INDEX 2001–103
Index
2000 National Fire Protection Association. All Rights Reserved.
The copyright in this index is separate and distinct from the copyright in the document that it indexes. The licensing provisions set forth for the
document are not applicable to this index. This index may not be reproduced in whole or in part by any means without the express written per-
mission of the National Fire Protection Association, Inc.
-A- Quantity . . . . . . . . . . . . . . . . .2-1.1, 4-1.3, 4-1.5, 4-7.2.2.11, A-2-1.1.2
Abort switches . . . . . . . . . . . . . . . . . . . . . . .2-3.5.3, 4-7.2.4.13, A-2-3.5.3 Recycling or disposal of. . . . . . . . . . . . . . . . . 4-1.4 to 4-1.5, A-2-1.4.2
Acceptance, installation . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7.2, A-4-7.2 Retrofitability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8
Accidental discharge . . . . . . . . . . . . . .see Unwanted system operation Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1, A-2-1
Actuation systems . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.1, 2-3.3, 4-7.2.4.4 Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4, A-5-4
Marine systems . . . . . . . . . . . . . . . . . . . . . . . 5-5, A-5-5.1.2, A-5-5.2.3 Clearances
Adjusted minimum design quantity (AMDQ) (definition) . . . . . . 1-3.1 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.9
Agent concentration Electrical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6.2, 5-3.2, A-5-3.2
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.2
Column pressure
Design concentration requirements . . . . . . . . . . . . . . . . . .3-4, A-3-4 Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.6.1.3
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8, A-5-8.4 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.4
Sea level equivalent of agent (definition). . . . . . . . . . . . . . . . 1-3.23 Compatibility of clean agents . . . . . . . . . . . . . . . . . . . . . . . 1-9, A-1-9.1
Alarm systems . . 2-3.1.1, 4-7.2.4.4 to 4-7.2.4.6, 4-7.2.4.10 to 4-7.2.4.13 Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 2
Equipment failure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5.4 Conductors, ungrounded, electrostatic charging of . . . . . . . . . 1-5.2.6
Hazardous atmosphere . . . . . . . . . . . . . . . . . . . . . . . . A-1-6.1.4.1(e) Containers
Marine systems protecting Class B hazards . . . . . . . . . 5-6.1 to 5-6.2, Arrangement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.3, A-2-1.3.2
5-6.5, A-5-6.1 to A-5-6.2, A-5-6.5 Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4.2, A-5-4.2
Operating alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5 Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.4, A-2-1.4.1
Time delays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5.6 Inspection, testing, and maintenance . . . . . . . . . 4-1.3 to 4-1.6, 4-2,
Application, rate of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7.1, A-3-7.1.2 4-7.2.2.8 to 4-7.2.2.9
Approval of installations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7, A-4-7 Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . 5-4.2 to 5-4.5, A-5-4.2
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12 Nonrefillable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1.5
Approved (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.3, A-1-3.3 Pressure . . . . . . . . . . . . . . . . . 5-4.2.1.1; see also Pressurization levels
Argon, as inerting agent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-5.1.2
Refillable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1.4, 5-11.2, 5-11.3.1
Attached volumes
Control systems . . . . . . . . . . . 2-3.1, 2-3.4, 4-7.2.4.4, 4-7.2.4.14, A-2-3.6
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.1
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . 5-5, A-5-5.1.2, A-5-5.2.3
Door fan measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.2.2
Primary power source, testing of . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.4
Authority having jurisdiction (definition) . . . . . . . . . . . . .1-3.4, A-1-3.4
Cylinders, stored, protection for . . . . . . . . . . . . . . . . . . . . . . 5-6, A-5-6
-B-
-D-
Blower (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.2
Decomposition, clean agents. . . . . . . 1-5.2.8, 5-2.3, A-1-5.2.8, A-1-6.1.1
-C- to A-1-6.1.3
Canadian Transport Commission, regulations . . . . . . . . . 2-1.4.3, 4-2.1 Discharge time and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3-7.1.2
Carbon dioxide, as inerting agent . . . . . . . . . . . . . . . . . . . . . . A-1-5.1.2 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3, 5-1.2, A-1-3, C-1.3
Cargo spaces, protection of . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5-2.2 Descending interface
Cast-iron pipe and fittings . . . . . . . . . . . . . . . . . . . . . . . 2-2.1.2, 2-2.3.2 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.5
Ceiling slab (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.3 Minimum time calculation . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.7
Chemical fires, use on . . . . . .1-5.2.5(1), 1-5.2.5(4), 5-2.2(1), 5-2.2(4) Retention calculations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.5
Class A fires Design concentration requirements . . . . . . . . . . . . . . . . . . . . 3-4, A-3-4
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.5 Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8, A-5-8.4
Flame extinguishment concentrations . . . 3-4.2.2, 3-4.2.4, A-3-4.2.2 Design factor (DF) (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.10
Class B fires Design quantity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5, A-3-5
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.6 Adjusted minimum design quantity (AMDQ) (definition) . . . 1-3.1
Flame extinguishment concentrations . . . . . . 3-4.2.1, 3-4.2.3, 5-8.3 Final design quantity (FDQ) (definition) . . . . . . . . . . . . . . . . 1-3.13
Class B hazards greater than 6000 ft, Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.4, A-5-8.4
marine systems protecting. . . . . . . . . . . . . . . . . . . .5-6, A-5-6
Minimum design quantity (MDQ) (definition) . . . . . . . . . . . 1-3.18
Class C fires
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.7 Detection systems. . . . . . 2-3.1 to 2-3.2, 4-7.2.4.4, 4-7.2.4.7 to 4-7.2.4.9,
A-2-3.2.1
Flame extinguishment concentrations . . . . . . . . . . . . . . . . . . 3-4.2.5 Marine systems . . . . . . . . . . . . 5-5, 5-6.1, A-5-5.1.2, A-5-5.2.3, A-5-6.1
Clean agents . . . . . . . . . . . . . . . . . . . . . . see also Agent concentration Discharge delays. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5.6
Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5.1, A-1-5.1 Discharge nozzles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.5
Compatibility with other agents. . . . . . . . . . . . . . . . . . . . 1-9, A-1-9.1 Discharge pressures, dynamic . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.1
Decomposition of . . . . . . . . . . . . . 1-5.2.8, 5-2.3, A-1-5.2.8, A-1-6.1.1 Discharge tests . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.10, A-4-7.2.2.10
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.8 Discharge time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7.1.2, A-3-7.1.2
Mixture density calculation . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.4 Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9.2
Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1.2, A-2-1.2 Disposal of agents . . . . . . . . . . . . . . . . . . . . . . . 4-1.4 to 4-1.5, A-2-1.4.2
2000 Edition
2001–104 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
Distribution system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2, A-2-2 Equivalent leakage area (ELA)
Discharge time . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-7.1.2, A-3-7.1.2 Calculation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.6.1.1, C-2.6.3
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9.2 Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.11
Extended discharge . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-7.2, A-3-7.2 Explosion prevention/suppression . . . . . . . . . . . . . . 1-5.2.4, A-1-5.2.4
Inspection and testing of . . . . . . . . . . . . . . . . . . 4-7.2.2, A-4-7.2.2.13 Extended discharge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7.2, A-3-7.2
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 -F-
Rate of application . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7.1, A-3-7.1.2 Fan pressurization apparatus (definition) . . . . . . . . . . . . . . . . C-1.3.12
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9.1 Field calibration check, enclosure integrity . . . . . . . . . . . . . . . . C-2.2.3
Door fan measurement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.2 Fill density
Equivalent leakage area (ELA) calculation . . . . . . . . . . . . . C-2.6.3 Containers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.4.1, A-2-1.4.1
Suspended ceiling leakage neutralization method . . . . . . . C-2.6.2 Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.12
Total enclosure leakage method . . . . . . . . . . . . . . . . . . . . . . C-2.6.1 Final design quantity (FDQ) (definition) . . . . . . . . . . . . . . . . . . . 1-3.13
Door fans Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2.3, A-2-2.3.1
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.6 Marine systems. . . . . . . . . . . . . . . . . 5-4.6 to 5-4.7, A-5-4.6 to A-5-4.7
Enclosure evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.5 Flame extinguishment concentrations . . . . . . . . . . . . . .3-4.2, A-3-4.2.2
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.4 Cup burner test procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . App. B
System design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.2.1 Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.3
Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.1.5, C-1.2.3.2, C-2.5.2 Flammable and combustible liquid fires . . . . . . . . . . . see Class B fires
DOT . . . . . . . . . see U.S. Dept. of Transportation (DOT), regulations Floor area, enclosure integrity . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.4
Duration of protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-6, A-3-6 Floor slab (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.13
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.5 Flow calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1.2.5, 3-2, A-3-2
Flow pressure gauge (definition) . . . . . . . . . . . . . . . . . . . . . . . C-1.3.14
-E- Flow tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.13, A-4-7.2.2.13
Effective floor area (definition) . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.7 Fluorine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1-5.1.2
Effective flow area (definition) . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.8 Fluoroiodocarbons (FICs). . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1-5.1.2
Electric control equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.4.1 Forced-air ventilating systems . . . . . . . . . . . . . . . . . . . . . . 3-3.5, A-3-3.5
Electrical and electronic hazards, use for . . . . . . 1-5.2.3(1), A-1-5.2.3, Functional testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5
A-3-6
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-2.1(5) -H-
Electrical clearances . . . . . . . . . . . . . . . . . . . . . . . . .1-6.2, 5-3.2, A-5-3.2 Halocarbon agents
Electrical components, inspection of . . . . . . . . . . . . . . . . . . . . . 4-7.2.4 Cargo spaces, protection of . . . . . . . . . . . . . . . . . . . . . . . . . . A-5-2.2
Electrical systems, marine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14 Containers . . . . . . . . . . . . . . . . . . . . 2-1.4.2(1), 2-1.4.5(a), A-2-1.4.2
Circuits, cylinder storage space . . . . . . . . . . . . . 5-6.2 to 5-6.4, 5-6.6, Decomposition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1-6.1.2
A-5-6.2 to A-5-6.4, A-5-6.6 Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.14, A-1-3.14
Electrostatic charging, ungrounded conductors . . . . . . . . . . . . . 1-5.2.6 Design concentration . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5.1, A-3-5.1
Employees Discharge time. . . .3-7.1.2.1, 3-7.1.2.3, 5-9.2.1 to 5-9.2.2, A-3-7.1.2.1
Hazards to . . . . . . . . . . . . . . . . . . . . . . . . . 1-6.1, 5-3, A-1-6.1, A-5-3.2 Employees, hazards to . . . . . . . . . . . . . . . . . . . . . . . 1-6.1.2, A-1-6.1.2
Safety requirements . . . . . . . . . . . . . . . . 1-6.1.4, 4-8, A-1-6.1.4, A-4-8 Flame extinguishment concentrations. . . . . . . . . . 3-4.2.2, A-3-4.2.2
Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6, A-4-6.2 Inspection and tests. . . . . . . . . . . . . . .4-1.3.1, 4-1.6, 5-11.3, A-5-11.3
Enclosure envelope (definition) . . . . . . . . . . . . . . . . . . . . . . . C-1.3.10 Physical properties. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-5.1
Enclosure integrity procedure . . . . . . . . . . . App. C; see also Door fans Piping, minimum requirements . . . . . . . . . . . . . . . . . . . . . . . A-2-2.1
Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.10
Recycling or disposal of. . . . . . . . . . . . . . . . . . . . . . . .4-1.4, A-2-1.4.2
Field calibration check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.2.3
Halon 1301
Fundamentals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1 Decomposition products. . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3-7.1.2
Leakage control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.8 System valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2-2.4.2
Limitations/assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2 Hazards
Retention calculation . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3, C-2.7 Clean agent systems used for . . . . . . . . . . . . . . . . 1-5.2, A-1-6, A-3-6
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.1 To employees . . . . . . . . . . . . . . . . . . . . . . . 1-6.1, 5-3, A-1-6.1, A-5-3.2
Test procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2 Hose test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
Enclosures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5.2.7 Hydrochlorofluorocarbons (HCFCs) . . . . . . . . . . . . . . . . . . . . A-1-5.1.2,
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.9 Figs. A-2-1.4.1(k) to (p)
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3, A-3-3.5 Hydrofluorocarbons (HFCs). . . . . . . A-1-5.1.2, Fig. A-2-1.4.1(q) to (v)
Explosion hazard of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-5.2.4 Hydrogen fluoride (HF) . . . . . . . . . . . . . . . . . . . . . A-1-5.1.2, A-3-7.1.2
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 -I-
Integrity, inspection of . . . . . . . . . . . . . . . . . . . . . . .4-7.2.3, A-4-7.2.3 Identification
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-7, A-5-7 Containers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.4.4, A-2-1.4.2
Overpressure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3-7.1.2 Piping systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.1.3
Sealing . . . . . . . . . . . . . . . . . . . . . . . . 4-5.3, 5-7.1(1), A-4-5.3, A-5-7.1 IG-541 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1-5.1.2
Total flooding systems used in . . . . . . . . . . . . . . . . .1-5.2.3, A-1-5.2.3 Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2-1.4.1
Engineered system (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.11 Decomposition products. . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1-5.1.3
Environmental factors . . . . . . . . . . . . . . . . . . . . . . 1-7, A-1-7, A-2-1.4.2 Isometric diagram . . . . . . . . . . . . . . . . . . . . . . . . . . Fig. A-2-1.4.1(v)
2000 Edition
INDEX 2001–105
Indicators, operating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5 Class B hazards greater than 6000 ft, systems
Inert gas, flow test using. . . . . . . . . . . . . . . . . . .4-7.2.2.13, A-4-7.2.2.13 protecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6, A-5-6
Inert gas agents Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.2.2
Containers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.4.2(2), 2-1.4.5(b) Design concentration requirements. . . . . . . . . . . . . . . . 5-8, A-5-8.4
Decomposition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-6.1.3 Detection, actuation, and control systems . . . . . . . . . 5-5, A-5-5.1.2,
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.15 A-5-5.2.3
Design concentration . . . . . . . . . . . . . . . . . . . . . . . . . . .3-5.2, A-3-5.2 Distribution system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9
Designations for . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-5.1.2 Electrical systems, compliance of . . . . . . . . . . . . . . . . . . . . . . . . 5-14
Discharge time . . . . . . . . . . . . . . . . . . . . .3-7.1.2.2, 5-9.2.3, A-3-7.1.2 Enclosure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7, A-5-7
Employees, hazards to . . . . . . . . . . . . . . . . . . . . . . .1-6.1.3, A-1-6.1.3 Hazards to personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3, A-5-3.2
Inspection and tests . . . . . . . . . . . . . . . . . . . . 4-1.3.2, 4-1.6, 5-11.3.1 Inspection and tests . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11, A-5-11.3
Piping, minimum requirements . . . . . . . . . . . . . . . . . . . . . . A-2-2.1 Nozzle choice and location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
Recycling or disposal of . . . . . . . . . . . . . . . . . . . . . . . 4-1.4, A-2-1.4.2 Periodic puff testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-13
Inert gas flow calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3-2 Use and limitations of . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2, A-5-2.2
Inerting concentrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4.3 Maximum protected height (definition) . . . . . . . . . . . . . . . . . C-1.3.15
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 Measurement, units of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
Electrical components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.4 Mechanical components, inspection of . . . . . . . . 4-7.2.2, A-4-7.2.2.13
Enclosures . . . . . . . . . . . . . . . . . . . . . . 4-4, 4-7.2.3, A-4-7.2.3, C-2.3.1 Metal fires, use on . . . . . . . . . . . . . . . 1-5.2.5(2) to (3), 5-2.2(2) to (3)
Minimum design quantity (MDQ) (definition) . . . . . . . . . . . . . .1-3.18
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11, A-5-11.3
Minimum protected height
Mechanical components . . . . . . . . . . . . . . . . . . 4-7.2.2, A-4-7.2.2.13
Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.6
Records/reports . . . . . . . . 4-1.2, 4-1.6, 4-2.2, 5-2.2, 5-11.1 to 5-11.2,
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.16
A-5-2.2
Minimum time calculation. . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.7
Visual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-2.2, 5-2.2 to 5-2.3
Installations, approval of . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7, A-4-7 -N-
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12 Nitrogen
Flow testing with . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.13, A-4-7.2.2.13
-J-
Inerting use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-5.1.2
Joints, pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.2, 4-7.2.2.3
No observed adverse effect level (NOAEL) . . . . . . . . . . . . . A-3-5.3.3
-L- Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.19
Leaks, enclosure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.3, A-4-7.2.3; Employee safety . . . . . . . . . . . . . . . . . 1-6.1.2.1, A-1-6.1.2, A-1-6.1.4.2
see also Equivalent leakage area (ELA) Normally occupied area
Alteration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.8.2 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.20, A-1-3.20
Discharge. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.8 Halocarbon fire extinguishing agents . . . . . . . . 1-6.1.2.1, A-1-6.1.2
Flow characteristics. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.6 Nozzles
Flow direction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.7 Choice and location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8, 5-10
Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.8.1 Discharge . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.5, 4-7.2.2.3, 4-7.2.2.5
Leak fraction calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.3 Inspection and testing of. . . . . . . . . . . . . . . . . . 4-7.2.2.2 to 4-7.2.2.7
Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .C-1.2.2.4, C-1.2.3.9 Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4.7, A-5-4.6
Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .C-2.6.1, C-2.6.2
-O-
Retention calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1
Operating devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.3, 2-3.5
Limitations, of systems . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-5.2, A-1-5.2
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5.2.5
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2, A-5-2.2
Out-of-service system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2-3.6
Liquefied compressed gas flow calculations . . . . . . . . . . . . . . . . . A-3-2
Oxygen, sea level equivalent of (definition) . . . . . . . . . . . . . . . . 1-3.24
Listed (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.16, A-1-3.16
Oxygen concentrations,
Lower leakage area calculation . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.2 personnel safety . . . 1-6.1.2.2, 1-6.1.3, A-1-6.1.2 to A-1-6.1.3
Lowest observable adverse effect level (LOAEL) . . . . . . . . . A-3-5.3.3
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.17 -P-
Employee safety . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6.1.2.1, A-1-6.1.2 Perfluorocarbons (FCs). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-5.1.2
Periodic puff testing . . . . . . . . . . . . . . . . . . . . . . . . . 5-13, A-4-7.2.2.13
-M- Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.1 to 2-2.2, A-2-2.1
Machinery spaces Inspection and testing of. . . . . . . . . . . . . . . . . . 4-7.2.2, A-4-7.2.2.13
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.2.3 Joints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.3
Hazards to employees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.1 Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . 5-4.6 to 5-4.7, A-5-4.6
Total flooding systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-2.1(1) Plans, working . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1.2
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5, A-4-5.3 Approval of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1.3
Manifolded storage containers . . . . . . . . . . . 2-1.3.5, 2-1.4.5, A-2-1.1.2 Flow calculations . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1.2.5, 3-2, A-3-2
Manual actuation systems . . . . . . . . . . . . . . . 2-3.3.5 to 2-3.3.7, 2-3.3.10 Pneumatic control equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.4.2
Marine systems . . . . . . . . . . . . . . . . . . . . 5-5.2.2 to 5-5.2.4, A-5-5.2.3 Pneumatic pressure testing . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.12
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Chap. 5 Power sources
Agent supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-4, A-5-4 Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5.2.1
Approval of installations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12 Testing of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.4
2000 Edition
2001–106 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
Pre-engineered systems Static pressure differential
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.21 Calculation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.5
Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1.2.3 Ex. Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.21
Flow calculations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2.1 Ex. Door fan test . . . . . . . . . . . . . . . . . . . . . C-1.2.1.5, C-1.2.3.2, C-2.5.2
Use and limitations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5.2.1 Steel pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.1.2, 2-2.3.6
Preliminary functional test. . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.1 Storage containers . . . . . . . . . . . . . . . . . . . . . . . . . . . . .see Containers
Pressure, stored cylinders . . . . . . . . . . . . . . . . . . . . . . . . .5-6.5, A-5-6.5 Superpressurization
Pressure adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . .3-5.3.3, A-3-5.3.3 Containers . . . . . . . . . . . . . . . . . . . . . . . . . .2-1.4.1, 2-1.4.4, A-2-1.4.1
Pressure differentials, enclosure . . . . . . A-3-7.1.2, C-1.2.1.5, C-1.2.3.2, Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.27
C-2.5.2, C-2.7.1.5 Suspended ceiling leakage neutralization method,
Pressure relief devices . . . . . . . . . . . . . . . . 2-2.1.6 to 2-2.1.7, A-2-1.4.1 door fan measurement. . . . . . . . . . . . . . . . . . . . . . . . C-2.6.2
Pressure testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1.3, 4-7.2.2.12 System design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 3
Pressurization levels System flow calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3-2
Containers. . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.4.1, 2-1.4.4, A-2-1.4.1 System functional operational test . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.2
Enclosures . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3.3, 3-5.3.3, A-3-5.3.3 -T-
Fittings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.3.1, 2-2.3.6, A-2-2.3.1 Temperatures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4.2.1.2
Marine systems . . . . . . . . . . . . . . . . . . . . . . 5-11.2 to 5-11.3, A-5-11.3 Clean agents and . . .1-5.2.8, 2-2.1.1, A-1-5.2.8, A-1-6.1(c), A-2-1.4.1,
Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2.1.1, 2-2.1.6, A-2-2.1 Figs. A-2-1.4.1(a) to (hh)
Primary agent supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.1.1 Containers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1.4.6, A-2-1.4.1
Primary power source Enclosure integrity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.3.3
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5.2.1 Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Testing of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.4 Container . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Protected enclosure (definition) . . . . . . . . . . . . . . . . . . . . . . . C-1.3.17 Cup burner test procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . App. B
“Puff test” . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-13, A-4-7.2.2.13 Discharge . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.10, A-4-7.2.2.10
Pump rooms Door fan test . . . . . . . . . . . . . . . . . . . . . C-1.2.1.5, C-1.2.3.2, C-2.5.2
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.2.4 Extinguishing concentration, evaluation of . . . . . . . . . . . .A-3-4.2.2
Total flooding systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-2.1(3) Flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.13, A-4-7.2.2.13
Purpose of standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 Functional . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5
Hose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
-R-
Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11, 5-13, A-5-11.3
Records/reports
Piping, pneumatic testing of. . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.2.12
Cup burner test procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-8
Primary power source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.4
Enclosure integrity procedure. . . . . . . . . . . . . . . . . . . . . . . . . . C-2.9
Time delays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5.6
Inspection . . . . . . . . . . . . . . . . . 4-2.2, 5-2.2, 5-11.1 to 5-11.2, A-5-2.2
Total enclosure leakage method, door fan measurement. . . . . C-2.6.1
Recycling of agents . . . . . . . . . . . . . . . . . . . . . . 4-1.4 to 4-1.5, A-2-1.4.2 Total flooding
Referenced publications . . . . . . . . . . . . . . . . . . . . . . . Chap. 6, App. D Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.28
Remote monitoring operations . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.5.3 Quantity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5, A-3-5
Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . see Records/reports
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.4, A-5-8.4
Reserve agent supply . . . . . . . . . . . . . . . . . . . . .2-1.1.2, 5-4.1, A-2-1.1.2
Total flooding system
Retention calculation, enclosure . . . . . . . . . . . . . . . . . . . C-1.2.3, C-2.7
Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.29
Retrofitability, clean agents to existing system . . . . . . . . . . . . . . . . . 1-8
Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.1
Return path
Enclosure integrity . . . . . . . . . . . . . . . . . . . . . . . . . 4-7.2.3, A-4-7.2.3
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.18
Use and limitations . . . . . . . . . . . . . . . . . . . . . . . . . 1-5.2.3, A-1-5.2.3
Door fan measurements. . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1.2.2.3
Marine systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2.1
Return path area (definition) . . . . . . . . . . . . . . . . . . . . . . . . . C-1.3.19
Total leakage area calculation . . . . . . . . . . . . . . . . . . . . . . . . . C-2.7.1.1
Room pressure gauge (definition). . . . . . . . . . . . . . . . . . . . . . C-1.3.20
Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-6, A-4-6.2
-S-
-U-
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6, 4-8, A-1-6, A-4-8
U.S. Dept. of Transportation (DOT), regulations . . . . . . 2-1.4.3, 4-2.1
Safety factor (SF) (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.22
Unwanted system operation . . . . . . . . . . . . . . . . . . . . . . . 2-3.6, A-2-3.6
Scope of standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
Uses, of systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5.2, A-1-5.2, A-3-6
Sea level equivalent of agent (definition) . . . . . . . . . . . . . . . . . . 1-3.23
Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-2, A-5-2.2
Sea level equivalent of oxygen (definition) . . . . . . . . . . . . . . . . 1-3.24
Shall (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.25 -V-
Shipping containers, DOT regulations . . . . . . . . . . . . . . . . . . . . 2-1.4.3 Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2.4, A-2-2.4.2
Should (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.26 Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4.6
Signs, warning and instruction. . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.5.5 Ventilating systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.5, A-3-3.5
Spaces (electronic/electrical equipment, marine) . . . . . . . . . .5-2.1(5) Marine systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7.2, A-5-7.2
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.2.1 Venting, piping systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.1.6
Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1.1 Visual inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2.2, 5-2.2 to 5-2.3
2000 Edition Cou/W