kg 4000Kg
Note : Pemasangan scaffolding ini dilakukan dibawah platform, untuk mengakses chasing yang akan di lakukan blasting
& painting, oleh karena itu pemasangan scaffolding gantung / Hanging Scaffolding, semua beban terletak pada
kekuatan Clamp Beam.