Yifred Kassa
Yifred Kassa
By
Yifred Kassa
November 2013
In Hydraulic Engineering
BY
Yifred Kassa
November 2013
Certification
I, the undersigned certify that I have read the thesis entitled Performance Assessment of
Drainage Structures and Proposed Mitigation Measures: The Case of Daleti-Odagodere Gravel
Road in Benishangul-Gumuz Region and here by recommend for acceptance by Addis Ababa
University in Partial fulfillment of Master of Science in Hydraulic Engineering.
____________________
Supervisor
Yifred Kassa, declares that this thesis is my own original work that has not been presented and
will not be presented by me to any other University for similar or any other degree award.
____________________________
Signature
This thesis is copyright material protected under the Berne Convention, the copy right act 1999
and other international and national enactments in that behalf, on intellectual property.
It may not be reproduced by any means, in full or in part, except for short extract in fair dealing
for research or private study, critical scholarly review or discourse with an acknowledgement,
without written permission of the school of postgraduate studies, on the behalf of both the author
and Addis Ababa University.
Acknowledgement
First, I would like to thank the almighty God for his unspeakable gift, help and protection during
my work.
I would like to express my genuine gratitude and appreciation to Dr. Agizew Nigussie, whose
encouragement, guidance and support from the initial to the final level of this thesis. He enabled
me to develop and understand the subject matter as well as the way of writing this research.
Without his help brotherly approach and free discussion, this thesis would not have been
completed.
I am grateful to Ethiopian Roads Authority that sponsored me by paying the fee of the University
and lastly but not least, I thank Benishangul-Gumuz Regional State Rural Roads Authority that
paid my salary and different expenses for this thesis work.
Abstract
This thesis presents results of the assessment of drainage structures; performance on Daleti-
Odagodere gravel road in Benishangul-Gumuz region and proposed mitigation measures.
Mitigation measures were proposed based on ERA drainage design manuals 2002 and 2011 for
Low Volume Roads.
Descriptive and exploratory methods of research were used for this thesis work. Field visits of the
catchment area that contributes runoff to the drainage structures were made and the existing
problems were described.
The necessary secondary data for this research are land cover map, topographical map, geological
map, and feasibility study of the road before construction. The primary data are photographs that
show the existing drainage structures conditions, flood level marks and information that is
gathered from the residences and road desk office about the performance of the drainage
structures during the rainy season. Hydrological analysis was carried out by using Rational and
SCS equations. Hydraulic parameters are determined by using Mannings equation.
Structural and hydraulically failures of drainage structures and roadways were investigated.
Moreover, stations of the road were investigated that require construction of minor drainage
structures but not constructed.
Suitable mitigation measures were proposed in order to make the road and drainage structures
serve for the intended purposes sustainably. New drainage structures were proposed where they
are lacking in the existing system.
TABLE OF CONTENTS
Certification .......................................................................................................................iii
Declaration and Copyright ..................................................................................................iv
Acknowledgement.............................................................................................................. v
Abstract ............................................................................................................................vi
Table of Contents .............................................................................................................vii
List of Tables ....................................................................................................................xii
List of Figures .................................................................................................................. xiii
List of Acronyms .............................................................................................................. xiv
CHAPTER 1: Introduction..........................................................................................1
1.1 General Background of Drainage Structures ...................................................................... 1
1.2 Background of Drainage Structures of the Study Area....................................................... 2
1.3 Statement of the Problem ................................................................................................ 3
1.4 Questions of the Research Study ...................................................................................... 4
1.5 Objective of the Research Study ...................................................................................... 4
1.5.1 General Objective of the Study ................................................................................... 4
1.5.2 Specific Objectives of the Study.................................................................................. 5
1.6 Significance of the Research Study .................................................................................. 5
1.7 Scope and Limit of the Research Study ............................................................................. 5
CHAPTER 2: Literature Review .....................................................................................7
2.1 General Description of Road Drainage Structures ............................................................. 7
2.1.1 Types of Culverts ...................................................................................................... 8
2.1.2 Road Surface Drainage ................................................................................................. 9
2.2 Alignment of Drainage Structures ....................................................................................... 9
2.3 Backwater Effect on Road Drainage Structures .................................................................. 10
2.4 Flow Velocity in Road Drainage Structures ........................................................................ 11
2.5 Design Flood for Road Drainage Structures ....................................................................... 11
2.5.1 The Criteria for Roadside Channels .............................................................................. 12
List of Tables
List of Figures
List of Acronyms
IDF- Intensity-Duration-Frequency
CHAPTER 1: Introduction
1.1 General Background of Drainage Structures
The objective of roadway drainage is to prevent on site water standing on the surface
and convey the offsite storm runoff from one side of the roadway to the other. To carry
out the offsite drainage either a culvert or a bridge should be used. Culverts are closed
conduits in which the top of the structure is covered by embankment at a minimum
thickness of 30cm (AACRA, 2004). Bridges are mainly provided for large streams and
rivers. United States National Bridge Inspection Standards (USNBIS, 1990) and ERA
drainage design manuals (ERA DDM, 2002 and 2011) define bridges as those structures
that have at least 6 meters of span along the roadway centerline.
The main operational differences between culverts and bridges are described in terms
of economics, hydraulics, structural aspects and maintenance attention requirements
(Kaan and Larry, 2004). The common properties of culverts and bridges are both
increase stream velocities, turbulence of flow, aggradations, scour, and bank erosion
downstream of the crossing structure (Richardson and Richardson, 1999). All culverts
should be designed with headwalls and wing walls or flared-end sections at the inlet and
outlet. Erosion protection should be provided at the outlet.
Adequate drainage is essential during the design of roadways, since it affects the
serviceability and usable life of the roadway, including the structural strength of the
pavement. Satisfactory cross-drainage facilities will limit the buildup of pond against the
upstream side of roadway embankments and avoid overtopping of the roadway. If
formation of pond on the carriageway occurs, hydroplaning (sliding of vehicles)
becomes an important safety concern. Rapid removal of storm water from the
pavement minimizes the phenomenon, which can result in the hazardous of
hydroplaning. Adequate cross-slope and longitudinal grade enhance such rapid removal
of storm water.
Drainage design involves providing facilities that collect, transport and remove storm
water from the roadway. The design must also consider the storm water reaching the
roadway embankment through natural stream flow or manmade ditches.
Daleti-Odagodere road is a low volume road and it is categorized under design standard
six (DS6) or design class two (DC2). According to ERA geometric design manual 2011
for low volume roads, DC2 low volume roads carry 25-75 vehicles per day (ERA, 2011)
and the road is classified under feeder road.
According to Highway Engineers and Consultants PLC, feasibility study report (2005),
the road is very important for economic development of the region in general and
Odabuldigilu district in particular. The road is 42 kilometers long and it has a width of 6
meters and on average 3 meters wide earthen side ditches on both sides of the road.
Throughout the road length, there are many bridges and culverts even if some of them
were not functioning properly during the rainy season. The road was designed to carry
50 vehicles per day on average in both directions, which makes it lie under the category
of design class two (DC2).
At some stations, the drainage structures are lacking even if they are required for the
road to function properly. Alignment of existing drainage structures at some stations is
improper. Due to this reason, stream crosscurrents are negatively affecting the proper
functioning of the drainage structures and carriageways. The overtopping runoff erodes
the embankments as well as the road-wearing course. The water that infiltrates in to
the carriageway over saturates the wearing course as well as sub-grade. Due to this,
the bearing capacity of the carriageway is weakened and traffic interruption was
common in Daleti-Odagodere road in the previous years during the rainy season.
Deforestation of land occurred on both sides of the road due to the agricultural activities
of investors and indigenous people. This has resulted in accelerated soil erosion and its
accumulation in the drainage structures. This causes storm water to overflow on the
carriageway and clogging of culverts by silts. In addition to silts, the logs and tree
branches are transported to the drainage structures on the upstream side of the
culverts. These are the main causes for the clogging of these drainage structures, which
causes overtopping of embankment by flood. As a result, spending of a large amount of
money during the rainy season is common every year for the removal of the logs,
branches of trees and the silt accumulated in the drainage structures.
Runoff, which is in excess of the drainage structures capacity, overtops the road
embankment and makes the road to function improperly due to erosion and ponding.
The wearing-course and sub-grade of the road become weak due to high moisture
content and the road could not carry traffic as the intended design requirement.
Moreover, at some stations even if construction of bridge was required, culverts with
inadequate rows of pipe were constructed. This created the road to be malfunction
during the rainy season every year due to overtopping. To alleviate this problem, culvert
and bridge drainage structures performance should be evaluated and mitigation
measures should be proposed for sustainable and proper functioning based on ERA
drainage design manuals 2002 and 2011 for low volume roads.
The general objective of the study is to evaluate the performances of the existing road
drainage structures and to propose mitigation measures that minimize frequent
maintenance of drainage structures and roadways on Daleti-Odagodere gravel road.
Therefore, this study is beneficial to the region for future road drainage structures
construction to avoid problems by assessing the performances of the existing drainage
structures and proposing mitigation measures to avoid improper functioning.
The study is expected to propose appropriate solutions to the drainage systems whose
implementation will contribute to the sustainability of the case study road.
The study is beneficial for academicians and researchers who conduct similar researches
on other road drainage structures, soil conservation strategies, erosion and scouring
prevention mechanisms and aggradations/degradations of the stream channel. It may
also support policy makers in their effort to address similar problems
The thesis is limited to the performance assessment of existing drainage structures and
proposing mitigation measures that are found only on Daleti-Odagodere road. The
research does not include structural design of all types of drainage structures except
proposing the type and size of the required drainage structures. However, hydrologic
analysis and hydraulic parameters determination for drainage structures that are
susceptible to failure are included in the research.
The two main types of water flows that can be considered are the flows that usually
crossing the area that could be diverted by the presence of the road, and the flows
generated by the runoff of the rainwater falling on the carriageway and its
surroundings. The basic design techniques in roadway drainage system should be
developed for economic design of surface drainage structures including ditches, culverts
and bridges (ERA, 2002). A hydraulic investigation and analysis of both the upstream
and downstream reaches of the watercourse is necessary to determine the best
location, size, and elevation of the proposed crossroad structure, whether a culvert or a
bridge. The investigation should ensure that any roadway structure or roadway
embankment that encroaches on or crosses the flood plain of a watercourse will not
cause significant adverse effect to the flood plain and will be capable of withstanding
the flood flow with minimal damage. It is significant to provide attention during design
of the magnitude, frequency and appropriate water surface elevations for the design
flood, the 100-year flood, and the overtopping or 500-year flood for all structures
(ADOT, 2007).
Culverts are usually, designed to operate with the inlet submerged if conditions permit.
This allows for a hydraulic advantage by increasing discharge capacity. Bridges are
usually, designed for non-submergence during the design flood event, and often
incorporate some freeboard.
Runoff management culvert strategically placed to manage and route roadway runoff
along, under, and away from the roadway. Many times these culverts are used to
transport upland runoff, accumulated in road ditches on the upland side of the roadway,
to the lower side for disposal.
M.Sc. Thesis in Hydraulic Engineering 8
Addis Ababa Institute of Technology, AAU
Strategically placed culverts, along with road ditch turnouts, will help to maintain a
stable velocity and the proper flow capacity for the road ditches by timely out letting
water. This will help to alleviate roadway flooding, reduce erosion, and thus reduce
maintenance problems. Culverts preserve the road base by draining water from ditches
along the road, and keeping the sub base dry.
Generally, drainage structures designed to prevent road damage during the most usual
floods such as annual, 10-year, 50-year or 100-year flood, depending on the importance
of the road and the type of structures (ERA, 2002) and to minimize the modifications in
the hydrology of the area.
A culvert placed too low in relation to the channel bottom may lose hydraulic
performance if the channel aggrades. In addition, a culvert placed at a slope different
from the natural channel slope may have problems related to both sediment deposition
and bed scour, and this affects hydraulic performance.
A culvert invert slope should match the streambed slope. Placing the culvert on a flatter
or steeper gradient from the natural streambed can cause sediment deposition in the
barrel. It can also cause scour that removes sediment from the barrel.
The horizontal alignment of culverts and bridges should match the natural streambed
alignment, as close as practicable. This is often possible when installing an original
culvert at a new crossing or when removing the existing culvert and replacing it with
another at exactly the same location.
Aggradations increase the backwater effect; affect the pressure on the structure, and
passes ability of the bridge (Johnson et al., 2002). Bridges seem to more readily allow
sediment transport than culverts and therefore have less accumulation up stream of the
crossing (Wellman et al., 2000).
designed for a 10-year storm and checked for adequate performance with a 25-year
interval storm event.
A surface drainage system collects and diverts storm water from the road surface and
adjoining areas to avoid flooding. It decreases the possibility of water infiltration into
the road and retains the road bearing capacity. Appropriate design of the surface
drainage system is an essential part of road design (Kalantari, 2011). Sub-surface
drainage systems drain water that has infiltrated through the pavement and the inner
slope but also ground water.
In ERA Low volume Roads drainage design manual the fall of 3-5% allowed on culverts
to ensure that water flows without depositing silt and other debris. In flat terrain, where
there is a high risk of silting, a factor of safety of two allowed in the design of the
culvert. Moreover, all pipes should have a minimum diameter of 0.60m to ensure that
they can be cleaned manually. It is important to install energy dissipating structures
and/or armor at the outlet where scour and erosion are likely to occur. These structures
are required where high exit velocity due to steep culvert installation, near proximity to
channel banks, and drops at the end of the culvert.
Culverts are drainage structures that have the span length of less than or equal to
6-meters otherwise it is major drainage structure (ERA, 2002). However, ERA BMS
considers those drainage structures that have span length of 4-meters and above as
bridge. In this research, drainage structures are considered bridges that have span
length of greater than 6-meters. Bridges are major roadway drainage structures, which
are used in runoff drainage systems where stream span is large, for which special
designs are made almost in every case greater than 6-meters (USNBIS, 1990).
to traffic, and the safety of the road users. With this respect, the most important
parameters for the design of major and minor drainage structures are the design flood,
hydraulics analysis and selection of construction materials.
In steep terrain, culvert capacity is usually governed by inlet control. The water depth at
the entrance conditions governs the capacity of culverts subject to inlet control. The
entrance conditions include the geometry of the opening, the wing walls, head walls,
the angle of wing walls & head walls and the protection of the culvert in to the
headwater pond.
Pipe roughness, outlet conditions including tail water level do not influence flow capacity
of culverts operating under inlet control. When the culvert barrel is not capable of
conveying as much flow as the inlet opening will accept the outlet control occurs
(FHWA, 2001).
Water passing through undersized culverts will scour away the surrounding soil over
time. This can cause a sudden failure during rain events. Degradation in streams can
cause the loss of bridge piers in stream channels, as well as piers and abutments in
caving banks.
Hydraulic conditions and rates of erosion are vastly different at abutments and piers at
any bridge site. Extent of erosion at abutments minimized, by placing them away from
the riverbanks. Piers are located in the middle of peak flood zones, where flood velocity
is the highest. The direction of flow is at right angles to the pier, which acts as an
obstruction, with the water flowing on both of its sides. Hence, foundation all around a
pier scoured. On the other hand, the foundation only on side exposed to the flow in
case of an abutment may be scoured.
Total scour at bridge footings is primarily sum of degradations and aggradations, local
scour and contraction scour. Degradation is a general and progressive (long-term)
lowering of the channel bed due to erosion over a relatively long channel length. Local
scour is due to increase in local flow velocities and turbulence levels because of
obstruction caused by bridge piers and abutments to the water flow. Contraction scour
is because of increased water velocity in the bridge opening due to decrease in cross-
sectional area of waterway at the bridge crossing.
Scour at a bridge crossing a river classified as general scour, contraction scour, or local
scour. General scour occurs irrespective of the existence of the bridge and can occur as
either long-term or short-term scour. Short-term general scour develops during a single
or several closely spaced floods.
Long-term general scour has a considerably longer timescale, normally of the order of
several years or longer and includes progressive degradation and (lateral) bank erosion.
Degradation is the general lowering of the riverbed. Bank erosion may result from
channel widening, meander migration, a change in river controls, or a sudden change in
the river course.
2. Contraction scour results from general increases of the velocities where the flow is
constricted during the velocity approaches the bridge opening and is characterized by a
general lowering in the bed elevation due to the contracted section. Contraction scour
can be further split into two types of scour viz., live bed scour, occurs when sediment
transported into the bridge area scours the streambed. The other is clear water scour
occurs during clear water stages and the increased flow velocities create higher shear
stresses and thus scour the streambed (Richardson and Richardson, 1999).
3. By contrast, local scour is due to changes in the local flow pattern at the bridge,
which is usually associated with three-dimensional flows and vortex systems. It is also
characterized by the formation of scour holes at the base of the bridge foundation. In
general, local scour is a continuous process of streambed degradation that results from
turbulence of water at the floodplains and underneath the bridge.
Localized scour is the combination of local and contraction scour. The types of localized
scour include clear-water scour and live-bed scour. When the bed resistance upstream
of the scoured area is equal to or less than the critical or threshold shear stress for the
commencement of the particle motion, clear water scour occurs. The maximum scour
depth in clear-water scour attained when the flow is not able to get rid of the particles
from the scour hole anymore.
Live-bed scour is also known as scour with sediment transport. It occurs when general
bed load is transported by the stream. Similar scour depths are achieved when the
materials removed from the scour hole is equal to materials supplied to the scour hole
from upstream after some time. Differentiation of the two types of scour is needed
because it is the main key point of the increment of the scour hole with time and
approach flow velocity (Raudkivi and Ettema, 1983).
These entire scour causes may further result in excessive pond formation, washing out
of roadway embankment and flooding of nearby properties.
Longitudinal stone dikes placed at the toe of channel banks can be effective
countermeasures for bank caving in degradation streams. Precautions to prevent
outflanking, such as tie backs to the banks, may be necessary where installations are
limited to the vicinity of highway stream crossing. In general, channel lining alone is not
a successful countermeasure against degradation problems (ERA, 2002).
Culvert drainage structures shall be adequate to avoid hazardous flooding and failures
of road or embankment structures. Poorly designed culverts are also more appropriate
to become jammed with sediment and debris during medium to large-scale rain events.
This can cause the road to fail, often introducing a large amount of fine sediment that
can clog other structures downstream and also damage crops and property. Hard bank
armoring and a proper sized structure can help to alleviate this pressure.
Providing scour protections are important at both inlet and outlet for all culverts to
protect the structure from damage. Providing rock armor is significant protection
measure of scour for inlets and outlets of culverts. Moreover, headwalls and end walls
utilized to control erosion and scour, to anchor the culvert against lateral pressures, and
to ensure bank stability. Constructing all headwalls from reinforced concrete material is
significant and may be straight and parallel to the channel, however, flared or warped,
with or without aprons is possible when the site and hydraulic conditions permit.
To prevent the possible piping failure, cement stabilized fill can be used to form the
culvert invert bedding for a suitable length. These measures found to perform well in
clayey/silty/sandy soils (Sherard et al., 1963).
At design discharge, water will normally pond at the culvert inlet and flow from this pool
will accelerate over a relatively short distance. Significant increases in velocity only
extend upstream from the culvert inlet at a distance equal to the height of the culvert.
Velocity near the inlet is approximated by dividing the flow rate by the area of the
culvert opening. The risk of channel erosion should be judged based on this average
approach velocity. The protection provided should be adequate for flow rates that are
less than the maximum design rate. Since depth of pondage at the inlet is less for
smaller discharges, greater velocities may occur. This is especially true in channels with
steep slopes where high velocity flow prevails.
Culvert inverts are sometimes placed below existing channel grades to increase culvert
capacity or to meet minimum cover requirements. Hydraulic Design Series No.5 (HDS 5)
(Normann, et al., 2001) discusses the advantages of providing a depression or fall at
the culvert entrance to increase culvert capacity. However, the depression may result in
Recessing the culvert into the fill slope and retaining the fill by either a headwall parallel
to the roadway or by a short headwall and wing walls does not produce significant
erosion problems. This type of design decreases the culvert length and enhances the
appearance of the roadway by providing culvert ends that conform to the embankment
slopes. A vertical headwall parallel to the embankment shoulder line and without wing
walls should have sufficient length so that the embankment at the headwall ends
remain clear of the culvert opening. Normally riprap protection of this location is not
necessary if the slopes are sufficiently flat to remain stable when wet.
Wing walls flared with respect to the culvert axis are commonly used and are more
efficient than parallel wing walls. The effects of various wing wall placements upon
culvert capacity are discussed in HDS 5 (Normann, et al., 2001). Use of a minimum
practical wing wall flare has the advantage of reducing the inlet area requiring
protection against erosion. The flare angle for the given type of culvert should be
consistent with recommendations of HDS 5.
Most inlet failures reported have occurred on large, flexible-type pipe culverts with
projected or mitered entrances without headwalls or other entrance protection. When
soils adjacent to the inlet are eroded or become saturated, pipe inlets can be subjected
to buoyant forces. Lodged drift and constricted flow conditions at culvert entrances
cause buoyant and hydrostatic pressures on the culvert inlet edges that, while difficult
to predict, have significant effect on the stability of culvert entrances.
Local scour is the result of high-velocity flow at the culvert outlet, but its effect extends
only a limited distance downstream as the velocity transitions to outlet channel
conditions. Natural channel velocities are usually less than culvert outlet velocities
because the channel cross-section, including its flood plain, is generally larger than the
culvert flow area. Thus, the flow rapidly adjusts to a pattern controlled by the channel
characteristics.
Long, smooth-barrel culverts on steep slopes will produce the highest velocities. These
cases will require protection of the outlet channel at most sites without any doubt.
However, protection is also often required for culverts on mild slopes. For these culverts
flowing full, the outlet velocity will be critical velocity with low tail-water and the full
barrel velocity for high tail-water. Where the discharge leaves the barrel at critical
depth, the velocity will usually be in the range of 3 to 6 m/s (FHWA, 2006).
Culverts are generally constructed at crossings of small streams, many of which are
eroding to reduce their slopes. This channel erosion or degradation proceeds in a
uniform manner over a long length of stream or it may occur abruptly with drops
progressing upstream with every runoff event. Information regarding the degree of
instability of the outlet channel is an essential part of the culvert site investigation. If
substantial doubt exists as to the long-term stability of the channel, measures for
protection should be included in the initial construction (FHWA, 2006).
Standard practice is to use the same end treatment at the culvert entrance and exit.
However, the inlet is designed to improve culvert capacity or reduce head loss while the
outlet structure should provide a smooth flow transition back to the natural channel or
into an energy dissipater (FHWA, 2006). Outlet transitions should provide uniform
redistribution or spreading of the flow without excessive separation and turbulence.
Therefore, it may not be possible to satisfy both inlet and outlet requirements with the
same end treatment or design.
foundations, abutments and piers of drainage structures. Narrow sections and hard
basement are important during construction of drainage structures in order to minimize
the cost of construction with the exception of excavation cost. Constructing drainage
structures on hard basement avoids scouring problem.
The culvert skew shall not exceed 450 as measured from a line perpendicular to the
roadway centerline. Culvert skews should be constructible with standard designs of 15 0,
300 and 450 skew (ADOT, 2007). Culvert skews are not advisable unless conditions do
not permit to install culverts normal to the natural streambed.
Sharp changes in the direction of flows to force shorter culvert crossings are prone to
scouring. The eroded material has potential to block the culvert opening. Sharp and
small radius bends also reduce the hydraulic efficiency of a channel (AACRA, 2004).
Installing culverts without wing walls and head walls will decrease the hydraulic
efficiency of the culvert. As a result, scouring and potential of diversion of water will be
created. The minimum grade for a culvert should generally be 0.5 (ACT Government,
1994). Flatter grades may be prone to siltation and are difficult to construct. The
maximum grade for a culvert should be chosen to limit the pipe full flow velocity to a
value less than or equal to 6m/sec to avoid scour (ACT Government, 1994).
3.1 Location
3.2 Topography
Altitude of the study area ranges from 580 meters to 2,731 meters above mean sea
level. Odabuldigilu district is located on the eastern slopes of the Dabus river, with
elevations ranging from approximately 2000 meters above mean sea level in the east to
just under 1000 meters at the bottom of the Dabus valley.
3.3 Climate
3.3.1 Temperature
Benishangul-Gumuz region has three major climatic zones viz., 75% lowland, 24%
temperate and 1% highland. The mean annual temperature of Odabuldigilu district
ranges from lowest of 250c to the highest of 380c during the months of January to May.
The highest wind speed is observed during the hot seasons of the year. According to
FDRE Ministry of Agriculture land administration and use directorate agro-climatic
classification, the study area is in the warm sub-humid region of the country.
3.3.2 Rainfall
Benishangul-Gumuz region is characterized by high amount of annual rainfall. The rainfall
ranges from 800mm to 2000mm and long duration of rainy months, May to October,
whereas the average annual rainfall in the study area is 1000mm with maximum and
minimum rainfall being 1300mm and 906mm respectively.
The study area is found on the Northwestern part of Ethiopia. The type of soil on the
study area is Nitisols (FAO, 1998) that covers almost 100% of the total soil coverage. In
Nitisols about 70% of the soil is silt loam of hydrologic soil group B and the remaining
30% is clay (FAO, 1998) of hydrologic soil group C.
Database Source
FAO, 1998
3.5 Demography
The 2007 national census reported a total population of 54,584, for Odabuldigilu
district. From the total population 28,885 were men and 25,699 were women; 3,165 or
5.8% of its population were urban dwellers. The population density was 39.35 people
per square kilometer. The majority of the inhabitants were Muslims, with 67.53% of the
population reporting they observed this belief, while 27.37% of the population was
Protestant and 4.14% practiced Ethiopian Orthodox Christianity.
Based on figures from the Central Statistical Agency in 2005, this district has an
estimated total population of 29,604, of whom 15,282 were men and 14,322 were
women. With an estimated area of 1,387.19 square kilometers, Odabuldigilu District had
a population density of 21.3 people per square kilometer, which is greater than the
Zone average of 19.95
The 1994 national census reported a total population of 22,320 in 4,743 households, of
whom 11,573 were men and 10,747 were women; no urban dwellers were recorded in
this district. The population density was 16.09 people per square kilometer. The
population density increased rapidly from 16.09 to 39.35 people per square kilometer
from 1994-2007.
The three largest ethnic groups reported in Odabuldigilu district were the Berta
(77.7%), the Oromo (18.6%), and the Gumuz (3.4%); all other ethnic groups made up
0.3% of the population. The language of Berta (Wutawutigna) is spoken as a first
language by 77.4%, 20% speak Oromiffa, and 2.4% speak Gumuz; the remaining 0.2%
spoke all other primary languages reported.
Concerning education, 2.73% of the population were considered literate, which is less
than the Zone average of 18.49%; only 0.55% of children aged 7-12 were in primary
school, whether the children aged 13-14 were in junior secondary school, nor were any
of the inhabitants aged 15-18 in senior secondary school. Concerning sanitary
conditions, 3.7% of all houses had access to safe drinking water, and 2.7% had toilet
facilities at the time of the census.
3.6 Hydrology
The hydrological feature of the study area is the seasonal rivers and streams water. The
rivers and streams are not gauged and so the actual discharges are not known.
M.Sc. Thesis in Hydraulic Engineering 28
Addis Ababa Institute of Technology, AAU
3.8 Socio-Economy
According to a number of socio-economic indicators and parameters, services and
infrastructural facilities in Odabuldigilu district are below the actual requirements. Due
to shortage of educated personnels in development management, inadequate provision
of roads, educational and health facilities the district lagged from other districts in the
region in economic development. The main economic activities are small-scale
agriculture and traditional gold mining.
Topography field visiting of the study area is carried out to determine existing
performance condition of drainage structures. Observing flood marks, measuring the
size of the existing drainage structures, measuring the elevation difference between
river/stream bed and flood mark as well as gathering information is carried out about
the overall performance of drainage structures during the rainy season.
The mathematical equations that are used to determine peak discharges are Rational
and SCS equations. Recommendations in ERA 2002 and 2011 for LVRs drainage design
manuals are used to determine peak discharges. These manuals are the lead
information documents and main reference tools for my thesis work. The main reason
that I used these manuals as the lead documents is, in our country these manuals are
guidelines and best of all materials regarding drainage system design and performance
evaluation.
The materials that are used for the study of the research are digital camera, GPS
device, and measuring tape. All these materials are used during field visit of the study
area.
ERA classified rainfall regions in to four major rainfall regions and eight sub-rainfall
regions in the country and developed IDF curves. To compare the developed IDF curve
with generated IDF curve of the study area local rainfall data are required. However,
local rainfall data are not available near the study area. The already developed
regionalized IDF curve by ERA is used to determine rainfall intensity.
ERA developed four IDF curves for rainfall regions in the country. The developed
curves are for A1&A4, A2&A3, B, C & D and Bahir Dar & Lake Tana rainfall regions. The
study area lies on sub-region B1 and the IDF curve was constructed for B, C and D
rainfall regions together. Therefore, I used the rainfall intensity from the IDF curve for
the corresponding return period.
In most cases rational and soil conservation service, (SCS) methods of flood
estimation are applied for minor drainage structures due to unavailability of
gauged data. Based on the aforementioned concepts, rational and SCS
mathematical equations are used for this thesis according to the area of the
catchment.
Actual runoff is far more complicated than the values that are calculated by rational
formula. Rainfall intensity is seldom the same over an area of appreciable size or for any
substantial length of time during the same storm. Even if a uniform intensity of rainfall
of duration equal to the time of concentration that occurs on all parts of the drainage
area, the rate of runoff would vary in different parts of the area because of differences
in the characteristics of the land surface and the non-uniformity of antecedent
conditions. However, for this thesis, the same characteristics of the land surface and
uniform antecedent conditions are considered.
Under some conditions, maximum rate of runoff occurs before all of the drainage areas
are contributing. Temporary storage of storm water routing toward defined channels
and within the channels themselves accounts considerable reduction in the peak rate of
flow except on very small areas. The error in the runoff estimate increases as the size of
the drainage area increases.
Due to these facts, for this thesis the rational method is not used to determine the rate
of runoff for large drainage areas. For the design of highway drainage structures, the
use of the rational method should be restricted to drainage areas up to 50 hectares in
Ethiopia. Hence, for this thesis the maximum value of the catchment area, 50 hectares,
is considered.
Q =0.00278CIA (4.1)
Where, Q= Peak flow in cubic meter per second (m3/sec)
C= Dimensionless weighted runoff coefficient
I= Rainfall intensity in millimeters per hour (mm/hr)
A= Drainage area in hectares (ha)
The basic assumptions in rational method to determine peak flood are:
1. The peak rate of runoff at any point is a direct function of the average rainfall
intensity for the time of concentration to that point.
2. The recurrence interval of the peak discharge is the same as the recurrence
interval of the average rainfall intensity.
3. The time of concentration is the time required for the runoff established and flow
from the most distant point of the drainage area to the point of discharge.
The main reason that is required to limit the use of rational method for small
watersheds pertains to the assumption that rainfall is constant throughout the entire
watershed. Severe storms, say a 100-year return period, generally cover a very small
area. Applying the high intensity corresponding to a 100-year storm to the entire
watershed could produce greatly exaggerated flows, as only a fraction of the area may
be experiencing such intensity at any given time.
The variability of the runoff coefficient also favors the application of the rational method
to small and developed watersheds. Although the coefficient is assumed to remain
constant, it actually changes during a storm event. The greatest fluctuations take place
on unpaved surfaces as in rural settings. Moreover, runoff coefficient values are much
more difficult to determine and may not be as accurate for surfaces that are not
smooth, uniform and impervious. Generally, the rational method provides the most
reliable results when applied to small, developed watersheds and particularly to
roadway drainage design. According to the aforementioned facts, I considered the
runoff coefficient constant throughout the catchment area that is encompassed the
study area.
i. Drainage area
ii. Land use
iii. Soil types (highly permeable or impermeable)
iv. Distance from the farthest point of the drainage area to the point of discharge
v. Difference in elevation from the farthest point of the drainage area to the point of
discharge
2. Determine the time of concentration for the selected recurrence interval with
duration equal to the time of concentration
3. Determine the rainfall intensity for the selected recurrence intervals
4. Select the appropriate runoff coefficient
5. Compute the design flow (Q= 0.00278CIA)
The runoff coefficient accounts for the effects of infiltration, detention storage, surface
retention, evapotranspiration, surface retention, flow routing and interception. The
product of runoff coefficient and rainfall intensity is the rainfall excess of runoff per
hectare. The runoff coefficient should be weighted to reflect the different conditions
that exist within a watershed.
The relation between storm duration, storm intensity, and storm return interval, is
represented by a family of curves called the intensity-duration-frequency curves, or IDF
M.Sc. Thesis in Hydraulic Engineering 35
Addis Ababa Institute of Technology, AAU
curves. Quantification of rainfall is generally carried out using isopluvial (Return Period)
maps and intensity-duration-frequency (IDF) curves (Chow et al., 1988). Various rainfall
contour maps developed to provide the design rain depths for various return periods
and durations (Hershfield, 1961). The IDF relationship is a mathematical relationship
between the rainfall intensity, the duration, and the return period (the annual frequency
of exceedance). For this research, ERA regionalized IDF curves are used to quantify
rainfall. The study area is found in the rainfall region of Ethiopia, in rainfall sub-region
B1 as shown on Appendix A on Figure 6.
The velocity of flow depends on the catchment characteristics and slope of the
watercourse. It is estimated from appendix A on Figure 2, according to ERA drainage
design manual 2011 for LVRs. The design return periods are taken from Appendix C in
Table 1.
To determine time of concentration for over land flow there are many formulae. Among
these the Kerby and Kirpich formulae are presented and for defined flow (Channel
flow), U.S. SCS formula is presented.
number), time of concentration, and rainfall. However, the SCS method also considers
the time distribution of the rainfall, the initial rainfall losses to interception and storage,
and an infiltration rate that decreases during the course of a storm. It is therefore,
potentially more accurate than the rational method and is applicable when the
catchment area is larger than 50 hectares (ERA, 2011)
The SCS 24-hour storm distributions are based on the generalized rainfall
depth-duration-frequency relationships collected for rainfall events lasting from 30
minutes up to 24 hours. Working in 30-minute increments, the rainfall depths are
arranged with the maximum rainfall depth assumed to occur in the middle of the
24-hour period. The next largest 30-minute incremental depth occurs just after the
maximum depth; the third largest rainfall depth occurs just prior to the maximum
depth, etc. This continues with each decreasing 30-minute incremental depth until the
smaller increments fall at the beginning and end of the 24-hour rainfall.
A relationship between accumulated rainfall and accumulated runoff derived by SCS for
numerous hydrologic and vegetative cover conditions are important for peak discharge
determination. The storm data included total amount of rainfall in a calendar day but
not its distribution with respect to time. The SCS runoff equation is therefore a method
of estimating direct runoff from 24-hour storm rainfall.
For P>0.2S
Q =0 for P0.2S (4.5)
Where:
Q = accumulated direct runoff, mm.
P = accumulated rainfall (i.e., the potential maximum runoff), mm.
Ia = initial abstraction (surface storage, interception, and infiltration prior to runoff),
mm.
S = potential maximum retention, mm.
S is a site index defined as the maximum possible difference between P and Q as P,
P-Ia is called effective rainfall. It is related to the soil and cover conditions of the
catchment area through the curve numbers. The curve number is a transformation of
potential maximum retention (NRCS, 2004).
(S is in millimeter) (4.6a)
(S is in inches) (4.6b)
The relationship between Ia and S was found to be;
Ia= 0.2S (4.7a)
Ia = (4.7b)
(4.10)
Travel time is the time it takes water to travel from one location to another in a
catchment area. Tt is a component of time of concentration.
1. Sheet Flow
After a maximum of 100 meters, sheet flow usually becomes shallow concentrated flow
(ERA DDM, 2002). The average velocity for this can be determined by the following
formulae according to the type of surface which water flows i.e. paved and unpaved. In
these formulae, average velocity is a function of watercourse slope and type of channel.
According to ERA DDM 2002 these two formulae are based on the solution of Mannings
equation with different assumptions for n (Mannings roughness coefficient) and R
(hydraulic radius, meter). According to the ERA DDM 2002 for unpaved areas, the value
of n is 0.05 and R is 0.12; for paved areas, the value of n is 0.025 and R is 0.06.
After determining average velocity, equation (3.9) is used to estimate travel time for the
shallow concentrated flow segment.
Open channels are assumed to begin where surveyed cross section information has
been obtained, where channels are visible on aerial photographs, or where blue lines
(including streams) appear on Ethiopian Mapping Agency (EMA) topographic maps
(1:50,000). Average velocity is usually determined for bank-full elevation. Mannings
equation or water profile information used to estimate average flow velocity. When the
channel section and roughness coefficient are available, then the average velocity can
be calculated by using Mannings equation. For this thesis, topographic map of the
study area was used that was produced in 1:50,000 scale.
V= (R2/3S1/2)/n (4.13)
After average velocity is calculated, Tt is calculated by using equation (3.9)
Tc=Tt1+Tt2+Tt3 (4.14)
Where, Tt1=travel time for sheet flow
Tt2=travel time for shallow concentrated flow
Tt3 =travel time for open channel flow
Using the calculated time of concentration, unit peak discharge is obtained from
Appendix A on Figure 4. After unit peak discharge is obtained, design peak discharge
is determined using the formula:
Design Peak Discharge, Qp =Qu*Q*A (4.15)
To describe these curves mathematically, SCS assumed that the ratio of actual retention
to potential maximum retention is equal to the ratio of actual runoff to potential
maximum runoff, the latter being rainfall minus initial abstraction. In mathematical
form, this empirical relationship is
(4.16)
After runoff has started, all additional rainfall becomes either runoff or actual retention
(i.e. the actual retention is the difference between rainfall minus initial abstraction and
runoff).
(4.17)
The potential maximum retention S has been converted to the Curve Number CN in
order to make the operations of interpolating, averaging, and weighting more nearly
linear. This relationship is
(4.18)
The curve number method was developed with daily rainfall data measured with
non-recording gauges. The relationship therefore excludes time as an explicit variable
(i.e. rainfall intensity is not included in the estimate of runoff depth).
Group A Soils have low runoff potential and high infiltration rates even when
thoroughly wetted. They consist chiefly of deep, well to excessively drained sands or
gravels and have a high rate of water transmission (greater than 7.62mm/hr). Group A
soils typically have less than 10 percent clay and more than 90 percent sand or gravel
and have gravel or sand textures. Some soils having loamy sand, sandy loam or silt
loam textures can be placed in this group if they are well aggregated, of low bulk
density, or contain greater than 35 percent rock fragments (NRCS, 2007).
Group B soils have moderate infiltration rates when thoroughly wetted and consist
chiefly of moderately deep to deep, moderately well to well drained soils with
moderately fine to moderately coarse textures. These soils have a moderate rate of
water transmission (3.81mm/hr-7.62mm/hr). Group B soils typically have between 10
percent and 20 percent clay and 50 percent to 90 percent sand and have loamy sand or
sandy loam textures. Some soils having loam, silt loam, silt, or sandy clay loam textures
can be placed in this group if they are well aggregated, of low bulk density, or contain
greater than 35 percent rock fragments (NRCS, 2007).
Group C soils have low infiltration rates when thoroughly wetted and consist chiefly of
soils with a layer that impedes downward movement of water and soils with moderately
fine-to-fine texture. These soils have a low rate of water transmission (1.27mm/hr to
3.81mm/hr). Group C soils typically have between 20 percent and 40 percent clay and
less than 50 percent sand and have loam, silt loam, sandy clay loam, clay loam, and
silty clay loam textures. Some soils having clay, silty clay, or sandy clay textures placed
in this group if they are well aggregated, of low bulk density, or contain greater than 35
percent rock fragments (NRCS, 2007).
Group D soils have high runoff potential. They have very low infiltration rates when
thoroughly wetted and consist chiefly of clay soils with a high swelling potential, soils
M.Sc. Thesis in Hydraulic Engineering 45
Addis Ababa Institute of Technology, AAU
with a permanent high water table, soils with a clay pan or clay layer at or near the
surface, and shallow soils over nearly impervious material. These soils have a very low
rate of water transmission (0-1.27mm/hr). Water movement through the soil is
restricted or very restricted. Group D soils typically have greater than 40 percent clay,
less than 50 percent sand, and have clayey textures. In some areas, they also have
high shrink-swell potential (NRCS, 2007).
The Mannings equation is used for calculating the cross-sectional area, wetted
perimeter, and hydraulic radius for flow of a specified depth in a pipe of known
diameter and/or stream channel cross-section. Mannings equation is applicable for a
constant flow rate of water through a channel with constant slope, size & shape, and
roughness.
(4.19)
Where, Q is the volumetric flow rate passing through the channel reach in m 3/sec.
A is the cross-sectional area of flow normal to the flow direction in m2.
S is the bottom slope of the channel in m/m (dimensionless).
n is a dimensionless empirical constant called the Manning roughness
coefficient.
R is the hydraulic radius = A/P.
Roughness coefficients represent the resistance to flood flows in channels and flood
plains (USGS, 2009). Roughness values for flood plains can be quite different from
values for channels; therefore, roughness values for flood plains should be determined
independently from channel values. For this research, the Mannings roughness
coefficients were used for different materials that are presented in ERA drainage design
manuals 2002 and 2011 for LVRs.
The friction loss is the energy required to overcome the roughness of the culvert barrel
(FHWA, 1965). Friction loss can be expressed in several ways. Since in most highways
engineering Manning's roughness coefficient is familiar, the following expression is
used:
(4.20)
Where, Hf = Friction loss, meter
n= Mannings roughness coefficient
V= Mean Velocity, m/sec
L= Length of Pipe, meter
R= Hydraulic Radius, meter
g= Acceleration due to gravity, 9.81m/sec2
Energy line is the total energy at any point along the culvert barrel and pressure line is
the hydraulic grade line. The energy line and the pressure line are parallel over the
length of the barrel except in the immediate vicinity of the inlet where the flow contracts
and re-expands. The velocity head is the difference between the energy line and the
pressure line.
(4.21)
Exit loss is one of the components of total head loss that occurs at the entrance of the
culvert barrel and it is expressed as:
(4.22)
Total head loss is the sum of velocity head, friction loss and exit loss. It is expressed as:
(4.23)
Where, H= Total head, meter
Hv = Velocity head, meter
He = Exit loss, meter
ke = Entrance loss coefficient
In computing headwater depths for outlet control, when the above bevel is used,
ke equals 0.25 for corrugated metal barrels and 0.2 for concrete barrels (FHWA, 1965).
The headwater depth is the water elevation at the entrance of the culvert barrel and it
is computed using the following expression.
(4.24)
Where: H = total head loss, meter
ho = (critical depth + D) or tail water depth, whichever is greater (maximum = D)
L = culvert length
S = culvert slope
4.3.3 Equation for ford crossing structure
When the water depth is deeper than 15.25cm, it is not appropriate to recommend
constructing stream-crossing ford due to the difficulty of traffic and pedestrians
(McDonald and Anderson, 2003). The hydraulic equation for unvented ford for flow
depth calculation is equation (2.25)
(4.25)
Where, Q is design discharge
n is the streambed roughness
B is stream width
H is flow depth
S is stream slope
(4.26)
Where, Qe is the design discharge in m3/second
w is the channel width in meter
H is the depth of flow in meter
S is the channel slope in meter/meter
n is Mannings roughness coefficient
Knowing Qe, w, n, and S from data collection, the depth of flow can be determined
through trial and error.
soil and land cover of the catchment for flood estimation, geological maps of
1:2,000,000 to determine geological formation that influence flood and channel
characteristics are secondary data. The previous and the existing land cover are
considered significantly. This is because during the construction period and at the
existing condition the runoff entering in to the drainage structures is quite different.
Meteorological data are not collected because around the study area there is no
meteorological station that recorded the rainfall, temperature, and relative humidity.
The Asossa and other meteorological stations in the country are very far from the study
area to obtain hydrological data for the study area accurately. The main choice is using
the IDF curve developed by ERA for low volume roads drainage design manual in 2011
for Ethiopian rainfall regions.
According to ERA drainage design manual for low volume roads 2011 and ERA drainage
design manual 2002, the study area is found on the hydrological sub-region of B1.
Hence, the IDF curve developed for B, C and D are used.
The rivers and streams in the study area are not perennial. There are no recorded data
of flow to use peak discharges like many rivers and streams in the country. The rainfall
intensity is taken from the already developed IDF curve for the corresponding return
periods.
4.5 Analysis method
Analysis of the collected data is carried out by rational, and SCS methods based on the
following factors that affect flood.
Drainage basin characteristics including size, shape, slope, land use, geology, soil
type, surface infiltration, and storage;
These parameters can be obtained from long-term climatic data, hydrological data, and
geological data, soils, land use/land cover maps prepared at medium and large scales
for general purposes and hydrographic and topographic survey and geotechnical
investigations along the road route.
The main cause for the embankment erosion was the lack of detail flood information
during rainy season and inadequate hydraulic design. The construction of the culvert
was carried out without some rational or statistical assessment of the expected flow i.e.
the construction was carried out by trial and error rather than considering hydrological
analysis and calculating hydraulic parameters during the design stage. The hydrologic
analysis is required to estimate peak discharge that is a major component of the overall
design effort. In general, drainage crossings must be designed to pass the appropriate
storm flows and debris or to survive overtopping.
In order to increase the hydraulic capacity, construction of wing walls and head walls
are required. However, the four rows of pipe culvert that each pipe has one-meter
M.Sc. Thesis in Hydraulic Engineering 52
Addis Ababa Institute of Technology, AAU
internal diameter, wing walls were not constructed as shown on Figures 4.1 and 4.2, as
a result the hydraulic efficiency decreased due to flow constriction and the peak flood
overtops the embankment.
Proper design and construction of drainage structures are vital components for road
structure to function without traffic interruption. Appropriate hydrological analysis of the
catchment area where the drainage structure will be constructed and appropriate
hydraulic parameters should be determined. If proper hydrological analysis and
hydraulic calculation were not practiced, either overdesign or under design would occur
that both involve excessive costs on a long-term basis.
A drainage structure designed to carry a short recurrence interval flood would have a
low first cost, but the maintenance cost would be high because the drainage structure
and roadway may be damaged by storm runoff almost every year. On the other hand, a
drainage structure designed to carry the long recurrence interval flood would be high in
initial cost, but low in maintenance cost.
Figure 5.1: Initially constructed three Rows of Pipe Culvert at Station 16+400
Figure 5.2: Four Rows of Pipe Culvert after one Row Pipe on the left added.
The primary function of bridges is to carry vehicles, bicycles and pedestrians. Bridge
abutments and piers shall generally be aligned to match the alignment of the existing
watercourse. Relocation of existing stream channels shall be avoided. Bridge structures
should be on a tangent alignment if such can be accomplished without sacrificing the
overall geometric design of the roadway. Tangent alignment affords easier bridge
construction thereby resulting in lower structure cost.
Road drainage structures in general should be aligned properly with respect to the
roadway cross-section in order to avoid traffic hazard and damage of structures by
flowing water crosscurrents. On Daleti-Odagodere road at station 32+300, the
alignment of bridge with respect to the roadway alignment is improper as shown on
Figure 5.3. When the alignment of road structure is improper, the superstructure will be
damaged by traffic hazard as a result frequent maintenance will occur on the structure
and finally its serviceability life will decrease.
As it is shown on Figure 5.3, the embankment of the bridge is eroded due to the
absence of wing walls construction that protects the embankment from being eroded by
retaining the embankment material. The flows from the side ditches, the roadway and
the adjoining land are the main causes for the erosion of embankment. Wing walls
stabilize the embankment by protecting from flood erosion that flows from roadway and
adjoining land that finally enters to the side ditches. Therefore, including the design and
construction of wing walls are significant for long serviceability of road drainage
structures as well as the road network. As I observed during the field visit, the
construction practice on this bridge is very poor; as a result, it may cause catastrophic
damage on life and property.
The approach roads should be straight with respect to the bridge alignment to a
minimum distance of 50 meters on both sides to avoid hazard of traffic and damage of
the structure by traffic. However, the bridge at station 32+300 is curve at the
approaches of the bridge.
On the right side, the bridge abutment was constructed improperly as shown on Figure
5.3. The abutment is expected endangered within a short period without providing the
expected benefit for the road users as intended.
Fords are drainage structures that are used to pass floodwater over and under them.
When the fords are constructed to flow flood over and under them, they are called
vented fords, but if they are constructed to flow flood only over them, they are called
unvented fords. These structures are constructed for low flow rates, at a relatively
narrow, shallow stream location and should be in an area of bedrock or coarse soil for
good foundation conditions. A ford can be narrow or broad, but should not be used in
deeply incised drainages that require a high fill or excessively steep road approaches.
The ford cross-sectional area should be equal to or greater than the natural channel
cross-sectional area. If the flow rate is high, it is not a feasible structure to be
constructed because for high flow rates the depth of flood cannot be known accurately
to pass traffic without hazard. This causes waiting of vehicles and pedestrians until the
flood will decrease. This is waste of time for the road users.
The depth, width, and velocity of flow, as well as sediment and floating debris content,
erosion on the waterway, especially of the ford surfaces and downstream of the ford,
the probability of flooding over the ford and the associated risks and consequences
The active channel width is 20 meter. The width of the crossing structure should be
equal or greater than the average active channel width. Based on the bank-full/active
channel width, it is clear to understand the type of the crossing structure to be bridge.
This stream is dry in winter season and experiences high amount of flow rate during
summer season. In general, not all the streams that are found on Daleti-Odagodere
road are perennial but during wet season they experience high amount of flood flow
which is infeasible to construct ford as crossing structure.
As it is shown on Figure 5.4, approach gradients, including the vertical and horizontal
curves are not to the standard design. Approach gradients will depend on vehicle
configuration, sight distances, traction requirements, and site conditions and layout.
Therefore, it is very dangerous for traffic movement during rainy season. It is also
dangerous even without flood flows because traffic accident will occur due to its
steepness on both sides of the ford.
Damaged Ford at
Station 36+000
Reviewing multiple years of aerial photography is helpful when determining the stability
of streams. Stable streams will show up in the same location year after year, while
unstable streams may change locations or widths in photographs taken during different
years. Not all these had been carried out for a slab culvert constructed at station
41+700 during site selection stage.
equations such as rational, and SCS. Hydraulic parameters calculations are carried out
using Mannings equation.
The flood damage potential of bridges and major culverts (greater than 1.22m
diameter) should be reviewed for the 50-year and 100-year frequency according to ERA
drainage design manuals 2002 and 2011 for LVRs. The scour potential for bridge
substructures should be reviewed for the 500-year frequency or overtopping event.
The geomorphology of the watershed and channel play key roles during the selection of
sites of drainage structures. Basic geomorphic principles allow designers to understand
the geomorphic processes and difficulties presented when drainage structures cross
various positions in the watershed. These processes change with location in the
watershed and along the reach where the crossing will be located. Channels are
extremely dynamic, responding to changes in the watershed by propagating changes
downstream to upstream and vice-versa depending on the channel position in the
watershed, the type of disturbance, and the channel types along the stream.
On Daleti-Odagodere road, as it was observed during the field visit and as shown on
Figure 5.5 geomorphology study was not carried out because the location of the slab
culvert is on the area of weak clay soil that is highly susceptible to scouring on both
upstream and downstream.
The proper construction practice is important after proper design for drainage structures
to function properly for the road users as intended. Only proper design by itself does
not make the drainage structure to serve properly up to its design life but also proper
construction practice must be carried out by appropriate personnel according to the
design.
On Daleti-Odagodere road as shown on Figure 5.5, the slab culvert was damaged within
a short period of time after construction due to poor construction practice as well as
poor design of abutment and slab. The slab culvert was constructed with a thickness of
30cm abutment as shown on the figure from bottom to top, which cannot carry vehicles
and also cannot resist the water pressure during the rainy season. Moreover, it cannot
withstand the lateral pressure of soil at the bottom. On the left side of the slab culvert,
the abutment is completely damaged.
The slab reinforcement arrangement and size as I observed from the damaged slab of
the slab culvert during the field visit was not according to the standard specification of
any bridge span and culvert construction in ERA drainage and bridge design manuals of
2002.
The site selection was not carried out based on the geomorphology investigation
because the site is highly scoured both upstream and downstream of the site, this
makes reconstruction problem. Therefore, to reconstruct the slab culvert, change of
route corridor is required in order to find hard stratum at the channel bottom.
Surface water can pond at the edge of the road and weakens the road surface.
Silt can accumulate at the edge of the road i.e. the silt cannot be washed away
through the drainage structure due to unconstructed drainage structure.
The visibility for road users is reduced, with increased risk of accidents on
persons or animals.
In order to serve a road properly for the road users, drainage structures should be
constructed by considering where the location of the crossing in the watershed is
required and how can water, sediment, and wood be transported at that location and
how is the catchment configured. Therefore, based on these considerations the
construction of minor culverts, culverts that have internal diameter less than or equal to
1.22m was required, at the aforementioned three stations before pondage can be
created
Culverts Bridges
Design Rainfall Checking Rainfall Design Rainfall Checking Rainfall
Depth Depth Depth depth
112mm 118mm 118mm 132mm
Culverts Bridges
Design Rainfall Checking Rainfall Design Rainfall Checking Rainfall
Depth Depth Depth depth
112mm 132mm 118mm 132mm
Similarly, the other catchment areas are delineated using the same procedure.
From Appendix C on Table 8, the runoff curve number for pasture, poor condition and
cultivated land without treatment average hydrologic soil group B is 80 and hydrologic
soil group C is 87. Therefore, average runoff curve number is (0.70x80) + (0.30x87)
=84.9 but the nearest CN value is 85.
topography from the topographical map. Hence, I used the slope that I obtained from
field reconnaissance.
v. Time of concentration
a. sheet flow
The sheet flow occurs up to 100 meters. Sheet flow, natural range, slope of 0.02 m/m,
and length of 100m and from Appendix B, Table 3, for range (natural) Mannings
roughness coefficient is 0.13. The 2-year, 24-hour rainfall depth is determined from
Appendix A in Figure 8 or Appendix C in Table 5 to be 65mm. Hence, from Equation
(4.12), travel time for sheet flow is determined as:
Tt = [0.091(nL) 0.8/ (P2)0.5S0.4]
= 0.42hr
b. Shallow Concentrated Flow
For shallow concentrated flow, unpaved watershed slope is approximated 0.02m/m and
length from topography map is 800m. From equation (4.12a), V=4.9178(S) 0.5 for
unpaved watershed. V=4.9178(0.02)0.5 =0.70m/sec. From equation (4.9), travel-time is
determined as:
Tt = L/ (3600V)
= 800/ (3600X0.70)
= 0.32hr
c. Channel Flow
For channel flow, natural stream channel, winding with weeds and pools, slope is
0.01m/m, and length is 886m. By direct measuring the average bottom width of the
stream channel is 2.5m, side slopes are 1V:1.5H, 20-year storm depth is observed from
flood mark and measured to be 1.5m. From Appendix B in Table 3, Mannings
roughness coefficient for fallow (no residue) channels is 0.050.
Cross-sectional flow area (A) = by+zy2
= (2.5 x 1) + 1.5(1.52)
M.Sc. Thesis in Hydraulic Engineering 68
Addis Ababa Institute of Technology, AAU
= 5.875m2
Wetted perimeter (Pw) = b+2y (1+z2)0.5
= 2.5+2x1.5 (1+1.52)0.5
= 7.91m
Hydraulic radius (R) = A/P
= 5.875/7.91
= 0.743m
From Equation (3.16), V = (R2/3S1/2)/n
= 1.64m/sec.
From equation (3.11), Tt = L/ (3600V)
= 0.15hr
Total Time of Concentration (Tc) is (0.42 + 0.32+ 0.15) = 0.89 hr
By the same procedures, catchment parameters at stations 36+000 and 41+700 are
determined.
Table 6.5: Catchment Parameters for Design and Check (Station 36+000)
Parameters of Design and Review Design Review
Return Periods(years) 10 15
Time of Concentration (hours) 0.82 0.82
Curve Number(CN) 94 94
Potential Maximum Retention(mm) 16.21 16.21
Initial Abstraction Ia (mm) 3.24 3.24
Design Storm (24-hr maximum rainfall) 98 105
Ia/P 0.033 0.031
Direct Runoff (mm) 81 90
Unit Peak Discharge (m3/s/km2/mm) 0.224 0.226
Peak Discharge (m3/sec) 108.87 122.04
Table 6.6: Catchment Parameters for Design and Check at Station 41+700
Parameters of Design and Review Design Review
Return Periods(years) 20 50
Time of Concentration (hours) 0.82 0.82
Curve Number(CN) 94 94
Potential Maximum Retention(mm) 16.12 16.12
Initial Abstraction Ia (mm) 3.24 3.24
Design Storm (24-hr maximum rainfall) 112 132
Ia/P 0.029 0.025
Direct Runoff (mm) 105 125
The drainage structure at station 16+400 is four rows pipe culvert as shown on Figure
5.2. The hydraulic calculation is carried out using equation (4.19). In Table 6.4, the
design and check discharges are 220.5m3/sec and 267.3m3/sec respectively. The
existing culvert was installed at a slope of 0.5%.
From equation (4.19), the design diameter of the drainage structure that the flood
should pass without disturbing the structure is 7.55m and the review diameter is 8.11m.
The existing four rows pipe culvert has 4-meters total opening, therefore, it is not
adequate. The bank-full width as shown on Figure 5.2 is wide. Due to the bank-full
width, the appropriate drainage structure that is recommended is bridge that has
12-meter clear span.
The outlet velocity of flow for the existing drainage structure for design and review are
erosive due to clayey and silty streambed. Therefore, it requires erosion protection
treatment.
Table 6.7: Hydraulic Parameters for Proposed Drainage Structure at Station 16+400
Parameters of Design and Review Design Review
Return Periods(years) 25 50
Slope of natural stream (%) 0.5 0.5
According to Table 6.5, the design and check discharges are 108.87m3/sec and
122.04m3/sec respectively. The stream roughness coefficient is 0.022 and average slope
of the stream is 0.005. The average bottom width of the stream is 8-meter. From
equation (4.25), the water depth (H) is 2.38m. Since the water depth is greater than
15.25cm, construction of ford on the channel bottom is not acceptable. The bank-full
width is 20m even if the average bottom width of the streambed is 8m and the bottom
elevation of stream is very deep with respect to the roadway cross-section.
Table 6.8: Hydraulic Parameters for Proposed Drainage Structure at Station 36+000
Parameters of Design and Review Design Review
Return Periods(years) 50 100
From Table 6.6, the design and check discharges are 112.4m3/sec and 134.4m3/sec
respectively. The stream normal Mannings roughness coefficient is 0.022 and the
stream slope is 0.008. The span of the slab culvert is 6-meter and the opening height is
4.60 meters.
Using equation (4.19) to obtain flow depth by trial and error, the depth of flow is about
3.1 meters. Therefore, the structure is safe from overtopping flood. The calculated
outlet velocity is 6.04m/sec for design and 7.22m/sec for review. This velocity is erosive
velocity because of the silty clay soil formation where the drainage structure is
constructed (See Table 2.1). Therefore, the drainage structure is not safe from scouring
and requires changing the site to reconstruct the slab culvert.
Table 6.9: Hydraulic Parameters for Proposed Drainage Structure at station 41+700
Parameters of Design and Review Design Review
Return Periods(years) 20 50
Table 6.10: Design Parameters for Proposed Drainage Structure at Station 15+500
The same procedures are followed for stations 22+500 and 23+100, therefore, the
design parameters are tabulated on Tables 6.11 and 6.12
Table 6.11: Design Parameters for Proposed Drainage Structure (Station 22+500)
Parameters of Design and Review Design Review
Return Periods (years) 20 25
Peak Discharges (m3/sec) 2.12 2.50
Rainfall Intensity (mm/hr) 112 120
Runoff Coefficient 0.2 0.2
Slope of Pipe Culvert (%) 2.5 2.5
Mannings Roughness Coefficient for Concrete Pipe 0.017 0.017
Diameter of Concrete Pipe (m) 0.90 0.90
Outlet Velocity (m/sec) 3.45 3.45
Hydraulic Radius (m) 0.23 0.23
Area of the Opening (m2) 0.64 0.64
Wetted Perimeter (m) 2.83 2.83
Length of Pipe Culvert (m) 9.0 9.0
Minimum Embankment Cover (m) 0.30 0.30
Maximum Inclination of Wing Walls 450 450
Head Water Depth (m) 0.74 0.74
Table 6.12: Design Parameters for Proposed Drainage Structure (Station 23+100)
Conclusions are drawn from the investigations of the results of the research.
Recommendations are provided based on the findings of the results of the research.
7.1 Conclusion
The conditions of the existing drainage structures and roads were assessed through
critical site observations. The capacity and adequacy of drainage structures were
assessed through hydrologic and hydraulic analysis. Under hydrologic analysis, return
periods, IDF curves, 24-hour rainfall analysis, delineation of watershed area,
computation of catchment parameters, and peak discharge computation were carried
out. The hydraulic analysis was used to assess the adequacy of existing drainage
structures, and propose new drainage structures where required.
7.2 Recommendation
On Daleti-Odagodere road, drainage structures failures have had serious negative
impact on road users. In order to minimize these negative impacts, the following
appropriate mitigation measures are recommended.
At station 15+500, weakening of carriageway occurred due to lack of drainage
structure. Therefore, to avoid this problem a pipe culvert of one-meter internal
diameter is recommended.
At station 16+400, the four rows of pipe culvert was inadequate to pass flood
through it during wet season. This resulted in erosion of embankment at the
downstream. Therefore, to avoid this problem, construction of 12-meter clear
span bridge is important.
At stations 22+500 and 23+100, drainage structures were not constructed; as a
result, weakening of carriageways occurred. Therefore, to avoid this problem,
construction of pipe culverts of 0.90-meter internal diameter is important at both
stations.
At station 32+300, the improper alignment of the short span bridge has made it
is susceptible to scour, and damage by vehicles. Therefore, replacement of the
bridge with proper alignment and same size is required.
At station 36+000, stream-crossing ford was constructed; however, due to high
flood; it was washed away by flood without serving for road users as intended.
The stream is very wide and deep that accommodates high flood. Therefore,
construction of Girder Bridge is important in order to pass flood during wet
season without disturbing the drainage facilities and stream embankments.
At station 41+700, slab culvert was constructed; however, due to poor quality
construction; the slab culvert was damaged without serving the intended
purpose. Therefore, relocation of slab culvert is important in order to reconstruct
based on ERA bridge design manual.
References
Addis Ababa City Roads Administration (2004). Drainage Design Manual, Addis Ababa.
Alderson, A., (2006), the Collection and Discharge of Storm Water from the Road
Infrastructure, ARRB Group LTD, Vermont South, Victoria, Australia. Research
Report ARR 368.
American Association of State Highway and Transportation Officials (AASHTO) Drainage
Manual. AASHTO Task Force on Hydraulics and Hydrology (1990).
Arizona Department of Transportation, Highway Drainage Design Manual Hydraulics
Final Report (2007).
Austroads (1994), Waterway Design-A guide to the hydraulic design of Bridges,
Culverts
and Flood ways, AUSTROADS National Office, Sydney.
David B. Thompson (2007). The Rational Method for Determining Peak Discharge.
Ethiopian Mapping Authority (1988), National Atlas of Ethiopia, Addis Ababa, Ethiopia.
30 Minutes to 24 hours and return periods from 1 to 100 years, tech. paper 40,
U.S. Department of Comm., Weather Bureau, Washington, D.C.
Hydraulic Design Series 5 (2001)-Federal Highway Administration Hydraulic Design of
Highway Culverts, U.S. Department of Transportation.
I. Kaan Tuncok, Stanley Consultants, Inc. Phoenix, Arizona and Larry W. Mays,
Department of Civil and Environmental Engineering Arizona State University
(2004), Hydraulic Design of Culverts and Highway Structures
James L. Sherard, Richard J. Woodward and Stanely F. Giziennski (1963), Earth and
Earth Rock Dams: Engineering Problems of Design and Construction..
Kalantari, K., (2011). Adaptation of Road Drainage Structures to Climate
ChangeTRITALWRLIC 2061.
Kattell, J. and Eriksson, M., (1998). Bridge Scour Evaluation: Screening, Analysis, &
Countermeasures. U.S. Department of Agriculture Forest Service. San Dimas
California.
Melville, B.W. and Coleman, S.E., (2000), Bridge Scour, Water Resources Publications,
LLC.
Normann, J. M., Houghtalen, R. J., and Johnston, W. J. Hydraulic Design of Highway
Culverts, Federal Highway Administration Hydraulic Design Series No. 5 (HDS-5),
Report Number FHWA-IP-85-15, McLean, VA, (1985).
Raudkivi AJ, Ettema R., (1983). Clear-Water Scour at Cylindrical Piers, J. Hydraulic Eng.
Am. Soc. Civil Eng., 109(3): 338-350
Richardson, E.V. and Davis, S.R., (2001). Evaluating Scour at Bridges. Fourth Edition,
Hydraulic Engineering Circular No. 18, U.S. Department of Transportation. Federal
Highway Administration (HEC 18), Arlington, Virginia.
Richardson, E.V. and Richardson, J.R., (1999). Determining Contraction Scour. In: E.V.
Richardson and P.F. Lagasse (Editors), Stream Stability and Scour at Highway
Bridges, American Society of Engineers, pp. 483-490
Simon, A. and Johnson, P.A., 1999. Relative Roles of Long Term Channel Adjustments
Processes and Scour on the Reliability of Bridge Foundations. In: E.V. Richardson
and P.F. Lagasse (Editors), Stream Stability and Scour at Highway Bridges.
American Society of Civil Engineers, pp. 151-165.
Thomas McDonald and Mark Anderson-Wilk (2003), Low Water Stream Crossings in
Iowa
A Selection and Design Guide Center for Transportation Research and Education
Iowa State University
U.S. ACT Government (1994). Urban Storm water: Standard Engineering Practices,
Ed (1).
U.S. Army Corps of Engineers (2005), Users Manual HEC-RAS (River Analysis System
Version 3.1.3). Hydrologic Engineering Center, US Army Corps of Engineers, Davis,
CA
U.S. Department of Agriculture Natural Resources Conservation Service, National
Engineering Handbook, issued May (2007).
U.S. Department of Transportation, Federal Highway Administration (2001), Hydraulic
Engineering Circular No. 22, Second Edition Urban Drainage Design Manual,
FHWA- NHI-01-021.
U.S. Department of Transportation, Federal Highway Administration (2006), Hydraulic
Engineering Circular No. 14, Third Edition Hydraulic Design of Energy Dissipaters
for Culverts and Channels, FHWA-NHI-06-086.
U.S. Department of Transportation Federal Highway Administration (1965), Hydraulic
Engineering Circular No. 5, Hydraulic Charts for the Selection of Highway Culverts
U.S. Geological Survey Water-supply Paper 2339, (2009), Guide for Selecting
Manning's Roughness Coefficients for Natural Channels and Flood Plains
U.S. Natural Resources Conservation Service (2004), National Engineering Handbook
Estimation of Direct Runoff from Storm Rainfall.
V.T.Chow, D.R. Maidment and L.W.Mays (1988), Applied Hydrology, McGraw- Hill.
Wellman, J.C., Combs, D.L. and Cook, B., (2000). Long-Term Impacts of Bridge and
Appendix A: Time of Flow, Unit Peak Discharge, Velocity of flow and SCS CN Charts
Figure 3: SCS Relation between Direct Runoff, Curve Number and Precipitation
Figure 7: IDF Curve for Rainfall Regions of B, C and D in Ethiopia (ERA DDM, 2002 &
2011)
Figure 9: Relationships between Precipitation, Direct Runoff and Curve Number (ERA, 2011)
Table 2: Recommended Runoff Coefficient (C) for Various Selected Land Uses
Table 2: Runoff Coefficient: Humid Catchment (ERA Drainage Design Manual, 2011)
Table 4: Storm Design Return Period-years for Severe Risk Situations (ERA DDM, 2011)
Structure Type Geometric Design Standard
DC4 DC3 DC2 DC1
Gutters and Inlets 5 5 5 2
Side ditches 15 10 10 5
Ford 15 10 10 5
Drift 15 15 10 5
Culvert diameter <2meter 25 20 20 10
Large culvert diameter >2meter 50 25 20 10
Gabion abutment bridge 50 25 20 -
Short span bridge(<15meter) 50 50 25 -
Masonry arch bridge 50 50 25 -
Medium span bridge (15-50 meter) 100 100 50 -