Corrective Action Report (CAR)
Supplier Name: Alkaram Textile Mills Pvt. Ltd. Khi. Supplier #. : 13867
Workmanship including uncut thread, lose thread, improper pressing, Ties length variation etc in
Process. Product Details:
EMMIE RUTA (Grey)
Reason for Corrective Action
Claim: Deviations/Defects: Quality Alaram: Others, please specify:
Problem Description
Poor Workmanship ( including uncut thread, lose thread, improper pressing, Ties length variation) in Emmie Ruta Dark Grey .
STEP 1 Fish Bone Analysis
MAN MACHINE MATERIAL
Poor handling
Negligence at Negligence at
stitching stage checking stage
Poor Workmanship in
Cause & Effect Emmie Ruta Dark Grey
Lack of awareness
reagrding customer
requirement
METHOD MEASUREMENT MOTHER NATURE
STEP 2 5 Why Analysis
Why ?1 Why?2 Why? 3 Why?4 Why? 5 Root Casue
Why the New
Why Stitching Why the weakness
Questions Fault? in checking ?
indutction is done
in checking ?
As both male and
female is
As converted from
incorporated in
piece rate to
checking section .
Due to weakness company account
The reason behind
Answers at the checking some new
is that to start the
stage . induction in
cheking at the
checking section is
stage where
done .
problem generates
.
STEP 3 Develop CORRECTIVE ACTION PLAN
Details of Containment Action
Describe Problem Responsible(s) Completion Date
Containment Action
to immediately stop All the goods are segregated and get
any further harm to Poor Workmanship in reworked regarding the customer Immediate
Mr. IMRAN AWAN
Customer Emmie Ruta Dark Grey requiremnts with the focus regarding
(GENERAL MANAGER PRODUCTION WEEK 1734
the observation highlighted above .
IKEA TOWER )
Responsible(s) Completion Date
A conceptof vertical checking has
been incorporated in the cheking .
The reason of going for vertical
checking is RIGHT FIRST TIME
( R.F.T) . The product is checked in
Corrective Action to the stitching line at the last
address Root Cause Poor Workmanship in operation against the customer
Immediate
requirements . If any thing found Mr. IMRAN AWAN
Emmie Ruta Dark Grey WEEK 1734
abnormal it will be rectified hand to (GENERAL MANAGER PRODUCTION
hand .This will be helpful for to scale IKEA TOWER )
both the operator and machine
level .Further more a rod with some
sticking material like tape will be
handed over to the cheking people to
remove the loose thread .
(GENERAL MANAGER PRODUCTION
Responsible: Title :
Mr. IMRAN AWAN IKEA TOWER )
Signature : / Date: 18-Aug-17