Line Set Up Sop

1. The SOP outlines the print setup process which requires an authorized QC person to monitor the operator. 2. The QC person is responsible for approving the correct print position, font size, matter and legibility on trial containers, as well as documenting the number of containers wiped and reprinted. 3. Final approval of the commercial production is given by the QC head and unit manager once the QC person is satisfied with the print quality on trial containers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views3 pages

Line Set Up Sop

1. The SOP outlines the print setup process which requires an authorized QC person to monitor the operator. 2. The QC person is responsible for approving the correct print position, font size, matter and legibility on trial containers, as well as documenting the number of containers wiped and reprinted. 3. Final approval of the commercial production is given by the QC head and unit manager once the QC person is satisfied with the print quality on trial containers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

SOP FOR PRINT SET UP

1. Authorised QC person to be
physically present during the set up
process to monitor the operation.
2. The operation is done by the
operator.
3. QC shall make sure to keep the
TRIAL containers separate, wipe the
containers of the defective trial print.
4. QC to confirm the correct print, in
terms of position, font size, matter and
legibility.
5. QC shall give approval for
commercial production.
6. QC shall make sure that the wiped
containers are printed with the right
matter in terms of position, font size,
and legibility.
7. QC shall document the approval by
indicating the number of containers
wiped and reprinted.
8. This is responsibility of QC and
operator has to just follow the
instruction of QC
LINE SET UP APPROVAL

DATE

SHIFT

MACHINE NO

PRODUCT

GRADE & PACK SIZE

OPERATOR NAME

FLUSHING SET UP
FLUSHING REQUIRED / NOT REQUIRED
FLUSHING QUANTITY
NAME OF QC PERSON
APPROVAL AFTER
FLUSHING
NOZZLE SET UP
STROKE 1 STROKE STROKE STROKE STROKE APPROVAL
2 3 4 5
NOZZLE 1

NOZZLE 2

NOZZLE 3

NOZZLE 4
NOZZLE 5

NOZZLE 6

INDUCTION SEAL SET UP


CURRENT SETTNG(no.) HEIGHT SETTING( cm) SPEED(bottle /min)

SEAL CHECK SAM SAM 2 SAM 3 SAM 4 SAM 5 APPROVAL


1
RESULT OF SAMPLE
CHECK(OK/NOT OK)
PRINT SET UP
MRP MFD ( MONTH & YEAR
)
BATCH. NO FONT SIZE

NO OF CONTAINERS USED
IN TRIAL
HAS THE TRIAL YES/NO IF YES, BY WHOM- NAME
CONTAINERS WIPED &
REPRENTED
APPROVED BY QC SIGN

QC HEAD SIGN

UNIT MANAGER SIGN