0% found this document useful (0 votes)
334 views1 page

Day Care Center 3

1. The document contains a floor plan layout with various rooms, walls, and features labeled with letters and numbers. 2. Key aspects of the plan include separate areas labeled for males and females, as well as spaces for snacks/arts/crafts, files/programs, and indoor play/storytelling. 3. Dimensions are provided for some walls and other architectural elements.

Uploaded by

mharie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
334 views1 page

Day Care Center 3

1. The document contains a floor plan layout with various rooms, walls, and features labeled with letters and numbers. 2. Key aspects of the plan include separate areas labeled for males and females, as well as spaces for snacks/arts/crafts, files/programs, and indoor play/storytelling. 3. Dimensions are provided for some walls and other architectural elements.

Uploaded by

mharie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D A B D

6000 6000

3000 3000 675 3000 3000 675


WALL HUNG
LAVATORY

0.20M X
0.20M FLR
TILES

W3 W5 675
D1 1 1
FILES/PROGRAMS
SHELVE
W6
FEMALE
(EL 0.25M) A B D
D B A
D2 MALE W6 6000

W1
EAVES LINE
4000
2 4000
3000 3000 GA 26
ROOFING
SPACE FOR W2
SHEET
ROOF APEX
SNACKS, 0.50M ELEVATED
300 X 25
ARTS AND SPACE FOR FREE
MM THK
CRAFTS (ELEV = 0.30M)
INDOOR PLAY,
DRAMATIZATION 8000
3 GAGE 26 ROOFING SHEET 8000
3 FACIA 2200 2200
BOARD
OR STOREY
TELLING
W2 TOP OF ROOF BEAM

W1 0.90M 3 LAYERS SHELVE 4000


4 4000 100 MM
THK CHB
CEMENT
(ELEV = 0.30M) PLAY PLASTER + 3000 3000

HOUSE W2 PAINT 100 MM


THK CHB
CEMENT 100 MM THK
0.90M 3 LAYER SHELVES D1 W3 PLASTER + CHB CEMENT

W2
5 675
5 FINISHED FLOOR LEVEL
300 300
PAINT PLASTER + PAINT

FLOWER BOX 1100


NGL

GUTTER (OPTIONAL)
(GROUND EL 0.00M) RAMP
1400

1651 B ROOF PLAN C FRONT ELEVATION D REAR ELEVATION


CE-2 SCALE 1:75M
CE-2 SCALE 1:75M
CE-2 SCALE 1:75M

A FLOOR PLAN
SCALE 1 : 75M

5 3 1
8000 1 2 3 4 5 1 3 5
4000 4000 8000

4000 4000
4000 4000

ROOF APEX

2200 2200

2500

TOP OF ROOF BEAM SEE TRUSS DETAIL

FINISHED CEILING LINE


FLOOR LEVEL
FOR
3000 3000
C.R. AND DRAMATIZATION
WASH AREA & STORY 2700
FINISHED FLOOR LEVEL TELLING AREA
100 MM THK CHB 1595 DAY CARE AREA
100 MM THK CHB FINISHED FLR
CEMENT PLASTER + CEMENT PLASTER FINISHED FLOOR LEVEL LEVEL FOR 100 MM THK CHB 100 MM THK CHB
PAINT + PAINT CR AREA 200 PLAY HOUSE CEMENT PLASTER CEMENT PLASTER
300 300 AREA + PAINT
NGL + PAINT
300

E RIGHT SIDE ELEVATION F LONGITUDINAL SECTION G LEFT SIDE ELEVATION


CE-2 SCALE 1:75M
CE-2 SCALE 1:75M CE-2 SCALE 1:75M

PREPARED BY: REVIEWED BY: PROJECT TITLE: APPROVED BY: CONCURRED BY: SHEET CONTENT SHEET

REPUBLIC OF THE PHILIPPINES RODOLFO MACALISANG


PPT
EDITHA T. LAYUGUE
ACT - TECHNICAL FACILITATOR
GILBERT MAGLINTE
MCT - TECHNICAL FACILITATOR
HON.
BARANGAY CAPTAIN
A-1
DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT
KALAHI CIDSS: NCDDP PROJECT CHECKED BY: NOTED BY:
FELECIANO COSEP
GILBERT MAGLINTE
MUNICIPAL ENGINEER
ENGR, ROEL L. JUMAO-AS, MMME
REGIONAL COMM.INFRA SPECIALIST LOCATION: LUMAPAS, BONIFACIO, MIS. OC. BSPMC CHAIRMAN
HON.
MUNICIPAL MAYOR
2

You might also like