This midnight ullage report provides tank level and volume measurements for an FSO vessel carrying Oyong crude oil. Tank 2C contained 1,312 bbls of oil, tank 3C contained 29,715 bbls, and the total oil volume on board was 116,081 bbls with 114,224 bbls at 60°F. The vessel draft was 7.5m forward and 10.8m aft with 3.3m of trim and no list. Remarks noted production loading into tank 6C and a tank changeover from 2C to 6C.

Uploaded by

Ihwan Asrul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views38 pages

04 Apr 2017

This midnight ullage report provides tank level and volume measurements for an FSO vessel carrying Oyong crude oil. Tank 2C contained 1,312 bbls of oil, tank 3C contained 29,715 bbls, and the total oil volume on board was 116,081 bbls with 114,224 bbls at 60°F. The vessel draft was 7.5m forward and 10.8m aft with 3.3m of trim and no list. Remarks noted production loading into tank 6C and a tank changeover from 2C to 6C.

Uploaded by

Ihwan Asrul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 38

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C Nil 0 Nil 0 0 0
2C 17.51 17.257 209 1,312 18.223 17.976 0.00 0 1,312 31.0 87.8 44.6 0.98613 1,294 3.234 1,290 0.12544
3C 6.35 6.127 4,724 29,715 Nil 29,715 31.0 87.8 44.6 0.98613 29,302 73.256 29,229 0.12544
4C 17.94 17.697 77 483 Nil 483 30.6 87.1 44.6 0.98648 476 1.190 475 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.024 2,767 17,402 17.933 17.712 71.19 448 16,954 31.3 88.3 44.6 0.98588 16,715 41.79 16,673 0.12544
7C 3.90 3.681 5,724 36,004 Nil 36,004 30.3 86.5 44.5 0.98680 35,529 88.823 35,440 0.12551
8C 3.78 3.564 5,149 32,383 17.640 17.419 208 1,307 31,077 30.2 86.4 44.6 0.98683 30,667 76.668 30,591 0.12544
SL.P 8.89 8.618 308 1,939 9.200 8.933 298 1,875 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.581 306 1,923 11.220 10.936 231 1,450 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 19,263 121,161 808 5,080 116,081 114,510 114,224
REMARKS: 871 62 810 799 798

PRODUCTION LOADING IN TO 6C
24.00lt Change over tank production COT 2 C in to COT 6 C

Gross Volume :(T.O.V.) 121,161 Oil Volume @ 60 F :(N.S.V.) 114,224 DRAFT FWD 7.50 m AFT
Less Free Water : 5,080 Less OBQ/ROB :
Oil Volume :(G.O.V.) 116,081 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 114,510 Long tons/Metric tons :
Long Tons/Metric Tons : 14,367 14,597 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 4-Apr-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

0 0
162 0.12745 164.866
3,675.703 0.12745 3734.601
59.721 0.12745 60.678
0 0
2,096.711 0.12745 2130.308
4,459.261 0.12752 4530.675
3,846.905 0.12745 3908.547
7.845 0.12745 7.971
58.255 0.12745 59.189

14,367 14,597

10.80 m TRIM 3.30 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 4-Apr-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Saiful Bahri

Crude Storage Lifting

24 Hours Total (bbls) 871 Last Lifting 19-Dec

BS and W % 0.25 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


116,081 -

Storage Net / G.S.V (Nbbls) 114,510 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 114,224

Days to Tank Tops 239 Vessel ETA -

Total Crude This Month (Nbbls) 114,510

Water Offtake

Water Received 24hrs (bbls) 62 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 5,080 Note :

Total P/W Received (bbls) 9,452

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 31.3

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
'24.00lt Change over tank production COT 2 C in to C
OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 200.27 ### 39.56 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0.00 1.37

Closing (m3) 200.27 38.19 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day works


2. Continue free gas by portable fan COT 1C & 5C
3. Maintenance bold & nut flange manifold inport
4. Colleting garbage in to container on lay down area
5. Transfer sea good materials
Tool box meeting 06.30
6. Maintenance Auxiliary engine no.2
7. Maintenance Auxiliary boiler

1. Reviewed deck, engine and galley dept. Works


2. Continue free gas by portable fan COT 1C & 5 C
3. Check & maintenance LSA /FFA
Supervisory Meeting 16.30 4. House keeping

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
S.T.O.P. Audit program

Observation Card Report : 24


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

NTO COT 6C
&5C
oduction COT 2 C in to COT 6 C

17481/114188
e Vessel

Comment

COT 1C & 5C
nifold inport
n lay down area

dept. Works
COT 1C & 5 C

Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C
07.30 - 07.45 lt : Checked O2 Content and LEL in COT 1C
Free Gas COT 1 C & 5C In Progress
09.00 - 14.00 : Running blower IG no.1 ( Free gas COT 5C )
'24.00lt Change over tank production COT 2 C in to COT 6 C
Mooring/Unmooring :

Bunkering/Debunkering :

Personnel & Material Transfer :


05.30 : 21 Persons PKP by KST. 51 ( out )
08.45 : 1 Box wood sea good by KST. 51 ( out )
08.50 : 1 Person Santos Rep by KST. 51 ( in )
17.00 : 3 Persons PKP by KST. 51 ( in )
18.30 : 18 Persons PKP by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assisted transfer Santos rep & contractor personnel
2. Continued free gas by portable fan in COT 1C
3. Free gas by IG blower fan COT 5C & Continue free gas using portable fan
3. Maintenance bold & nut flange manifold inport
4. Collected garbage in to container at lay down
5. Marked label at wing bridge port side
6. House keeping COT 5C area
7. Transferred sea good material

ENGINE :
1. Maintenance auxiliary engine no.2
2. Maintenance auxiliary boiler burner equipment
3. Replaced fine filter no.2 RO with spare
4. Cleaned condenser sea water side tube air conditioner for accommodation
5. Running up A/E No. 1 & 3:
09.00 - 14.00 : - Free gas by IG blower fan COT 5C

2. PERMIT TO WORK PW MW HW CSE IP VAL


469 1865 384 181 8 1080
2.1 J HA 469 1865 384 181 6 1080
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1.37 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 0 28
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
21 20
MAN HOURS ( POB X 12 HRS )
Previous man hours 234084 Days W/O LTI 1223 Since 28-Nov-13
Man hours today 288
Total man hours 234372
Safe man hours 234372
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


04-Apr-17 @2400 HRS

TOTAL
3987
3985
TRANS ROB
0 200.37
0 38.19
ROB `
81
268
ROB
200
POB
45

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1782 2 1784
3578 24 3602
3 0 3
0 0 0
188 0 188

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( KL ) ( KL ) ( KL ) ( KL ) ( KL ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 43.77 0 0 1.30 0 0.0 0.0 24.0 42.47
02 42.47 0 0 1.30 0 0.0 0.0 24.0 41.17
DO Consumption for Boiler
03 41.17 0 0 1.61 0 8.0 0.0 16.0 39.56 (Burning n Before stop 0.2
KL )

04 39.56 0 0 1.37 0 5.5 0.0 18.5 38.19 Free gas COT 5C


05
06
07
08
09
10

11
12
13
14
15
16
17
18

19

Date

20
21

22

23

24

25

26
27
28

29

30
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12 13
2 13 12 13 14
3 11 14 14 13
4 12 14 13 14
5 12 13 14
6 14 13 14
7 13 12 13
8 12 13 12
9 13 14 13
10 13 14 13
11 14 12 14
12 12 12 13
13 13 13 13
14 11 13 12
15 13 12 12
16 14 13 13
17 12 14 13
18 13 14 12
19 11 12 13
20 12 12 14
21 12 13 12
22 13 14 12
23 12 14 13
24 14 13 14
25 12 13 14
26 12 14 13
27 14 12 14
28 14 12 13
29 13 14
30 14 13
31 13 13

TOTAL 393 365 405 54 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8 8
2 7 8 8 7
3 7 8 8 7
4 8 8 7 8
5 8 7 8
6 7 8 8
7 8 8 7
8 8 8 7
9 8 8 8
10 7 8 8
11 8 7 8
12 7 8 7
13 7 8 8
14 8 8 8
15 8 8 7
16 8 7 8
17 8 8 7
18 7 8 8
19 7 8 8
20 8 8 7
21 8 7 8
22 8 8 7
23 7 8 8
24 8 8 8
25 8 8 8
26 7 8 7
27 7 7 8
28 8 8 8
29 8 7
30 8 7
31 8 7

TOTAL 237 218 236 30 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975 4,983
2 4,951 4,968 4,971 4,991
3 4,971 4,971 4,973 4,982
4 4,954 4,970 4,972 4,965
5 4,980 4,975 4,973
6 4,969 4,969 4,974
7 4,972 4,974 4,973
8 4,957 4,972 4,930
9 4,960 4,977 4,945
10 4,987 4,978 4,961
11 4,991 4,975 4,952
12 4,984 4,971 4,960
13 4,966 4,977 4,981
14 4,958 4,975 4,972
15 4,963 4,973 4,981
16 4,974 4,969 4,941
17 4,988 4,972 4,959
18 4,964 4,974 4,981
19 4,978 4,976 4,985
20 4,971 4,971 4,994
21 4,973 4,974 4,963
22 4,970 4,975 4,952
23 4,966 4,972 4,958
24 4,960 4,977 4,949
25 4,969 4,970 4,961
26 4,972 4,969 4,983
27 4,974 4,973 4,978
28 4,975 4,970 4,966
29 4,970 4,960
30 4,973 4,959
31 4,978 4,958

TOTAL 154,082 139,237 153,940 19,921 0 0 0 0 0 0 0 0

Average/
Day 4,970 4,973 4,966 664 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55 160
2 70 120 40 155
3 135 110 95 135
4 80 90 30 140
5 120 120 95
6 125 90 145
7 130 95 135
8 60 110 145
9 40 115 145
10 110 110 140
11 100 100 150
12 105 110 130
13 100 100 50
14 55 110 65
15 85 70 140
16 90 110 60
17 90 85 80
18 95 95 70
19 55 95 70
20 75 80 125
21 90 155 115
22 80 165 145
23 80 165 120
24 80 165 140
25 95 150 130
26 150 165 135
27 110 140 90
28 150 40 65
29 125 40
30 140 100
31 90 160

TOTAL 2,990 3,195 3,205 590 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Apr 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Apr-2017 24 1 21 46
2-Apr-2017 24 1 21 46
3-Apr-2017 24 1 21 46
4-Apr-2017 24 0 21 45

TOTAL 96 3 84 183
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 4/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total

Crew mess Advised to Galley crew to improved daily house


1 BOY RICHARD TOGAS Master room keeping in food storage
Done Positive 1

2 IYYANG C/O CCR Free gas COT 5C by IG fan blower Done Positive 1

3 ANDI AHMAD UNIT 2/O Bridge Check and maintenance navigation equipment Done Positive 1

Wing Bridge Marked label at wing bride deck after wall


4 INDRA 3/O Deck repainted
Done Positive 1

Cleaned condenser sea water tubes provision


5 JULY MANGIRI C/E Engine Room
reff cool machine
Done Positive 1

6 ACO AKBAR 2/E RO Room Replaced fine filter no.2 RO with spare Done Positive 1

7 RATNO SITUMORANG 3/E Engine Room Maintenance auxiliary engine no.2 Done Positive 1

8 LILIK WAHYUWANTO 4/E Boiler Maintenance auxiliary boiler burner equipment Done Positive 1

Cleaned condenser sea water side tube air


9 NIKO ARIYO E/E AC Room
conditioner for accommodation
Done Positive 1

10 AANG Bosun Main deck House keeping all equipment store Done Positive 1

11 UDIYANTO AB Forward Deck Maintenance bold & nut flange manifold inport Done Positive 1

12 M SAFARI AB Forward Deck Maintenance bold & nut flange manifold inport Done Positive 1

13 MOHAMMAD ANSORI AB Main deck House keeping main deck COT 5C area Done Positive 1

Assisted 3/O frequently checked gas content in


14 ANTONY OS Main deck
COT 1C and COT 5C
Done Positive 1

Assisted bosun house keeping all equipment


15 DEDI BIN WARNA OS Main deck
store
Done Positive 1

Cleaned condenser sea water side tube air


16 SYAEFUL IMAM FTR AC Room
conditioner for accommodation
Done Positive 1

17 NUR ALI MTM RO Room Assisted 2/E cleaned fine filter for RO for spare Done Positive 1

18 ADOR MTM RO Room Installed new drain pipe COPT area Done Positive 1

Assisted 3/E Maintenance auxiliary boiler


19 UMAR SAID MTM RO Room
burner equipment
Done Positive 1

20 SUMARDI WIPER Engine Room Assisted maintenance auxiliary engine no.2 Done Positive 1

21 HASAN C/Cook Galley Clean up cooking equipment after used Done Positive 1

22 ROHIM 2ND/Cook Galley Daily house keeping at galley room Done Positive 1

Crew mess
23 RANGGUN JAWI STWD
room
House keeping at crew mess room Clean & tidy Positive 1
Officer Mess
24 BOBBY MANGONTO STWD Room
Daily house keeping at officer mess room Clean & tidy Positive 1

TOTAL 24
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING

6 BUTTERWORTHING COT 1C ( COP NO. 2 )


1ST STAGE ( 4 MTRS ) 17/Mar/17
2ND STAGE ( 8 MTRS ) 17/Mar/17
1ST STAGE ( 12 MTRS ) 17/Mar/17
1ST STAGE ( 16 MTRS ) 17/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 1C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING TOTAL 40 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING BY SAMPLING HOLE BY OIL GAUGING TAPE : 2 CM ( SLUDGE ) ONLY AT BELLMOUTH AREA
7 GAS FREE BY USING I.G.S FIX FAN 18/Mar/17
20/Mar/17
TOTAL TANK CLEANING AND GAS FREE : 61 HRS
8 GAS FREE BY USING 2 SETS PNEUMATIC AIR 21/Mar/17
DRIVEN FAN 22/Mar/17
23/Mar/17
24/Mar/17
25/Mar/17
26/Mar/17
COT ATM RESULTS : O²/ 21.00% - LEL/NIL - CO/NIL - HC/NIL
FREE GAS BY PORTABLE FAN : 5 Days
TANK CLEANING AND GAS FREE COMPLETED FOR COT 1 C : 8 Days
REMARKS :
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES, DUE TO REMAINING SLUDGE IN TAN
TTL HRS
24

12
10

10

40

OUTH AREA
11
11
61
22
22
22
22
22
22
193
MAINING SLUDGE IN TAN
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

7 BUTTERWORTHING COT 5C ( COP NO. 2 )


1ST STAGE ( 12 MTRS ) 25/Mar/17
1ST STAGE ( 16 MTRS ) 25/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING CLEANING TOTAL 46 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING SAMPLING HOLD BY OIL GAOUGING TAPE : 5 CM SLUDGE AREA BELLMOUTH
7 FREE GAS BY USING I.G.S FIX FAN 25/Mar/17
27/Mar/17

TOTAL TANK CLEANING AND GAS FREE : 59 HRS


27/Mar/17 18.00 pm O2 Content : 18 %, LEL : 29 %, CO : %, H2S : 5 %

ESTIMATE COMPLETED 31 MARCH 2017


8 FREE GAS BY USING I.G.S FIX FAN 28/Mar/17
17.00 pm O2 Content : 18 %, LEL : 12 %, CO : %, H2S : %
29/Mar/17
17.00 pm O2 Content : 18,5 %, LEL : 6 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 30/Mar/17
DRIVEN FAN 17.20 pm O2 Content : 20, %, LEL : 3 %, CO : 0 %, H2S : 0 %
Will be done again Cleaning for Cargo tank 5 C
Tank cleaning COT 5 C
FREE GAS BY USING I.G.S FIX FAN
15,00 pm O2 Content : 20, 9 %, LEL : 20 %, CO : 0 %, H2S : 0 %

NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN