General Requirements: Project Client Name

This document is a selection table for GESTRA steam traps. It requests project and client information then asks for requirements such as the application, principle of operation, and process/piping data including upstream/downstream pressures, temperatures, flow rates, pipe sizes, and standards. The table is used to select the appropriate GESTRA steam trap for a given application.

Uploaded by

Zulfadli Rani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views1 page

General Requirements: Project Client Name

This document is a selection table for GESTRA steam traps. It requests project and client information then asks for requirements such as the application, principle of operation, and process/piping data including upstream/downstream pressures, temperatures, flow rates, pipe sizes, and standards. The table is used to select the appropriate GESTRA steam trap for a given application.

Uploaded by

Zulfadli Rani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GESTRA SELECTION TABLE

Project : ……………………………………
Client Name : ……………………………………

General Requirements
1 Application Type Based (No Application)
2 Tick (✓) where Draining Saturated Steam Lines
3 applicable Draining Superheated Steam Lines
4 Heat Exchanger; steam side controlled
5 Heat Exchanger; uncontrolled / heating coil
6 Steam Tracer; undercooling / subcooling required
7 Others : ……………………………..
8 Principle Thermostatic with bimetallic regulator
9 Tick (✓) where Thermostatic with membrane regulator
10 applicable Ball Float
11 Thermodynamic
12 Pump Trap
13 Others : ……………………………..
14
15 Process & Piping Data
16 Information Value Unit
17 Upstream pressure of steam trap bara
18 Downstream pressure of steam trap bara
19 Process Flowrate kg/h
20 Temperature of upstream pressure °C
21 Piping Nominal Size (DN size) mm
22 Piping Pressure Class (ASME Rating) #
23 End Connection Type
24 End Connection Standard
25 Others: ………………………….
26 Others: ………………………….
27 Tag Number (if available)