MAKEUP WATER PIPING – PIPE SUPPORT ANALYSIS REPORT
Issued for Review and
0 06-09-2016 BT LJA MG
Approval
Rev. Date Description PREP CHK APPD
Project Title:
2x350MW COASTAL THERMAL POWER PLANT
Thamminapatnam, Nellore, AP
Owner :
MEENAKSHI ENERGY PRIVATE LIMITED
Project Management
Consultant
TRACTEBEL CONSULTING ENGINEERS (P) LTD.,
Owner’s Engineer:
STEAG ENERGY SERVICES (INDIA) PVT. LTD
BOP EPC Electro-Mechanical
Contractor:
EDAC ENGINEERING LIMITED
BOP EPC Electro-Mechanical Contractor’s Engineer:
BOP Supplier / Package:
Project No. Job Scal Sheet No.
No. e
- 1 Of 15
Document No : CTP-20-DE-M-ER-PAB-XXXX
Sub-Contractor Drawing No.:-
Sub-Supplier:--
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
Contents
1) GENERAL 3
1.1 Scope 3
1.2 Definitions 3
1.3 Units of measurement 3
2.REFERENCE DOCUMENTS, CODES AND STANDARDS 3
2.1 Reference Documents 3
2.2 Codes and Standards 3
3.DESIGN DATA, DESIGN CRITERIA AND ASSUMPTIONS 4
3.1 Design Data 4
3.2 Design Criteria 4
3.3 Assumptions and Notes 5
4.CALCULATION METHODOLOGY 5
4.1 Computer Program Description 5
4.2 Load cases Analysed 5
5. CONCLUSIONS 7
6. APPENDIX : 9
6.1 APPENDIX-A (PIPE SUPPORT ANALYSIS)
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
GENERAL
1.1 Scope
The scope of this analysis report is to evaluate and verify the stresses in Makeup Water
Piping Support(saddle type) with respect to Allowable value and given Dimensional
configuration.
1.2 Definitions
The following definitions are used in the report:
NB : Nominal Bore
P&ID : Piping and Instrumentation Diagram
GA : General Arrangement
1.3 Units of measurement
In this document the SI units are used.
2. REFERENCE DOCUMENTS, CODES AND STANDARDS
2.1 Reference Documents
The following documents have been used as reference for the basic input data considered in
the stress analysis verifications:
SI. No. Drawing / Document No. Drawing / Document Title
1. CTP-20-ED-M-PA-PAR-009 _R4 Makeup Water piping layout
2.2 Codes and Standards
The verifications have been carried out in compliance with the following codes and
Standards:
ASME B 31.1, POWER PIPING
ASME Sec VIII Div 2. Saddle analysis
3. DESIGN DATA, DESIGN CRITERIA AND ASSUMPTIONS
3.1 Design Data
The main pipe support geometry has been created as per enclosed input drawing in the
PVElite stress analysis program.
DESCRIPTION UNIT PARAMETERS
Fluid type Makeup water
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
Fluid Density Kg/m³ 1030
Design Pressure Kg/Cm² (g) 4.7
Design Temperature ºC 50
Operating Temperature ºC 33
Ambient Temperature ºC 30.5
IS 2062 Gr.B (with 1mm thk corocoat lining)
Pipe Material
[Equivalent material in CAESAR is A53 B]
Pipe OD & Thickness - Refer Pipe Dimensions below
Pipe Density Kg/m³ 7833
Corrosion Allowance mm 0
Hydro test Pressure
1.5
Factor
Pipe Dimensions
SELECTED PIPE (mm)
Sl. no. SECTION
NB OD THK.
1. Makeup water pipe 1400
3.2 Design Criteria
The resulting stresses on the pipe due to the loads are combined and verified according to
the method and the allowable values, respectively, stated by the ASME Code.
4. CALCULATION METHODOLOGY
4.1 Computer Program Description
The global stress analysis of the piping has been performed using PVElite 2016
4.2 Load cases Analysed
Sl.
No. LOAD CASES LOAD CASE TYPE /
ANALYSED CONDITION
L1 WW+HP Hydro test condition
L2 W+D1+T1+P1 Operating condition
L11 L2-L10 Thermal Expansion Condition
Notation Description :
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
WW – Water filled weight
W – Weight
D1 – Displacement case 1
T1,T2,T3 – Thermal Case 1,2 & 3
P1 – Pressure Case 1
HP – Hydro Pressure
F1 - Concentrated Force Case 1
U1 – Uniform load case 1
U2 - Uniform load case 2
5.0 CONCLUSION:
Based on the supports, under all load cases are analysed.
Loads on Support are within the allowable value.
Stresses at all locations are within the allowable limit as per code.
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
APPENDIX – A
PIPE SUPPORT ANALYSIS
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
As Per drawing :
CTP-20-ED-M-PA-PAR-009 _R4 Makeup Water piping layout
As per PV Elite Model :
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC
MEENAKSHI ENERGY PRIVATE LIMITED SEA WATER INTAKE PIPING
2 X 350 MW COASTAL THERMAL POWER PLANT STRESS ANALYSIS REPORT
THAMMINAPATNAM, NELLORE, AP
CTP-29-DE-I-DO-PAB-0017-REV0-16.02.16 EDAC