PRESENT COMMITMENTS OF MAINTENANCE WORKS FOR REFINERIES
No. Description Projects Clients
Maintenance of static equipment,pipelines RELIANCE RIL,JAMNAGAR
and associated equipments at Reliance INDUSTRIES LIMITED
industries limited.
Maintenance & Shutdown Work EOIL,
1 ESSAR OIL (I) LTD.
CDU/VDU PLANT JAMNAGAR
Maintenance & Shutdown Work EOIL,
2 ESSAR OIL (I) LTD.
DELAYED COKER PLANT. JAMNAGAR
Maintenance & Shutdown Work EOIL,
3 ESSAR OIL (I) LTD.
DEISEL VGO PLANT JAMNAGAR
Maintenance & Shutdown Work
EOIL,
4 ALKYLATION & HMUs PLANT. ESSAR OIL (I) LTD.
JAMNAGAR
RELIANCE RELIANCE
Maintenance & Shutdown Work in
5 PETROLEUM LTD. PETROLEUM LTD.
FCC UNIT PLANT.
Jamnagar. Jamnagar
RELIANCE RELIANCE
Maintenance & Shutdown Work
6 PETROLEUM LTD. PETROLEUM LTD.
CLEAN FUEL PLANT.
Jamnagar. Jamnagar
RELIANCE RELIANCE
Shutdown jobs in COKER for installation
7 PETROLEUM LTD. PETROLEUM LTD.
of 3rd PSV IN COKE DRUMS.
Jamnagar. Jamnagar.
Maintenance Jobs for AEROMATIC & RELIANCE RELIANCE
8 POLY PROPELYNE & SULFUR PETROLEUM LTD. PETROLEUM LTD.
RECOVERY PLANTS. Jamnagar Jamnagar
RELIANCE RELIANCE
Maintenance work of Rotary Equipments
9 PETROLEUM LTD. PETROLEUM LTD.
under Jamnagar Project Cell.
Jamnagar Jamnagar
RELIANCE RELIANCE
Maintenance of FIN FAN Cooler and Heat
10 PETROLEUM LTD. PETROLEUM LTD.
Exchangers in JERP
Jamnagar Jamnagar
RELIANCE RELIANCE
Maintenance work of Electrical
11 PETROLEUM LTD. PETROLEUM LTD.
Instrumentation Equipments under JPC
Jamnagar Jamnagar
MAJOR SHUTDOWN JOBS EXECUTED FOR REFINERIES
S. No. Plant Days Year
ONGC, Uran
1 90 1991
Bombay Dyeing, Mumbai
2 90 1994
RIL, Pathalaganga, Raighad
3 30 1996
Tata Power Plant, Mumbai
4 45 1996
Kribhco, Hazira, Surat
5 25 1996
Tata Power Plant, Mumbai
6 25 1997
RIL, Hazira, Surat
7 6 1997
RPL, Jamnagar
8 60 1998
RIL, Hazira, Surat
9 2 1999
RIL, Hazira, Surat
10 15 1999
ONGC, Hazira, Surat
11 12 2000
RPL (Crude), Jamnagar
12 60 2003
RPL (Crude VGO), Jamnagar
13 60 2004
RPL (Crude Aromatic Coker), Jamnagar
14 60 2005
RPL (Crude), Jamnagar
15 45 2005
RPL, Jamnagar
16 70 2006
RPL (Crude), Jamnagar
17 30 2008
RPL, Jamnagar
18 80 2008
RIL, Hazira, Surat
19 90 2009
MAJOR PROJECTS EXECUTION AND MAINTENANCE FOR THE LAST 20 YEARS
No. Description Projects Clients Year
Fabrication & Erection of Structures & Ispat Industries
1 L&T ECC 1994
Equipments Ltd. Raigad
Fabrication & Laying of Underground
2 RIL – Hazira, Surat L&T ECC 1994
Piping
Fabrication & Erection of Material Essar Steel
3 L&T ECC 1994
Handling system Ltd. Hazira, Surat
Fabrication & Erection of Structures, C P P of TATA,
4 L&T ECC 1994
Equipments & Various Piping Bombay
5 Fabrication of various Equipments L&T, HEW L&T ECC 1994-95
Fabrication & Assembly of Offshore
6 L&T, HEW L&T ECC 1994-95
Platforms – 3 Nos.
Fabrication & Erection of Various Piping
7 RIL – Hazira L&T ECC 1995
in NGL Plant
Fabrication, Sandblasting, Painting &
8 Erection of various Piping & Structures RIL – Hazira L&T ECC 1995-96
for POY-I Plant
Fabrication, Sandblasting, Painting &
9 RIL – Hazira L&T ECC 1995-96
Erection of Heaters
Fabrication & Assembly of Various
10 structural items & PL. work (With & L&T, Powai L&T ECC 1995-97
without supply)
Fabrication & Assembly Of offshore
11 ENRON L&T ECC 1996
Platform
Fabrication, Erection & Testing of Air INDO-GULF,
12 L&T ECC 1996-97
Seperation Unit Dahej, Bharuch
Fabrication, Sandblasting, Painting,
13 Erection & Testing of various Piping & RIL – Hazira L&T ECC 1996-97
Structures of POY – 2 Plant
Complete Mechanical Construction
14 RIL – Hazira L&T ECC 1997
activities of MEG – 111plant
Fabrication & Erection of Loading,
15 RIL – Hazira L&T ECC 1997
Unloading-system of Jetty
Fabrication & Erection of Various Piping
16 RIL – Hazira L&T ECC 1997
in polyethylene Plant
Fabrication & Erection of Various
17 RIL – Hazira L&T ECC 1998
Structures for Plant
No. Description Projects Clients Year
Fabrication & Assembly & Hydro
Testing
18 a. Atmosphere Column 1No. L&T HEW L&T Hazira 1997-98
b. Vacuum Column 1No.
c. Stripper Column 4 No.
Fabrication, Assembly, Sandblasting,
L&T, RPL &
19 Painting & Erection of 13 Nos. Fired RPL Jamnagar Petro Chem, 1997-98
Heaters USA
Fabrication, Erection & Testing of rack L&T ECC-
20 RPL Jamnagar 1997-99
Piping (All types of piping involved) Group & RPL
Fabrication & Erection of Hydro L&T ECC-
21 RPL Jamnagar 1997-99
Treating Plant unit I & II Group & RPL
Sand Blasting & Painting, Fabricated
Pipe lines & structural for various Plants L&T ECC-
22 RPL Jamnagar 1997-99
Group & RPL
& RPL
Erection of Structures (Coker Plant) L&T ECC-
23 RPL Jamnagar 1998-99
Group & RPL
Fabrication & Erection of Piping,
24 Structure & Equipments for PP line “C”, RPL Jamnagar RPL Jamnagar 1999-2004
MTF, CDU/VDU and tank form area.
Fabrication & Assembly of Offshore L&T HEW
25 L&T Hazira 2001-02
Platform Hazira
Fabrication & Assembly of Offshore L&T HEW
26 L&T Hazira 2002-03
Platform Hazira
Fabrication & Assembly of Offshore L&T HEW
27 L&T Hazira 2003-04
Platform Hazira
Fabrication, Slag blasting/Painting & ESSAR STEEL
28 ESSAR STEEL LTD. 2003-04
Erection of Structures LTD.
Fabrication & Erection of Piping,
29 Structure & Equipments for PP line “C”, RPL Jamnagar RPL Jamnagar 2004-05
MTF, CDU/VDU and tank form area.
Fabrication & Assembly of Offshore L&T - MFF
30 L&T Hazira 2004-05
Platform Hazira
Fabrication & Assembly of Offshore L&T - MFF
31 L&T Hazira 2005-06
Platform Hazira
Fabrication, Slag Blasting / Painting &
32 Essar Construction Ltd ECL-Hazira 2005-07
Erection of Structures
Fabrication & Erection of Piping,
33 Structure & Equipments for PP line “D”, RPL Jamnagar RPL Jamnagar 2005-07
MTF, CDU/VDU and tank form area.
No. Description Projects Clients Year
Fibrication & Erection of Piping,
34 Structure & Equipments for POY-4, RPL Hazira RPL Hazira
CRACKERS
Fabrication & Assembly of Offshore L&T-MFF
35 L&T Hazira
Platform (BF & N2A) Hazira
Fabrication & Assembly of JACKET L&T-MFF
36 L&T Hazira
STR-(NEA) Hazira
Erection of DTA Heater Structure with
37 RPL Jamnagar RPL-Jamnagar
Fabrication & Erection of Radiant Coil
Assembly & Erection of Reformers for
38 RPL Jamnagar RPL-Jamnagar
Hydrogen Genreation unit – 4 Nos.
Fabrication of Piping Spools (CS, CS
39 RPL Jamnagar RPL-Jamnagar
nace, LTCS, Alloy, SS, and IBR) at PFS 2007
Fabrication & Erection of Piping &
40 RPL Jamnagar RPL-Jamnagar
Structures at PRU, PP, VGO, OSBL
Fabrication & Erection of 5 Nos.
41 Heaters and Structural & Piping for RPL Jamnagar RPL-Jamnagar
Coker Plant
Fabrication and Assembly of Offshore
Platforms, including Piping, Erection of
Rotary & Static Equipments namely:
(a) BCP B2 – Deck L&T Hazira L&T-Hazira
(b) BCP B2 – Compressor Module
(c)
6 clamp on Project
(d)
ADGAS Module
Fabrication o& Erection of Various Essar
Essar Construction (I)
43 Construction (I)
piping for Crude Area Ltd.
Ltd.
Fabrication & Supply of Fired heaters Essar
Essar Construction (I)
44 Construction (I)
(Fabricated at Sachin Workshop) Ltd.
Ltd.
2008
Fabrication & Supply of Fired heaters Essar
Essar Construction (I)
45 Construction (I)
(Fabricated at Sachin Workshop) Ltd.
Ltd.
Fabrication of Structurals, Ductings &.. Essar
Essar Construction (I)
46 Construction (I)
Essar Const.(I)LTD Ltd.
Ltd.
No. Description Projects Clients Year
Slag Blasting & Painting of Essar
47 Essar Construction (I) Ltd. Construction (I)
structurals Equipments and Piping.
Ltd.
Essar
48 Erection of MH – System Essar Construction (I) Ltd. Construction (I)
2008
Ltd.
Fabrication & Assembly Of
Essar
49 Offshore Platforms Including Piping Essar Construction (I) Ltd. Construction (I)
for MOQ-HA Deck Ltd.
Reliance Petroleum Ltd
50 Maintenance of Platformer RPL, Jamnagar
Jamnagar
Maintenance of SHP/TAME Reliance Petroleum Ltd RPL, Jamnagar
51 Jamnagar
PLANT.
Maintenance of Main Tank Form Reliance Petroleum Ltd RPL, Jamnagar
52 Jamnagar
Area
2009
Maintenance Of CDU/VDU, FCCU Reliance Petroleum Ltd RPL, Jamnagar
53 Jamnagar
& COKER PLANT.
Reliance Petroleum Ltd RPL, Jamnagar
54 Maintenance for Alkylation Area Jamnagar
Reliance Petroleum Ltd RPL, Jamnagar
55 Maintanance of Fired Heater Jamnagar
Maintenance of ROTARY Reliance Petroleum Ltd RPL, Jamnagar
56 Jamnagar
Equipments.
Maintenance of SULFUR Recovery Reliance Petroleum Ltd RPL, Jamnagar
57 Jamnagar
PLANT
Reliance Petroleum Ltd RPL, Jamnagar
58 Maintenance of MERCXES PLANT Jamnagar 2010
Maintenance of AEROMATIC Reliance Petroleum Ltd RPL, Jamnagar
59 Jamnagar
PLANT.
Reliance Petroleum Ltd RPL, Jamnagar
60 Maintenance of HMUs Plant. Jamnagar
Quality Policy
Sun World, Engaged in Mechanical Construction
Construction works is committed to satisfy its customers
through
Timely Completion of Projects.
Projects.
Quality Fabrication Jobs.
Jobs.
Adhering to Safety norms.
norms.
Improving competency of employees.
employees.
Maintaining good housekeeping at site.
site.
Continually improving the effectiveness of Quality Management System.
Quality Policy
Sun World Engg Co. strives to conduct its business with a total commitment to our customers
and their requirements. We define quality as conformance to our customer’
customer’s need,
need, both
internal and external; and conformance to all quality requirements.
In order to achieve this goal, we need the cooperation and effort of the entire Sun World Engg
Co work force. We must function as a team in our efforts to give the customer what they want
every time.
At Sun World Engg Co. we are dedicated to achieving the highest
highest degree of customer
(internal and external) satisfaction.
We will achieve this by:
1. Knowing who our customers are and what they want – through open communication.
2. Understanding the requirements of our jobs and the systems that support us – through
through
training and education.
3. Making continuous improvement a part of every day and every job – through the use
of team participation and measurements.
4. Ensuring that our Policy and Procedure Manuals
Manuals reflect what we actually do.
5. Remembering that we are here because of our Customers! Realizing our customers
are the reason we have our jobs, and that through on-
on-time delivery of quality parts at a
fair market price is how we will keep them.
6. Helping
Helping each other to help ourselves.
7. Understanding how our jobs fit into the overall flow of work at Sun World Engg Co.
C Continuous Improvement through
A Alignment of our Mission and Goals
R Responsibility and Respect for our job and each other
E Educating one another.
SAFETY POLICY
It is the policy
policy of Sun World Engineering Co, to manage all health, safety &
environment aspects to fulfill
fulfill the objectives Sun World Engineering Co, area
committed to:
1. Taking all practical measures to safeguard the health and safety of Workers.
2. A high degree of perception regarding both the internal and external
environment.
3. Introducing new technology, systems or equipment to achieve safer operation
and reduced impact on the environment and providing high quality training
programs to the workers.
4. All management function will comply with safety requirements as they relate to
planning, operation
operation and maintenance of machinery and equipment. All
employees will perform their jobs properly,
properly, in accordance with established
procedures and safe work practice.
SAFETY PROGRAM
Sun World Engineering Co. will provide a craftsman that is reliable, safety-
safety-minded and
verifiably skilled. SWE has a reputation for the highest safety standards in our industry and
we are very much proud of these ratings.
Our Program Includes:
Random worksite safety inspections
Pre-
Pre-employment, post-
post-accident and random drug testing.
Weekly Toolbox safety talks.
OSHA 10 and 30 hour certification training
Site specific Safety coordination with clients.
First Aid, CPR and AED Training
Confined space training
Use of personal protective equipment
Other specialized topics as per
per clients and OSHA requirements
LOTO and
and HAZCOM
Sun World Engineering Co. #1 Goal for its services is the protection of personnel, equipment,
and the environment. By maintaining comprehensive guidelines for proper EHS management
of our personnel, we provide the safest and most regulatory compliant
compliant personnel in the
industry. Our emphasis on safety starts at the top of the organization and is educated to all
personnel as the major groundwork or project performance. Our EHS course of action
provides the basis for all site specific programs that are
are used all over the world. With a high
level of safety awareness, SWE workforce maintains high level of productivity and gets the
job done either on time or before time.
OUR CLIENT LIST
LI Company Name Location
1 Larsen & Toubro Ltd Mumbai
2 Larsen & Toubro ECC Const. Group Surat
3 Heurtey Petrochem., Mumbai
4 Reliance Industries Ltd., Surat
5 Reliance Petroleum Ltd., Jamnagar
6 Reliance Engineering Associates Pvt. Ltd., Jamnagar
7 Steel Corporation of Gujarat Ltd., Surat
8 ESSAR Construction Ltd., Surat
9 ESSAR Steel Ltd., Surat