Safety Guide for Working at Height

The document provides a job safety analysis for working at heights at PT. Viking Engineering. It identifies potential hazards such as falls, falling objects, improper use of safety equipment, and electrical issues. It recommends controls like using fall protection harnesses when working over 1.8 meters, inspecting scaffolding, limiting work to certified personnel, properly attaching safety hooks, providing fall rescue plans, and installing electric protections like ELCBs. The analysis is intended to help supervisors and workers safely complete tasks working at heights.

Uploaded by

Dedy Kurniawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
398 views4 pages

Safety Guide for Working at Height

The document provides a job safety analysis for working at heights at PT. Viking Engineering. It identifies potential hazards such as falls, falling objects, improper use of safety equipment, and electrical issues. It recommends controls like using fall protection harnesses when working over 1.8 meters, inspecting scaffolding, limiting work to certified personnel, properly attaching safety hooks, providing fall rescue plans, and installing electric protections like ELCBs. The analysis is intended to help supervisors and workers safely complete tasks working at heights.

Uploaded by

Dedy Kurniawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PT.

VIKING ENGINEERING
Prepared by / Disiapkan oleh: Approved by / Disetujui Issue / Date Issued / Tanggal Document No / No. Dokumen :
oleh : Terbitan : 1 Penerbitan :
HSE Manager / Manajer K3L Director / Direktur Revision / 01 Feb 2016 Form VB / CL 02
Revisi : 0

Document Title / Judul JOB SAFETY ANALYSIS / ANALISA


Pg/Hal 1 of/dari 4
Dokumen KESELAMATAN KERJA
Job Description/ Department / Departemen Production & Facilities
WORKING AT HEIGHT
Deskripsi Pekerjaan Ref No./ No. Ref VB/RA/16 2.0
Location / Lokasi PTVE BATAM Date / Tanggal Oct 18,2017

Job Step Hazards Control


Action Party /
(Sequence of Activity) / (Potential Risk) / (Recommended Measures)
No Pendukung
Langkah Kerja Bahaya (Potensi Resiko) Pengendalian
Tindakan
(Urutan Kegiatan) (Rekomendasi Tindakan)

1 Preparation: Human Performance - Ensure the PTW issued is compatible with the activity Supervisor
Preparation of - Human Error (Issued Wrong - Ensure all persons involved pay attantion on the discussion
procedures. (PTW, PTW, Not focus on JSA - Use loud and clear sound
JSA and Toolbox Talk/ discussion, Sound not clear - Use understood language on the discussion
Meeting) on JSA and TBT discussion - PTW Working at Height must issue if working above 1.8 meter refer to
Persiapan: and missundertand the Company Instruction Manual doc no : VB/CIM/03/16 section 3.0
Persiapan prosedur- discussion) - Pastikan PTW yang diterbitkan sesuai dengan pekerjaannya
prosedur (PTW, JSA Kinerja Manusia - Pastikan seluruh pekerja memperhatikan pembahasannya
dan Toolbox Talk/ - Kesalahan Manusia - Gunakan suara yang keras dan jelas
Meeting) (Menerbitkan PTW yang - Gunakan bahasa yang dipahami saat diskusi
salah, Tidak fokus saat - Surat izin bekerja diketinggian harus diterbitkan jika bekerja diatas 1.8
pembahasan JSA, Suara meter, mengacu kepada Panduan Instruksi Perusahaan doc no :
tidak jelas saat membahas VB/CIM/03/16 section 3.0
JSA dan TBT, dan salah
mengerti pembahasan)
PT. VIKING ENGINEERING
Prepared by / Disiapkan oleh: Approved by / Disetujui Issue / Date Issued / Tanggal Document No / No. Dokumen :
oleh : Terbitan : 1 Penerbitan :
HSE Manager / Manajer K3L Director / Direktur Revision / 01 Feb 2016 Form VB / CL 02
Revisi : 0

Document Title / Judul JOB SAFETY ANALYSIS / ANALISA


Pg/Hal 2 of/dari 4
Dokumen KESELAMATAN KERJA
2 Working at Height Gravity: - To used full body harness anytime working above 1.8M height. Supervisor
activity / - Slip, Trip, Fall (Personal) - When use scaffolding, ensure the scaffolding inspected and in good
Aktifitas bekerja - Falling Object order to use.
diketinggian : Gravitasi : - Only certified person do the working at height activity.
- Terpeleset, terjatuh (orang) - Ensure the hook was hooked properly.
- Benda terjatuh - Check and ensure the hooked point in good condition.
- To secure all the portable tools/ equipment to prevent it from falling.
- Provide one standby watcher to monitor condition of worker who
working at height.
- Barricade working area to prevent un-authorized person entering the
working area.
- Provede rescue plan before start the activity
- Menggunakan Full Body harness ketika bekerja diatas ketinggian 1.8m
- Ketika menggunakan perancah, pastikan perancah tersebut telah di
inspek dan dalam kondisi baik sebelum digunakan
- Hanya pekerja yang tersertifikasi yang dibenarkan bekerja diketinggan.
- Pastikan kait telah terkait dengan benar.
- Cek dan pastikan bahwa tempat pengkait dalam kondisi yang bagus
- Sediakan satu orang untuk mengawasi pekerja dimana pekerja bekerja
diketinggian
- Barikade area kerja untuk mencegah orang yang berkepentingan
masuk kedalam area kerja
- Sediakan rencana keselamatan sebelum aktifitas dimulai
PT. VIKING ENGINEERING
Prepared by / Disiapkan oleh: Approved by / Disetujui Issue / Date Issued / Tanggal Document No / No. Dokumen :
oleh : Terbitan : 1 Penerbitan :
HSE Manager / Manajer K3L Director / Direktur Revision / 01 Feb 2016 Form VB / CL 02
Revisi : 0

Document Title / Judul JOB SAFETY ANALYSIS / ANALISA


Pg/Hal 3 of/dari 4
Dokumen KESELAMATAN KERJA
Motion: - Ensure you stable enough before start doing the job.
- Body Positioning - Pastikan anda cukup stabil sebelum memulai pekerjaan
Gerakan :
- Posisi tubuh

Electrical: - Ensure no electric power on the scaffolding.


- Electric transformers - When scaffolding become a support for electrical cables, ensure the
Listrik : cables not torned. Any otjer electrical protection ELCB (electrical leakage
Transformer Listrik circuit breaker) Installed to the panel or RCB (residue circuit breaker)
- Pastikan tidak ada aliran listrik diperancah
- Ketika perancah dijadikan tempat meletakkan kabe listrik , pastikan kabel
tersebut tidak sobek/koyak. Proteksi listrik ELCB lainnya (permutus arus
listrik) diinstal kepanel atau RCB (residue circuit breaker)

Review & Recommendation for improvements to this JSA/


Tinjauan & Rekomendasi untuk pengembangan JSA :
PT. VIKING ENGINEERING
Prepared by / Disiapkan oleh: Approved by / Disetujui Issue / Date Issued / Tanggal Document No / No. Dokumen :
oleh : Terbitan : 1 Penerbitan :
HSE Manager / Manajer K3L Director / Direktur Revision / 01 Feb 2016 Form VB / CL 02
Revisi : 0

Document Title / Judul JOB SAFETY ANALYSIS / ANALISA


Pg/Hal 4 of/dari 4
Dokumen KESELAMATAN KERJA

Work Personnel Members/ Anggota Kelompok Kerja


Name Designation Name Designation
Nama Jabatan Nama Jabatan
Jines Silaban Supervisor

Sabarudin HSE Inspector

Prepared by : Reviewed by:

Dedy Kurniawan Mual Sihombing


HSE Lead Div Project Manager