Work Clearance: Construction Aycqc

This document is a work clearance for the ISFB Industrial Support Facility project. It details installations in mechanical, telecom, and plumbing disciplines. The installations were executed and completed by AYC site engineers and inspected by AYC quality control personnel. The clearance acknowledges the work but notes it is an internal document and does not replace inspections or approvals needed from the project owner.

Uploaded by

moytabura96
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views4 pages

Work Clearance: Construction Aycqc

This document is a work clearance for the ISFB Industrial Support Facility project. It details installations in mechanical, telecom, and plumbing disciplines. The installations were executed and completed by AYC site engineers and inspected by AYC quality control personnel. The clearance acknowledges the work but notes it is an internal document and does not replace inspections or approvals needed from the project owner.

Uploaded by

moytabura96
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

DISCIPLINE:

WORK CLEARANCE

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

CONSTRUCTION AY C QC

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 1 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and
DISCIPLINE:

WORK CLEARANCE MECHANICAL

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

AYC Site Engineer - MECHANICAL AYC QC - MECHANICAL

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 2 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and
DISCIPLINE:

WORK CLEARANCE TELECOM

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

AYC Site Engineer - TELECOM AYC QC - TELECOM

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 3 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and
DISCIPLINE:

WORK CLEARANCE PLUMBING

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

AYC Site Engineer - PLUMBING AYC QC - PLUMBING

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 4 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.