Mynetworkdiagram PDF

The document contains a network diagram with 23 tasks labeled A through U and critical path from A to EE of 150 time units. It shows the tasks, their durations, and dependencies. The critical path with the longest total duration determines the minimum time to complete the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

Mynetworkdiagram PDF

The document contains a network diagram with 23 tasks labeled A through U and critical path from A to EE of 150 time units. It shows the tasks, their durations, and dependencies. The critical path with the longest total duration determines the minimum time to complete the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NETWORK DIAGRAM

3 7 11 Q(20)
J(d

P(d
u

1)
mm

1)
I(24

um
B(
y)

L(

my
)
A(3) C(1) E(5) G(10) K(5) N(10) O(8) R(10) T(10)
1 2 4 6 9 10 13 14 15 16
1)

)
M

15
D( (1
5)

H(
D
(1
)
S(15)
5 E(5) 8 12

P(dummy)
18 20
DD

5)
(2
Z(1
3)

0)
Y(

U(10) V(15) X(9) CC(5) EE(3)


16 17 19 21 22 23

K(
5 ) AA(5)

BB(5)

CRITICAL PATH:
A-C-D-F-H-K-N-O-Q-T-U-V-D-EE

3+1+15+15+5+10+8+10+10+10+15+15+20+3=150