Solar Rooftop Calculation-Domestic (For Home) : Project Cost Rs. 69000/KW (RS) A 69000

This document calculates the costs, subsidies, returns, and payback period for a 1 kW domestic solar rooftop system in India. Key details include: - Total project cost is Rs. 69,000, with Rs. 30,700 in available subsidies (44.49% of cost) and a net investment of Rs. 38,300. - The system generates 5 units per day and 1825 units per year. At Rs. 7 per unit, the yearly savings are Rs. 12,775. - The monthly return on net investment is 2.74% and yearly return is 33.36%. The payback period is 36.48 months.

Uploaded by

Iren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views1 page

Solar Rooftop Calculation-Domestic (For Home) : Project Cost Rs. 69000/KW (RS) A 69000

This document calculates the costs, subsidies, returns, and payback period for a 1 kW domestic solar rooftop system in India. Key details include: - Total project cost is Rs. 69,000, with Rs. 30,700 in available subsidies (44.49% of cost) and a net investment of Rs. 38,300. - The system generates 5 units per day and 1825 units per year. At Rs. 7 per unit, the yearly savings are Rs. 12,775. - The monthly return on net investment is 2.74% and yearly return is 33.36%. The payback period is 36.48 months.

Uploaded by

Iren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SOLAR ROOFTOP CALCULATION-DOMESTIC(FOR HOME)

(1) PLEASE ENTER YOUR INPUTS IN YELOW CELL TO REACH YOUR CALCULATION,YOU CAN PUT
MAX Rs.20,000/- SUBSIDY BY GEDA-(2) FOR 1 KW PUT Rs..10,000/- IN GEDA SUBSIDY
PREPARED BY :REAL MULTIPLE SOLUTIONS
Senction PGVCL Load in Electricity Bill ( KW ) 2
Solar permissible Load (50% of senctioned load) -(KW) 1
Project cost Rs. 69000/KW(Rs)=A
69000
Project cost paid by customer immediately after registration
MNRE Subsidy -30% of Project Cost (Rs)=A 20700
GEDA Subsidy Rs. 10000/KW (Rs)=B
10000
(Max up to 2 Kw Load)=RS.20,000/- MAX
Total Subsidy Available (Rs) 30700
TOTAL SUBSIDY IN PERCENTAGE( %) 44.49
Net Investment Rs.= (C)=A-B 38300

RETURN ON INVESTMENT(ROI)
Unit Generation by solar rooftop system per Day/KW (units) 5
Total Unit Generete /Day by solar rooftop system (units) 5
Total Unit Generated in a month by solar rooftop system (units) 150
Total Unit Generated in a year by solar rooftop system (units) 1825

Approx Rate of Unit in (Rs) 7


Monthly Amount Saved in (Rs) 1050
Yearly Amount Saved (Rs) 12775

Monthly Return on UR Net Invesment (%) 2.74

Yearly Return on UR Net Invesment (%) 33.36

Payback Time on Net Investment (Months) 36.48