Project Progress Report Jan 2018

This progress report from January 28, 2018 provides an update on Project GTC 644E/2014. The project is an extension of the distribution network and is 25.48% completed overall based on an original completion date of December 2, 2018. Milestone 1 is 13.78% complete while Milestone 2 is 25.48% complete. To date, work totaling 51,272,194.29 has been completed out of the original 174,200,000 contract amount.

Uploaded by

Athambawa Ramees
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views2 pages

Project Progress Report Jan 2018

This progress report from January 28, 2018 provides an update on Project GTC 644E/2014. The project is an extension of the distribution network and is 25.48% completed overall based on an original completion date of December 2, 2018. Milestone 1 is 13.78% complete while Milestone 2 is 25.48% complete. To date, work totaling 51,272,194.29 has been completed out of the original 174,200,000 contract amount.

Uploaded by

Athambawa Ramees
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PROGREES STATUS REPORT AS OF 28th  January 2018

Project No  :‐ GTC 644E/ 2014 Project Start Date  11‐Aug‐15


Project Name  :‐ Extension Distribution of Network Phase 06, Package E  Project Completion  Date (REV) 2‐Dec‐18
Clinent  :‐ Kahramaa  Project Duration  1209
Consultant  :‐ KEO Internatinal Consultant  M‐01  Completion Date  21‐Jun‐18
Contractor  :‐ AALCO Group M‐02  Completion Date  2‐Dec‐18

PROJECT  TIME STATUS 
Contract Amout  174,200,000.00
Varaiation Order  Nil OVERALL  MILESTONE 01 MILESTONE 02
13.78%
Value of Varaiation order  Nil 25.48%
25.48%
74.5% 74.5%
Valuation No   18
86.2%
Work Done  51,272,194.29
Amount of invoiced  47,224,662.23
Elapsed Time  % Remaining Time % Elapsed Time  % Remaining Time % Elapsed Time  % Remaining Time %
Approved Amount  47,224,662.23

Construction Phase Progress 
120.00%
This Weeks Progress Cummaltive Progress
Cumm Plan % , 100.00%
100.00% Planned Actual Planned Actual

1.01% 0.47% 100.00% 46.27%


80.00%

Cumm Actual %
Variance -0.54% Variance -53.73%
Percentage  %

Cumm Plan %
60.00%

Cumm Actual % 46.27
Actual
40.00% Cummaltive Progress

This Weeks Progress

20.00%
Planned

0.00%
0.00% 50.00% 100.00%

Construction S‐Curve (WHERE FULL CLEARANCE AVAILABLE)
Physcial Progress Each Site 
Length  This Period  Cummulative  Actual  120.00%
Project Area  BL Start  BL Finish Actual Start  Status
(m) Plan  Actual  Variance   Plan  Actual  Variance   Finish
Milestone 01
Garafat Rayyan  1206 100.00% 100.00% 14‐Jan‐15 16‐Apr‐16 22‐Feb‐16 Completed  100.00% 98.75%
Wadi Aba Seela  3422 100.00% 100.00% 29‐Nov‐15 17‐Apr‐16 8‐Dec‐16 Completed  Cum Plan % 94.73%
90.72%
Umm Slal Ali ‐01 242 100.00% 100.00% 25‐Jan‐16 4‐Apr‐16 30‐Mar‐16 14‐Jun‐16 Completed  Cum Actual % 86.52% 81.93%
82.58%
Umm Slal Ali ‐02 1399 8.00% 2.50% ‐0.50% 93.00% 95.00% 27‐Jan‐16 3‐May‐16 ongoing  80.00% 78.84%
77.01%
Umm Slal Ali‐03 529 100.00% 100.00% 18‐Feb‐16 21‐Apr‐16 25‐02‐16 Completed  Percentage%  70.87% 75.52%
Al Refaig  7441.5 7.00% 5.00% ‐2.00% 44.00% 57.00% 15‐Nov‐16 30‐Jul‐16 on going  65.08% 72.49%
69.33%
Milestone 02 60.00% 59.31% 65.80%
54.52% 60.56%
58.69%
Lebsayyer part 01 12757 100.00% 100.00% 13‐Feb‐16 4‐Dec‐16 14‐Feb‐16 Completed  51.52%
49.08%
46.70% 53.89%
AL Galeetha  2401 100.00% 100.00% 14‐Jan‐16 30‐Nov‐16 27‐Mar‐16 Completed 43.72% 49.54%
Umm Birka  5224 9.00% 4.00% ‐5.00% 85.00% 74.00% ‐11.00% 19‐Apr‐16 27‐Oct‐16 On going  40.00% 38.73% 46.34%
36.18% 42.91%
40.72%
32.49%
Al Gharafa Nort A 1286 15.00% 1.00% ‐14.00% 95.00% 74.00% ‐21.00% on going  29.76% 36.52%
34.72%
25.68% 31.58%
Al Gharafa Nort B 331 Pending  22.85% 29.62%
20.00% 20.35% 25.54%
Zekreet & Broog  6319 100% 100.0% 20‐Mar‐16 22‐Oct‐16 1‐May‐16 completed  14.73%
22.74%
18.89%
Al Ebb  305 on going  7.22% 11.57%
2.70%
Lebsayyer Part 02 6750 3.00% 0.50% ‐2.50% 98.00% 81.00% ‐17.00% 2‐Feb‐17 on going  0.00% 0.56%
0.01% 4.59%
2.20%
30‐Nov‐15

30‐May‐16

30‐Sep‐16
30‐Nov‐16

30‐May‐17

30‐Sep‐17
30‐Nov‐17
30‐Jan‐16
30‐Mar‐16

30‐Jul‐16

30‐Jan‐17
30‐Mar‐17

30‐Jul‐17
0.83%
0.44%
0.11%
Umm Slal Ali  202 100.00% 100.00% 27‐Dec‐16 10‐Mar‐17 Completed 
Al Khesaha  5617 100.00% 100.00% 20‐02‐2017 Completed 

Lebsayyer Lewaijiya  8749 100.00% 100.00% 0.00% 15‐Nov‐16 Completed  Month


Physcial 
Length 
Excavation  Pipe Laying  1st Layer Backfilling  9 Bar Test 
Pipe  Length (m) (m)
Available 
Diameter  This  This  Cummulati This  Cummulativ This  Cummul
BOQ Scope of  Previous  Cummulative  % Previous % Previous % Previous %
(mm)  Period Period ve  Period e  Period ative 
work 
100 10078 7122 6375 0 6375 63.26% 6251 0 6251 62.0% 6182 66 6248 62.0% 5966 0 5966 59.20%

150 20694 19238 19328 0 19328 93.4% 18973 0 18973 91.7% 17857 0 17857 86.3% 16233 0 16233 78.44%

200 13179 14658 13859 0 13859 105.2% 13262 386 13648 103.6% 9805 880 10685 81.1% 6404 0 6404 48.59%

300 32589 19739 19799 275 20074 61.6% 16246 423 16669 51.1% 14708 0 14708 45.1% 11470 0 11470 35.20%

400 36051 8646 7143 55 7198 20.0% 6685 0 6685 18.54% 5990 0 5990 16.6% 689 0 689 1.91%

600 2401 3874 3277 175 3452 143.8% 2515 45 2560 107% 2402 0 2402 100% 2402 0 2402 100%

1200 8 8 8 0 8 100.0% 8 0 8 100% 8 0 8 100% 8 0 8 100%

Total  115000 73285            505              70,294           854      64,794           946         57,898        ‐   43,172

@ Ras Al Noof, Surrounding @ Waterlogged Area  @ Al Refaig  , Pipe laying  @ Ras Al Noof  , Final  Layer Backfilling  @ Lebsayyer , W.P for Chamber Wall @ Rawdath Razeed , Pipe Laying 


The status of project Area which was received from Kahramaa up to 27th January 2018

Project Name :‐Extension Distribution of Network, Phase 06 – GTC 644 ‐Package E                          

Original Scope of Work                                                                                                                                                                                          115 km
Length of RO and Other Permits Cleared Area (M1 & M 2)                                                                         86.396 Km
Length of MME Rejected                                                                                                                                  1.779 Km
Length of issues and under discussion with Kaharamaa Planning Department                                   10.652 Km
Dele on of Area from Scope of work                                                                                                          34.571  Km
5

RO and Other Permits Cleared Area

1200 Dia
100 Dia

150 Dia

200 Dia

300 Dia

400 Dia

600 Dia

Length
Total 
Milest
Site/Area Drawing No  Status
one

1 Garrafat Al Rayyan NDS‐12BP‐011 415 316 475 1,206 Commissioned 


2 M‐01 Umm Slal Ali ‐Area ‐1 NDS‐12BP‐013 242 242 Commissioned 
3 Wadi Aba seleel NDS‐11F‐108 RevB 6 39 1135 1630 612 3,422 Commissioned 
4 Lebsayyer ‐ Part 01 NDS‐12BP‐003  8268 2205 2295 12,768 Commissioned 
5 AL Ghaleeda NDS‐12F‐047 Rev 2 2401 8 2,409 Commissioned 
6 Zekreet & Broog 72‐ 05‐00d 385 2757 6 3232 5 13 6,398 Commissioned 
7 Lebsayyer & Lewaijiya 80‐15‐00b 55.92 2070 2370 4,496 Commissioned 
M‐02
8 Naga Al Mamlaha (HDPE) NDS‐16F‐012a 890 890 Commissioned 
9 Rawdath Egdaim NDS‐17F‐BP03 770 770 Commissioned 
10 Umm Slal Ali ‐Area ‐4  NDS‐16F‐BP001   202 202 Commissioned 
11 Umm Slal Ali‐ Area 3 NDS_13F_BP16a 95 434 529 Commissioned 
Al Keesha (70/20/00) 70‐20‐00
13 3565 776 842 568 5,751 Completed ‐ Not Commissioned 
14 M‐01 Umm Slal Ali ‐ Area 2 NDS_13F_BP15b 744 28 627 1,399 95 % Completed 
15 Al Refaig 72/04/00  7445 7,445 57 % Completed 

Lebsayyer‐ Part 02 NDS‐12BP‐003 
17 1094 5668 12 6,774 81% Completed 
18 Ras Al Noof (New Proposal ) 74/28/00  27 3965 3  3,995 78% Completed 
19 Gharafa North A NDS‐DMA‐512A 10 64 1,213 1,287 68% Completed 
20 Umm Birka NDS‐12F‐046d 1,976 3,222   5,198 74 % Completed 
Lebsayyer & lewaijiya 80‐15‐00b
22 4296 4,296 Completed ‐ Not Commissioned 
23 M‐02 Al Wukair  91/23/00 Rev B 1390 1,390 20% Completed 
24 Mekaines & Rawdath Rasid  82/12/00 Rev A 2361 58 2,419 23% Completed 
WadiAba Seleel 91/21/00 Rev E
26 2 4 627 3902 4,535 New Site Received On 21‐01‐2018
Al Refaig  72/04/00 Rev E 
27 3213 3627 6,840 New Site Received On 21‐01‐2018
Feereej Absel Aziz  14/03/00
28 882 491 362 1,735 New Site Received On 21‐01‐2018

Total Length  (Meter) HDPE Pipe  890

Total Length  (Meter) DI Pipe  10329 23360.92 15020 20366 12548 3874 8 86,396

MME Rejected ‐ Hold 

Si. Mile  Site/ Area Drawing No   Total 


No stone 100 Dia 150 Dia 200 Dia 300 Dia 400 Dia 600 Dia 1200 Dia. Length Status
Simsima NDS‐12BP‐014 RevA
1 M‐02 209 491 741 338   1,779 MMUP Rejected due to no ROW

Total Length  (Meter) 1,779

Corridor issues Discussion with Kahramaa Planning Department ‐ Hold

Mile   Total 
Site Area  Drawing No 
Si. stone 100 Dia 150 Dia 200 Dia 300 Dia 400 Dia 600 Dia 1200 Dia. Length Status

  MME Approved 600mm Line only 
2 Ras Al Noof  NDS‐13F‐017B 4942 2344 7286 and Corridor not yet confirm, DR 
under process ‐ Oh Hold 

Al Ebb  ‐ Zone 70  NDS‐15F‐BP46     
M‐02 305 305 On Holddue to Site Obstruction  
Under discussion with M/s. 
Furssiya  54‐10‐00 C Ashghal & Water Planning 
7 13 21 1622 177 1,840 Department. 

Rawdat Al Jahaniya  51/18/00 Rev A Ro Under Process ‐ WP Hold due 


18 14 525 664 1,221 to 350 m out off ROW. 
Total 
Length   10652
Deletion of Area
Si. Mile  Total 
No stone Site/ Area  100 Dia 150 Dia 200 Dia 300 Dia 400 Dia 600 Dia 1200 Dia. Length Status 
1 Ghaleetha ‐ Part 02 4084 8326 12410
Letter Reff:‐ TW/6786/2016
 2 Wadi Al Ekresh & Al Slemiya Village
890 5800 5059 11749
 Gharrafat Al Rayyan‐70 (NDS‐
3
M‐02  16F‐BP001) 172 219 391 Transferred to Boom Contractor 
4 Gharafa North A  94 81 8 1357 1816 3356 TW/TWS/6311/2017
5 Heenath Al Seela 566 1902 3821 45 6334
6 Al Gharrafa North B 218 113 331
Total length (Meter) 266 1756 7928 14321 10255 45 0 34571