0% found this document useful (0 votes)
75 views18 pages

Technohertz: Process Flow Chart

The document outlines the production process for a 5.0KVA stabilizer. It involves: 1) Raw materials receiving incoming inspection before storage. 2) Parts are assembled into subassemblies and the chassis. 3) Initial testing includes DCR and chassis assembly checks. 4) Labeling and visual, electrical, and mechanical checks are performed. 5) Items passing inspection are packed and handed over to stores for delivery.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views18 pages

Technohertz: Process Flow Chart

The document outlines the production process for a 5.0KVA stabilizer. It involves: 1) Raw materials receiving incoming inspection before storage. 2) Parts are assembled into subassemblies and the chassis. 3) Initial testing includes DCR and chassis assembly checks. 4) Labeling and visual, electrical, and mechanical checks are performed. 5) Items passing inspection are packed and handed over to stores for delivery.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

TH

Customer Part No. : -


SVM Part No. : 5.0KVA
Part description : 5.0KVA stabilizer

10

ISSUE OF RAW MATERIAL TO INCOMING


INCOMING INSPECTION INSPECTIO
N

STORAGE OF
RAW
MATERIAL

RAW
MATERIAL
ISSUE TO
PRODUCTIO
N

20
Buck boost
SUB PARTS A
transformer,Variac ,change
ASSEMBLY
over switch,Fuse link,motor
CHASSIS
plate,chassis & control card

30
Page 1 of 18
TH
Customer Part No. : -
SVM Part No. : 5.0KVA
Part description : 5.0KVA stabilizer

INITIAL
ISSUE OF RAW MATERIAL TO DCR
INCOMING INSPECTION TESTING

40
Buck boost
transformer,Variac ,change CHASSIS OVE
over switch,Fuse link,motor ASSEMBL
plate,chassis & control card

50

LABELING

Ok

Visual
Check
Page 2 of 18
TH
Customer Part No. : -
SVM Part No. : 5.0KVA Visual
Part description : 5.0KVA stabilizer Check

ISSUE OF RAW MATERIAL TO Ok


INCOMING INSPECTION

Electrica
Test

60

Ok
FINAL INSPECTION

Hipot
Test

Page 3 of 18
TH
Customer Part No. : -
SVM Part No. : 5.0KVA
Part description : 5.0KVA stabilizer
Ok

ISSUE OF RAW MATERIAL TO


INCOMING INSPECTION
Mechanic
Check

* INDICATES CTQ
APPROVED BY:

Page 4 of 18
TH
Customer Part No. : -
SVM Part No. : 5.0KVA
Part description : 5.0KVA stabilizer

ISSUE OF RAW MATERIAL TO


INCOMING INSPECTION
70

PACKING
PACKING

80

PRE
DISPATCH
INSPECTIO
N

Ok

Handing over t
Stores
* INDICATES CTQ
Page 5 of 18
TH
Customer Part No. : -
Handing over t
SVM Part No. : 5.0KVA
Stores
Part description : 5.0KVA stabilizer

ISSUE OF RAW MATERIAL TO


INCOMING INSPECTION REVISION HISTORY
REV NO. REV DATE REVISION DETAILS REMARKS
1.0 NEW ISSUE

APPROVED BY:
TH/F No. 05/ Rev-1/Dt: 01.12.2017

Page 6 of 18
technohertz
PROCESS FLOW CHART
Document No. :
Rev No. :
Rev Date :

COMING REJECTED
SPECTIO
N

ACCEPTED

ORAGE OF
RAW
ATERIAL

RAW
ATERIAL
SSUE TO
ODUCTIO
N

ARTS ARE
EMBLY IN
HASSIS

Page 7 of 18
technohertz
PROCESS FLOW CHART
Document No. :
Rev No. :
Rev Date :

NITIAL
DCR
ESTING

IS OVERALL
SEMBLY

BELING

Visual
Check Not Ok
Page 8 of 18
technohertz
PROCESS FLOW CHART
Document No. :
Rev No.
Visual :
Check
Rev Date :
Asthetics

Ok

Not Ok
ectrical
Test

Ok

Hipot
Test
Not Ok

Page 9 of 18
technohertz
PROCESS FLOW CHART
Document No. :
Rev No. :
Rev Date :
Ok

chanical
Check

Å
REVIEWED BY :

Page 10 of 18
technohertz
PROCESS FLOW CHART
Document No. :
Rev No. :
Rev Date :

Not Ok SEND BACK TO


ACKING
ACKING PRODUCTION FOR
NECESSARY ACTION

Not Ok

PRE
SPATCH
SPECTIO
N

over to

Page 11 of 18
technohertz
PROCESS FLOW CHART
Document No. :
over to
Rev No. :
Rev Date :

REVIEWED BY :

Page 12 of 18
z
HART
PFD/ 5.0KVA
1.0
-
.

SEND TO SUPPLIER
THROUGH STORES

Page 13 of 18
z
HART
PFD/ 5.0KVA
1.0
-

NC
NC TRAY
TRAY

Details & Legibility *


technoherts

Page 14 of 18
z
HART
PFD/ 5.0KVA
1.0
-

NC TRAY

Must meet Electrical & Electronics characteristics

Page 15 of 18
z
HART
PFD/ 5.0KVA
1.0
-

Page 16 of 18
z
HART
PFD/ 5.0KVA
1.0
-

SEND BACK TO
PRODUCTION FOR
NECESSARY ACTION

RECHECK
RECHECK

Ok

SEND
SEND BACK
BACK TO
TO
PRODUCTION
PRODUCTION FOR
FOR
NECESSARY
NECESSARY ACTION
ACTION

Page 17 of 18
z
HART
PFD/ 5.0KVA
1.0
-

Page 18 of 18

You might also like