04 Apr 2017
04 Apr 2017
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 17.51 17.257 209 1,312 18.223 17.976 0.00 0 1,312 31.0 87.8 44.6 0.98613 1,294 3.234 1,290 0.12544
3C 6.35 6.127 4,724 29,715 Nil 29,715 31.0 87.8 44.6 0.98613 29,302 73.256 29,229 0.12544
4C 17.94 17.697 77 483 Nil 483 30.6 87.1 44.6 0.98648 476 1.190 475 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.024 2,767 17,402 17.933 17.712 71.19 448 16,954 31.3 88.3 44.6 0.98588 16,715 41.79 16,673 0.12544
7C 3.90 3.681 5,724 36,004 Nil 36,004 30.3 86.5 44.5 0.98680 35,529 88.823 35,440 0.12551
8C 3.78 3.564 5,149 32,383 17.640 17.419 208 1,307 31,077 30.2 86.4 44.6 0.98683 30,667 76.668 30,591 0.12544
SL.P 8.89 8.618 308 1,939 9.200 8.933 298 1,875 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.581 306 1,923 11.220 10.936 231 1,450 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 19,263 121,161 808 5,080 116,081 114,510 114,224
REMARKS: 871 62 810 799 798
PRODUCTION LOADING IN TO 6C
24.00lt Change over tank production COT 2 C in to COT 6 C
Gross Volume :(T.O.V.) 121,161 Oil Volume @ 60 F :(N.S.V.) 114,224 DRAFT FWD 7.50 m AFT
Less Free Water : 5,080 Less OBQ/ROB :
Oil Volume :(G.O.V.) 116,081 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 114,510 Long tons/Metric tons :
Long Tons/Metric Tons : 14,367 14,597 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 4-Apr-17
0 0
162 0.12745 164.866
3,675.703 0.12745 3734.601
59.721 0.12745 60.678
0 0
2,096.711 0.12745 2130.308
4,459.261 0.12752 4530.675
3,846.905 0.12745 3908.547
7.845 0.12745 7.971
58.255 0.12745 59.189
14,367 14,597
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bahri
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
'24.00lt Change over tank production COT 2 C in to C
OIW Peak (mg/I) 0
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 6C
&5C
oduction COT 2 C in to COT 6 C
17481/114188
e Vessel
Comment
COT 1C & 5C
nifold inport
n lay down area
dept. Works
COT 1C & 5 C
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Bunkering/Debunkering :
ENGINE :
1. Maintenance auxiliary engine no.2
2. Maintenance auxiliary boiler burner equipment
3. Replaced fine filter no.2 RO with spare
4. Cleaned condenser sea water side tube air conditioner for accommodation
5. Running up A/E No. 1 & 3:
09.00 - 14.00 : - Free gas by IG blower fan COT 5C
9. EHS AUDIT/INSPECTION
TOTAL
3987
3985
TRANS ROB
0 200.37
0 38.19
ROB `
81
268
ROB
200
POB
45
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
11
12
13
14
15
16
17
18
19
Date
20
21
22
23
24
25
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 664 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
TOTAL 96 3 84 183
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 4/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
2 IYYANG C/O CCR Free gas COT 5C by IG fan blower Done Positive 1
3 ANDI AHMAD UNIT 2/O Bridge Check and maintenance navigation equipment Done Positive 1
6 ACO AKBAR 2/E RO Room Replaced fine filter no.2 RO with spare Done Positive 1
7 RATNO SITUMORANG 3/E Engine Room Maintenance auxiliary engine no.2 Done Positive 1
8 LILIK WAHYUWANTO 4/E Boiler Maintenance auxiliary boiler burner equipment Done Positive 1
10 AANG Bosun Main deck House keeping all equipment store Done Positive 1
11 UDIYANTO AB Forward Deck Maintenance bold & nut flange manifold inport Done Positive 1
12 M SAFARI AB Forward Deck Maintenance bold & nut flange manifold inport Done Positive 1
13 MOHAMMAD ANSORI AB Main deck House keeping main deck COT 5C area Done Positive 1
17 NUR ALI MTM RO Room Assisted 2/E cleaned fine filter for RO for spare Done Positive 1
18 ADOR MTM RO Room Installed new drain pipe COPT area Done Positive 1
20 SUMARDI WIPER Engine Room Assisted maintenance auxiliary engine no.2 Done Positive 1
21 HASAN C/Cook Galley Clean up cooking equipment after used Done Positive 1
22 ROHIM 2ND/Cook Galley Daily house keeping at galley room Done Positive 1
Crew mess
23 RANGGUN JAWI STWD
room
House keeping at crew mess room Clean & tidy Positive 1
Officer Mess
24 BOBBY MANGONTO STWD Room
Daily house keeping at officer mess room Clean & tidy Positive 1
TOTAL 24
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
MAINING SLUDGE IN TAN
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
46