ASIM ENO BASSEY GNSE, AMIMechE
18 IBB Way, Calabar 540221
asimbassey@yahoo.com
+ (234) 706 7910 380
Other Name: Tata
Date of Birth: April 18, 1992
Place of Origin: Calabar, CRS
SUMMARY
Highly focused individual, success driven and result oriented with a hands-on approach to
tackling projects and accomplishing goals. An effective strategist, leveraging sound
experience through analytical reasoning in realizing ideas. Highly personable with good
leadership and interpersonal skills able to build and motivate a high-performing team.
SKILLS
Leadership Process Auditing Planning & Scheduling
Research Quality Control Design Analysis
EDUCATION
University of Uyo Uyo
M.Eng. Mechanical Engineering Production In view
Cross River University of Technology Calabar
B.Eng. Mechanical Engineering September 2014
Hope Waddell Training Institution Calabar
West African Senior School Certificate Examination June 2007
Police Children School Calabar
First School Leaving Certificate July 2001
EXPERIENCE
DE-OBABOB INVESTMENT LIMITED Calabar
Planning & Control Engineer February 2016 October 2016
Frontline operations coordination; planning through execution. Perform on-site field surveys
and present technical analysis. Promote and implement process improvements and other
business development functions.
HAZCON NIGERIA LIMITED Port Harcourt
Welding & Quality Control Engineer October 2014 January 2016
Analyse designs and specifications, communicate and enforce applicable Codes and
Standards. Prepare and qualify procedures and personnel; recommend modifications to
mitigate errors in construction and delivery. Support construction through in-process
supervision and inspection of stages and FAT. Prepare MDRs and partake in job tender
exercises.
TECHNICAL PARTNERS & LOGISTICS SERVICES LIMITED Port Harcourt
Field Engineer June 2014 September 2014
Supervised maintenance at OML 124 Flow Station with overlapping functions like closeout of
audit gaps and pending deliverables from past projects.
HAZCON NIGERIA LIMITED Calabar
Engineer-in-Training July 2012 May 2014
Involved in a wide range of supervised shop floor operations and practices and several in-
house competence based [ISO 9001:2008 Internal Auditor, ASNT NDT Level II (VT, PT, MT,
RT, UT) ASME BPVC] trainings as per Quality Assurance & Control.
CERTIFICATIONS
Certificate of National Service November 2015
National Youth Service Corps, Uyo
Certificate of Proficiency in Human Resources & Skill Acquisition October 2015
Horebson Resources, Lagos
Competence Based Basic First Aid Course November 2014
Nigeria Red Cross Society, Uyo
Occupational Safety and Health Supervisor November 2013
Geigle Safety Group, USA
Certificate in Information Technology August 2007
Cross River State Computer Institute, Calabar
PROFESSIONAL MEMBERSHIPS
Institute of Mechanical Engineers, London.
Nigerian Society of Engineers, Calabar.
Nigerian Red Cross Society, Uyo.
HOBBIES
Networking, learning and skills development.
REFERENCES
Engr. Augustine Eno MNSE Dr. (Mrs.) Obia Esien
+ (234) 803 3137 705 + (234) 803 3796 739
Consultant Academic
Projects catalogue of attached!
YEAR PROJECTS CLIENT
2016 Pre-commissioning of 24 x 32km Oron Calabar Gas Line 7E/EGSL
RoW Preparation for the Construction of Calabar Katsina Ala INFRACROSS
Superhighway and Bakassi Deep Sea Port Projects
2015 Fire and Diesel Lines Protective Coatings at OML 58 Field Logistic TUPNI/DIL/
Base WGCL
Umu-East Flowline Project MWOG
Fabrication of Gaslift Lines and Flowlines for Offshore Wells Hook- APDNL
up
Fabrication of 3nos. VFD Skid Assembly for West Fault Block ARL
Platform Deck Extension
Fabrication and on-skid Installation of Glycol Sump Tank Package for NPDC/SPDC/
Utorogu Non-associated Gas Handling Facility METS
2014 Blasting of Internally Corroded Antan Linepipes APDNL
Fabrication of Valve Access Platform for Adanga South Water APDNL
Injection Platform
Fabrication closeout of Ebughu BC2 Punchlist Items APDNL
Repair of Vandalized 2 Air and 2 Fuel Gas Lines Going to Well 16 APDNL
Fabrication of Hook-up Pipe Spools for WIJ P-6400 Pump APDNL
Sectional Replacement of Corroded 2 T-200 Oil Recovery Line APDNL
Fabrication of Demo Vessel (Air Receiver) for ASME Certification HNL
2013 Fabrication of ADRP Riser Clamps APDNL
Fabrication and Assembly of KTMB Manifold for Kita Marine APDNL
Extension Platform
2012 Fabrication and Integration of Adanga North A (R) Platform (ADNA) APDNL
In addition, several visits offshore (OML 123) for inspections and surveys on FPSO (Knock)
Adoon, MOPU (Borgen Dolphin) Marc Lorenceau and Production Platforms Ebughu and
Adanga for APDNL at HNL.