References : Urban Stormwater management manual
Table of Average Rainfall Intensity (mm/hr)
for Kuala Lumpur referred to table 13.A1
For Rainfall Duration > 30 minutes
referred to equation 13.2
                                                                          Storm Duration         , tc (mins)
ARI (year)      15    18     20     22    24      26   28   30     32       33      37    38      40     42    44     46     48     50       52      54    56       58
     2        139.5 128.6   122.3 116.7 111.6 107.0 102.9   99.0   95.5    93.8    87.8   86.4   83.8   81.4   79.1   76.9   74.9   73.0    71.2    69.5   67.8    66.3
     5        166.5 153.6   146.2 139.4 133.3 127.7 122.6 117.9 113.5 111.5 104.1 102.4          99.1   96.1   93.3   90.6   88.1   85.8    83.5    81.4   79.4    77.5
    10        182.5 169.0   161.1 153.8 147.1 141.1 135.5 130.4 125.6 123.4 115.2 113.3 109.7 106.4 103.3 100.4              97.6   95.0    92.5    90.2   88.0    85.9
    20        199.8 185.0   176.2 168.2 160.9 154.2 148.1 142.4 137.2 134.7 125.7 123.7 119.8 116.1 112.7 109.4 106.4 103.5                100.8    98.3   95.8    93.5
    50        217.3 202.1   192.9 184.4 176.6 169.4 162.8 156.6 151.0 148.3 138.4 136.2 131.9 127.8 124.1 120.5 117.2 114.0                111.0 108.2 105.5      103.0
   100        240.5 223.2   212.8 203.3 194.5 186.5 179.1 172.2 165.9 162.9 152.0 149.5 144.8 140.3 136.1 132.2 128.5 125.0                121.7 118.6 115.7      112.9
For Short Rainfall Duration < 30 minutes
referred to equation 13.3, 13.4 and table 13.3
value of 2P24h=     100 (KUALA LUMPUR).
                                                                                  Storm Duration        , tc (mins)
ARI (year)       5      6      7     8     9      10   11   12     13       14      15    16      17     18    19     20     21     22       23      24    25       26
     2        212.5 201.5 193.7 187.8 183.3 179.6 171.3 164.4 158.5 153.5 149.1 143.6 138.7 134.4 130.5 127.0 123.0 119.4                  116.0   113.0 110.2    107.6
     5        288.1 266.9 251.8 240.5 231.7 224.6 213.0 203.3 195.1 188.1 182.0 174.8 168.4 162.7 157.7 153.1 148.1 143.5                  139.3   135.5 132.0    128.7
     10       315.3 292.7 276.5 264.4 255.0 247.4 234.7 224.1 215.2 207.5 200.9 192.9 185.9 179.7 174.2 169.2 163.6 158.6                  154.0   149.8 145.9    142.3
     20       352.4 325.8 306.9 292.7 281.6 272.8 258.5 246.6 236.6 228.0 220.5 211.7 203.9 197.0 190.8 185.3 179.2 173.6                  168.5   163.9 159.6    155.6
     50       385.3 356.6 336.1 320.8 308.8 299.3 283.7 270.7 259.8 250.3 242.2 232.5 224.0 216.5 209.7 203.6 196.9 190.8                  185.2   180.1 175.4    171.1
    100       432.3 398.8 374.9 356.9 342.9 331.8 314.2 299.6 287.2 276.6 267.4 256.7 247.2 238.7 231.2 224.4 217.0 210.2                  204.0   198.3 193.1    188.3
  60
 64.8
 75.7
 83.9
 91.3
100.5
110.2
  27      28      29      30
105.2   103.0   101.0   99.0
125.7   122.9   120.3   117.9
139.0   135.9   133.0   130.4
152.0   148.6   145.4   142.4
167.1   163.4   159.9   156.6
183.8   179.7   175.8   172.2
                                                                                         'file:///conversion/tmp/scratch/370956013.xls'#$MD (R
                                        JURUTERA PERUNDING TEGAP SDN. BHD.
           PROJECT : 06186                                                           Designed :
page       Main Drain A1 Compuation                                                  Date       :
   of      post-development discharge computaion - Catchment A1                      Checked :
    REF.                                                CALCULATION
                                                  0.3 FB        TWL
                                                                                Box Culvert
                                                   D
                                                            W
                                                                                       Pudu Cut Drain
           Box culvert Capacity computation                                                 area,Ap =
                                                                                       perimeter, Pp =
           depth,             D=           1.35        m without FB
           width,             W=           1.20        m
           Area,              A =          1.78        m2
           perimeter,         P =          4.02        m
                              R=           0.44        m
           drain gradient , S =1/           300
                             n=            0.015       (for lined concrete drain)
           discharge, Q =                  3.98        m3/s       > required. OK.
           velocity, V =                   2.24        m/s        < 4.0 m/s. OK
           top water lever TWL =           1.76        m              100 years storm Q100,post
           top water lever TWL =           1.39        m                  10 years storm Q10,post
           top water lever TWL =           1.23        m                   5 years storm Q5,post
           Thus, Proposed 2.4 x 1.8 m PC Box Culvert
           (include 0.3 free board)
                                                                                      'file:///conversion/tmp/scratch/370956013.xls'#$MD (R
                                          JURUTERA PERUNDING TEGAP SDN. BHD.
          PROJECT : 06186                                                          Designed :
page      Main Drain A2 Compuation                                                 Date       :
   of     post-development discharge computaion - Catchment A2                     Checked :
   REF.                                              CALCULATION
                                     0.3 FB        TWL
                                                                     Box Culvert
                                      D
                                              W
                                                                                     Pudu Cut Drain
                                                                                          area,Ap =
          Box culvert Capacity computation                                           perimeter, Pp =
          depth,             D=            1.80     m      without FB
          width,             W=            2.10     m
          Area,              A =           4.95     m2
          perimeter,         P =           4.65     m
                             R=            1.06     m
          drain gradient , S =1/            500
                            n=             0.015
          discharge, Q =                  15.39     m3/s         > required. OK.
          velocity, V =                    3.11     m/s          < 4.0 m/s. OK
          top water lever TWL =            1.51     m             100 years storm Q100,post
          top water lever TWL =            1.11     m                 10 years storm Q10,post
          top water lever TWL =            1.01     m                   5 years storm Q5,post
          Thus, Proposed 2.1 x 1.8 m PC Box Culvert
          (include 0.3 free board)
 'file:///conversion/tmp/scratch/370956013.xls'#$MD (RSD)
SDN. BHD.
signed :                           YauTY
 e       :                         Jun-06
ecked :
                                       OUTPUT
                        0.16       m
                        1.17       m
                         =          8.82 m3/s
                         =          6.19 m3/s
                         =          5.27 m3/s
 'file:///conversion/tmp/scratch/370956013.xls'#$MD (RSD)
SDN. BHD.
signed :                           YauTY
 e       :                         Jun-06
ecked :
                                       OUTPUT
                        0.16       m
                        1.17       m
                         =          6.87 m3/s
                         =          4.63 m3/s
                         =          4.04 m3/s
                                                                                                  'file:///conversion/tmp/scratch/370956013.xls'#$Catchm
                                 JURUTERA PERUNDING TEGAP SDN. BHD.
                                        d
           PROJECT : 06186                                                                    Designed :
                                        r
page       Catchment Flow Compuation fora Main Drain A1                                       Date       :
   of           Existing Catchment A1   i                                                     Checked :
    REF.                                n      CALCULATION
           1.0                          a
                Post Development Catchment   Area
                Upstream Catchment Area gA1                                        A1=Forest Reserve = 33.23ac.
                                        e
                                                r
             1.1 Determine of time of concentration,         t
                                                e          up c (up stream)
                   for density grassed surface (n=0.060)
                                                s
                   average surface slopes =5%   e
      Design       overland flow distance = 50m r
                                                v                                                     to    =
  chart 14.1
                                                e
                   average velocity in open drain ,                 assumed v =                     2       m/s
                   natural channel,                                                                 Ld      =
                   drain flow time,                                                                td = Ld / (v x 60) =
                   thus,    time of concentration,                                              tc     =      t o+ t d =
           1.2 Determine rainfall intensity and Runoff Coefficient
                 Referred to Table of Average Rainfall Intensity (mm/hr) for short rainfall
                 duration for tc = 22mins
                     thus,
                 rainfall intensity for 5 years storm                                             I22
                                                                                                  5
                                                                                                                      =
                 rainfall intensity for 10 years storm
                                                                                                 10
                                                                                                   I22                =
                 rainfall intensity for 100 years storm
                                                                                                100
                                                                                                   I22                =
design chart Runoff Coefficient for Upstream catchment,                                          C5           =
    14.4     7   Park Lawns and Meadows                                                          C10          =
                                                                                                 C100         =
           1.6   Discharge flow computaion, Qpre , for Post-development
                 Q = (A1 x Cavg) x I22
                 Discharge flow for 5 years storm                                                 Q5,post =
                 Discharge flow for 10 years storm                                                Q10,post =
                 Discharge flow for 100 years storm                                             Q100,post     =
                                 JURUTERA PERUNDING TEGAP SDN. BHD.
                                        d
           PROJECT : 06186                                                                    Designed :
                                        r
page       Catchment Flow Compuation fora Main Drain A2                                       Date       :
   of           Existing Catchment A2   i                                                     Checked :
    REF.                                n      CALCULATION
           1.0                          a
                Post Development Catchment   Area
                Upstream Catchment Area gA2                                        A2=Forest Reserve = 33.23ac.
                                        e
                                                r
             1.1 Determine of time of concentration,         t
                                                e          up c (up stream)
                   for density grassed surface (n=0.060)
                                                s
                   average surface slopes =5%   e
      Design       overland flow distance = 50m r
  chart 14.1
                                                v                                                     to    =
                                                e
                   average velocity in open drain ,                 assumed v =                     2       m/s
                   natural channel,                                                                 Ld      =
                   drain flow time,                                                                td = Ld / (v x 60) =
                   thus,    time of concentration,                                              tc     =      t o+ t d =
           1.2 Determine rainfall intensity and Runoff Coefficient
                 Referred to Table of Average Rainfall Intensity (mm/hr) for short rainfall
                 duration for tc = 25mins
                     thus,
                 rainfall intensity for 5 years storm
                                                                                                  5
                                                                                                   I25           =
                 rainfall intensity for 10 years storm
                                                                                                 10
                                                                                                    I25          =
                 rainfall intensity for 100 years storm
                                                                                                 100
                                                                                                    I25          =
design chart Runoff Coefficient for Upstream catchment,                                          C5          =
    14.4       7   Park Lawns and Meadows                                                        C10         =
                                                                                                 C100        =
           Rainfall Intensity Based on I25 from section 1.2
           1.6 Discharge flow computaion, Qpre , for Post-development
                 Q = (A2 x Cavg) x I25
                 Discharge flow for 5 years storm                                                 Q5,post =
                 Discharge flow for 10 years storm                                                Q10,post =
                 Discharge flow for 100 years storm                                             Q100,post    =
version/tmp/scratch/370956013.xls'#$Catchment(RSD)
                     YauTY
                     Apr-06
                             OUTPUT
                       13.45        ha
                          17        mins
                         600        m
                          5         mins
                         22         mins
                      143.50          mm/hr
                      158.57          mm/hr
                      210.18          mm/hr
                        0.53
                        0.56
                        0.63
                        2.84        m3/s
                        3.32        m3/s
                        4.95        m3/s
YauTY
Apr-06
    OUTPUT
 17.42   ha
  17     mins
  100    m
   1     mins
  18     mins
131.96   mm/hr
145.87   mm/hr
193.11   mm/hr
 0.51
 0.53
 0.61
 3.26    m3/s
 3.74    m3/s
 5.70    m3/s
                                                                                   'file:///conversion/tmp/scratch/370956013.xls'#$Ex
                                   JURUTERA PERUNDING TEGAP SDN. BHD.
          PROJECT : 06186                                                 Designed :
page      Existing Main Drain Capacity Checking                           Date       :
   of                                                                     Checked :
   REF.                                    CALCULATION
                                    0.3 FB          TWL
                                                                      Box Culvert
                                     D
                                                W
                                                                         Pudu Cut Drain
          Box culvert Capacity computation                                    area,Ap =      0.16
                                                                         perimeter, Pp =     1.17
          depth,           D=            3.10       m without FB
          width,           W=            3.10       m
          Area,            A =        9.77          m2
          perimeter,       P =        9.42          m
                           R=         1.04          m
          drain gradient , S =1/       600
                           n=         0.015         (for lined concrete drain)
          discharge, Q =             27.25          m3/s        > required. OK.
          velocity, V =               2.79          m/s         < 4.0 m/s. OK
          Maximum Pond dischagre for 100 years storm =                    15.204 m3/s
file:///conversion/tmp/scratch/370956013.xls'#$ExtMD
SDN. BHD.
                   YauTY
                   Jun-06
                            OUTPUT
                   m
                   m
                                                                                              'file:///conversion/tmp/scratch/370956013.xls'#$
                                        JURUTERA PERUNDING TEGAP SDN. BHD.
           PROJECT : 06186                                                           Designed :
page       Main Drain A1 Compuation                                                  Date       :
   of      post-development discharge computaion - Catchment A1                      Checked :
    REF.                                                CALCULATION
                                                  0.3 FB        TWL
                                                                                Box Culvert
                                                   D
                                                            W
                                                                                       Pudu Cut Drain
           Box culvert Capacity computation                                                 area,Ap =
                                                                                       perimeter, Pp =
           depth,             D=           1.50        m without FB
           width,             W=           2.40        m
           Area,              A =          3.76        m2
           perimeter,         P =          5.52        m
                              R=           0.68        m
           drain gradient , S =1/           300
                             n=            0.015       (for lined concrete drain)
           discharge, Q =                 11.20        m3/s       > required. OK.
           velocity, V =                   2.98        m/s        < 4.0 m/s. OK
           top water lever TWL =           1.24        m              100 years storm Q100,post
           top water lever TWL =           0.93        m                  10 years storm Q10,post
           top water lever TWL =           0.82        m                   5 years storm Q5,post
           Thus, Proposed 2.4 x 1.5 m PC Box Culvert
           (include 0.3 free board)
                                                                                            'file:///conversion/tmp/scratch/370956013.xls'#$
                                          JURUTERA PERUNDING TEGAP SDN. BHD.
          PROJECT : 06186                                                          Designed :
page      Main Drain A2 Compuation                                                 Date       :
   of     post-development discharge computaion - Catchment A2                     Checked :
   REF.                                              CALCULATION
                                     0.3 FB        TWL
                                                                     Box Culvert
                                      D
                                              W
                                                                                     Pudu Cut Drain
                                                                                          area,Ap =
          Box culvert Capacity computation                                           perimeter, Pp =
          depth,             D=            1.50     m      without FB
          width,             W=            2.10     m
          Area,              A =           3.15     m2
          perimeter,         P =           5.10     m
                             R=            0.62     m
          drain gradient , S =1/            300
                            n=             0.015
          discharge, Q =                   8.79     m3/s         > required. OK.
          velocity, V =                    2.79     m/s          < 4.0 m/s. OK
          top water lever TWL =            1.24     m             100 years storm Q100,post
          top water lever TWL =            0.92     m                 10 years storm Q10,post
          top water lever TWL =            0.83     m                   5 years storm Q5,post
          Thus, Proposed 2.1 x 1.5 m PC Box Culvert
          (include 0.3 free board)
     'file:///conversion/tmp/scratch/370956013.xls'#$MD
SDN. BHD.
signed :                         YauTY
 e       :                       Jun-06
ecked :
                                     OUTPUT
                     0.16        m
                     1.17        m
                      =           8.82 m3/s
                      =           6.19 m3/s
                      =           5.27 m3/s
     'file:///conversion/tmp/scratch/370956013.xls'#$MD
SDN. BHD.
signed :                         YauTY
 e       :                       Jun-06
ecked :
                                     OUTPUT
                     0.16        m
                     1.17        m
                      =           6.87 m3/s
                      =           4.63 m3/s
                      =           4.04 m3/s
                                            xx
                                                                                                                 'file:///conversion/tmp/scratch/370956013.xls'#$C
                                       JURUTERA PERUNDING TEGAP SDN. BHD.
                                                  d
               PROJECT : 06186                                                                    Designed :
                                                  r
page           Catchment Flow Compuation          a                                               Date       :
   of                post-development discharge computaion
                                                  i        - Catchment A1                         Checked :
    REF.                                          n         CALCULATION
               1.0   Post Development Catchment   a      Area
                     Upstream Catchment Area g(A1-A1b)                                          A1a=Forest = 35.2ac.
                                                  e
                     Project Site (A1b)                                                  ( developed area ) = 17.2ac.
                                                r                                           Overall Catchment, A1 =
             1.1 Determine of time of concentration,               t
                                                e             up c (up stream)
                   for density grassed surface (n=0.060)
                                                s
                   average surface slopes =5%   e
      Design       overland flow distance = 50m r
                                                v                                                         to    =
  chart 14.1
                                                e
                   average velocity in open drain ,                       assumed v =                   2       m/s
                   natural channel,                                                                     Ld      =
                   drain flow time,                                                                    td = Ld / (v x 60) =
                   thus,    time of concentration,                                                  tc     =      t o+ t d =
               1.2 Determine rainfall intensity and Runoff Coefficient
                     Referred to Table of Average Rainfall Intensity (mm/hr) for short rainfall
                     duration for tc = 22mins
                         thus,
                     rainfall intensity for 5 years storm                                             I22
                                                                                                      5
                                                                                                                               =
                     rainfall intensity for 10 years storm
                                                                                                     10
                                                                                                       I22                     =
                     rainfall intensity for 100 years storm
                                                                                                    100
                                                                                                       I22                     =
design chart Runoff Coefficient for Upstream catchment,                                              C5                =
    14.4         7   Park Lawns and Meadows                                                          C10               =
                                                                                                     C100              =
               1. 3 Determine of time of concentration,             t
                                                                  dn c (down stream)
                     for bare soil surface (n=0.0275)
                     average surface slopes =0.5
      Design         overland flow distance = 50m
  chart 14.1                                                                                           to      =
                     average velocity in open drain ,                     assumed v =                 0.8      m/s
                     natural channel,                                                                  Ld      =
                     drain flow time,                                                                 td = Ld / (v x 60) =
                     thus,    time of concentration,                                                  tc         =          to+ td =
               1.4 Determine rainfall intensity and Runoff Coefficient
                     Referred to Table of Average Rainfall Intensity (mm/hr) for short rainfall
                     duration for tc = 16mins
                         thus,
                     rainfall intensity for 5 years storm                                             I16
                                                                                                      5
                                                                                                                               =
                     rainfall intensity for 10 years storm
                                                                                                     10
                                                                                                       I16                     =
                     rainfall intensity for 100 years storm
                                                                                                    100
                                                                                                       I16                     =
design chart Runoff Coefficient for Upstream catchment,                                              C5                =
    14.4         3   Semi-Detached Houses on Bare Earth                                              C10               =
                                                                                                     C100              =
                 1.5 Determine Average Runoff Coefficient
                                                                                                           C5 =
                                                                                                           avg
                     Cavg =      Ci Ai                                                                   C 10 =
                                                                                                          avg
                                 Ai                                                                  avg
                                                                                                          C 100 =
               Rainfall Intensity Based on I22 from section 1.2
               1.6   Discharge flow computaion, Qpre , for Post-development
                     Q = (A1 x Cavg) x I22
                     Discharge flow for 5 years storm                                                  Q5,post =
Discharge flow for 10 years storm      Q10,post =
Discharge flow for 100 years storm   Q100,post   =
                                       JURUTERA PERUNDING TEGAP SDN. BHD.
                                                  d
               PROJECT : 06186                                                                    Designed :
                                                  r
page           Catchment Flow Compuation          a                                               Date       :
   of                post-development discharge computaion
                                                  i        - Catchment A2                         Checked :
    REF.                                          n         CALCULATION
               1.0   Post Development Catchment   a      Area
                     Upstream Catchment Area g(A2-A2b)                                         A2a=Forest = 42.12ac.
                                                  e
                     Project Site (A2b)                                                    ( developed area ) = 7.1ac.
                                                r                                            Overall Catchment, A2 =
             1.1 Determine of time of concentration,            t
                                                e             up c (up stream)
                   for density grassed surface (n=0.060)
                                                s
                   average surface slopes =5%   e
      Design       overland flow distance = 50m r
                                                v                                                         to    =
  chart 14.1
                                                e
                   average velocity in open drain ,                    assumed v =                      2       m/s
                   natural channel,                                                                     Ld      =
                   drain flow time,                                                                    td = Ld / (v x 60) =
                   thus,    time of concentration,                                                  tc     =      t o+ t d =
               1.2 Determine rainfall intensity and Runoff Coefficient
                     Referred to Table of Average Rainfall Intensity (mm/hr) for short rainfall
                     duration for tc = 25mins
                         thus,
                     rainfall intensity for 5 years storm
                                                                                                      5
                                                                                                       I25                =
                     rainfall intensity for 10 years storm
                                                                                                     10
                                                                                                        I25               =
                     rainfall intensity for 100 years storm
                                                                                                     100
                                                                                                        I25               =
design chart Runoff Coefficient for Upstream catchment,                                              C5              =
    14.4       7   Park Lawns and Meadows                                                            C10             =
                                                                                                     C100            =
               1. 3 Determine of time of concentration,          t
                                                              dn c (down stream)
                     for bare soil surface (n=0.0275)
                     average surface slopes =0.5
      Design         overland flow distance = 50m
  chart 14.1                                                                                              to   =
                     average velocity in open drain ,                  assumed v =                    0.8      m/s
                     natural channel,                                                                  Ld      =
                     drain flow time,                                                                 td = Ld / (v x 60) =
                     thus,    time of concentration,                                                  tc         =       to+ td =
               1.4 Determine rainfall intensity and Runoff Coefficient
                     Referred to Table of Average Rainfall Intensity (mm/hr) for short rainfall
                     duration for tc = 16mins
                     thus,
                     rainfall intensity for 5 years storm                                             I16
                                                                                                      5
                                                                                                                          =
                     rainfall intensity for 10 years storm
                                                                                                     10
                                                                                                       I16                =
                     rainfall intensity for 100 years storm
                                                                                                    100
                                                                                                       I16                =
design chart Runoff Coefficient for Upstream catchment,                                              C5              =
    14.4       3   Semi-Detached Houses on Bare Earth                                                C10             =
                                                                                                     C100            =
                 1.5 Determine Average Runoff Coefficient
                     Cavg =      Ci Ai                                                                    C5 =
                                                                                                           avg
                                 Ai
                                                                                                          C 10 =
                                                                                                          avg
                                                                                                      avg
                                                                                                          C 100 =
               Rainfall Intensity Based on I25 from section 1.2
               1.6 Discharge flow computaion, Qpre , for Post-development
                     Q = (A2 x Cavg) x I25
                     Discharge flow for 5 years storm                                                  Q5,post =
Discharge flow for 10 years storm      Q10,post =
Discharge flow for 100 years storm   Q100,post   =
///conversion/tmp/scratch/370956013.xls'#$Catchment
                     YauTY
                     Apr-06
                             OUTPUT
                        14.09        ha
                         6.89        ha
                        20.98        ha
                          17         mins
                         600         m
                          5          mins
                         22          mins
                      143.50          mm/hr
                      158.57          mm/hr
                      210.18          mm/hr
                        0.53
                        0.56
                        0.63
                          12         mins
                         200         m
                          4          mins
                          16         mins
                      174.77          mm/hr
                      192.93          mm/hr
                      256.66          mm/hr
                        0.84
                        0.89
                        0.90
                         0.63
                         0.67
                         0.72
                        5.27         m3/s
6.19   m3/s
8.82   m3/s
YauTY
Apr-06
    OUTPUT
 16.85   ha
  0.00   ha
 16.85   ha
  17     mins
 1000    m
   8     mins
  25     mins
131.96   mm/hr
145.87   mm/hr
193.11   mm/hr
 0.51
 0.53
 0.61
  12     mins
  200    m
   4     mins
  16     mins
174.77   mm/hr
192.93   mm/hr
256.66   mm/hr
 0.84
 0.89
 0.90
  0.51
  0.53
  0.61
 3.15    m3/s
3.62   m3/s
5.51   m3/s