0% found this document useful (0 votes)
55 views2 pages

Milestone Schedules

Project milestone schedules contain key dates such as the project start date, project end date, and other major milestones. These other milestones may include review meetings, prototype availability, procurement, testing, and more. The document also provides a table that specifies the index and description for statements of work covering various project areas such as civil, electrical, HVAC, installation, instruments, mechanical equipment, piping, project administration, and vessels. A separate schedule for data items is recommended so managers can assign personnel with writing skills and to identify the direct labor hours and costs associated with generating reports.

Uploaded by

Harry Keane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views2 pages

Milestone Schedules

Project milestone schedules contain key dates such as the project start date, project end date, and other major milestones. These other milestones may include review meetings, prototype availability, procurement, testing, and more. The document also provides a table that specifies the index and description for statements of work covering various project areas such as civil, electrical, HVAC, installation, instruments, mechanical equipment, piping, project administration, and vessels. A separate schedule for data items is recommended so managers can assign personnel with writing skills and to identify the direct labor hours and costs associated with generating reports.

Uploaded by

Harry Keane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

11.

9 MILESTONE SCHEDULES

Project milestone schedules contain such information as :

 Project start date


 Project end date
 Other major milestone

Project start and end date, if known, must be included. Other major milestones such as
review meeting, prototype available, procurement, testing, and so

TABLE 11-2. SPESIFICATION FOR STATEMENT OF WORK

Description Specification No.


Civil 100 (Index)
 Concrete 101
 Field equipment 102
 Piling 121
 Roofing and siding 122
 Soil testing 123
 Structural design 124
Electrical 200 (Index)
 Electrical testing 201
 Heat tracing 201
 Motors 209
 Power systems 225
 Switchgear 226
 Synchronous generators 227
HVAC 300 (Index)
 Hazardous environment 301
 Insulation 302
 Refrigeration piping 318
 Sheet metal ductwork 319
Installation 400 (Index)
 Conveyors and chutes 401
 Fired heaters and boilers 402
 Heat exchangers 403
 Reactors 414
 Towers 415
 Vessels 416
Instruments 500 (Index)
 Alarm system 501
 Control valves 502
 Flow instruments 503
 Level gages 536
 Pressure instruments 537
 Temperature instruments 538
Mechanical equipment 600 (Index)
 Centrifugal pumps 601
 Compressor 602
 High-speed gears 603
 Material handling equipment 640
 Mechanical agitators 641
 Steam turbines 642
Piping 700 (Index)
 Expansion joints 701
 Field pressure testing 702
 Installation of piping 703
 Pipe fabrication specs 749
 Pipe supports 750
 Steam tracing 751
Project administration 800 (Index)
 Design drawings 801
 Drafting standards 802
 General requirements 803
 Project coordination 841
 Reporting procedure 842
 Vendor data 843
Vessels 900 (Index)
 Fireproofing 901
 Painting 902
 Reinforced tanks 948
 Shell and tube heat exchangers 949
 Steam boilers 950
 Vessel linings 951

on, should also be identified. The last topic, data items, is often overlooked. There are two
good reasons for preparing a separate schedule for data item. First, the separate schedule
will indicate to line managers that personnel with writing skills may have to be assigned. Second,
data items require direct-labor man-hours for waiting, typing, editing, proofing, retyping, graphic
art, and reproduction. Many companies identify on the data items schedules the approximate
number of pages per data items, and each data items is priced out a cost per page, say $250/page.
Pricing out data items separately often induces customers to require fewer reports.

You might also like