0 ratings0% found this document useful (0 votes) 513 views10 pagesIrc 74
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
TENTATIVE GUIDELINES
FOR
LEAN-CEMENT CONCRETE
soUbee 2 AND Ride BL
LEAN CEMENT-FLY ASH
I 3 CONCRETE AS A PAVEMENT
BASE OR SUBBASE
THE INDIAN ROADS CONGRESSnc: ras
Decor Gea (oad Delp) & ASL Sectaty
* cigs one serarap a tase?
Ty cmoy Ramee Eater ue) hitey Shear
4 Qetche At” Cup Ks
£ RESostownn Sit nn ahaa os
ie Rica
3 ha
Beg Din Sal Metals Dison, Cet
a
TENTATIVE GUIDELINES
FOR
LEAN-CEMENT CONCRETE
AND,
LEAN CEMENT-FLY ASH
CONCRETE AS A PAVEMENT
BASE OR SUBBASE
blah by
‘THE INDIAN ROADS CONGRESS
Samant Howse, Shaan esd,
‘ew Debi i0011
cnataan asFirst Pabished: March 1979
(The Rights of Pubcon and of Trosation are revere)
‘TENTATIVE GUIDELINES FOR LEAN-CEMENT
CONCRETE AND LEAN CEMENT-FLY ASH
‘CONCRETE AS A PAVEMENT BASE OR
SUBBASE,
Lean cement corte and lean ctmentfy ash conrete are
semiigdmmterate having ctintysapeio lead "enprcion
‘tetas ar comptrd to Saves! grsalar bee nee te
ter lice waerbound mnacdamy "As aufss smaller thickness of
these materia eam be weed tg selace the conventional baer 290
"ible sures exible and ri pavemen constrain,
Besides, superior fond spread ies,’ Ian cement
onect andes eoment By ath contd ae reasant to soining
Glan of water and eam serve as good Working palo on softer
‘Bandatins These ould be pateaary scl aa base eobase
hue i beavy if reas, of in ick cotton sol rene (when
oe in Sc heh tn wih eta cent ah
Ssh i araible ‘wig economis lead” Ar there uatere wil
Sal edi hen a eo en hey ie
‘ne courses has fo be obtained fot long dtsnces
In on cement cone mis the semen pute at thin
due «o'lesy quan cement.” Addition of fy ash rel in
Formation of menty ao poste of thicker onahtensy theeoy
feronng the platy aod adhesives ote mad ecg
‘tone a together, eof fs ne
‘inibute towards relieving is problem. NE NT AHO
“These guidelines were approved bythe Cement Concrete Rosd
Surfacing Commitee (porsontl sites bom) fa teasing Hed
2 Bhopal oa the Sth Becenber, 1976
1Bi Ra
erie
Dieta Genere and
Dovomea erenie
ese were then processed by the Speieations end Standards
rma ei il Nee Bch Fah
fhe Commitee were ened ou by Dr, we ION oF
ARUP, Sitka aubted by VR. hull CE. Sei ak. Rise
2 THOREDERR REE or Ha cra concn ao
ESSERE Si SSP
24. As Subbasetase Course in Fes Paveeat
ZL Asfaluein case of semirgid materi i by tensile
yack, ie CHR meted of dergn sso sane easeta
Howe ia te absence of an esublshed presse oe ene
of fombigd bases or subboses in composie. comune
{Biknes of fean cement concrete or Iea Cement ek eth
layer ay be "designed fr the present ss per ig COI aaa oF
dssan, "age IRC: 37-1970 “Goilclnes for ‘Teiee cPey a
*
vesens™ wg an eqivaleney
utr of 130". "Phe dick esy ot
the Semitigid Iyer 20 obtained shal theesfer te SRS Tot
degeacy by calculating is ude Tond cisying Mapes
Meyer eauatons
ke: 4359)
defi
3(1-$)
where Aeulinate oed carrying capacity for ineior loading
onal,
Vat
sone, Rglem (050-035 fog ie ane
Pie oad :
“thins ofthe Ian cementen cmeaty ah concrete
yer ean
‘Rolmons ia of lan cemenifein cement Ay ash
‘concrete (0,200.30), a 7
‘r= madulusofrubgrdeceaction determined on top of the
[get below leah cementiean eomeaty ah cogs,
glen
‘aequvalet radius of tosd distbation over the lean
nonteancemeat ly a conse oge Ss,
‘ty et ee
213, To allow fr loud repetition during the deign lie of
ig, pase, he siimate toa een bay, See LG af
Hie hn te design mea ade Se emlY shuld be
(Put) recommended for he putpise we peer eaTamed
ee
Sree] oe we we ww
ton Pacor 15015 tate as
eee se
214, Temperature stresses may not be considered ia thls
si i a ies tna yee
Hiying pavement “ayer. Thickness of eta cemenilen comet
p88 nc layer, should Rovers, ne ene oe es a
215, Aa itive example of thicknes design for tean
seen cement ah contole hase It Hele pene S
sea In dmesare
22 As Subtase Course under Rigid Pavement
‘The thickness of lean cement conerete or lean cementy aah
once layer for seas 9 ubbase course tinder cement sence
Dierent should te as perIRC: 151970, “Slandacd Spine
ei oF esr Be Comcast
Revon 151970 recommends the passion of 19 oa,
{Wie fe emeit ones obese te eae
bfvater bound aca
2. ‘The tenth reguiement of itn cement eoncetiean
comet yah concet shal bear gen a ure
Se Cment
[Semen for ws in lean cement cones o ean cement fyash
onsets sould conform to he rquiemonaf 1: eSNG seeeee
feats for Onnay” and Low’ Heat Forand Conant (Sera)
Renin)” og 4489 pecifatons fr Porkand Resse
{Geta «18 485967 Porta Hstarnace Slag Conese Seed
Revision)" The use of portand poszaltna concn shea hag oer
essed 6 lean cement concrete only Ie thould ot be wal ene
‘of leancement Ay ash concrete,
32. Bly Ash
Fly sh should conform o 18: 3812 Patt 1) 1966, Standard
Specitions for Fly” Ash, Partly For Use. adnininy fo
Conca," The time ietcivy shou not bees a8 Seo
neat not lis han 2800 oj, and Carbon conte or
th 12 per ea
33. Anmegates
Conee spares for use in Yan cement concrete or lea
emery "aah “cones shouldbe her neue oes sogae
fonfyming 01: 3831970 “Standard Specdeutoer he asso
Fine Aparegser ftom Netrl Suress fer Cancer these
broken brick confocming o 18 Ses 968 «Speefeitn br Bockes
sik Course Anargate for Us in Lime Coatrete™ of coger sane
{te conforming tolS: 26861968 “Speciation or Ces AES.
te Use ta Lime ‘Gena depending pen theta
th, ine apgrnate shuld confor Be
18st Sree tor Broken Boa Pie Ase ices Vos,
Hine Morar" Ageropue conforming wo TS: 2¢6¢18¢4 and tetiag
the fcaed grading Yor he aggregate as sipuited iS See
|sTomty also be considered" Inscccing the agergeten cea
‘ulema siptated in para should be kept Sine
‘The maaimum nominal se ofthe agrepate shuld ot exceed
2.1m por thould ibe fees than 20 ane Bus eee Seen
‘aerate sould be win the linia gies in Te
SS
lname ean ping 7 oe
Noaineasinun ie Nontalwaism sn
2mm se cary
5 we 4sSA, Water
Water ated in mining or cv of eoerete shoud be cleat
snd fies from injorioue amon of seleterous mater, Poible
Steers penny cousdered salstetry for ths purpose:
4. Mix Design Cetera
4d. To act as seairigit paveweat layer ean cet
cyoctiaan ometlne ay Sone shold dened
Shen compen sng of gem at 28 ay
Apes nea it, te don by cling, ka
vy eg ,
4.12. Having terard to procese variances ia he fl, te
Iabottory mie shou be designed for 1.25 tines the required 28
ye i rena,
42. Mix Deige
421, ‘The mix proportions for lean cerient concrie and
Jean cto yaa concrete ve designed by tin ane rrr mtios,
ST llline Sclecton of saiable proportions of the tial mix,
Dacia res fow ach conerele mine. signed wi yaa
Ponting 18 3812 (Part T1966. Specticatons for Fy” Asn
for tie ah Admintre for Concrete diam course sand aad
od quality erated course aggregate cf 20 mim mst se are ea
frtable Sad
422., The maximum sz of the couse agzeate in te mic
is totiad'by the thickness of the lean cement concrete laa
eet iy aah canocete layer so be lid and houlé generally ‘at
EERE WS tom foe Wo em Inger thickness, Wile fleung ta,
‘ae proportion frot Table Sor alloneace should be made fo
‘Funds nthe mano size and shape of ageregate a Inco a
Sean th apa er eae
{ibn nates content cage fom angular (crarhedaparegte) 10
Younded (uncrshed pave) shupe fouls futon tn both Wate
foandes Gatenty ang increase or etretse in Agrees modelos
Siidsequcess ike change in stad content” Signfcantly, lower
Siu ay eed en ogress sch a Boke ik os
Re:t49»
“ama Pamouano Tne Lan Cher Conner Mas
MinPoporians (me) | Mae
%]_ vetoes ory | am gy |
% os] ae.
Dl me
EER neste
Tue Que Coos Tan
&, Tet a ingen eae
~~ aaNEETIA Gace pa ee
ek
To Gay oat
2. ano Fy ‘sonar. zs
5 abate Above ISRO.) er 0 ut
4 306 oot to423, Asa 1oWph pude forthe spulated 28 day compres
iv stsogt of 40cD Kglen the approrimae total oparees)
pet to il Se the ange of 21R and ater cone See
SST per can by weight of tts dry materials or tee cee
oneete mite, when eeshed Hoe wed a ae ety
424. In ease of lean cemeatty ash concrete, optim
strength ib obtined by cepacng about 50 per sant or Sea ee
weit in convention lan coca concrete ina by Syet aate
totic ide Tables andl) "The unter cote reque:
‘ent inthis ase acensed by about 1 pee cen oa dal
Binds org han double vba he cocina eat
ong mix Te folowing procedure ay, therelony, Se neeee
{© btn mi proportions fof ean cement ash conctie
(1) Suet eas cement concrete mit ciresponding roughly
'o 0 percent ofthe sent requreien fv lega cone.
By a conte ie Be tea i Sey
(Gent: and conse agrepic) by wel, ith watt
Soeat of by weight otal agers
i
|
i
i
i
(Coresponing mix for lean meaty ash consrete ma
© saan sea iad
1: (-9) x pam (cementsandilyars ode aggeste),
aio of cic gravity of Ayah snd sand,
*-erorin of dy wage a one ote
imiiote ence by" Hse on Squats
Ween Ara ad fe, ud oS OM
adopted for p. : ae
© ce mn a ae
Senge cearesg eaten cr
hate ie ted ump (12 mm), “Ea we ded
(4) Siniany, determine water content segurement for two
© Station ines " :
tne spe er (52)
arn coe epeymy (ZL)
at text coes for determination of sompresve sey
© Soe Be tce ee, and et Sppropte
sigh mle ome gt
Very approximately, the ratio of total aggregate eluding Ay
sl (.cemta wi be the range of 1623 dad water requirement
‘nthe range of 1-12 per cent by welehtof lta. dey ‘materia for
thespulted 28 day Compressive strenght in terange of 400 Fy
‘hen crushed Sone wred oe Sout area.
5. nouns
SL. Batcing and Mining Eqapment
Dogtra yin etna enn
ao oi of rere eg met eg sty
Soe oe ene cee
SENSE Sis a Se
12. Comat Pot .
eae aces
sedan teirseea tues
Becuinuraiaarete i nGargar tae
Seeclahitceeinrs haan as dere
‘used. *
(PREPARATION oF Tix: supGRADE|SUBASE
61, The subgade or subbase over which de Jean cement
coueeaieancomentty ah concrete Iyer et be id, should oe
eced or fig, prade og erosion vide Chapter fof IRS:
947, Hanabook of “Quilty Conta or Contest of Ronds
td Rayaye (Fst Revson)". Ail reels bsyoad the pets
Iltgalrtace should be rected," Sof and yielding spots bad
fut if‘prsent, should be coreied and fll vat em the
Ehecing an clieation of he ndetging ayer shuld be dene
fesse days i advance of lying lean uma Concro tens Comet
fy ask concrete,
6.2. To peovent absorption of water fom lesa cement gone
creteancenant ly ah ences the underlying age Sl ebe
esvered wih water proof paper or brows fo mist cndion
°
|
tip cacao ons
age and Hauling of Cement
{The orovisans ig clase 6.1 of IRC 15-970: “Sandacd
Spectators and” Cade a Practice forthe‘ Conteysion ot
Geert Rens soni atowed a eur cae sed andi
72. Storage and Handing o Fly Ast
Fy ash, being light and very tne, gts cally ais borne, AB a
artim ay Ye aac abl tne ahd
‘ih ter Sethe op ding anion When oo aged
‘ay be red in raul treo ps Gop for the roneese
top utace may be eer kept wet ocoveed wit irl
73. Storage and Handing of Ageeztes
‘Ths proon a au 2 of IRC: 11970 “Sanda Spec.
eal ate of rae ty the Conse f Cone
Roath ou bs flowed nteaget of Stange sod Seach
cow eet of sors lng
7A Batching and Mining of Materials
‘The materials for making lean coment constteeen
eset ash concrete mix should be batched by weir eae
Proved weigh-batcing euipnent.- Valume Stceing ea ae
‘ted ony wien unavailable. Water may be eetced by ude
‘sing clltvated connie. Broprsoning ofthe conseaone ne
‘iat Hould be on fe tis of datgned tak proportion makin,
lc allonance for moisture presen infy ath and sprees WEN
Toaiog the mine, water shaulé be aude Rit conten
nen ad nggicges the at,
742, Mitug should be done la power din tes of ape
rove ps, ad uniorm homogenous ms fal he ees
fall beetsited. “Te mixer should aot be oreamady ee age
» alse ming tine (1 min} shouldbe alowed to enc ane
0
.
15, ‘Tramsportation and Placement
“The lay comet concrtainn comets ah const so
be trneporved tnd ao aceon the. prepara sabradesubbare 0
Mt e Compact layer has the Fequled deh slope sad -combe,
‘The mount of surcharge sequced be about 2028 per cent of the
Ueknes of layer to Bead "The seal amount of ersange may
Redoermined iroepy field tal Transporation and psement
seal! elo ne iio eo sereration hoy posta he
Btah which. Deoomesagregted dering placing” "should. be
‘Soouphiy med heal buy of he Sch Sig te roe
‘ess bsprending.
1.6. Compotion
76.1. When soficent length of Iean cement. coneeelean
cane ash conerete he been ft ptm oli. compaction
‘SHould be commenced (ee para 32). Rolin shout tar om the
‘tier edges of the pavenen and proceed toward the mule excep
‘StSopereteated ptions where It shovld commence at the lower
‘tae fnd proceed towards the higher." Adcjuate number Of pases
Sl be gen to ensure full compaction. lah psses ace generally
Sonsderd adequate forthe purpose
1U62._ ‘The grade and camber ofthe surfs sould be shecked
aig Sompion anda epins shold be crested By
‘emving of adding es mater
2.3., Commision shold be completed within specified
period wich She not exceed 48 minutes sumer nd Uhr i
ner ute aing “ie maatmem theknes fo be compacted fo
Single layer should no0 qened TO cy in case of sat whe!
elles and 3 eg cate of vinaory voller of equvalet capacty
(i en sy Whee ‘tate Snecma
layer shouldbe lid wihin one hos of sornaciin of the presse
hig hye
12. oat
No lah eo be oie act const ns the
end ofthadays werk. ‘Thus shal be formed. by chamferag the
fae of the land Tait ayer at an ange of about 30" tothe
18 Caving
[Afer nyng sod compseton of the total thikness of lean
0ment conereeleancemeat-y ash cones i should be eued for
{heft 48 tours by coveing ie mith wet sunty tops o heat ae
rari ee as ln yi a an
or watering quently in moderate quantities” Cariog by pony
not seer No iif shoud bealloed on i et ee
Yep courses have ben lid
79, Recteaton of Surface Ireglarites
The finished surfice should be chesked for ine, level, grade
pd surfer fh, Provlons in Chaper of IRCSP NT
‘*Hatdbook of Quality Conta for Constraton of Read tnd Rare
ways (Fist Revision” shouldbe followed for ik spares The
shcking and section a the svtae if coqulted, shoe be ee
Fed oo we the mic sill paste. Any suace fveglries eh
{ithe burdened layer shuts be eovzcied by cting o& sulbeeaty
large patches and flying fo apeiicton
1. Leae eenent cones and
Sigil mae Shp teen ca
‘oftiemmaleculdryingshrage’ ‘Ther oacks re Tigh ant
Fetsed on fo the wearfog surface if tie sence ayers pach
ith a hin biaminous wearing cours (eq. earice desing oF
renip, To prevent uch reftcdon craskitg, When, leat cent
foseetoean Comeatly ash eonerete wsdl i cmposte pveret
Eetseucton, sir recommended that an intents ayes of wate
Sogn item, bumibo micadam shoot
Hegel inthe emivgd yo ado bon ee eee ae
to the sure. Minton’ tickness of the. Intermeding see
Dis wearing curse sould ot bees than 10 en
in cementy seh concrete,
182, In xs of rgd pavement, whsce lean cmeat concrete)
leencoyey th ene wed a ake ceme om
{iste nearing course canbe ld dcety thereon ‘without provision
ft tea ier a Ses ee ly Of Ihe Set
onerete layer, cracks from the semtigh “aitlase do. not
‘eft a
9. quattry coxteor
Qutty nto ese and thelr minimum deseble frequency
should Bea gvenin Table “st
2
Amesve 1
AN ILLUSTRATIVE EXAMPLE OF THICKNESS
DISIGN FOR LEAN CEMENT/LEAN CEMENT FLY
ASH CONCRETE BASE IN TLENIBLE. PAVEMENT
Design Parameters 5
Design whee lon, ? 110 ke
Present Tale Ineiy ‘500 veiday
‘tyre pressure Ss talon
33
Modulus of subgrade rection, & “ao eglene
euatency fictors in terms of granule onstruction:
{ean mentum cement yas Contes
Biuminous macadumn
Asal concrete
‘led mix desi compressive svength of Letn cementLean
‘coment By ash concrete fo 60 kglont
Desia Procedure
‘Step 1. Design trae intensity for feuible pavement at tate
rowih rte of 73% and design fe 10 years ous
fees
0 (14007598
3032.06
18, which ls under tals clasieaton
Felling (Curve Fof CHR curves for fxible pavement design
(GRC: 375970) the otal hike oF consrecionrequed one
{he compacted ot of CBR 8 works out as Soe,
‘Step 2. Assuming minimum cover of 10 em bieminoes racic
fem and’ cn A.C oer elena Comenicn coment.
Ay ah conve: tvs
valent gramlar coateyton thickness over ean
cnn cone apc ae
base 1032.04 452002280 em
a|
Stop 3. Rasiys of oad dispersion on Laan cxnen)Lssn cement
Ay ash conte ate,
radi of eontat st srface thickness of equvuent
raul contrcton over the be
=43.0em
Stop 4 For eusuringu minim load factor of 1.67, te se
uted tlie Tend creyngsaptiy of es cement
Ayach coneete bee, EPH
(A100 167-8850 48,
166m
»
snd king fod x= x0
0510 rene
tas,
so ate ie |
Vee |)
Tatas Saco
~s2em
eo
28 anes
poo Dati BexiOat6ei
1-§) 3 E00)
=10 > ne
Gem may be taken as the imum design
‘Mica ea catenin creat yb a
sre base
4
‘Step 5. Total equivalent granular thickness of Jean ceient!
lean cement fy ah conte base. aud bisinnons
‘iver thereon, taking So eutvaleny factor of 130 or
‘ean cemens ean cetent fy ab ance
16x 1.54280
14.0: 28.0~520 em
hich atiseg the design thickness raguirenent over
ompacted robgade ss per CBR erm
Summary: The dig seston of ele pavement it ean
ew
AY ah concrete base, therfore at nen.
Wem Lean Cenent/tean Cement Fly Ash
Concrete (Mins 28 day eid
J ——_eompressivesrengin Go kg em?)