ATR on Flight Safety Documents System
S.No.                       Compliance Check Report                                    ATR
  1     Operator not nominated any person as Nodal Officer for         Capt. Jaswant Singh, Junior Pilot has
        compliance of flight safety documentation system. Hence no     been nominated as Nodal Officer for
        process for following :-                                       Flight Safety Documents System and
        1. Review the document on a yearly basis                       process to review on yearly basis or
        2. Review after major events, technology changes, changes in   after major events etc would be
        safety regulations                                             completed in time and detailed
        3. Maintain accurate, detailed records of communication for    records thereof would also be
        reviewing and validation process considering its effect on     maintained in prescribed formats.
        entire flight safety documentation system
 2      Flight safety documents system was not validated before        Flight safety documents system has
        deployment, under realistic condition                          now been validated under realistic
                                                                       condition
 3      No document cell as given in FSDS manual does exist within     Document cell as given in FSDS
        the organization.                                              manual has been established.
 4      Tracking system does not include a procedure to verify that    Procedure to verify that operational
        operational personnel have the most recent updates.            personnel have most recent updates
                                                                       is being included in tracking system.
 5      Information contained in each the Operators document has      Requisite information in Operators
        not been properly categorized depending on Time critical,      document is being categorized.
        Time sensitive etc. More so sequencing is not being done to
        place the time critical information early
6   There is no system developed for information gathering, System for gathering information,
    review and disposition system to process information review and disposition is being
    obtained through regulations.                           formulated.
7   Master manual Register is not being maintained properly.   Master manual register has been
                                                               prepared and now being maintained
                                                               as per norms.
8   There is no process for distribution of the documents      Process    for    distribution    of
    throughout the organization                                documents       throughout      the
                                                               organization has been formulated.
                              ATR on Safety Management System
1   Filled gap analysis was not available with the        Gap analysis in respect of existing safety
    Operator                                              arrangements as compared to those necessary
                                                          for SMS function has been prepared and will
                                                          be made available to next audit.
2   Safety policy has not been communicated               Safety policy has been communicated
    effectively throughout the organization               effectively throughout the organization.
3   Safety committee exists but no evidence to show       Safety committee is functional as monthly
    that its functional                                  meetings of the committee are conducted.
4   ERP is not been tested yet                            Recently in the month of Oct., 2017 we have
                                                          gone through the proving flight in which ERP
                                                          has been tested.
5   There is no system for the recording and storage of   Required documents are being maintained
    SMS documentation and records, i.e., hazard logs,     according to norms.
    risk assessments and safety cases.
6    The procedure for voluntary reporting system         Procedure for voluntary reporting system has
    however not functional                                been made functional.
7   The procedures of checklists are not being            Procedures for checklists are being reviewed
    reviewed when significant changes in the              whenever significant changes in the
    organization occur.                                   organization occur.
8   Safety surveys are not being carried out              Safety surveys are now being carried out.
9   The process for communication of safety related       Process for communication of safety related
    information to operators does not exist.              information to Operators has been formulated.
10    Amended SMS manual as per revised CAR section 1   Amendment of SMS manual as per revised CAR
      Series C part 1 needs to be submitted             Section 1, Series C Part 1 is under process and
                                                        will be submitted as soon as possible.
11.   Chief of Flight safety has not been nominated     In view of size of organization, Accountable
                                                        Manager Capt. Keshri Singh is performing the
                                                        duties of Chief of Flight Safety also.
12.   CVR monitoring records are not available          CVR monitoring records is available in the
                                                        organization and will be made available during
                                                        next audit.