Value Stream Mapping Process : Ring Eye Seal
Weekly Orders
Production Control
Monthly Orders
Trialc
o Monthly Forecast
2 1 1 1 1
Recieving Foundry - Foundry - Machining Deburr Inspect
Static Pour Heat Treat
C/T : C/T : C/T : 15 min C/T : C/T :
C/O : 60 min C/O : C/O : 150 min C/O : C/O :
Avail: Avail: Avail: Avail: Avail:
FPY : 100% FPY : 100% FPY : FPY : FPY :
FPY : 100% FPY : 100% FPY : FPY : FPY :
OEE/Util : OEE/Util : OEE/Util : OEE/Util : OEE/Util :
Productio
Productio
Metric / Data Box Definitions : Considerations : 22 Work day / month ; 1 shift => 7 hour (after PFD) = 7.5 Hour - 2 x 10 Min - 10 Min
T/T = Travel time L/T = Lead time C/O = Change over time C/Te = Cycle time (Oven, Equipment) Takt = Available work time per shift
Q/T = Queue time L/T = P/T + T/T P/T = Process time P/T = Q/T + C/T + C/O Perf = Performance Time customer demand qty. per s
C/T = Cycle time PFD = Personal Fatigue & Delay Time C/Tt = Cycle time (Touch) FPY = First Pass Yield Av=Availability OEE = FPY * Av * Perf
Ch Ch
ec ec Che
k k ck
✘
Bo Bo Box
Date : Current
x Future
x Ideal
202
Timeline20 20 Operator
0 1
Ded. Proc. Shared Proc. Proc. Time
Verbal Info Proc. Cell Prod. Lead
Time
See Sched. Tel. Info Tel. Info
JCWP Elec. Info Man. Info
A
Supplier/ OR Manual pull/
Customer Withdrawl
Production MRP/ Order
Control ERP Input
Other Info
Kanban Signal Production
Post Kanban Kanban
Withdrawl Kaizan Queue
Kanban Burst
Recieving
Load Store / WIP Safety
Leveling Stock
0X 0X
Inventory First in, First out
FIFO
Push: Push Sequenced
Matl. Move Pull :
OR
Shipment
External Warehouse
PLT Movement
Production Lead time Oven / Quality Problem Area
Production Cycle Efficiency Heat /Prep.
work time per shift Define effective Work hour/day
demand qty. per shift x working day & calculate Takt time.
Record all your assumptions.
Process :
Value Stream Mapping
Queue Cycle ChangeoverTi Std. Units Processed WIP Distance to next Existing FPY Existing Comments :
Zone Oper Step Time Time me Inventory Finished process OEE