DECK SLAB AND BE
TBEAM
SNO LOAD BM(SAG) BM(HOG) SLS1 SLS2 SLS3 ULS1
1 SELF 2.28E+04 3.41E+04 1.0 1.0 1.0 1.4
2 SDL-FIX 2.41E+03 4.00E+03 1.0 1.0 1.0 1.4
3 SDL-VARY 2.41E+03 3.12E+03 1.2 1.2 1.2 1.8
4 UNI TEMP-RISE 1.93E+03 6.20E+02 0.0 1.0 0.6 0.0
5 UNI TEMP-FALL -1.27E+03 -2.30E+03 0.0 1.0 0.6 0.0
6 BRAKING -7.85E+02 7.85E+02 1.0 0.8 1.0 0.0
7 LL-max case 7.80E+03 9.35E+04 1.0 0.8 1.0 0.0
8 GRAD-TEMP RISE -1.92 -0.86 0.0 0.8 0.0
9 GRAD-TEMP FALL 0.1 1.91 0.0 0.8 0.0
10
11
12
13
14
CREEP SHRINKAGE
U 10.2 m
Ac 2.3375 sqm
2Ac/U 0.4583333333 m
Fcm 45 Mpa
DECK SLAB AND BEAM FORCES
FACTORED MOMENTS
ULS2 ULS3 ULS4 SLS1 SLS2 SLS3 ULS1 ULS2 ULS3 ULS4
1.4 1.4 1.4 2.28E+04 2.28E+04 2.28E+04 3.08E+04 3.08E+04 3.08E+04 3.08E+04
1.4 1.4 1.4 2.41E+03 2.41E+03 2.41E+03 3.25E+03 3.25E+03 3.25E+03 3.25E+03
1.8 1.8 1.8 2.89E+03 2.89E+03 2.89E+03 4.22E+03 4.22E+03 4.22E+03 4.22E+03
0.0 0.9 1.5 0.00E+00 2.41E+03 1.45E+03 0.00E+00 0.00E+00 2.17E+03 3.62E+03
0.0 0.9 1.5 0.00E+00 2.41E+03 1.45E+03 0.00E+00 0.00E+00 2.17E+03 3.62E+03
0.0 1.5 1.2 2.41E+03 1.81E+03 2.41E+03 0.00E+00 0.00E+00 3.62E+03 2.77E+03
1.8 1.5 1.2 2.41E+03 1.81E+03 2.41E+03 0.00E+00 4.22E+03 3.62E+03 2.77E+03
SUM 3.29E+04 3.65E+04 3.58E+04 3.83E+04 4.25E+04 4.98E+04 5.10E+04
0.0 0.9 1.5
0.0 0.9 1.5
h 2.0 m
h1=0.3h 0.6 0.15 17.8 h1=h4=0.2h
h2=0.3h 0.6 0.25
h3=0.3h 0.6 0.15 h2=h3=0.25h
0.25 m
2=h3=0.25h 0.25 m